You are on page 1of 11

ABRAM YORDAN LUBIS

RNO ENGINEER
INDONESIA

CURRICULUM VITAE

PERSONAL DATA

Full Name : ABRAM YORDAN LUBIS


Place of Birth : MEDAN North Sumatra,
Indonesia
Date of Birth : May, 18th 1988
Gender : Male
Religion : Catholic
Marital Status : Single
Nationality and Citizenship : Indonesia
Permanent Address : JL. Rami IV No. IV, 21414 P.Simalingkar
MEDAN - North Sumatra, Indonesia.

Available Period : 1 weeks


Thailand Mobile Phone : +66953960921
Indonesia Mobile Phone : +6287773923901/082117755552
Line Id : bramars
Language : English and Bahasa
Email : abramyordanloebis@gmail.com

EDUCATION BACKGROUND
Highest Education
Level : S1-Telecomunication Degree :
3.01
Institute / University UNIVERSITY OF DARMA AGUNG 2007 - 2011
Field of Study :
Senior High School : SMA PARULIAN-1 MEDAN 2003-2006
Junior High School : SMP SWASTA MULIA DAN PENCAWAN 1997-2000
MEDAN
Elementary School : SD Negri 061719 MEDAN 1991-1997

SKILL
Software Skills
Familiar with Windows XP/Seven Operating System
Microsoft Office
Map Info Professional, Probe, Actix, Nemo (Indoor or Outdoor) Tems Investigation
Google Earth
Hardware Skills:
ABRAM YORDAN LUBIS
RNO ENGINEER
INDONESIA

Computer Hardware Component (Processor, RAM, etc.)

ORGANIZATION EXPERIENCES

Member of GMKI cab. Medan (2007-2011)


Member of FUTSAL University Of Darma Agung (2007-2011)
Member of BEM Of University Of Darma Agung (20010-2011)

JOB EXPERIENCES

Work Experience

RNO HQ at KMS for XL-Axiata OPERATOR with HUAWEI Equipment, Pre-


Access Cluster JPS KALIMANTAN, INDONESIA.
April 2017- Now 2017

LTE FDD Pre-Access Cluster Optimization

Tracking and analyze Worst Performance Cell

Perform Pre-Access Cluster Optimization and Improving KPI achievement base line
KPI Acceptance,

Review the report before team Regional submit to HQ Huawei or Costumers,

Trial strategic parameter depends of case to improve KPIs Acceptance as per


contracted (Accessibility, Retainability, Mobility and Service Integrity),

OSS KPI Maintenance after CR CDD implementation, analyze and escalated,

Physical Tuning Optimization with E-Tilt, M-Tilt, RF site audit, PCIPCH/PRS Power
adjustment, and Layering Parameter Adjustment 2D/2F (3G) or Blind Redirection
(4G).

Costumer Complaint Handling.


ABRAM YORDAN LUBIS
RNO ENGINEER
INDONESIA

Work Experience

Radio Network and Optimization at ELABRAM for CELCOM OPERATOR with


HUAWEI Equipment, Pre-Access Cluster Project NORTH MALAYSIA,
MALAYSIA.
February 2017- April 2017

WCDMA/LTE FDD Pre-Access Cluster Optimization

Perform Pre-Access Cluster Optimization and Improving KPI achievement base line
KPI Acceptance,

Review and present directly to Costumer for Quality Certificate Acceptance Report,

Trial strategic parameter depends of case to improve KPIs Acceptance as per


contracted (Accessibility, Retainability, Mobility and Service Integrity)

OSS KPI Maintenance after CR implementation, analyze and escalated to Cluster


Costumer Owner if found abnormal KPI Degradation,

Physical Tuning Optimization with E-Tilt, M-Tilt, RF site audit, PCIPCH/PRS Power
adjustment, and Layering Parameter Adjustment 2D/2F (3G) or Blind Redirection
(4G).

Perform Neighbor Audit and Feature Implementation for 4G SRVCC Volte, Carrier
Aggregate, L2U/L2G and Blind Redirection and for 3G U-Intra, U-Inter, U2L and U2G.

Costumer Complaint Handling.


ABRAM YORDAN LUBIS
RNO ENGINEER
INDONESIA

Work Experience

Radio Network and Optimization at AC Progress Technologies co. ltd. for DTAC
OPERATOR with HUAWEI Equipment, Pre-Access Cluster Project NORTH
THAILAND, THAILAND.
September 2016- February 2017

WCDMA/LTE FDD Pre-Access Cluster Optimization

Perform Pre-Access Cluster Optimization and Improving KPI achievement base line
KPI Acceptance,

Review and present directly to Costumer (DTAC Operator) for Quality Certificate
Acceptance Report,

Trial strategic parameter depends of case to improve KPIs Acceptance as per


contracted (Accessibility, Retainability, Mobility and Service Integrity)

OSS KPI Maintenance after CR implementation, analyze and escalated to Cluster


Costumer Owner if found abnormal KPI Degradation,

Physical Tuning Optimization with E-Tilt, M-Tilt, RF site audit, PCIPCH/PRS Power
adjustment, and Layering Parameter Adjustment 2D/2F (3G) or Blind Redirection
(4G).

Perform Neighbor Audit and Feature Implementation for 4G SRVCC Volte, Carrier
Aggregate, L2U/L2G and Blind Redirection and for 3G U-Intra, U-Inter, U2L and U2G.

Costumer Complaint Handling.


ABRAM YORDAN LUBIS
RNO ENGINEER
INDONESIA

Work Experience

RF Consultant and Optimization at AC Progress Technologies co. ltd. for TRUE


MOVE OPERATOR with Ericsson Equipment, Pre-Access Cluster Project SOUTH
THAILAND, THAILAND.
July 2016- September 2016

WCDMA/LTE FDD Pre-Access Cluster Optimization

Perform Pre-Access Cluster Optimization and Improving KPI achievement base line
KPI Acceptance,

Review and present directly to Costumer (TRUE MOVE Operator) for Quality
Certificate Acceptance Report,

Trial strategic parameter depends of case to improve KPIs Acceptance as per


contracted (Accessibility, Retainability, Mobility and Service Integrity)

OSS KPI Maintenance after CR implementation, analyze and escalated to Costumer


cluster owner if found abnormal KPI Degradation,

Physical Tuning Optimization with E-Tilt, M-Tilt, RF site audit, PCIPCH/PRS Power
adjustment, and Layering Parameter Adjustment 2D/2F (3G) or Blind Redirection
(4G).

Perform Neighbor Audit and Feature Implementation for 4G SRVCC Volte, Carrier
Aggregate, L2U/L2G and Blind Redirection and for 3G U-Intra, U-Inter, U2L and U2G.

Costumer Complaint Handling.


ABRAM YORDAN LUBIS
RNO ENGINEER
INDONESIA

Work Experience

2G/3G/4G RNO Engineer at PT Lintas Media Telekomunikasi for TELKOMSEL


VIP Care and Event Project to HUAWEI equipment. JABO, INDONESIA
Nov 2014- July 2016

2G/3G/4G Jabodetabek VIP Care High Level Costumer Complaint Handling (Example
CEO/COO TELKOMSEL, BOD/CTO SingTel, Indonesia Security Ministry Level,
Indonesia Telecommunication Ministry)

Healthy Check 2G/3G/4G OSS KPI and Alarm Surrounding During Complaint
Reported, KPI Basic Checked; TCH Blocking, SD Blocking, HSDPA/HSUPA User
Number, RTWP, Availability, FACH, IUB, IPPM, UL Interference (LTE) and TWAMP
(LTE).
Tracing Number of Complainer on IMSI Trace(2G/3G/4G) from PCHR data, Traffica
(for 2G/3G Only) by FMA Analysis and PS Core Nastar (for LTE Only) to found the
root cause RF condition after the complainer reported to VIP Team.
CR Parameter Implementation for Conditional Situation Depend of Complaint.
Physical Tuning.
Review Report to Costumer.

2G/3G/4G Assessment and Optimization Event VIP Crowded Handling (Big Event)

2G/3G/4G Capacity Assessment Check KPI OSS Site Existing or New Site Combat
Before Event Start, Optimization If Found KPI Degrade due to Congestion and
Physical Tuning If Necessary.
2G Checking Monitoring KPI OSS and Blocking Only,
3G Feature and License Check and make sure All Cell Has Implemented on NodeB
Level and Cell Level.
Example Feature and License for Reference;
(HUSPA 2ms TTI Func, CCPIC Func, CE Overbooking, 64 Qam, Flex dual carrier HSDPA
Func, DC, FDC, Turbo IC, Turbo IC Phase 2, IC Func, CCPIC Phase 2, RTWP Protection,
RB Parking, Load based Intelligent Power, HSDPA Scheduler pool/Switch, HSDPA
Code number and CE Code Number).
- 3G Parameter Check and Implementation for Event Crowded.
Example Parameter for Reference;
(UCELL CAC, UCELL HSDPA/HUSPA, UCELLLDM, UCELLLDR, UCELLCELLREEL,
UCELLINTERRATHOCOV, CPICHPOWER, Neighbor, FACH, CNBAP, BBU LOAD,
XCPULOAD).
ABRAM YORDAN LUBIS
RNO ENGINEER
INDONESIA

4G OSS KPI Monitoring, Parameter and Feature Implementation


Example Parameter and Feature Reference;
(Running CR NPT There was Included Parameter and Feature Inside, Neighbor
Relation (L2L, L2U, U2L, G2L), Blind redirections activated and Layering Strategic,
PRB Utilization Capacity Check, RS Power Adjustment).

Optimization Bad Spot after DT Verification.


Checking DT Log.
Physical tuning.

3G Worse Performance Cell VIP Cluster and POI Jabodetabek.

- Analyze and Monitoring WPC daily,


- Troubleshoot and Escalated Alarm Issue related to Performance,
- FFT Scan and analyze for Interference case.
ABRAM YORDAN LUBIS
RNO ENGINEER
INDONESIA

Work Experience

2G/3G/4G RF Optimization Leader at PT Lintas Media Telekomunikasi For


TELKOMSEL VIP Complaint and Event Project to HUAWEI equipment. JABO,
INDONESIA
Jun 2014- Nov 2014

Review VIP Route Report, VIP Complaint Report and Event Report
Optimization Bad Spot
Presentation the report to Customer and User
Arrange the RF Engineer to making the report after DT Verify
Analyze the complaint compare with the DT Report and KPI/Performance Surrounding
Check/Audit neighbor relation during complaint
Analyze the log file by Tems Actix, Probe Assistant and Map info

Work Experience

2G/3G RF Optimization at PT Lintas Media Telekomunikasi For TELKOMSEL VIP


Complaint and Event Project to HUAWEI equipment. JABO, INDONESIA
Feb 2014- Jun 2014

Optimization VIP Route and VIP Complaint


Analyze the complaint compare with the DT Report and KPI Surrounding
Check/Audit neighbor relation during complaint
Analyze the log file by Tems Actix, Probe Assistant and Map info
Give some recommendation Optimization to RNO
Coordinator The Drive Test Engineer VIP JABO

DT ANALYZE 2G/3G Engineer at PT China Comservice Indonesia for H3I(HCPT)


MS NPM Project to HUAWEI equipment. BALIKPAPAN CES KAL, INDONESIA
Feb 2013- Feb 2014
ABRAM YORDAN LUBIS
RNO ENGINEER
INDONESIA

Analysis logfile by Actix Analyzer, Layer 3 message, making report SSV 2G/3G, Report
VIP Complaint, Cluster Optim and Monthly report, Monitoring KPI, Query Alarm
RTWP and VSWR tracker
Swap Test, Check cross feeder, doing all functionary test, HSDPA, Hand Over
Second and First carieer, test all coverage, video call, sms, DL and UL, tilting
antena,
2G & 3G SSV Drive Test and Cluster Before After Swap, SCR NPM, Scanner,
Roolout and Drive Test Monthly Balikpapan.

DT 2G/3G (Drive Test) Engineer at PT Econo Spasia Global for TELKOMSEL NPI
Project to ERICCSON equipment. ACEH-Lhoksemawe (home base), INDONESIA
Agust 2012 January 2013

2GSSV Drive Test and Cluster Before After Drive Test


o Static Test :
- Cell parameter check each sector i,e MCC, MNC, LAC, CI, BCCH and BSIC in
GSM & DCS.
- Call setup and SMS check for each sector i,e MOC, MTC, originating SMS and
terminating SMS in GSM & DCS.
- Signal & Quality Test i,e Rx Lev and Rx Qual for each sector in GSM & DCS.
- Reselection 2G to 3G for each sector in GSM and DCS.
- Checking for intra site handover and inter band handover (G900 & G1800) if the
site support dual band.
- Data capability (GPRS/EGPRS) check.
o Moving Test :
- Check for inter site handover also parameter for Target cell, CI, BCCH, BSIC for
each sector.
- Cross feeder checking by CI based on idle mode MS.
- VIP Complaint
- Site audit
- Reporting

Work Experience

DT (Drive Test) Engineer at PT LMT Indonesia for XL Swap Project to HUAWEI


equipment. ACEH, INDONESIA
ABRAM YORDAN LUBIS
RNO ENGINEER
INDONESIA

May 2012 August 2012


2GSSV Drive Test and Cluster Drive Test
o Static Test :
- Cell parameter check each sector i,e MCC, MNC, LAC, CI, BCCH and BSIC in
GSM & DCS.
- Call setup and SMS check for each sector i,e MOC, MTC, originating SMS and
terminating SMS in GSM & DCS.
- Signal & Quality Test i,e Rx Lev and Rx Qual for each sector in GSM & DCS.
- Reselection 2G to 3G for each sector in GSM and DCS.
- Checking for intra site handover and inter band handover (G900 & G1800) if the
site support dual band.
- Data capability (GPRS/EGPRS) check.
o Moving Test :
- Check for inter site handover also parameter for Target cell, CI, BCCH, BSIC for
each sector.
- Cross feeder checking by CI based on idle mode MS.

Work Experience

DT (Drive Test) Engineer at PT Nexwave for XL Swap Project for HUAWEI


equipment. SUMBAGSEL, INDONESIA
January 2012 April 2012
2GSSV Drive Test and Cluster Drive Test
o Static Test :
- Cell parameter check each sector i,e MCC, MNC, LAC, CI, BCCH and BSIC in
GSM & DCS.
- Call setup and SMS check for each sector i,e MOC, MTC, originating SMS and
terminating SMS in GSM & DCS.
- Signal & Quality Test i,e Rx Lev and Rx Qual for each sector in GSM & DCS.
- Reselection 2G to 3G for each sector in GSM and DCS.
- Checking for intra site handover and inter band handover (G900 & G1800) if the
site support dual band.
- Data capability (GPRS/EGPRS) check.
o Moving Test :
- Check for inter site handover also parameter for Target cell, CI, BCCH, BSIC for
each sector.
- Cross feeder checking by CI based on idle mode MS.

On Job Training
LTE HUAWEI SMART CARE INTRODUCTION
PS Core Nastar Analyze
Traffica Analyze Training
FMA Analyze Training

QUALIFICATION
o High motivation and quick learner to develop skills, knowledge, and experience.
ABRAM YORDAN LUBIS
RNO ENGINEER
INDONESIA

o Very good healthy


o Technical documentation skills
o Planning and organizing skills

I confirm that all of the points in my Curriculum Vitae are true.


Thank you for your kind attention

Sincerely Yours

ABRAM YORDAN L.

You might also like