You are on page 1of 56

BILL OF QUANTITIES FOR PROPOSED RESIDENTIAL APARTMENTS AT NO: 118/36,St.

ANTHONY'S ROAD, OLD COLOMBO NEGOMBO ROAD,WATTALA.

ITEM DESCRIPTION UNIT QTY


A PILING WORK
Note:-Piling work is separate Contract work
1.0 Preliminaries ,Mobilization and De-Mobilization of
pile drilling rings, support cranes, bentonite tanks,
drilling tools and accessories, welding plants and
all plants and equipment as necessary. Item 1.00

2.0 All inclusive rate for soil boring (depth


commencing from ground level-Average depth
20m)pile bore cleaning and disposal of soil etc.
2.1 P1-600 mm dia bored. Piles (6 Nos) m 120.00
2.2 P2-750 mm dia bored. Piles (12 Nos) m 240.00
2.3 P3-900 mm dia bored. Piles (16 Nos) m 320.00
2.4 P4-1000 mm dia bored. Piles (09 Nos) m 180.00
3.0 Docketing of piles in bed Rock up to 1.5m depth
including disposal of rock fragments & cleaning
of pile base to the satisfaction of the Engineer.
3.1 P1-600 mm dia bored. Piles (6 Nos) m 9.00
3.2 P2-750 mm dia bored. Piles (12 Nos) m 18.00
3.3 P3-900 mm dia bored. Piles (16 Nos) m 24.00
3.4 P4-1000 mm dia bored. Piles (09 Nos) m 13.50

4.0 Empty boring


4.1 P1-600 mm dia bored. Piles m 18.00
4.2 P2-750 mm dia bored. Piles m 36.00
4.3 P3-900 mm dia bored. Piles m 48.00
4.4 P4-1000 mm dia bored. Piles m 27.00

5.0 Concrete-Labor charges only m3 560.00

6.0 Reinforcement-Labor charges only Ton 41.00

7.0 Cutting off top of piles


Pile hacking up to 1m from ground level
excludingexcavation,Dewatering and shoring.
7.1 P1-600 mm dia bored. Piles m 6.00
7.2 P2-750 mm dia bored. Piles m 12.00
7.3 P3-900 mm dia bored. Piles m 16.00
7.4 P4-1000 mm dia bored. Piles m 9.00

8.0 Pile tests

8.1 Pile integrality test Nos 43.00

8.2 PDA test for piles


8.2.1 For 600mm dia pile No 1.00
8.2.2 For 750mm dia pile No 1.00
8.2.3 For 900mm dia pile No 1.00
8.2.4 For 1000mm dia pile No 1.00

9.0 Site Clearing, removal of mud. Item 1.00

A PILING WORK CARRIED TO SUMMARY


ITEM DESCRIPTION UNIT QTY
B PRELIMINARIES

1 Allow for soil investigation Item 1.00


2 Allow for tube well Item 1.00

3 Allow for insurance, bonds and guarantees Item 1.00

4 Allow for clearing site including removal of


all vegetation and dispose of debris from
site, during the period of construction. Item 1.00

5 Allow for security at site Item 1.00

6 Allow for provision for temporary electricity and


water supply during the duration of the project. Item 1.00

7 Allow for provision for of adequate sanitary and


welfare facilities for workmen. Item 1.00

8 Allow for construction and maintenance of


temporary sheds and stores for duration of the Item 1.00
project.

9 Allow for sign boards and advertisement Item 1.00

10 Allow for scaffolding & shoring materials Item 1.00


Hoist for materials lifting

11 Allow for plants & machinery hire Item 1.00

12 Allow for project managements Item 1.00

13 Allow for Design & Architectural charges Item 1.00

14 Allow for Transporting excess earth and debris


from the site Cube 1.00

B PRELIMINARIES CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


C EXCAVATION & EARTH WORK
Note :
Rates shall be include for :-
a Leveling and grading bottom of excavation and
keeping sides to plumb.
b Keeping trenches free from water and in a clean
and dry condition.
c Back filling and consolidating.
d Excess earth transport 1 Km distance

1 Clearing, leveling site vegetation, including bushes,


removing shrubs and top soil, Mud to average
depth of 12"and transport away from site Item 1.00

Excavation commencing from existing ground


level noting any materials met with except rock
requiring, blasting, part return fill in ram and
surplus disposed as directed in the following.
2 Excavation for raft foundation in Basement slab
not exceeding 5'-0" from average ground level Cube 175.00
Ditto ion plinth beam Cube 11.00

3 Pile cap (PC 01,02,03,04,05-25 Nos) Cube 20.00


exceeding 5 0" and not exceeding 10'-0"
from average ground level

4 Excavation for Lift well Pile cap(PC 06)


exceeding 5'- 0" and not exceeding
10'-0"from average ground level Cube 12.00

Earth filling
5 Back filling with available earth Cube 354.00

Ant termite Treatment


6 Ant termite treatment shall be in accordance
with manufacture's specification and to the
approval of Consultant by specialist sub
contractor.Antitermite treatment to be sprayed Item Allow
over the area of construction

C EXCAVATION AND EARTH WORK CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


D CONCRETE WORK
Note:- Mix proportion of each item to be followed
strictly. All concrete should be properly vibrated
and made dense. All form work and
reinforcement measured separately. The above
rates include for mixing plant, handling, hoisting,
depositing, compacting, curing and making good
after removal of form work.

2" thick lean cement concrete 1:3:6(1") in the


following
1 3"thick Lean concrete under Pile cap (PC 1. Sqrs 8.50
PC 2,PC 3,PC 4 & PC 5)

2 3"thick Lean concrete under lift well Pile cap Sqrs 2.00
(PC 06)

3 Lean concrete under raft Slab Sqrs 54.00


Ditto in plinth( raft) beam Sqrs 13.00

4 GROUND FLOOR Grade 25 Concrete


(a) Cement concrete for Pile work(material only) Cube 200.00
(b) Pile Cap Cube 34.20
(c).Raft beam Cube 11.00
(d). Raft slab Cube 77.00
(e).Columns ground to upper floor Cube 9.00
(f).Retaining wall Cube 20.50
(g).Lift well Cube 2.70
(h).Sump Wall Grade 30 Concrete Cube 1.85
(i).Stair case ground to upper floor Cube 0.70
(J).Lift wall ground to upper floor Cube 3.00
(k).Ramp Slab ground to upper floor Cube 12.25
(l).Beam in upper floor Cube 16.75
(m). Slab in upper floor Cube 38.25

5 UPPER FLOOR Grade 25 Concrete


(a). Columns upper floor to first floor Cube 9.50
(b).Stair case upper floor to first floor Cube 1.50
(c).Lift wall upper floor to first floor Cube 4.50
(d).Beam in first floor Cube 64.00
(e) Slab in first floor Cube 32.00

6 FIRST FLOOR Grade 25 Concrete


(a). Columns First floor to second floor Cube 8.25
(b). Stair case First floor to second floor Cube 1.25
(c).Lift wall First floor to second floor Cube 3.25
(d). Beams in second floor Cube 11.50

ITEM DESCRIPTION UNIT QTY


D CONCRETE WORK (Contd.)
(e). Slab in second floor Cube 36.00
(f). Balcony wall stiffness column and coping Cube 1.00
(g). Lintel Cube 1.75

7 SECOND FLOOR Grade 25 Concrete


(a). Columns Cube 8.25
(b) Stair case second floor to third floor Cube 1.25
(c).Lift wall second floor to third floor Cube 3.25
(d). Beams in third floor Cube 11.50
(e). Slab in third floor Cube 36.00
(f). Balcony wall stiffness column and coping Cube 1.00
(g). Lintel Cube 1.75

8 THIRD FLOOR Grade 25 Concrete


(a). Columns Cube 8.25
(b). Stair case third floor to fourth floor Cube 1.25
(c).Lift wall third floor to fourth floor Cube 3.25
(d). Beams in fourth floor Cube 11.50
(e). Slab in fourth floor Cube 36.00
(f). Balcony wall stiffness column and coping Cube 1.00
(g). Lintel Cube 1.75

9 FOURTH FLOOR Grade 25 Concrete


(a). Columns Cube 8.25
(b). Stair case fourth floor to fifth floor Cube 1.25
(c).Lift wall fourth floor to fifth floor Cube 3.25
(d). Beams in fifth floor Cube 11.50
(e). Slab in fifth floor Cube 36.00
(f). Balcony wall stiffness column and coping Cube 1.00
g). Lintel Cube 1.75

10 FIFTH FLOOR Grade 25 Concrete


(a). Columns Cube 8.25
(b). Stair case fifth floor to sixth floor Cube 1.25
(c).Lift wall fifth floor to sixth floor Cube 3.25
(d). Beams in sixth floor Cube 11.50
(e) Slab n sixth floor Cube 36.00
(f). Balcony wall stiffness column and coping Cube 1.00
(g). Lintel Cube 1.75

11 SIXTH FLOOR Grade 25 Concrete


(a). Columns Cube 8.25
(b). Stair case sixth floor to seventh floor Cube 1.25
(c).Lift wall in sixth floor to seventh floor Cube 3.25
(d). Beams in seventh floor Cube 11.50
(e). Slab in seventh floor Cube 36.00
(f). Balcony wall stiffness column and coping Cube 1.00
(g). Lintel Cube 1.75

ITEM DESCRIPTION UNIT QTY


D CONCRETE WORK (Contd.)
12 SEVENTH FLOOR Grade 25 Concrete
(a). Columns Cube 8.25
(b). Stair case seventh floor to roof terrace Cube 1.25
(c).Lift wall seventh floor to roof terrace Cube 3.25
(d). Beams in roof terrace Slab Cube 11.50
(e). Slab in roof terrace Slab Cube 36.00
(f). Balcony wall stiffness column and coping Cube 1.00
(g). Lintel Cube 1.75

13 ROOF TERRACE Grade 25 Concrete


(a). Columns Cube 4.50
(b).Lift wall Roof terrace to machine room Cube 6.00
(c).Machine room and stair well beam Cube 0.70
(d).Machine room base and stair well roof slab Cube 2.75
(e) Water tank beam Cube 1.75
(f).Water tank base, wall and cover slab Cube 8.50
(g).Balcony wall stiffness column and coping Cube 1.40
(h)Swmming pool Cube 12.25

CONCRETE WORK CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


E FORM WORK
Note:-All necessary boarding, supports, erecting,
framing, cutting, angles, striking or removal,
cleaning, wetting & treating before placing.
Swan softwood formwork to Raft slab and beam
and Plywood to columns, beams, sumps,
water tank, staircase, lintels and slab.

1 GROUND FLOOR
(a) Pile Cap Sqrs 25.50
(b).Raft beam Sqrs 15.00
(c). Raft slab Sqrs 4.50
(d).Columns ground to upper floor Sqrs 14.00
(e).Retaining wall Sqrs 55.00
(f).Lift well Sqrs 10.50
(g).Sump Wall Grade 30 Concrete Sqrs 5.00
(h).Stair case ground to upper floor Sqrs 1.25
(i).Lift wall ground to upper floor Sqrs 6.00
(j).Ramp Slab ground to upper floor Sqrs 20.50
(k).Beam in Upper floor Sqrs 29.00
(l). Slab in Upper floor Sqrs 64.00

2 UPPER FLOOR
(a). Columns upper floor to first floor Sqrs 20.50
(b).Stair case upper floor to first floor Sqrs 4.00
(c).Lift wall upper floor to first floor Sqrs 16.00
(d).Beam in first floor Sqrs 107.00
(e) Slab in first floor Sqrs 60.00

3 FIRST FLOOR
(a). Columns First floor to second floor Sqrs 31.00
(b). Stair case First floor to second floor Sqrs 3.00
(c).Lift wall First floor to second floor Sqrs 12.00
(d). Beams in second floor Sqrs 46.70
(e). Slab in second floor Sqrs 72.00
(f). Balcony wall stiffness column and coping Sqrs 3.50
(g). Lintel Sqrs 11.00

4 SECOND FLOOR
(a). Columns second floor to third floor Sqrs 31.00
(b) Stair case second floor to third floor Sqrs 3.00
(c).Lift wall second floor to third floor Sqrs 12.00
(d). Beams in third floor Sqrs 46.70
(e). Slab in third floor Sqrs 72.00
(f). Balcony wall stiffness column and coping Sqrs 3.50
(g). Lintel Sqrs 11.00

5 THIRD FLOOR
(a). Columns Sqrs 31.00
(b). Stair case third floor to fourth floor Sqrs 3.00
(c).Lift wall third floor to fourth floor Sqrs 12.00

ITEM DESCRIPTION UNIT QTY


E FORM WORK (Contd.)
(d). Beams in fourth floor Sqrs 46.70
(e). Slab in fourth floor Sqrs 72.00
(f). Balcony wall stiffness column and coping Sqrs 3.50
(g). Lintel Sqrs 11.00

6 FOURTH FLOOR
(a). Columns Sqrs 31.00
(b). Stair case fourth floor to fifth floor Sqrs 3.00
(c).Lift wall fourth floor to fifth floor Sqrs 12.00
(d). Beams in fifth floor Sqrs 46.70
(e). Slab in fifth floor Sqrs 72.00
(f). Balcony wall stiffness column and coping Sqrs 3.50
g). Lintel Sqrs 11.00

7 FIFTH FLOOR
(a). Columns Sqrs 31.00
(b). Stair case fifth floor to sixth floor Sqrs 3.00
(c).Lift wall fifth floor to sixth floor Sqrs 12.00
(d). Beams in sixth floor Sqrs 46.70
(e) Slab n sixth floor Sqrs 72.00
(f). Balcony wall stiffness column and coping Sqrs 3.50
(g). Lintel Sqrs 11.00

8 SIXTH FLOOR
(a). Columns Sqrs 31.00
(b). Stair case sixth floor to seventh floor Sqrs 3.00
(c).Lift wall in sixth floor to seventh floor Sqrs 12.00
(d). Beams in seventh floor Sqrs 46.70
(e). Slab in seventh floor Sqrs 72.00
(f). Balcony wall stiffness column and coping Sqrs 3.50
(g). Lintel Sqrs 11.00

9 SEVENTH FLOOR
(a). Columns Sqrs 31.00
(b). Stair case seventh floor to roof terrace Sqrs 3.00
(c).Lift wall seventh floor to roof terrace Sqrs 12.00
(d). Beams in roof terrace Slab Sqrs 46.70
(e). Slab in roof terrace Slab Sqrs 72.00
(f). Balcony wall stiffness column and coping Sqrs 3.50
(g). Lintel Sqrs 11.00

10 ROOF TERRACE
(a). Columns Sqrs 18.00
(b).Lift wall Roof terrace to machine room Sqrs 13.75
(c).Machine room and stair well beam Sqrs 2.75
(d).Machine room base and stair well roof slab Sqrs 5.50
(e) Water tank beam Sqrs 5.25
(f).Water tank base, wall and cover slab Sqrs 22.00
(g).Balcony wall stiffness column and coping Sqrs 10.00
(h)Swmming pool Sqrs 12.50

E FORM WORK CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


F REINFORCEMENT
a Note :-Cutting, bending, tying, placing in
position, Holding and supporting including
temporary fixing, supports, hanging & binding
all included the rate.

b Reinforcement steel to concrete of size


specified in the drawings for column bases,
columns, beams, slabs,staircase,water tanks,
sumps & lintels.

1 GROUND FLOOR
(a) Pile work (material only) MT 41.00
(b) Pile Cap MT 9.68
(c).Raft beam MT 7.78
(d). Raft slab MT 21.79
(e).Columns basement to ground floor MT 4.95
(f).Retaining wall MT 5.80
(g).Lift well MT 0.57
(h).Sump Wall Grade 30 Concrete MT 0.52
(i).Stair case Ground to Upper floor MT 0.10
(J).Lift wall Ground to Upper floor MT 0.85
(k).Ramp Slab Ground to Upper floor MT 3.47
(l).Beam in Upper floor MT 15.28
(m). Slab in Upper floor MT 10.19

2 UPPER FLOOR
(a). Columns upper floor to first floor MT 6.72
(b).Stair case upper floor to first floor MT 0.34
(c).Lift wall upper floor to first floor MT 1.27
(d).Beam in first floor MT 85.36
(e) Slab in first floor MT 12.80

3 FIRST FLOOR
(a). Columns First floor to second floor MT 5.84
(b). Stair case First floor to second floor MT 0.34
(c).Lift wall First floor to second floor MT 0.92
(d). Beams in second floor MT 8.97
(e). Slab in second floor MT 10.57
(f). Balcony wall stiffness column and coping MT 0.57
(f). Lintel MT 0.99

4 SECOND FLOOR
(a). Columns MT 5.84
(b) Stair case second floor to third floor MT 0.34
(c).Lift wall second floor to third floor MT 0.92
(d). Beams in third floor MT 8.97
(e). Slab in third floor MT 10.57
(f). Balcony wall stiffness column and coping MT 0.57
(g). Lintel MT 0.99

ITEM DESCRIPTION UNIT QTY


F REINFORCEMENT (Contd)
5 THIRD FLOOR
(a). Columns MT 5.84
(b). Stair case third floor to fourth floor MT 0.34
(c).Lift wall third floor to fourth floor MT 0.92
(d). Beams in fourth floor MT 8.97
(e). Slab in fourth floor MT 10.57
(f). Balcony wall stiffness column and coping MT 0.57
(g). Lintel MT 0.99

6 FOURTH FLOOR
(a). Columns MT 5.84
(b). Stair case fourth floor to fifth floor MT 0.34
(c).Lift wall fourth floor to fifth floor MT 0.92
(d). Beams in fifth floor MT 8.97
(e). Slab in fifth floor MT 10.57
(f). Balcony wall stiffness column and coping MT 0.57
g). Lintel MT 0.99

7 FIFTH FLOOR
(a). Columns MT 5.84
(b). Stair case fifth floor to sixth floor MT 0.34
(c).Lift wall fifth floor to sixth floor MT 0.92
(d). Beams in sixth floor MT 8.97
(e) Slab n sixth floor MT 10.57
(f). Balcony wall stiffness column and coping MT 0.57
(g). Lintel MT 0.99

8 SIXTH FLOOR
(a). Columns MT 5.84
(b). Stair case sixth floor to seventh floor MT 0.34
(c).Lift wall in sixth floor to seventh floor MT 0.92
(d). Beams in seventh floor MT 8.97
(e). Slab in seventh floor MT 10.57
(f). Balcony wall stiffness column and coping MT 0.57
(g). Lintel MT 0.99

9 SEVENTH FLOOR
(a). Columns MT 5.84
(b). Stair case seventh floor to roof terrace MT 0.34
(c).Lift wall seventh floor to roof terrace MT 0.92
(d). Beams in roof terrace Slab MT 8.97
(e). Slab in roof terrace Slab MT 10.57
(f). Balcony wall stiffness column and coping MT 0.57
(g). Lintel MT 0.99

ITEM DESCRIPTION UNIT QTY


F REINFORCEMENT (Contd)

10 ROOF TERRACE
(a). Columns MT 3.18
(b).Lift wall Roof terrace to machine room MT 1.70
(c).Machine room and stair well beam MT 0.50
(d).Machine room base and stair well roof slab MT 0.78
(e) Water tank beam MT 1.24
(f).Water tank base, wall and cover slab MT 2.41
(g).Balcony wall stiffness column and coping MT 0.79
(h)Swimming pool MT 5.79

F REINFORCEMENT CARRIED TO SUMMARY

G MASONRY WORK
Note:
Rates shall include for all joggles, dowels,ties,rough
and fair cutting forming splays, angles, revels and
setting, jointing, fixing in position and pointing,
clearing etc.
1 Random rubble masonry in cement mortar 1:5
for boundary wall foundation. Cube 13.00

G MASONRY WORK CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


H BLOCK WORK AND BRICK WORK
Notes;
Rates shall include for all rough and fair cutting,
plumbing angles, raking out joints, plastering etc.
cutting chases making good and sundry, items of a
like nature.
1 9" Thick Brick work in cement mortar mix 1:5 in
all floors.
(a). Ground floor and boundary wall Sqrs 22.00
(b). Upper floor Sqrs 15.00
(c). First floor Sqrs 26.30
(d). Second floor Sqrs 26.30
(e). Third floor Sqrs 26.30
(f). Fourth floor Sqrs 26.30
(g). Fifth floor Sqrs 26.30
(h). Sixth floor Sqrs 26.30
(i). Seventh floor Sqrs 26.30
(j). Roof terrace Sqrs 4.00

2 4 1/2" Thick Brick work in cement mortar mix


1:5 in all floors.
(a). Ground floor Sqrs 2.00
(b). Upper floor Sqrs 3.50
(c). First floor Sqrs 56.00
(d). Second floor Sqrs 56.00
(e). Third floor Sqrs 56.00
(f). Fourth floor Sqrs 56.00
(g). Fifth floor Sqrs 56.00
(h). Sixth floor Sqrs 56.00
(i). Seventh floor Sqrs 56.00
(j). Roof terrace Sqrs 4.00

3 4 1/2" Thick Brick work in cement mortar mix


1:5 in all floors balcony.
(a). First floor Sqrs 10.00
(b). Second floor Sqrs 10.00
(c). Third floor Sqrs 10.00
(d). Fourth floor Sqrs 10.00
(e). Fifth floor Sqrs 10.00
(f). Sixth floor Sqrs 10.00
(g). Seventh floor Sqrs 10.00
(j). Roof terrace Sqrs 16.00

H BLOCK WORK AND BRICK WORK CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


I WATER PROOFING MATERIALS
Notes:-For necessary leveling and trimming on
top of the plinth walls applying "xypex" of
approved product including preparation of
surface all according to manufacturer's
specification for water proofing in the
following

1 Toilet floor and wall 7'-0"high in first floor Sqrs 21.50


Ditto in second floor Sqrs 21.50
Ditto in third floor Sqrs 21.50
Ditto in fourth floor Sqrs 21.50
Ditto in fifth floor Sqrs 21.50
Ditto in sixth floor Sqrs 21.50
Ditto in seventh floor Sqrs 21.50
Ditto in roof terrace Sqrs 2.80

2 Sump internal surface Sqrs 6.75

3 Lift well base and wall Sqrs 3.75

4 Water tank internal surface Sqrs 9.50

5 Roof terrace Sqrs 61.50

6 Machine room, & water tank top surface Sqrs 10.00

7 Swmming pool Sqrs 12

I WATER PROOFING MATERIALS CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


J METAL WORK
Notes: All fabrication work,delivery,unloading,
Hoisting, fitting and fixing in position
Necessary painting of approved color including
one coat of anticorrosive and two coats of
enamel

1 Bronze anodized aluminium Blustered in stair


case 2'-9" high embedded in step and landing
at bottom,with necessary fitting all as per details
drawing and specification Lft 480.00

2 Bronze anodized aluminium Blustered in stair


consisting vertical balusters embedded in
with necessary
fitting all as per details drawing & specification Lft 225.00

3 Bronze anodized aluminium hand rail Fixed along


the top of balcony wall with steel bracket and
hand rails joints and edges to be smooth
surfaces. Lft 3,600.00

4 Roller shutter door type RSD1,01 No.20'-0"


wide X 10'-0"heigh overall 20 gauge aluminum
automatic roller shutter door with all necessary
fitting No 1.00

J METAL WORKCARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


K CARPENTRY AND JOINERY
Note:-
a Rates shall include for an cutting,noching,drilling,
linking,trimming,forming,jointing,splayed edges
and the like including fixing in position complete
with all nails, spikes and screws and priming to
joints and ends.
b The whole of the timber used in the work shall
be the best of its kind obtainable and shall be
thoroughly dry and well seasoned free from
shakes,vanes,loose of dead knots and any other
defects and shall be to approval of the Architect
c The size of timber given below are nominal with
allowance for planning except where described
as finished size.
d Rates for doors, windows and fanlight shall
include for glass beading and glass shall be
5mm thick
e Rate include for Approved quality Ironmongery
for door, window and fanlight and rates including
door locks
g Rates shall be include for approved color and
quality primer & approved color two coats of
Spray paint or varnish and water based spray
paint as specified by the consultant.
h All carpentry work to be used teak and carried
out all as per details drawing and specification
i Rates shall be include for Door,windw and
fanlight frame fix on wall in position
1 Door type D.Size 4'-0"wide X 8'-0" high overall
door with 4"X 3" frame in approved timber and
1 1/4" thick decorated paneled sashes in
approved timber including 1'-0"high glass louvers
on top. in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

2 Door type D1.Size 3'-0"wide X 7'-0" high overall


door with 4"X 3" frame in approved timber and
1 1/4" thick paneled sashes in approved timber.
in first floor Nos 16.00
Ditto in second floor Nos 16.00
Ditto in third floor Nos 16.00
Ditto in fourth floor Nos 16.00
Ditto in fifth floor Nos 16.00
Ditto in sixth floor Nos 16.00
Ditto in seventh floor Nos 16.00

ITEM DESCRIPTION UNIT QTY


K CARPENTRY AND JOINERY (Contd)

3 Door type D2.Size 2'-6"wide X 7'-0" high overall


door with 4"X 3" frame in approved timber and
1 1/4" thick single4 hung paneled sashes in
approved timber in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

4 Door type D3.Size 3'-0"wide X 7'-0" high overall


door with 4"X 3" frame in approved timber and
1 " thick single4 hung flushed paneled sashes
in approved timber in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00
K CARPENTRY AND JOINERY CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


L ALUMINUM WORK
Note:
a Rates shall be include for supplying, fabricating
and fixing in position complete with all nails,
rivets screws and necessary fitting including door
b All window frames to be fixed to walls using
plastic wall plugs not more than 2'-6" C/RS
c 6mm Thick clear glass to be used for all glass
panels
d All doors, windows and fanlight to be used
Powder coated aluminum members to be used
and all as per details drawing and specification
e All fanlight are top hung
f All windows and fanlight to have casement
fasteners as locking device
g Rate shall include for necessary fitting and lock
for door in approved quality

1 Window type DW,size 8'-0"wide X 8'-0"high overall,


in powder coated aluminum glazed window with
fixed glazed fanlight on top. . in first floor Nos 22.00
Ditto in second floor Nos 22.00
Ditto in third floor Nos 22.00
Ditto in fourth floor Nos 22.00
Ditto in fifth floor Nos 22.00
Ditto sixth floor Nos 22.00
Ditto in Seventh floor Nos 22.00

2 Window type W,size 7'-0"wide X 5'-0"high overall,


in powder coated aluminum glazed window with
fixed glazed fanlight on top. . in first floor Nos 4.00
Ditto in second floor Nos 4.00
Ditto in third floor Nos 4.00
Ditto in fourth floor Nos 4.00
Ditto in fifth floor Nos 4.00
Ditto sixth floor Nos 4.00
Ditto in Seventh floor Nos 4.00

3 Window type W1,size 3'-6"wide X 4'-6"high overall,


in powder coated aluminum glazed window with
fixed glazed fanlight on top. . in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto sixth floor Nos 6.00
Ditto in Seventh floor Nos 6.00
ITEM DESCRIPTION UNIT QTY
L ALUMINUM WORK(Contd)

4 Fanlight type FL size 2'-0"wide X 3'-0"high overall,


in powder coated aluminum glazed top hung
fanlight with fixed louvers fanlight on top in
first floor Nos 12.00
Ditto in second floor Nos 12.00
Ditto in third floor Nos 12.00
Ditto in fourth floor Nos 12.00
Ditto in fifth floor Nos 12.00
Ditto sixth floor Nos 12.00
Ditto in Seventh floor Nos 12.00
Ditto in Eight floor Nos 12.00

L ALUMINUM WORK CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


M PLASTER WORK
Note
Rate shall include for rules,screeds,grouds etc.
and making good around pipes, sanitary fittings
and similar fixtures.
1 5/8" Thick Plastering in cement sand & lime 1:1:5
to external surfaces of walls finished semi rough
(a). Ground floor wall boundary wall and column Sqrs 50.00
(b). Upper floor with column Sqrs 20.00
(c). First floor Sqrs 68.00
(d). Second floor Sqrs 68.00
(e). Third floor Sqrs 68.00
(f). Fourth floor Sqrs 68.00
(g). Fifth floor Sqrs 68.00
(h). Sixth floor Sqrs 68.00
(i). Seventh floor Sqrs 68.00
(j). Roof terrace Sqrs 55.00

2 5/8 Thick plastering in cement, sand & lime


1:1:5 to internal surfaces of walls and column
finished semi rough
(a). Ground floor Sqrs 25.00
(b). Upper floor Sqrs 30.00
(c). First floor Sqrs 182.00
(d). Second floor Sqrs 182.00
(e). Third floor Sqrs 182.00
(f). Fourth floor Sqrs 182.00
(g). Fifth floor Sqrs 182.00
(h). Sixth floor Sqrs 182.00
(i). Seventh floor Sqrs 182.00
(j). Roof terrace Sqrs 20.00

3 5/8" Thick Plastering in cement sand & lime


1:1:5 to external surfaces of reveals finished
semi rough
(a). Ground floor Lft 20.00
(b). Upper floor L.ft 930.00
(c). First floor L.ft 1,030.00
(d). Second floor L.ft 1,030.00
(e). Third floor L.ft 1,030.00
(f). Fourth floor L.ft 1,030.00
(g). Fifth floor L.ft 1,030.00
(h). Sixth floor L.ft 1,030.00
(i). Seventh floor L.ft 1,030.00
(j). Roof terrace L.ft 135.00

ITEM DESCRIPTION UNIT QTY


M PLASTER (Contd.)
4 5/8" Thick Plastering in cement & lime to
internal surfaces of reveals finished semi rough
(1:1:5)
(a). Ground floor L.ft 20.00
(b). Upper floor L.ft 930.00
(c). First floor L.ft 2,200.00
(d). Second floor L.ft 2,200.00
(e). Third floor L.ft 2,200.00
(f). Fourth floor L.ft 2,200.00
(g). Fifth floor L.ft 2,200.00
(h). Sixth floor L.ft 2,200.00
(i). Seventh floor L.ft 2,200.00
(j). Roof terrace L.ft 175.00

5 Two coats of enamel paint for all PVC


surfaces. Item 1.00

M PLASTER WORK CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


N FLOOR PAVING WORK
Note:-
Rate shall include for all temporary rules,
screeds, grounds etc. rounded angles and
and edges and the like, bedding and pointing
making good between new and old work,
making good around pipes, sanitary fittings
and other fixtures, cleaning down and protecting
upon completion.

1 Insitu finishing 5/8" thick cement and sand 1:3


screed for copping finish semi rough in
balconies in the following.
(a). First floor L.ft 350.00
(b). Second floor L.ft 350.00
(c). Third floor L.ft 350.00
(d). Fourth floor L.ft 350.00
(e). Fifth floor L.ft 350.00
(f). Sixth floor L.ft 350.00
(g). Seventh floor L.ft 350.00
(j). Roof terrace L.ft 1,000.00

Cement and sand 1:3 rendering not less than


1/2" thick and finished smooth with neat cement
floating to the following.

2 Sump wall and base internal surface Sqrs 6.75

3 Lift well base and wall Sqrs 3.75

4 Water tank base and wall Sqrs 9.50

Cement and sand 1:3 rendering not less than


1/2" thick, cement mixed with 5% by weight of
pudlo or equivalent water proofing compound
finished semi rough to the following

5 Lift machine room and stair well roof slab Sqrs 4.00

6 Water tank Covered slab Sqrs 6.00

N FLOOR PAVING WORK CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


O TILE WORK
1 16"X 16"size non-skid heavy duty import quality
floor tile with 1/2" thick 1:2 bedded and pointed
with colored cement to match the tile in
Ground floor parking area Sqrs 76.30

Ditto in Upper floor parking and ramp Sqrs 118.20


2 16"X 16" Colored ceramic imported quality floor
tile with 1/2"thick 1:2 bedded and pointed with
colored with surrounding in Dinning, living area
and bed room
(a). First floor Sqrs 52.20
(b). Second floor Sqrs 52.20
(c). Third floor Sqrs 52.20
(d). Fourth floor Sqrs 52.20
(e). Fifth floor Sqrs 52.20
(f). Sixth floor Sqrs 52.20
(g). Seventh floor Sqrs 52.20

3 12"X 12" Colored ceramic floor tile with 1/2"


thick 1:2 bedded and pointed with colored
cement to match with surrounding in Kitchen,
store and lobby
(a). First floor Sqrs 10.50
(b). Second floor Sqrs 10.50
(c). Third floor Sqrs 10.50
(d). Fourth floor Sqrs 10.50
(e). Fifth floor Sqrs 10.50
(f). Sixth floor Sqrs 10.50
(g). Seventh floor Sqrs 10.50

4 12"X12" Colored ceramic floor tile with 1/2" 1:2


bedded and pointed with colored cement to
match with surrounding in balcony, in the
following
(a). First floor Sqrs 11.40
(b). Second floor Sqrs 11.40
(c). Third floor Sqrs 11.40
(d). Fourth floor Sqrs 11.40
(e). Fifth floor Sqrs 11.40
(f). Sixth floor Sqrs 11.40
(g). Seventh floor Sqrs 11.40
(j). Roof terrace Sqrs 85.70

ITEM DESCRIPTION UNIT QTY


O TILE WORK (Contd.)
5 12"X12"Colored ceramic floor tile with 1/2" 1:2
bedded and pointed with colored cement to
match with surrounding in ,passage and lobby
in the following.
(b). First floor Sqrs 6.00
(c). Second floor Sqrs 6.00
(d). Third floor Sqrs 6.00
(e). Fourth floor Sqrs 6.00
(f). Fifth floor Sqrs 6.00
(g). Sixth floor Sqrs 6.00
(h). Seventh floor Sqrs 6.00
(j). Roof terrace Sqrs 1.75

6 12"X12" Granite floor with minimum 1/2" 1:3


bedded and pointed with colored cement to
match with surrounding in stair case landing, mid
landing and lobby area in the following
(a). Ground floor to Upper floor Sqft 368.00
(b). Upper floor to First floor Sqft 368.00
(c). First floor to Second floor Sqft 368.00
(d). Second floor to Third floor Sqft 368.00
(e). Third floor to Fourth floor Sqft 368.00
(f). Fourth floor to Fifth floor Sqft 368.00
(g). Fifth floor to sixth floor Sqft 368.00
(h). Sixth floor to Seventh floor Sqft 368.00
(I). Seventh floor to Roof terrace Sqft 368.00

7 4" high Colored glassed ceramic tiles skirting


with bedded and pointed with colored cement
in Ground floor parking area L.ft 550.00
Ditto in Upper floor(a). First floor L.ft 650.00

8 4" high Colored glassed ceramic tiles skirting


with bedded and pointed with colored cement
in the Living, Dining and Bed room
(a). First floor L.ft 750.00
(b). Second floor L.ft 750.00
(c). Third floor L.ft 750.00
(d). Fourth floor L.ft 750.00
(e). Fifth floor L.ft 750.00
(f). Sixth floor L.ft 750.00
(g). Seventh floor L.ft 750.00

ITEM DESCRIPTION UNIT QTY


O TILE WORK (Contd.)
9 4" high Colored glassed ceramic tiles skirting
with bedded and pointed with colored cement
in the Kitchen and store
(a). First floor L.ft 265.00
(b). Second floor L.ft 265.00
(c). Third floor L.ft 265.00
(d). Fourth floor L.ft 265.00
(e). Fifth floor L.ft 265.00
(f). Sixth floor L.ft 265.00
(g). Seventh floor L.ft 265.00

10 4" high Colored glassed ceramic tiles skirting


with bedded and pointed with colored cement
in the Balcony
(a). First floor L.ft 550.00
(b). Second floor L.ft 550.00
(c). Third floor L.ft 550.00
(d). Fourth floor L.ft 550.00
(e). Fifth floor L.ft 550.00
(f). Sixth floor L.ft 550.00
(g). Seventh floor L.ft 550.00
(j). Roof terrace L.ft 550.00

11 4" high Colored glassed ceramic tiles skirting


with bedded and pointed with colored cement
in the passage
(a). Ground floor L.ft 50.00
(b). First floor L.ft 130.00
(c). Second floor L.ft 130.00
(d). Third floor L.ft 130.00
(e). Fourth floor L.ft 130.00
(f). Fifth floor L.ft 130.00
(g). Sixth floor L.ft 130.00
(h). Seventh floor L.ft 130.00
(j). Roof terrace L.ft 50.00

12 4" high Colored Granite skirting with bedded


and pointed with colored cement in the Stair
case, landing and mid landing
(a). Ground floor to Upper floor L.ft 50.00
(b). Upper floor to First floor L.ft 180.00
(c). First floor to Second floor L.ft 120.00
(d). Second floor to Third floor L.ft 120.00
(e). Third floor to Fourth floor L.ft 120.00
(f). Fourth floor to Fifth floor L.ft 120.00
(g). Fifth floor to sixth floor L.ft 120.00
(h). Sixth floor to Seventh floor L.ft 120.00
(I). Seventh floor to roof terrace L.ft 120.00

ITEM DESCRIPTION UNIT QTY


O TILE WORK (Contd.)

13 12"X 12" Ceramic floor tile paving of and non skid


set in cement and sand 1:3 bedding 1/2" thick
with neat cement floating and the joints pointed
with colored cement to match the color of the
tiles in the following toilet floor.
(a). First floor Sqrs 5.65
(b). Second floor Sqrs 5.65
(c). Third floor Sqrs 5.65
(d). Fourth floor Sqrs 5.65
(e). Fifth floor Sqrs 5.65
(f). Sixth floor Sqrs 5.65
(g). Seventh floor Sqrs 5.65

14 12"X 24" Clorured glazed tile lining to wall of toilet


unto a height of 9'-0" from floor level including
boarders corners angles etc set in cement and
sand 1:3 bedding 5/8"thick with neat cement
floating to match the color of the tiles in the
following
(a). First floor Sqrs 28.08
(b). Second floor Sqrs 28.08
(c). Third floor Sqrs 28.08
(d). Fourth floor Sqrs 28.08
(e). Fifth floor Sqrs 28.08
(f). Sixth floor Sqrs 28.08
(g) Seventh floor Sqrs 28.08

O TILE WORK CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


P PAINTING WORK
Note:- All painting work includes preparation of
surfaces, cleaning, smoothing, knotting, toping
etc. Protection of floors and fittings removing
and replacing door and window sashes and
cleaning window etc. up on completion.
1 Prepare & apply one coat of primer two coat of
weather shield paint to all external surfaces.
(a). Ground floor Sqrs 50.00
(b). Upper floor Sqrs 20.00
(c). First floor Sqrs 68.00
(d). Second floor Sqrs 68.00
(e). Third floor Sqrs 68.00
(f). Fourth floor Sqrs 68.00
(g). Fifth floor Sqrs 68.00
(h). Sixth floor Sqrs 68.00
(i). Seventh floor Sqrs 68.00
(j). Roof terrace wall and water tank soffit Sqrs 90.00

2 Prepare & apply one coat primer and two coats


of emulsion for internal wall and column .
(a). Ground floor Sqrs 55.00
(b). Upper floor Sqrs 50.00
(c). First floor Sqrs 10.00
(d). Second floor Sqrs 10.00
(e). Third floor Sqrs 10.00
(f). Fourth floor Sqrs 10.00
(g). Fifth floor Sqrs 10.00
(h). Sixth floor Sqrs 10.00
(i). Seventh floor Sqrs 10.00
(j). Roof terrace wall Sqrs 12.00

3 Prepare & apply one coat primer, one coat of


potty(Skim coat) and two coats of emulsion
for internal wall and attached column .
(a). First floor Sqrs 172.00
(b). Second floor Sqrs 172.00
(c). Third floor Sqrs 172.00
(d). Fourth floor Sqrs 172.00
(e). Fifth floor Sqrs 172.00
(f). Sixth floor Sqrs 172.00
(g). Seventh floor Sqrs 172.00

ITEM DESCRIPTION UNIT QTY


P PAINTING WORK(Contd)
4 Prepare & apply one coat primer, one coat of
potty(Skim coat) and two coats of emulsion
for the soffit slab and side and soffit beam
including staircase.
(a). Ground floor Sqrs 120.00
(b). Upper floor Sqrs 81.00
(c). First floor Sqrs 85.00
(d). Second floor Sqrs 85.00
(e). Third floor Sqrs 85.00
(f). Fourth floor Sqrs 85.00
(g). Fifth floor Sqrs 85.00
(h). Sixth floor Sqrs 85.00
(i). Seventh floor Sqrs 85.00
(j). Roof terrace wall Sqrs 20.00

P PAINTING WORK CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES
Note:-
All necessary fittings, clips, etc
Supplying and laying of PVC conduit fitting etc.
required to complete the installation successfully
All work should be carried out according to
drawings confirmed to C.E.B & I.E.E regulations.
All wiring in conduit pipes must be buried in to
the walls.
All the fittings should be British made
All the lamp shades and other luxury fitting
designed and make approved by Architect and
supplied by client.
All the lamp parts should finish with fittings. No
extra payments will be allowed for fixing.
All switches must be approved sunken type with
boxes.
Contractor will have to get the approval and
supply from the C.E.B.

Ground floor
1 4'-0",36W fluorescent lamp wired with 1mm2
Pvc/pvc/Cu cable in pvc conduit pipe controlled
by 5 Am switch Nos 57.00

2 5 Am Switch socket outlet wired 1mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu
earth cable in pvc conduit pipe Nos 4.00

3 13 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu
earth cable in pvc conduit pipe Nos 2.00

4 CCTV camera socket wired RG cable in pvc


conduit pipe to each camera from the console Nos 12.00

5 3 Phase motor point wire with 4 X 4 mm2


pvc/pvc/cu cable and 1 X 4mm2.5 pvc /cu earth
cable in pvc conduit pipe with floater wiring Nos 2.00

6 3 Phase motor point wire with 4 X 4 mm2


pvc/pvc/cu cable and 1 X 4mm2.5 pvc /cu earth
cable in pvc conduit pipe with fair freight Nos 2.00

7 single Phase motor point wire with 2 X 2.5 mm2


pvc/pvc/cu cable and 1 X 4mm2.5 pvc /cu earth
cable in pvc conduit pipe Nos 1.00

Upper floor
8 4'-0",36W fluorescent lamp wired with 1mm2
Pvc/pvc/Cu cable in pvc conduit pipe controlled
by 5 Am switch Nos 57.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)
9 5 Am Switch socket outlet wired 1mm2
Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu
earth cable in pvc conduit pipe Nos 6.00

10 15 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe Nos 3.00

11 Telephone socket wired with 0.5 mm2 pvc/cu


twin single pair telephone cable in pvc conduit
pipe from the Intercom panel Nos 1.00

12 CCTV camera socket wired RG cable in pvc


conduit pipe to each camera from the console Nos 12.00
13 Recess mounted MCB distribution board
consisting following item Nos 1.00
1 No 100 A 4P MCCB
1No 63A 4P MCB
6 Nos 32 A 4P MCB
6 Nos 32 A DP MCB
6 Nos 32A DP (30mA) RCCB
30Nos 6A SP MCB
9Nos 16A SP MCB

14 Recess mounted main power distribution board Set 1.00


consisting following item
2 No 300 A 4P MCCB
2 No 300 A 3 phase bus bar
1No 100 A 4P MCB
3No 63 A 4P MCB
1 No 300A 4P Change over switch

15 16mm2 earth cable in pvc conduit pipe from


dissipation board to main earth bus bar m 10.00

16 25mm2 pvc/cu earth cable in pvc conduit pipe


from Main earth bus bar to main earth m 20.00

17 4 X 1 core 50mm2 pvc/pvc/cu cable in pvc


conduit pipe from distribution board to Change
over switch m 5.00

18 4 X 1 Core 50mm2 pvc/pvc/cu cable in pvc


conduit pipe from Change over switch to CEB
meter m 5.00

19 4 X 1 Core 50mm2 pvc/pvc/cu cable in pvc


conduit pipe from Change over switch to
generator m 20.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)
Typical floor type -A
20 4-0" 36W fluorescent lamp wired 1mm2
Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 7.00
Ditto in second floor Nos 7.00
Ditto in third floor Nos 7.00
Ditto in fourth floor Nos 7.00
Ditto in fifth floor Nos 7.00
Ditto in sixth floor Nos 7.00
Ditto in seventh floor Nos 7.00

21 Ceiling light with fitting wired with 1mm2


Pvc/pvc/Cu cable in pvc conduit pipe controlled
by 5 Am switch in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

22 Chandler light with fitting wired with 1mm2


Pvc/pvc/Cu cable in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

23 Mirror light wired with 1mm2 Pvc/pvc/Cu cable


in pvc conduit pipe controlled by 5 Am switch Nos 2.00
in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

24 Wall bracket lamp with fitting wired 1mm2


Pvc/pvc/Cu cable two way wiring in pvc
conduit pipe controlled by 5 Am two way
switch in first floor Nos 7.00
Ditto in second floor Nos 7.00
Ditto in third floor Nos 7.00
Ditto in fourth floor Nos 7.00
Ditto in fifth floor Nos 7.00
Ditto in sixth floor Nos 7.00
Ditto in seventh floor Nos 7.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

25 Ceiling fan with regulator wired 1mm2


Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

26 5 Am Switch socket outlet wired 1mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu
earth cable in pvc conduit pipe in first floor Nos 13.00
Ditto in second floor Nos 13.00
Ditto in third floor Nos 13.00
Ditto in fourth floor Nos 13.00
Ditto in fifth floor Nos 13.00
Ditto in sixth floor Nos 13.00
Ditto in seventh floor Nos 13.00

27 5 Am Shaver Switch socket outlet wired 1mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 3.00
Ditto in second floor Nos 3.00
Ditto in third floor Nos 3.00
Ditto in fourth floor Nos 3.00
Ditto in fifth floor Nos 3.00
Ditto in sixth floor Nos 3.00
Ditto in seventh floor Nos 3.00

28 13 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

29 15 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)
30 Cooker point wired 2.5mm2 Pvc/pvc/Cu cable and
2.5 mm2 pvc/Cu earth cable in pvc conduit pipe
from cooker point to ABC box in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

31 Bell wired 1mm2 Pvc/pvc/Cu cable wiring in


pvc conduit pipe controlled by 5 Am bell push
in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

32 Exhaust fans fixed on wall or fanlight wired


1mm2 Pvc/pvc/Cu cable wiring in pvc conduit
pipe controlled by 5 Am switch in first floor Nos 3.00
Ditto in second floor Nos 3.00
Ditto in third floor Nos 3.00
Ditto in fourth floor Nos 3.00
Ditto in fifth floor Nos 3.00
Ditto in sixth floor Nos 3.00
Ditto in seventh floor Nos 3.00

33 Telephone socket wired with 0.5 mm2 pvc/cu


twin twisted pair telephone cable in pvc conduit
pipe from the telephone junction box in
first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

34 Telephone socket wired with 0.5 mm2 pvc/cu


twin single pair telephone cable in pvc conduit
pipe from the Intercom panel in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

35 TV Antenna sockets outlet wired 5C2V cable


in pvc conduit pipe from cable connection.
in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto
Ditto in
in fourth floor
fifth floor Nos
Nos 2.00
2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

36 Recess mounted MCB distribution board


consisting following item Nos 7.00
1 No 32 A 4P MCB
3 Nos 32 A DP MCB
3 Nos 32A DP (30mA) RCCB
18Nos 6A SP MCB
9Nos 16A SP MCB
30No home BUS bar

37 4 X 1core 6mm2 pvc/pvc/cu cable in pvc


conduit pipe from distribution board to CEB
Meter in first floor m 20.00
Ditto in second floor m 25.00
Ditto in third floor m 30.00
Ditto in fourth floor m 35.00
Ditto in fifth floor m 40.00
Ditto in sixth floor m 45.00
Ditto in seventh floor m 50.00

38 4mm2 earth cable in pvc conduit pipe from


dissipation board to earth bus bar in first floor m 20.00
Ditto in second floor m 25.00
Ditto in third floor m 30.00
Ditto in fourth floor m 35.00
Ditto in fifth floor m 40.00
Ditto in sixth floor m 45.00
Ditto in seventh floor m 50.00

Typical floor type -B


39 4-0" 36W fluorescent lamp wired 1mm2
Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 7.00
Ditto in second floor Nos 7.00
Ditto in third floor Nos 7.00
Ditto in fourth floor Nos 7.00
Ditto in fifth floor Nos 7.00
Ditto in sixth floor Nos 7.00
Ditto in seventh floor Nos 7.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

40 Ceiling light with fitting wired with 1mm2


Pvc/pvc/Cu cable in pvc conduit pipe controlled
by 5 Am switch in first floor Nos 3.00
Ditto in second floor Nos 3.00
Ditto in third floor Nos 3.00
Ditto in fourth floor Nos 3.00
Ditto in fifth floor Nos 3.00
Ditto in sixth floor Nos 3.00
Ditto in seventh floor Nos 3.00

41 Chandler with fitting wired with 1mm2


Pvc/pvc/Cu cable in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

42 Mirror light wired with 1mm2 Pvc/pvc/Cu cable


in pvc conduit pipe controlled by 5 Am switch Nos 2.00
in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

43 Wall bracket lamp with fitting wired 1mm2


Pvc/pvc/Cu cable two way wiring in pvc
conduit pipe controlled by 5 Am two way
switch in first floor Nos 7.00
Ditto in second floor Nos 7.00
Ditto in third floor Nos 7.00
Ditto in fourth floor Nos 7.00
Ditto in fifth floor Nos 7.00
Ditto in sixth floor Nos 7.00
Ditto in seventh floor Nos 7.00

44 Ceiling fan with regulator wired 1mm2


Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 5.00
Ditto in second floor Nos 5.00
Ditto in third floor Nos 5.00
Ditto in fourth floor Nos 5.00
Ditto in fifth floor Nos 5.00
Ditto in sixth floor Nos 5.00
Ditto in seventh floor Nos 5.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

45 5 Am Switch socket outlet wired 1mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu
earth cable in pvc conduit pipe in first floor Nos 10.00
Ditto in second floor Nos 10.00
Ditto in third floor Nos 10.00
Ditto in fourth floor Nos 10.00
Ditto in fifth floor Nos 10.00
Ditto in sixth floor Nos 10.00
Ditto in seventh floor Nos 10.00

46 5 Am Shaver Switch socket outlet wired 1mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

47 13 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

48 15 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

49 Cooker point wired 2.5 mm2 Pvc/pvc/Cu cable and


2.5 mm2 pvc/Cu earth cable in pvc conduit pipe
from cooker point to ABC box in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

50 Bell wired 1mm2 Pvc/pvc/Cu cable wiring in


pvc conduit pipe controlled by 5 Am bell push
in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

51 Exhaust fans fixed on wall or fanlight wired


1mm2 Pvc/pvc/Cu cable wiring in pvc conduit
pipe controlled by 5 Am switch in first floor Nos 3.00
Ditto in second floor Nos 3.00
Ditto in third floor Nos 3.00
Ditto in fourth floor Nos 3.00
Ditto in fifth floor Nos 3.00
Ditto in sixth floor Nos 3.00
Ditto in seventh floor Nos 3.00

52 Telephone socket wired with 0.5 mm2 pvc/cu


twin twisted pair telephone cable in pvc conduit
pipe from the telephone junction box in
first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

53 Telephone socket wired with 0.5 mm2 pvc/cu


twin single pair telephone cable in pvc conduit
pipe from the Intercom panel in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

54 TV Antenna sockets outlet wired 5C2V cable


in pvc conduit pipe from cable connection.
in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

55 Recess mounted MCB distribution board


consisting following item Nos 7.00
1 No 32 A 4P MCB
3 Nos 32 A DP MCB
3 Nos 32A DP (30mA) RCCB
18Nos 6A SP MCB
9Nos 16A SP MCB
30No home BUS bar

56 4 X 1core 6mm2 pvc/pvc/cu cable in pvc


conduit pipe from distribution board to CEB
Meter in first floor m 30.00
Ditto in second floor m 35.00
Ditto in third floor m 40.00
Ditto in fourth floor m 45.00
Ditto in fifth floor m 50.00
Ditto in sixth floor m 55.00
Ditto in seventh floor m 60.00
57 4mm2 earth cable in pvc conduit pipe from
dissipation board to earth bus bar in first floor m 30.00
Ditto in second floor m 35.00
Ditto in third floor m 40.00
Ditto in fourth floor m 45.00
Ditto in fifth floor m 50.00
Ditto in sixth floor m 55.00
Ditto in seventh floor m 60.00

Typical floor type -C


58 4-0" 36W fluorescent lamp wired 1mm2
Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

59 Ceiling light with fitting wired with 1mm2


Pvc/pvc/Cu cable in pvc conduit pipe controlled
by 5 Am switch in first floor Nos 5.00
Ditto in second floor Nos 5.00
Ditto in third floor Nos 5.00
Ditto in fourth floor Nos 5.00
Ditto in fifth floor Nos 5.00
Ditto in sixth floor Nos 5.00
Ditto in seventh floor Nos 5.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

60 Chandler light with fitting wired with 1mm2


Pvc/pvc/Cu cable in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

61 Mirror light wired with 1mm2 Pvc/pvc/Cu cable


in pvc conduit pipe controlled by 5 Am switch Nos 2.00
in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

62 Wall bracket lamp with fitting wired 1mm2


Pvc/pvc/Cu cable two way wiring in pvc
conduit pipe controlled by 5 Am two way
switch in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

63 Ceiling fan with regulator wired 1mm2


Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 4.00
Ditto in second floor Nos 4.00
Ditto in third floor Nos 4.00
Ditto in fourth floor Nos 4.00
Ditto in fifth floor Nos 4.00
Ditto in sixth floor Nos 4.00
Ditto in seventh floor Nos 4.00

64 5 Am Switch socket outlet wired 1mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu
earth cable in pvc conduit pipe in first floor Nos 4.00
Ditto in second floor Nos 4.00
Ditto in third floor Nos 4.00
Ditto in fourth floor Nos 4.00
Ditto in fifth floor Nos 4.00
Ditto in sixth floor Nos 4.00
Ditto in seventh floor Nos 4.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

65 13 Am Switch socket outlet wired 1mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

66 15 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 5.00
Ditto in second floor Nos 5.00
Ditto in third floor Nos 5.00
Ditto in fourth floor Nos 5.00
Ditto in fifth floor Nos 5.00
Ditto in sixth floor Nos 5.00
Ditto in seventh floor Nos 5.00
67 Cooker point wired 2.5mm2 Pvc/pvc/Cu cable and
2.5 mm2 pvc/Cu earth cable in pvc conduit pipe
from cooker point to ABC box in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

68 Bell wired 1mm2 Pvc/pvc/Cu cable wiring in


pvc conduit pipe controlled by 5 Am bell push
in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

69 Exhaust fans fixed on wall or fanlight wired


1mm2 Pvc/pvc/Cu cable wiring in pvc conduit
pipe controlled by 5 Am switch in first floor Nos 3.00
Ditto in second floor Nos 3.00
Ditto in third floor Nos 3.00
Ditto in fourth floor Nos 3.00
Ditto in fifth floor Nos 3.00
Ditto in sixth floor Nos 3.00
Ditto in seventh floor Nos 3.00

ITEM DESCRIPTION UNIT QTY


R ELECTRICAL SERVICES (Contd)

70 Telephone socket wired with 0.5 mm2 pvc/cu


twin twisted pair telephone cable in pvc conduit
pipe from the telephone junction box in
first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

71 Telephone socket wired with 0.5 mm2 pvc/cu


twin single pair telephone cable in pvc conduit
pipe from the Intercom panel in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

72 TV Antenna sockets outlet wired 5C2V cable


in pvc conduit pipe from cable connection.
in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

73 Recess mounted MCB distribution board


consisting following item Nos 7.00
1 No 32 A 4P MCB
3 Nos 32 A DP MCB
3 Nos 40A DP (30mA) RCCB
18Nos 6A SP MCB
6Nos 20A SP MCB
27No home BUS bar

74 4 X 1core 6mm2 pvc/pvc/cu cable in pvc


conduit pipe from distribution board to CEB
Meter in first floor m 25.00
Ditto in second floor m 30.00
Ditto in third floor m 35.00
Ditto in fourth floor m 40.00
Ditto in fifth floor m 45.00
Ditto in sixth floor m 50.00
Ditto in seventh floor m 55.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

75 4mm2 earth cable in pvc conduit pipe from


dissipation board to earth bus bar in first floor m 25.00
Ditto in second floor m 30.00
Ditto in third floor m 35.00
Ditto in fourth floor m 40.00
Ditto in fifth floor m 45.00
Ditto in sixth floor m 50.00
Ditto in seventh floor m 55.00

Typical floor type -D


76 4-0" 36W fluorescent lamp wired 1mm2
Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00
77 Ceiling light with fitting wired with 1mm2
Pvc/pvc/Cu cable in pvc conduit pipe controlled
by 5 Am switch in first floor Nos 5.00
Ditto in second floor Nos 5.00
Ditto in third floor Nos 5.00
Ditto in fourth floor Nos 5.00
Ditto in fifth floor Nos 5.00
Ditto in sixth floor Nos 5.00
Ditto in seventh floor Nos 5.00

78 Chandler light with fitting wired with 1mm2


Pvc/pvc/Cu cable in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

79 Mirror light wired with 1mm2 Pvc/pvc/Cu cable


in pvc conduit pipe controlled by 5 Am switch Nos 2.00
in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

80 Wall bracket lamp with fitting wired 1mm2


Pvc/pvc/Cu cable two way wiring in pvc
conduit pipe controlled by 5 Am two way
switch in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

81 Ceiling fan with regulator wired 1mm2


Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 4.00
Ditto in second floor Nos 4.00
Ditto in third floor Nos 4.00
Ditto in fourth floor Nos 4.00
Ditto in fifth floor Nos 4.00
Ditto in sixth floor Nos 4.00
Ditto in seventh floor Nos 4.00
82 5 Am Switch socket outlet wired 1mm2
Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu
earth cable in pvc conduit pipe in first floor Nos 4.00
Ditto in second floor Nos 4.00
Ditto in third floor Nos 4.00
Ditto in fourth floor Nos 4.00
Ditto in fifth floor Nos 4.00
Ditto in sixth floor Nos 4.00
Ditto in seventh floor Nos 4.00

83 13 Am Switch socket outlet wired 1mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

84 15 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 5.00
Ditto in second floor Nos 5.00
Ditto in third floor Nos 5.00
Ditto in fourth floor Nos 5.00
Ditto in fifth floor Nos 5.00
Ditto in sixth floor Nos 5.00
Ditto in seventh floor Nos 5.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

85 Cooker point wired 2.5mm2 Pvc/pvc/Cu cable and


2.5 mm2 pvc/Cu earth cable in pvc conduit pipe
from cooker point to ABC box in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

86 Bell wired 1mm2 Pvc/pvc/Cu cable wiring in


pvc conduit pipe controlled by 5 Am bell push
in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

87 Exhaust fans fixed on wall or fanlight wired


1mm2 Pvc/pvc/Cu cable wiring in pvc conduit
pipe controlled by 5 Am switch in first floor Nos 3.00
Ditto in second floor Nos 3.00
Ditto in third floor Nos 3.00
Ditto in fourth floor Nos 3.00
Ditto in fifth floor Nos 3.00
Ditto in sixth floor Nos 3.00
Ditto in seventh floor Nos 3.00

88 Telephone socket wired with 0.5 mm2 pvc/cu


twin twisted pair telephone cable in pvc conduit
pipe from the telephone junction box in
first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

89 Telephone socket wired with 0.5 mm2 pvc/cu


twin single pair telephone cable in pvc conduit
pipe from the Intercom panel in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

ITEM DESCRIPTION UNIT QTY


R ELECTRICAL SERVICES (Contd)

90 TV Antenna sockets outlet wired 5C2V cable


in pvc conduit pipe from cable connection.
in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

91 Recess mounted MCB distribution board


consisting following item Nos 7.00
1 No 32 A 4P MCB
3 Nos 32 A DP MCB
3 Nos 40A DP (30mA) RCCB
18Nos 6A SP MCB
6Nos 20A SP MCB
27No home BUS bar

92 4 X 1core 6mm2 pvc/pvc/cu cable in pvc


conduit pipe from distribution board to CEB
Meter in first floor m 25.00
Ditto in second floor m 30.00
Ditto in third floor m 35.00
Ditto in fourth floor m 40.00
Ditto in fifth floor m 45.00
Ditto in sixth floor m 50.00
Ditto in seventh floor m 55.00

93 4mm2 earth cable in pvc conduit pipe from


dissipation board to earth bus bar in first floor m 25.00
Ditto in second floor m 30.00
Ditto in third floor m 35.00
Ditto in fourth floor m 40.00
Ditto in fifth floor m 45.00
Ditto in sixth floor m 50.00
Ditto in seventh floor m 55.00

Typical floor type -E


94 4-0" 36W fluorescent lamp wired 1mm2
Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 7.00
Ditto in second floor Nos 7.00
Ditto in third floor Nos 7.00
Ditto in fourth floor Nos 7.00
Ditto in fifth floor Nos 7.00
Ditto in sixth floor Nos 7.00
Ditto in seventh floor Nos 7.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

95 Ceiling light with fitting wired with 1mm2


Pvc/pvc/Cu cable in pvc conduit pipe controlled
by 5 Am switch in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

96 Chandler light with fitting wired with 1mm2


Pvc/pvc/Cu cable in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

97 Mirror light wired with 1mm2 Pvc/pvc/Cu cable


in pvc conduit pipe controlled by 5 Am switch Nos 2.00
in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

98 Wall bracket lamp with fitting wired 1mm2


Pvc/pvc/Cu cable two way wiring in pvc
conduit pipe controlled by 5 Am two way
switch in first floor Nos 7.00
Ditto in second floor Nos 7.00
Ditto in third floor Nos 7.00
Ditto in fourth floor Nos 7.00
Ditto in fifth floor Nos 7.00
Ditto in sixth floor Nos 7.00
Ditto in seventh floor Nos 7.00

99 Ceiling fan with regulator wired 1mm2


Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 5.00
Ditto in second floor Nos 5.00
Ditto in third floor Nos 5.00
Ditto in fourth floor Nos 5.00
Ditto in fifth floor Nos 5.00
Ditto in sixth floor Nos 5.00
Ditto in seventh floor Nos 5.00

ITEM DESCRIPTION UNIT QTY


R ELECTRICAL SERVICES (Contd)

100 5 Am Switch socket outlet wired 1mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu
earth cable in pvc conduit pipe in first floor Nos 13.00
Ditto in second floor Nos 13.00
Ditto in third floor Nos 13.00
Ditto in fourth floor Nos 13.00
Ditto in fifth floor Nos 13.00
Ditto in sixth floor Nos 13.00
Ditto in seventh floor Nos 13.00

101 5 Am Shaver Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

102 13 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

103 15 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 7.00
Ditto in second floor Nos 7.00
Ditto in third floor Nos 7.00
Ditto in fourth floor Nos 7.00
Ditto in fifth floor Nos 7.00
Ditto in sixth floor Nos 7.00
Ditto in seventh floor Nos 7.00

104 Cooker point wired 6 mm2 Pvc/pvc/Cu cable and


2.5 mm2 pvc/Cu earth cable in pvc conduit pipe
from cooker point to ABC box in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

105 Bell wired 1mm2 Pvc/pvc/Cu cable wiring in


pvc conduit pipe controlled by 5 Am bell push
in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

106 Exhaust fans fixed on wall or fanlight wired


1mm2 Pvc/pvc/Cu cable wiring in pvc conduit
pipe controlled by 5 Am switch in first floor Nos 3.00
Ditto in second floor Nos 3.00
Ditto in third floor Nos 3.00
Ditto in fourth floor Nos 3.00
Ditto in fifth floor Nos 3.00
Ditto in sixth floor Nos 3.00
Ditto in seventh floor Nos 3.00

107 Telephone socket wired with 0.5 mm2 pvc/cu


twin twisted pair telephone cable in pvc conduit
pipe from the telephone junction box in
first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

108 Telephone socket wired with 0.5 mm2 pvc/cu


twin single pair telephone cable in pvc conduit
pipe from the Intercom panel in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

109 TV Antenna sockets outlet wired 5C2V cable


in pvc conduit pipe from cable connection.
in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

110 Recess mounted MCB distribution board


consisting following item Nos 7.00
1 No 32 A 4P MCB
3 Nos 32 A DP MCB
3 Nos 40A DP (30mA) RCCB
18Nos 6A SP MCB
9Nos 16A SP MCB
30No home BUS bar

111 4 X 1core 6mm2 pvc/pvc/cu cable in pvc


conduit pipe from distribution board to CEB
Meter in first floor m 30.00
Ditto in second floor m 35.00
Ditto in third floor m 40.00
Ditto in fourth floor m 45.00
Ditto in fifth floor m 50.00
Ditto in sixth floor m 55.00
Ditto in seventh floor m 60.00

112 4mm2 earth cable in pvc conduit pipe from


dissipation board to earth bus bar in first floor m 30.00
Ditto in second floor m 35.00
Ditto in third floor m 40.00
Ditto in fourth floor m 45.00
Ditto in fifth floor m 50.00
Ditto in sixth floor m 55.00
Ditto in seventh floor m 60.00

Typical floor type -F


113 4-0" 36W fluorescent lamp wired 1mm2
Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 7.00
Ditto in second floor Nos 7.00
Ditto in third floor Nos 7.00
Ditto in fourth floor Nos 7.00
Ditto in fifth floor Nos 7.00
Ditto in sixth floor Nos 7.00
Ditto in seventh floor Nos 7.00

114 Ceiling light with fitting wired with 1mm2


Pvc/pvc/Cu cable in pvc conduit pipe controlled
by 5 Am switch in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

115 Chandler light with fitting wired with 1mm2


Pvc/pvc/Cu cable in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

116 Mirror light wired with 1mm2 Pvc/pvc/Cu cable


in pvc conduit pipe controlled by 5 Am switch Nos 2.00
in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

117 Wall bracket lamp with fitting wired 1mm2


Pvc/pvc/Cu cable two way wiring in pvc
conduit pipe controlled by 5 Am two way
switch in first floor Nos 7.00
Ditto in second floor Nos 7.00
Ditto in third floor Nos 7.00
Ditto in fourth floor Nos 7.00
Ditto in fifth floor Nos 7.00
Ditto in sixth floor Nos 7.00
Ditto in seventh floor Nos 7.00

118 Ceiling fan with regulator wired 1mm2


Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

119 5 Am Switch socket outlet wired 1mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu
earth cable in pvc conduit pipe in first floor Nos 13.00
Ditto in second floor Nos 13.00
Ditto in third floor Nos 13.00
Ditto in fourth floor Nos 13.00
Ditto in fifth floor Nos 13.00
Ditto in sixth floor Nos 13.00
Ditto in seventh floor Nos 13.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

120 5 Am Shaver Switch socket outlet wired 1mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 3.00
Ditto in second floor Nos 3.00
Ditto in third floor Nos 3.00
Ditto in fourth floor Nos 3.00
Ditto in fifth floor Nos 3.00
Ditto in sixth floor Nos 3.00
Ditto in seventh floor Nos 3.00

121 13 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

122 15 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe in first floor Nos 6.00
Ditto in second floor Nos 6.00
Ditto in third floor Nos 6.00
Ditto in fourth floor Nos 6.00
Ditto in fifth floor Nos 6.00
Ditto in sixth floor Nos 6.00
Ditto in seventh floor Nos 6.00

123 Cooker point wired 2.5mm2 Pvc/pvc/Cu cable and


2.5 mm2 pvc/Cu earth cable in pvc conduit pipe
from cooker point to ABC box in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

124 Bell wired 1mm2 Pvc/pvc/Cu cable wiring in


pvc conduit pipe controlled by 5 Am bell push
in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

125 Exhaust fans fixed on wall or fanlight wired


1mm2 Pvc/pvc/Cu cable wiring in pvc conduit
pipe controlled by 5 Am switch in first floor Nos 3.00
Ditto in second floor Nos 3.00
Ditto in third floor Nos 3.00
Ditto in fourth floor Nos 3.00
Ditto in fifth floor Nos 3.00
Ditto in sixth floor Nos 3.00
Ditto in seventh floor Nos 3.00

126 Telephone socket wired with 0.5 mm2 pvc/cu


twin twisted pair telephone cable in pvc conduit
pipe from the telephone junction box in
first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

127 Telephone socket wired with 0.5 mm2 pvc/cu


twin single pair telephone cable in pvc conduit
pipe from the Intercom panel in first floor Nos 1.00
Ditto in second floor Nos 1.00
Ditto in third floor Nos 1.00
Ditto in fourth floor Nos 1.00
Ditto in fifth floor Nos 1.00
Ditto in sixth floor Nos 1.00
Ditto in seventh floor Nos 1.00

128 TV Antenna sockets outlet wired 5C2V cable


in pvc conduit pipe from cable connection.
in first floor Nos 2.00
Ditto in second floor Nos 2.00
Ditto in third floor Nos 2.00
Ditto in fourth floor Nos 2.00
Ditto in fifth floor Nos 2.00
Ditto in sixth floor Nos 2.00
Ditto in seventh floor Nos 2.00

129 Recess mounted MCB distribution board


consisting following item Nos 7.00
1 No 32 A 4P MCB
3 Nos 32 A DP MCB
3 Nos 32A DP (30mA) RCCB
18Nos 6A SP MCB
9Nos 16A SP MCB
30No home BUS bar

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

130 4 X 1core 6mm2 pvc/pvc/cu cable in pvc


conduit pipe from distribution board to CEB
Meter in first floor m 20.00
Ditto in second floor m 25.00
Ditto in third floor m 30.00
Ditto in fourth floor m 35.00
Ditto in fifth floor m 40.00
Ditto in sixth floor m 45.00
Ditto in seventh floor m 50.00

131 4mm2 earth cable in pvc conduit pipe from


dissipation board to earth bus bar in first floor m 20.00
Ditto in second floor m 25.00
Ditto in third floor m 30.00
Ditto in fourth floor m 35.00
Ditto in fifth floor m 40.00
Ditto in sixth floor m 45.00
Ditto in seventh floor m 50.00

Typical floor common area


132 Ceiling light with fitting wired with 1mm2
Pvc/pvc/Cu cable in pvc conduit pipe controlled
by 5 Am switch Nos 27.00

133 Wall bracket lamp with fitting wired 1mm2


Pvc/pvc/Cu cable two way wiring in pvc
conduit pipe controlled by 5 Am two way
switch Nos 9.00

134 CCTV camera socket wired RG cable in pvc


conduit pipe to each camera from the console Nos 18.00

135 Recess mounted MCB distribution board


consisting following item Nos 1.00
1 Nos 32 A DP MCB
1 Nos 32A DP (30mA) RCCB
7Nos 6A SP MCB

136 2 X 1core 6mm2 pvc/pvc/cu cable in pvc


conduit pipe from distribution board to change
over switch m 10.00

137 2.5mm2 earth cable in pvc conduit pipe from


dissipation board to earth bus bar m 10.00

Roof terrace
138 Ceiling light with fitting wired with 1mm2
Pvc/pvc/Cu cable in pvc conduit pipe controlled
by 5 Am switch Nos 3.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

139 Waterproof Wall bracket lamp with fitting wired


1mm2Pvc/pvc/Cu cable wiring in pvc conduit pipe
controlled by 5 Am switch Nos 12.00

140 400W Sport lamp with fitting wired


1mm2 Pvc/pvc/Cu cable wiring in pvc conduit
pipe controlled by 5 Am switch Nos 8.00

141 Dom light with fitting wired


1mm2 Pvc/pvc/Cu cable wiring in pvc conduit
pipe controlled by 5 Am switch Nos 9.00

142 5 Am Switch socket outlet wired 1mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu
earth cable in pvc conduit pipe Nos 4.00

143 13 Am Switch socket outlet wired in ring circuit


in 2.5mm2 Pvc/pvc/Cu cable and 2.5 mm2
pvc/Cu earth cable in pvc conduit pipe Nos 3.00

144 15 Am Switch socket outlet wired 2.5mm2


Pvc/pvc/Cu cable and 2.5 mm2 pvc/Cu earth
cable in pvc conduit pipe Nos 2.00

145 3 Phase motor point wire with 4 X 4 mm2


pvc/pvc/cu cable and 1 X 4mm2.5 pvc /cu earth
cable in pvc conduit pipe with Lift Nos 2.00

146 Recess mounted MCB distribution board


consisting following item Nos 1.00
1 Nos 60 A 4P MCB
8 Nos 32 A 4P MCB
6 Nos 32 A 4P (30mA) RCCB
6 Nos 32 A DP MCB
6 Nos 32A DP (30mA) RCCB
6Nos 6A SP MCB
6Nos 20A SP MCB
1Nos 16A SP MCB
18Nos home BUS bar

147 4 X 1core 16mm2 pvc/pvc/cu cable in pvc


conduit pipe from distribution board to BUS bar m 55.00

ITEM DESCRIPTION UNIT QTY


Q ELECTRICAL SERVICES (Contd)

148 4 X 1core 6mm2 pvc/pvc/cu cable in pvc


conduit pipe from lift distribution board to
BUS bar m 75.00

149 6mm2 earth cable in pvc conduit pipe from


dissipation board to earth bus bar m 55.00

150 2.5mm2 earth cable in pvc conduit pipe from


lift dissipation board to earth bus bar m 75.00

Q ELECTRICAL SERVICES CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


R PLUMPING INSTALLATION
Notes:-
a. Solders, rivets screws, nails, brackets, straps.
b. All laps straight cutting and waste
c. Chasing in brick work, block work and making
good.
d. All work should be confirmed to the municipal
requirements by - law.
e Water pipe type 1000 PVC, C.I.or E.W.to
include all bends, junctions and specials.
f. Concrete and encasing to soil pipes 1:3:6 (1")
minimum thickness 3".
g. All sanitary fitting should be in Royal dilution or
equivalent except the servant's toilet and must
be approved by the Architect. Fittings and
accessories to match the sanitary fittings.
h. Prices of sanitary appliances will include for
fixing in brick work and concrete work with all
the necessary brackets, plugs, screws, etc.
I. Each bathroom should be in a different color
except the servant's toilet.
j. Soil pipe type 600 PVC include all bends,
functions and special.

COLD WATER

2 63mm dia PVC pipe fixing completed. for pump L.ft 700.00

3 50mm dia PVC pipe fixing completed. L.ft 300.00

4 32mm dia PVC pipe fixing completed. L.ft 14,000.00

5 25mm dia PVC pipe fixing completed. L.ft 3,500.00

6 20mm dia PVC pipe fixing completed. L.ft 2,250.00

7 90mm (dia) Gate valve Nos. 6.00

8 63mm (dia) Non return valve. Nos. 4.00

9 63mm (dia) Gate valve Nos. 10.00

10 50mm (dia) Gate valve Nos. 6.00

11 32mm (dia) Gate valve Nos. 150.00

12 25mm (dia) Gate valve Nos. 125.00

13 20mm (dia)Angle valve / stop tap Nos 350.00

ITEM DESCRIPTION UNIT QTY


R PLUMPING INSTALLATION (Contd)
14 20mm (dia) Bib tap / Nos 140.00

15 20mm (dia) Garden tap Nos 10.00

16 Supply and fixing of 63mm dia. Centrifugal


Architect approved type water pump with
suction pipe impeller and switch etc. Nos. 4.00
17 Supply and fixing of 50mm dia. Centrifugal
Architect approved type water pump with
suction pipe impeller and switch etc. Nos. 2.00

SOIL DRAINAGE
18 160mm Dia PVC 600pipe Laid on concrete bed
1:3:6 including specials fixed complete Rate
shall include for necessary expansion and
smoke testing for lines in under ground Soil
sewer and waste line. L.ft 100.00

19 160mm Dia PVC 600 Pipe fixed on wall


vertically slab soffit and beam horizontally
including junction, bends, specials fixed
complete including junction, bends, specials
fixed complete for Soil sewer, L.ft 400.00

20 160mm Dia PVC 600 Pipe fixed on slab soffit


and beam horizontally including junction, bends,
specials fixed complete for waste line.
Kitchen waste L.ft 400.00

21 110mm Dia PVC 600 Pipe fixed on slab soffit


and beam vertically including junction, bends,
specials fixed complete for Soil sewer, waste
line. L.ft 1,300.00

22 110mm Dia PVC 600 Pipe fixed on wall from


toilet horizontal connection including junction
bends, specials fixed complete for Soil sewer L.ft 900.00

23 90mm Dia PVC 600 Pipe fixed on wall


vertically, including junction, bends, specials
fixed complete for Waste line L.ft 800.00

24 63mm Dia PVC 600 Pipe fixed on wall and slab


horizontally and vertically, including junction,
bends, specials fixed complete for Kitchen L.ft 600.00
Waste line

25 50mm Dia PVC 600 Pipe laid inside the toilet


and kitchen wall and floor including junction,
bends, specials fixed complete for waste water L.ft 1,200.00

ITEM DESCRIPTION UNIT QTY


R PLUMPING INSTALLATION (Contd)
26 40mm Dia PVC 600 Pipe laid inside the toilet
and kitchen wall and floor including junction,
bends, specials fixed complete for waste water
pipe L.ft 900.00

27 Manhole 2'- 0" X 2'- 0" X 2'-0"(average depth) in


6" thick concrete base, 9" thick side walls,
4" thick per-cast reinforced and completed with
forming of channel etc. and 3/4" thick. 1 : 3
cement rendering with neat cement floating to
all exposed surfaces. Nos. 2.00

28 Interceptor manhole 2'- 6" X 2'- 6" X 3'-0" in


6" thick concrete base, 9" thick side walls,
4" thick precast reinforced and completed with
forming of channel etc. and 3/4" thick 1 : 3
cement rendering with neat cement floating to
all exposed surface including supply and fix
interceptor trap land in concrete bedding. Nos. 1.00

29 Waste water Gully pit 12" X 12" X 12" deep


internal with gully trap, R C C cover and
cement rendering. Nos 3.00

30 Catch pit 6" X 6"or PVC junction box 6" dia in


concrete bedding with stainless steel grating Nos 120.00

RAIN WATER DRAINAGE


31 225mm Dia PVC600 pipe Laid on concrete
bed 1:3:6(1") including specials fixed complete
for under ground Rain water line. L.ft 100.00

32 150mm Dia PVC 600pipe Laid on concrete bed


1:3:6(1") including specials fixed complete for
under ground Rain water line. L.ft 125.00

33 150mm Dia PVC 600 Pipe fixed on wall


vertically, slab soffit and beam horizontally
including junction, bends, specials fixed
complete for rain water L.ft 500.00

34 110mm dia PVC 600 Pipe fixed on wall vertically,


slab soffit and beam horizontally including
junction, bends, specials fixed complete for
rain water L.ft 1,800.00

35 63mmdia PVC 600 Pipe fixed on wall vertically,


slab soffit and beam horizontally including
junction, bends, specials fixed complete for
rain water L.ft 750.00

ITEM DESCRIPTION UNIT QTY


R PLUMPING INSTALLATION (Contd)
36 Catch pit 6" X 6"or PVC junction box 6" dia in
concrete bedding to collect the rain water
including stainless steel grating Nos 225.00

37 Rainwater manhole 24" X 24" X 24" deep


including silt pit,RCC cover finished smooth Nos 6.00

38 Concrete drain 12" X12" Av slope internal


surface finished smooth with neat cement and
covered by 16mm&20mm Stainless Steel
grating infront of entrance Lft 40.00

APPLIANCES
39 Supply and install low level suite import quality
including cistern all complete to working order.
in first floor Nos. 12.00
Ditto in second floor Nos. 12.00
Ditto in third floor Nos. 12.00
Ditto in fourth floor Nos. 12.00
Ditto in fifth floor Nos. 12.00
Ditto in sixth floor Nos. 12.00
Ditto in seventh floor Nos. 12.00
Ditto in Ground floor Nos. 1.00
Ditto in Roof floor Nos. 2.00

40 Supply and install Hand bidet spray all complete


to working order in first floor. Nos. 12.00
Ditto in second floor Nos. 12.00
Ditto in third floor Nos. 12.00
Ditto in fourth floor Nos. 12.00
Ditto in fifth floor Nos. 12.00
Ditto in sixth floor Nos. 12.00
Ditto in seventh floor Nos. 12.00
Ditto in Ground floor Nos. 1.00
Ditto in Roof floor Nos. 2.00

41 Supply and Installed 22" x 15" white glassed


fire clay pedestal type wash basin completed
with mixture tap and all accessories to working
order in first floor. Nos. 12.00
Ditto in second floor Nos. 12.00
Ditto in third floor Nos. 12.00
Ditto in fourth floor Nos. 12.00
Ditto in fifth floor Nos. 12.00
Ditto in sixth floor Nos. 12.00
Ditto in seventh floor Nos. 12.00
Ditto in Ground floor Nos. 1.00
Ditto in Roof floor Nos. 2.00

ITEM DESCRIPTION UNIT QTY


R PLUMPING INSTALLATION (Contd)

42 Supply and Installed Stainless steel kitchen


sink with single drain and single bowl. Fixing
completed with all necessary accessories to
working order. including in first floor . Nos. 6.00
Ditto in second floor Nos. 6.00
Ditto in third floor Nos. 6.00
Ditto in fourth floor Nos. 6.00
Ditto in fifth floor Nos. 6.00
Ditto in sixth floor Nos. 6.00
Ditto in seventh floor Nos. 6.00

43 Toilets Accessories Luxury type


in Ground floor . Set 1.00
Ditto in first floor . Set 12.00
Ditto in second floor Set 12.00
Ditto in third floor Set 12.00
Ditto in fourth floor Set 12.00
Ditto in fifth floor Set 12.00
Ditto in sixth floor Set 12.00
Ditto in seventh floor Set 12.00
Ditto in Roof floor Set 2.00

44 24"X24"approved make complete set of


bathroom mirrors to be fixed on walls with
3/16" thick horizontal glass sheets to be
bottom of the mirrors in Ground floor . Nos 1.00
bottom of the mirrors in first floor . Nos 12.00
Ditto in second floor Nos 12.00
Ditto in third floor Nos 12.00
Ditto in fourth floor Nos 12.00
Ditto in fifth floor Nos 12.00
Ditto in sixth floor Nos 12.00
Ditto in seventh floor Nos 12.00
Ditto in roof floor Nos 2.00

45 Supply and Installed stainless steel shower


with Mixture tap in Ground floor . Nos 1.00
with Mixture tap in first floor . Nos 12.00
Ditto in second floor Nos 12.00
Ditto in third floor Nos 12.00
Ditto in fourth floor Nos 12.00
Ditto in fifth floor Nos 12.00
Ditto in sixth floor Nos 12.00
Ditto in seventh floor Nos 12.00
Ditto in roof floor Nos 2.00

ITEM DESCRIPTION UNIT QTY


R PLUMPING INSTALLATION (Contd)
46 Supply and Install 15 liters capacity electric
geyser complete with all accessories in
working order in approve make in first floor . Nos. 12.00
Ditto in second floor Nos 12.00
Ditto in third floor Nos 12.00
Ditto in fourth floor Nos 12.00
Ditto in fifth floor Nos 12.00
Ditto in sixth floor Nos 12.00
Ditto in seventh floor Nos 12.00

47 10mm Hot water pipe line laid on wall


in first floor . L.ft 125.00
Ditto in second floor L.ft 125.00
Ditto in third floor L.ft 125.00
Ditto in fourth floor L.ft 125.00
Ditto in fifth floor L.ft 125.00
Ditto in sixth floor L.ft 125.00
Ditto in seventh floor L.ft 125.00

48 15mm Hot water pipe line laid on wall


in first floor . L.ft 125.00
Ditto in second floor L.ft 125.00
Ditto in third floor L.ft 125.00
Ditto in fourth floor L.ft 125.00
Ditto in fifth floor L.ft 125.00
Ditto in sixth floor L.ft 125.00
Ditto in seventh floor L.ft 125.00

49 Extra cover for making shower tray with


glassed tile as per architect instructions .
in first floor . Nos. 12.00
Ditto in second floor Nos. 12.00
Ditto in third floor Nos. 12.00
Ditto in fourth floor Nos. 12.00
Ditto in fifth floor Nos. 12.00
Ditto in sixth floor Nos. 12.00
Ditto in seventh floor Nos. 12.00

50 Supply and Installed of Shower cubical as


per details drawing in first floor . Nos 12.00
Ditto in second floor Nos. 12.00
Ditto in third floor Nos. 12.00
Ditto in fourth floor Nos. 12.00
Ditto in fifth floor Nos. 12.00
Ditto in sixth floor Nos. 12.00
Ditto in seventh floor Nos. 12.00

R PLUMPING INSTALLATION CARRIED TO SUMMARY

ITEM DESCRIPTION UNIT QTY


S MISCELLANEOUS ITEM

1 Allow provisional sum for mechanical


passenger lift (3 phase 30amp) Item Allow

2 Allow provisional sum for central fire


protection system. Item 1.00

3 Allow provisional sum for stand by generator. Item 1.00


4 Allow provisional sum for main water
connection. Item 1.00

5 Allow provisional sum for main electricity.


including Transformer, Main KW/H Item 1.00

6 Allow provisional sum for sewer connection. Item 1.00

7 Allow provisional sum for lightning protection


system Item 1.00

8 Allow provisional sum for CCTV system


camera including digital Video recorder(DVR)
complete system Item 1.00

9 Allow provisional sum for Telephone and


Intercom system arrangement for all units
swimming pool, function hall and security Item 1.00

10 Pantry cupboard with all necessary luxury type


fitting as per drawing for all kitchen Nos 42.00

11 Allow provisional sum for Cooker hood in kitchen


area as per details drawing and specification Nos 42.00

12 Allow provisional sum for Gas Cooker for all Nos 42.00
kitchen

13 Allow provisional sum for air conditions supply


and instillation (12000BTU) Nos 140.00

14 Allow provisional sum for air conditions supply


and instillation (18000BTU) Nos 42.00

15 Allow provisional sum for flower trough


including water proofing Item 1.00

16 Allow provisional sum for Name board,


Floor Numbers, Apartment Numbers in
stainless steel or brass, Entrance gate etc. Item 1.00

ITEM DESCRIPTION UNIT QTY


S MISCELLANEOUS ITEM(Contd)

17 Allow provisional sum for Fabricating and fixing


of natural aluminum letter box size
12" X 12" X 9" with locks Item 1.00

S MISCELLANEOUS ITEM CARRIED TO SUMMARY


BILL OF QUANTITIES FOR PROPOSED RESIDENTIAL APARTMENTS AT NO: 118/36,St.
ANTHONY'S ROAD, OLD COLOMBO NEGOMBO ROAD,WATTALA.

SUMMARY
ITEM DESCRIPTION
A PILING WORK

B PRELIMINARIES

C EXCAVATION & EARTH WORK

D CONCRETE WORK

E FORM WORK

F REINFORCEMENT

G MASONRY

H BLOCK WORK AND BRICK WORK

I WATER PROOFING

J METAL WORK

K CARPENTRY AND JOINERY

L ALUMINUM WORK

M PLASTER WORK

N FLOOR PAVING WORK

O TILE WORK

P VARNISHING & PAINTING WORK

Q ELECTRICAL SERVICES

R PLUMPING INSTALLATION

S MISCELLANEOUS ITEM

You might also like