You are on page 1of 2

Task Name

5. Road Work
5.1 SITE CLEARANCE 20,019.54 84,915.54 595,786.31 637,300.27 320,779.47
Clearing and Grubbing
64,896.00 32,448.00
5.2 EARTHWORKS 43,264.00 21,632.00
543,318.77 617,280.73

Cut to Fill Extra over item


42.01 for excavating and
breaking in common (normal)
excavation to fill ii)
Compacted to 93% of
modified AASHTO density

Extra over item 42.01 for


excavating and breaking in
common (normal) excavation
to spoil
14,221.00

BASE, SUB BASE AND


GRAVEL WEARING COURSE
350,544.00 408,968.00

Gravel Sub Base Material


with minimum soaked
California Bearing Ratio (CBR)
shall be 30% when
determined at a density of
95% of the maximum dry
density when determined in
accordance with the
requirements of AASHTO T-
180 method D.

300,759.93

Crushed stone base


courses constructed with
proper care with materials
described above should have
CBR values in excess of 98 per
cent.
143,181.26
BITUMINOUS CONCRETE &
ROAD BASE 57,314.79
Rigid Concrete pavment
MINOR DRAINAGES

Excavation for foundation


trenches, in all other Classes
of Materials (for Under Drain
Pipes & Manholes)

20,019.54 193,075.54 1,557,950.08 1,663,549.00 822,035.45


Ginbot planed amount
3,843,358.55 589,945.87 6,092,105.55

97,344.00
64,896.00
1,160,599.50

14,221.00

759,512.00

300,823.35 601,583.28

57,272.50 200,453.76

143,286.97 200,601.76

3,522,515.66 587,085.94 4,109,601.60


2,348,343.77 391,390.63 2,739,734.40

-
4,256,629.61