Professional Documents
Culture Documents
L&T CONSTRUCTION
INFRASTRUCTURE, EDRC&T
CLIENT : CONSULTANT :
PROJECT : DESIGN & CONSTRUCTION OF ELEVATED VIADUCT & 5 ELEVATED STATIONS CC-28
APPD KB 21/05/2014
CODE REV.
DOC. No. O 1 2 1 9 3 - Q - B R - C M - D C - 0 5 4
A
CONTENTS
1.0 Introduction 3
1.0 Introduction
counter weight = 80 MT
STAGES CANTILEVER LENTGTH PIER REACTIONS ON TRESTLES (MT) PIER REACTIONS ON TRESTLES (MT)
T1 T2 P66 T3 T4
Maximum Reactions on Trestle/Bearing (MT) 102.431 174.27 112.927 140.676 61.195
Minimum Reactions on Trestle/Bearing (MT) 23.284 11.105 34.28 13.659 49.999
Reference Drawing No: O12193 - Q - BR -CM - CQ - 0918 to 922 (Rev-A)