Wall & Ceiling Close Request Form

Project Title: UoN Waterside Campus, Student Residences Date:


Document Number: DLTH003
Building: Project No: C1027 Room No:

Initial & Date to confirm inspection


Ref Item Description Result Sub-Contractor KIER Gage Tupper Comments
Initial Date Initial Date Initial Date
1
M&E 1st Fix Complete to external Walls
HOLD POINT
Stair case and pod walls/ceiling
Correct boards
Deflection detail
2 Fixings
Mastic Joint
Fire & Acoustic Detailing
Overall Standard
VCL, Pattress & Insulation to ext. Wall &
3
Patresses to 1st side of internal walls.
st
1 Side Boarding
Inc GF Knibs and M&E Plant and
Riser rooms, Pod / lobby walls
Correct boards
4 Deflection detail
Fixings
Mastic Joint
Fire & Acoustic Detailing
Overall Standard
Pattresses/Noggins set out & installed
5
correctly
HOLD POINT
2nd fix M&E to walls / services and
fittings checked for fire stopping & air
6
sealing along with duct sections and
pipework to BWKs holes.
7 Sign off for Close up
HOLD POINT
nd
2 Side boarding
Correct boards used & staggered
Deflection detail
Fixings (type/centres)
8
Correct pattress installed
Mastic jointing
Acoustic & Fire detailing
Overall Standard
MF Metal installed as per spec./GB
9 Guidance leaving grid section out where
cables are hung
10 Ceiling pattresses fitted
HOLD POINT
M&E 2nd fix following firestopping
/services and fittings pulled and fitted
11
where patressed and cables pulled in to
riser for ceilings.
12 Fire stopping Complete
Services completed after fire stopping &
13
air sealing
14 Sign off for Close up
HOLD POINT
Board Ceiling
Correct boards used & staggered
Fixings (type/centres)
15
Overall Standard
Kitchen or Accessable ceiling to have
Bond-it applied
HOLD POINT
16 Plastering conforms to BS8212
AREA COMPLETE

Following inspection below and identification of unsatisfactory results as a Non Conformance within Issues Register and record Non Conformance no. below
These works haver been inspected and are:(tick below as appropriate) Date NC No. Signature Print Name
Satisfactory
Sub-Contractor Satisfactory after
Unsatisfactory (retest
Accepted
Kier Satisfactory after
Unsatisfactory (retest
Accepted
Gage Tupper Satisfactory after
Unsatisfactory (retest