You are on page 1of 64

Alcatel-Lucent GSM

9125 TC Installation Manual

BSC & TC Document


Installation & Dismantling Manual

3BK 17251 0001 RJZZA Ed.06


BLANK PAGE BREAK

Status RELEASED

Short title INS


All rights reserved. Passing on and copying of this document, use
and communication of its contents not permitted without written
authorization from Alcatel.

2 / 64 3BK 17251 0001 RJZZA Ed.06


Contents

Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.1.1 Hardware Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.1.2 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.1.3 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.1.4 Initial State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.1.5 Final State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.1.6 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.1.7 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.2.2 Site-Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.4 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1.4.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1.4.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
1.4.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
2 Install A9125 TC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2.1 Before Going On Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
2.2 Before You Start (On Arrival at the Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
2.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2.3 Install Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2.3.1 Prepare Floor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2.3.2 Rack Delivery and Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
2.3.3 Prepare Site Cable Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
2.3.4 Fix Rack to Floor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
2.4 Install Power Supply Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
2.4.1 Install Cables in Site Cable Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
2.4.2 Run Cables with Rack Top Entry (C1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
2.4.3 Run Cables with Rack Bottom Entry (C2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
2.4.4 Connect Earth Cable (GND) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
2.4.5 Connect DC 48 Volts Power Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
2.4.6 Test Power Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
2.5 Install JSTCIF Subrack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
2.5.1 Install JSTCIF Subrack in JRTC Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
2.5.2 Connect Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
2.5.3 Complete Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
2.6 Install PCM Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
2.6.1 Install Cables in Cable Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
2.6.2 Route Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
2.6.3 Connect to Back of Subracks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
2.6.4 Test PCM Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
2.7 Install X.21 Cables (O1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
2.8 Install STM1 Optical Fiber Cables (O3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
2.8.1 Install Cables in Cable Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
2.8.2 Route the Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
2.9 Install Ethernet Cables (O3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
2.10 Before You Leave . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63

3BK 17251 0001 RJZZA Ed.06 3 / 64


Contents

4 / 64 3BK 17251 0001 RJZZA Ed.06


Preface

Preface
Purpose This document describes how to Install on site an 9125 TC of the Alcatel-Lucent
BSS.

Whats New In Edition 06


The following sections were added:
Install STM1 Optical Fiber Cables (O3) (Section 2.8)

Install Ethernet Cables (O3) (Section 2.9)

Install JSTCIF Subrack (Section 2.5).


Update of system title.

In Edition 05
Update for document type, category, mnemonic and editorial review.

In Edition 04
Reference for Label and socket used for DDF was corrected.

In Edition 03
3BKA80CBR126263
- B8 - Product Platforms naming - The Product Platforms naming were changed according to the CR.

3BK 17251 0001 RJZZA Ed.06 5 / 64


Preface

Audience This document is intended for:


Installers

Site administrators

Supervisors

Project managers

Field service technicians


Occasional users (e.g., subcontractors).

Assumed Knowledge You must have a basic understanding of the following:

Basic knowledge of Alcatel BSS equipment

Experience of electrical mounting and cabling.

6 / 64 3BK 17251 0001 RJZZA Ed.06


1 Overview

1 Overview

This Overview gives information needed by project managers and foremen, for
presentation to the customer and for site planning.

3BK 17251 0001 RJZZA Ed.06 7 / 64


1 Overview

1.1 Presentation
1.1.1 Hardware Description
1.1.1.1 Rack Configuration
Cable Glands

DC Connection Box

Cable Glands

Figure 1: A9125 TC Rack (Front View)

8 / 64 3BK 17251 0001 RJZZA Ed.06


1 Overview

1.1.1.2 Weight and Dimensions

Width 600 mm
Depth 600 mm
Height (with 50 mm eyebolts for 2000 mm
craning)

Weight 250 kg (maximum configuration)

1.1.2 Cases
The following cases apply:

C1: The rack is installed on a concrete floor and the cable way arrives at
the top of the rack

C2: The rack is installed on a raised floor and the cable way arrives under
the rack.

C3: 75 Ohm PCM cables are installed

C4: 120 Ohm PCM cables are installed.

1.1.3 Options
The following options apply:

O1: Install earthquake frame on raised floor


O2: Install X.21 cables

O3: Install STM1 and Ethernet cables.

1.1.4 Initial State


The rack and installation kits are packed and delivered on site.

1.1.5 Final State


When installation is complete:

The rack is ready for commissioning

The rack is not powered up.

1.1.6 Restrictions
None.

3BK 17251 0001 RJZZA Ed.06 9 / 64


1 Overview

1.1.7 Grouped Task Sequence


The following figure shows the task sequence to install an A9125 TC.

Before Going On Site

Before You Start

Delivery

Install Racks (C1 or C2 + O1)

Install Power Supply Cables

Install JSTCIF subrack

Install PCM Cables


Install 75Ohm Cables (C3)
Install 120Ohm Cables (C4)

Install X.21 Cables (02)

Install STM1 Cables (03)

Install Ethernet Cables (03)

Before You Leave

10 / 64 3BK 17251 0001 RJZZA Ed.06


1 Overview

1.2 Preparation
1.2.1 Prerequisites
The following prerequisites must be fulfilled:

The site conforms to the safety rules of the General Wiring Handbook
The site is ready to receive the racks, according to SPP-43.

1.2.2 Site-Specific Information


The following site-specific information is required:

Site
Grounding plate location
Power supply cabinet location
Fuse breakers location in power box
2-wire or 3-wire power system
Precise rack location
Number of PCM cables to be installed
PCM terminal block location
Number of STM1 cables to be installed
Number of Ethernet cables to be installed
Number of alarms to be connected
Alarm terminal block location.

Rack
Door opening direction (left or right)
Rack fixing (wall, raised floor, steel construction, concrete foundation).

Kits : PCM cables impedance (120-ohm, 75-ohm).

3BK 17251 0001 RJZZA Ed.06 11 / 64


1 Overview

1.3 Scheduling

Time based on technical constraints


The number of resources shown in the table below does not take into account
individual customer or safety requirements.

Grouped Task Time/Task: Inst 1 Time/Task: Total


Inst 2 Time/Task

Before Going On Site 30 min. 30 min. 1h

Before You Start 30 min. 30 min. 1h

Delivery (*1) (*1) (*1)

Install Racks ( C1 or C2 + O1) 1h15 2h10 3h25

Install Power Supply Cables (20 meters) 1h40 - 1h40

Install JSTCIF subrack 20 min. 10 min. 30 min.

Install PCM Cables (*2) (time required depends on case and/or option)

120-ohm Cables (One Subrack) ( C3) 10h 10h 20h

75-ohm Cables (One Subrack) ( C4) 11h 11h 22h

Install X.21 Cables (One Subrack) ( O2) 1h40 - 1h40

Install STM1 optical fiber cables (O3) 15 min. 15 min. 30 min.

Install Ethernet cables (O3) 5 min. 5 min. 10 min.

Before You Leave 15 min. 15 min. 30 min.

Total (without Cases and Options) 4h10 4h25 8h35

Total (with Cases and Options) 15h50 - 16h50 14h25 - 15h25 30h15 - 31h15

Inst : Installer
(*1) : Transportation time to final location depending of the site
(*2) : Choose the right case to calculate the installation time

12 / 64 3BK 17251 0001 RJZZA Ed.06


1 Overview

1.4 Resources
Resources provides information about the tools, installation kits, supplies and
applicable documents required to install the A9125 TC.

1.4.1 Tools
1.4.1.1 Hardware Tools
The following table is used to check, at base, the availability of the necessary
tools.
Refer to the Tools Catalogue to check the contents.

Kit Name Reference Calibration

Basic kit tools OUT 001 No

Testing tool kit for PCM cables OUT 002 No

1.4.1.2 Installation Kits


The following table is used to check, on site, the mandatory or optional delivery
item kits.
The symbols used are :

mandatory kit
technical choice kit

customer option kit.

Mandatory Kits Mnemo Reference Qty

Basic kit JDTC 3BK 25283 AA 1

2 Mbits cables: - - -
120 ohm - 8 pairs - L907/8 (roll 100 m) CA120S8 3BK 08965 AA -
120 ohm - 8 pairs - L907/8 (roll 250 m) CA120S8 3BK 08965 AB -
75 ohm - 8 coax - FLEX3/8 (roll 100 m) CACOAX8 3BK 25241 AA -
75 ohm - 8 coax - FLEX3/8 (roll 250 m) CACOAX8 3BK 25241 AB -

Jumpers for DDF: - - -


120 ohm 1 pair (roll 100 m) CA120S 3BK 08941 AA -
120 ohm 1 pair (roll 250 m) CA120S 3BK 08941 AB -
75 ohm 1 coax FLEX3 (roll 100 m) CACOAX1 3BK 08939 AA -
75 ohm 1 coax (roll 250 m) CACOAX1 3BK 08939 AB -

3BK 17251 0001 RJZZA Ed.06 13 / 64


1 Overview

Mandatory Kits Mnemo Reference Qty

GND cable Yellow/Green - - -


For distance 0m < L < 20m: PC16YG1 3BK 08957 AA -

1 x 16 mm 2 (roll 100 m) PC16YG1 3BK 08957 AB -


- -
1 x 16 mm 2 (roll 250 m)
- -
For distance 20m < L < 40m:
PC35YG1D 3BK 08960 BA
1 x 35 mm2 (roll 100 m)

DC 48 Volts power cables PC16BL1D 3BK 08955 BA -


For distance 0m < L < 20m: PC16BL1 3BK 08955 BB -

-48V blue 1 x 16 mm2 (roll 100 m) PC16B1D 3BK 08956 BA -


PC16B1 3BK 08956 BB -
-48V blue 1 x 16 mm2 (roll 250 m)
PC35BL1D 3BK 08958 BA -
0V black 1 x 16 mm2 (roll 100 m)
PC35B1D 3BK 08959 BA -
0V black 1 x 16 mm2 (roll 250 m)
For distance 20m < L < 40m:

-48V blue 1 x 35 mm2 (roll 100 m)

0V black 1 x 35 mm2 (roll 100 m)

Mechanical part for 24 terminal blocks MP24 1AD 02843 0001 -

Label for 24 terminal blocks LAB 1AD 02853 0001 -

CAD terminal block 120/ 75 ohm JS10 1AD 06634 0011 -

Wall support for 4 x MP24 DDF 1AD 02846 0001 -

Vertical cable way JDTCO 3BK 25297 AA 1

Raised floor fixing JDTCFF 3BK 25341 AA 1

Earthquake kit for raised floor fixing JDSISM 3BK 25284 AA 1

X.21 cable JLX21 3BK 25285 AA -

Heat shrinking sheath for FLEX 3 75-ohm cables ST 75 1AC 00330 0002 120 per
subrack

STM1 IP Subrack - - 1

JSTCIF subrack JSTCIF 1

Set of cables for JSTCIF JLTCIF 1

Ethernet cables JLCAT6 2

STM1 cabling kit - - 1

SFP modules 8

14 / 64 3BK 17251 0001 RJZZA Ed.06


1 Overview

Mandatory Kits Mnemo Reference Qty

Optical Fiber Cable JLOPT6 3BK 28064 AA 3

STM1 board - - 2

JBTCIF board JBTCIF 3BK 27384 AA 1

Casket equiped for storage of extralength fibers 1AB 08579 0001 4/TC

LC connector duplex support 2xSTM1 LC for 1AB 08579 0002 1/casket


casket

1.4.1.3 Software Tools


None.
1.4.1.4 Forms
None.

1.4.2 Supplies
The Installer must supply these kits (not included in Alcatel kits).

Item Qty

Set of rubber sleeves for all cables 1

Wire terminal 8 mm for 16 mm 2 cable (lug) 4

Wire terminal 6 mm for 16 mm 2 cable (lug) 5

3BK 17251 0001 RJZZA Ed.06 15 / 64


1 Overview

1.4.3 Applicable Documents


The following table is used to check, at base, the availability of the necessary
documents.

Document Title Reference

Applicable Notification List (ITL-PRO) 3DF 00462 0004 AAAGA

Applicable Operation Instructions (IO) 3DF 00300 0004 UAZZA

General Wiring Handbook 3BK 17160 0001 RJZZA

Tools Catalogue for Field Activity 3BK 20458 0001 RJZZA

Site Premises Inspection Form (CEL) 8BL 00704 0015 DRBRA

Completion Check List (generic) 3BK 17200 0002 QZZZA

Specification for Site Preparation (SPP-43) 8BL 00704 0057 DRZZA

BSS Site Premises Inspection, Post Handover 8BL 00704 0016 DRBRA

Installation Method of DDF for BSS Equipment 3DF 00435 0033 RJZZA

16 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2 Install A9125 TC

Install A9125 TC presents all the checks needed before starting the installation
and all detailed tasks to be performed on site.

3BK 17251 0001 RJZZA Ed.06 17 / 64


2 Install A9125 TC

2.1 Before Going On Site


Before going on site, you must check that the following information and supplies
are available:

The customer has been informed of the:


Date
Time
Site name
Site address
Purpose of the operation

All Prerequisites (Section 1.2.1) are fulfilled

Personnel are available and ready for operation (refer to Scheduling


(Section 1.3)

Site-Specific Information (Section 1.2.2) is available and ready for operation

Hardware Tools (Section 1.4.1.1)are available and ready for operation

Installation Kits (Section 1.4.1.2) are available and ready for operation

Applicable Documents (Section 1.4.3) are available.

2.2 Before You Start (On Arrival at the Site)


2.2.1 Checks
Before you start, perform the following operations:

Check that all Prerequisites (Section 1.2.1) are fulfilled

Check applicable notifications and operating instructions (refer to the


Applicable Notifications List and Applicable Operation Instructions List)
Check the availability of all necessary tools, kits and supplies.

Check that the safety precautions have been taken in accordance with the
safety instructions described in the General Wiring Handbook

Check which Cases (Section 1.1.2) or Options (Section 1.1.3) apply


Complete the header field of the CCL. The CCL is completed as each
instruction is carried out.

Complete the Site Premises Inspection Form (CEL)


Check that the resistance of the anti-static wrist strap is greater than 1
Mohm and connect the anti-static wrist strap to the rack earth.

18 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.2.2 Required Knowledge


You must be familiar with the following:

The safety rules and precautions given in the General Wiring Handbook

How to document faults and anomalies as described in the General


Wiring Handbook

How to complete the Site Premise Inspection form

Grouped Task Sequence (Section 1.1.7).

2.3 Install Rack


There are two installation cases:

C1: The rack is installed on a concrete floor and the cable way arrives at
the top of the rack
C2: The rack is installed on a raised floor and the cable way arrives under
the rack.

2.3.1 Prepare Floor

To be compliant with EN 60950 rules, it is mandatory that the rack be fixed


to the floor (See the SPP).

Choose the installation case which fits your site:

C1: Fix to concrete floor

C2: Fix to raised floor.

3BK 17251 0001 RJZZA Ed.06 19 / 64


2 Install A9125 TC

2.3.1.1 Drill Concrete Floor (C1)

1 2

To drill the concrete floor:


1. Using the supplied template, mark the concrete foundation.
2. Drill holes in the concrete foundation 12 mm, h = 70 mm).

2.3.1.2 Drill Raised Floor (C2)

1234
1234
1234567890
123
1234
1234
1234
1234567890
123
1234
1234
1234
1234567890
123
1234

1
123456789
123456789012
123456789
123456789012
123456789
123456789012
123456789
1234567890122
To drill the raised floor:
1. Using the template, cut a rectangular hole in the tile to pass the cables.
2. Using the template:
Drill the tile 12 mm

Drill the floor 12 mm, h = 60 mm +/-3 mm.

20 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.3.2 Rack Delivery and Positioning

1 2

5
6

To position the rack:


1. With the crane, lift the packaging.
2. Lift using the eyebolts of the rack.
3. Transport the pallet.
4. Unpack the rack.
5. Remove the bottom cover plate of the rack.
6. At the top of the rack, remove the craning eyebolts.

3BK 17251 0001 RJZZA Ed.06 21 / 64


2 Install A9125 TC

2.3.3 Prepare Site Cable Way


Choose the appropriate case for your site:

C1: Concrete floor, top cable entry

C2: Raised floor, bottom cable entry.

2.3.3.1 Prepare Top Rack Entry of Cables (C1)

Nr Materials Reference Kit

1 Vertical cable way kit 3BK 25297 AAAA JDTCO

2 Edge protection 1AD 01782 0001 JDTC

1 2

4
3

To run the cables:


1. Cut a hole in the site cable way.
2. Cover the cut-out with edge protection (1AD 01782 0001).
3. Fix the support to the rack.
4. Fix the separating corner to the vertical cable way.
5. Fix the vertical cable way to the support at the top of the rack.
6. Fix the vertical cable way to the site cable way.

22 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.3.3.2 Prepare Bottom Rack Entry of Cables (C2)


There is no specific preparation of the cable way. Use the same rules for
cable separation.

2.3.4 Fix Rack to Floor


2.3.4.1 Fix to Concrete Floor (C1)

Nr Materials Reference Kit

1 Expanding plug for hole 12 mm 1AD 01166 0001 3BK 25283 AAAA
(JDTC)
2 Screws HM 8 x 65 mm 1AD 00215 0042

3 Washer 8 mm 1AD 00087 0149

To fix the rack to the concrete floor:


1. Level the rack.
2. Fix the rack to the concrete floor.

12345
12345
12345
1212
12345123451234
5 mm Levelling foot

Figure 2: Fixing to Concrete Floor

3BK 17251 0001 RJZZA Ed.06 23 / 64


2 Install A9125 TC

2.3.4.2 Fix to Raised Floor (C2)

Nr Materials Reference Kit

1 Screw 8 mm x 80 mm 1AD 00215 0092 3BK 25341 AA


(FKG3I)
2 Washer 8 mm 1AD 00087 0149
+
3 Frame of rack -
3BK 25283 AA
4 Raised floor support 3BK 08094 AA (FBFF)

5 Coupling nut 8 mm 1AD 01655 0001

6 Threaded rod 8 mm 1AD 01660 0003

7 Hexagon nut 8 mm 1AD 00197 0006

8 Washer 8 mm 1AD 00087 0149

9 Wall plug 8 mm for hole 12 mm 1AD 01666 0001

To fix the rack to the raised floor:


1. Put the expanding plug (9) in the concrete floor (See Figure 3).
2. Screw the threaded rod (6), then the washer (8) and nut (7).
3. Screw the coupling nut (5) as shown in the figure below.
4. Screw the screw (1) with the washer (2).

Note: In this case, do not level the rack.


123456
123456 1
123456
123456
123456
123456
2

123456
123456112123
3

123412345678
123456 12345678
123 1234
123412345678 123456781234
123412345678 123456781234
4

5 H
6
Length of 7
threaded rod
L = H 30 mm 8
112
1234
12
12
1223
1211211
11 1234
1 234
2
12
1223
12
1234
123123
1234
123123
9
123123 60

123123 ( O hole = 12 mm)

123123
123123
12345
Figure 3: Fixing to Raised Floor

24 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.3.4.3 Fix Earthquake Frame (O1)

This option can be installed only with a raised floor exactly 34 cm high from
the concrete ground.

1 4 3 2
5

10
7

Figure 4: Mechanical Assembling of Frame

Nr Materials Reference Kit

1 Pedestal 3BK 25339 AAAA 3BK 25284 AAAA


(JDSISM)
2 Bracket 3BK 25340 AAAA

3 Screw 16 x 40 1AD 00204 0059

4 Washer M16 1AD 00254 0006

5 Screw 8 x 35 1AD 00254 0038

6 Washer M8 1AD 00254 0003

7 Nut H8 1AD 00197 0006

8 Expanding wall plug 1AD 02655 0001

9 Washer M10 1AD 00453 0005

10 Screw 10 x 65 1AD 00050 0010

3BK 17251 0001 RJZZA Ed.06 25 / 64


2 Install A9125 TC

To fix the earthquake frame:


1. Assemble the earthquake frame using screw (3) and washer (4). (Refer
to Figure 4 above)
2. Using the earthquake frame, mark the concrete ground.
3. Drill the ground and fit the wall plug (8) (Refer to Figure 5 below.)
4. Fix the earthquake frame using washer (9) and screw (10)
5. Fix the rack to the frame using (5) (6) and (7).

1234567
6. Cut and fit the tiles around the earthquake frame.

1234567
1234567
5

1234567
A9125 TC

1234567
1234567 6
1234567
1234567
12 12
Tile

12345 1234567
12345671234
123456712 12
1234
12345
1234567
12345
1234567
7
Earthquake
Frame
340 mm

10
9
12 12
11
1234
1 2
1123
21
2 1234
1
11234
2
123
1
12
12
23
2
1234 1234
1234
123 12
1234
8 123
123 12
12
123 12
123
1234
123412
Figure 5: Fixing Method (Raised Floor at Same Level as Earthquake Frame)

26 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.4 Install Power Supply Cables


Use the procedures described below to:
Install protective earth and power cables in the site cable way (for both C1
and C2)

Connect the protective earth cable

Connect the DC 48 Volts power cables

Before making any electrical connections to the rack, ensure that the safety
instructions are followed.
It is essential that :

The electrical power supply is disconnected. Make sure that all breakers or
fuses devoted to the new rack in the site connection box are switched OFF

The protective EARTH (GND) must be connected to the equipment before


DC power cable connection. The Earth must be first connected at the site
side and secondly at the rack side.

2.4.1 Install Cables in Site Cable Way

1 2

1m

3 4

To install the cables in the cable way:


1. Install the yellow/green cable in the power compartment of the cable way.
2. Install the DC 48V power cables in the power compartment of the cable way
(BAT A - BAT B and BAT RET cables).
3. Attach the cables with plastic tie wraps.
4. Cut the cables to a good length.

3BK 17251 0001 RJZZA Ed.06 27 / 64


2 Install A9125 TC

2.4.2 Run Cables with Rack Top Entry (C1)

200 mm braid

Figure 6: General View : Outlet of Power Cables

The following figure shows the 2-wire system.


BAT A
BAT B
BAT RET
GND

BRAID
Figure 7: 200 mm Braid Connection

To run the cables:


1. Fix the 200 mm braid to the cable way (mechanical ground) (refer to
Figure 6).
2. Fix the earth braid to the specific stud of the rack (refer to Figure 7).

28 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.4.3 Run Cables with Rack Bottom Entry (C2)


The following figure shows the metallic sheath passing on the top left rear of
the rack.

Figure 8: Bottom Entry of Cables

3BK 17251 0001 RJZZA Ed.06 29 / 64


2 Install A9125 TC

In the following figure, the cables are attached at the left rear.

123
123

1
1
1
1
1

Figure 9: Power Cables Inside the Rack

30 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

123
123
123
123
123
123

Figure 10: Metallic Sheath is Fixed to the Raised Floor Cable Way

FRONT OF RACK

12345678901234567890123456789012123456
12345678901234567890123456789012123456
123456789012345678901234567890121
123456789012345678901234567890121
123456789012345678901234567890121
PCM PCM

123456789012345678901234567890121
POWER SUPPLY

123456789012345678901234567890121
12345678901234567890123456789012123456
123456789012345678901234567890121
123456789012345678901234567890121
123456789012345678901234567890121
PCM X21 PCM

123456789012345678901234567890121
123456789012345678901234567890121
12345678901234567890123456789012123456
123456789012345678901234567890121
12345678901234567890123456789012123456
123456789012345678901234567890121
123456789012345678901234567890121
PCM X21 X21

123456789012345678901234567890121
123456789012345678901234567890121
12345678901234567890123456789012123456
123456789012345678901234567890121
12345678901234567890123456789012123456
123456789012345678901234567890121
123456789012345678901234567890121
123456789012345678901234567890121
123456789012345678901234567890121
123456789012345678901234567890121
12345678901234567890123456789012123456

REAR OF RACK
Figure 11: Position in Cable Glands

To run the cables:


1. Pass the three power cables and the GND cable in the metallic sheath.
2. Remove the bottom and the top cable gland of the rack.
3. Pass the metallic sheath in the first row as shown in Figure 9.
4. Cut the metallic sheath and fit a lug.
5. Screw the metallic sheath to the dedicated stud of the rack.
6. Screw the metallic sheath to the site cable way under the tiles.

3BK 17251 0001 RJZZA Ed.06 31 / 64


2 Install A9125 TC

The following picture shows the metallic sheath and the PCM passing on the
left rear of the rack.

Figure 12: Bottom of Rack

32 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.4.4 Connect Earth Cable (GND)

Check if the equipment has to be connected in 3-wire or 2-wire power system.


If requested by the customer, it must be changed on site (see figures below).
Remark : The site extremity of the GND cable has to be labeled (example:
A9125 TC N 4).

Nr Materials Reference Kit

1 90 bent lugs Depends on the diameter of the cables Basic kit 3BK 25283 AAAA
(JDTC)

2 Tie wraps - Consumable supplies

3 Labels -

Rack side

Site side
1 2

BAT A BAT A
BAT B BAT B

BAT RET BAT RET

Black

Electrical GND
Bracket 200 mm braid (yellow/green)
or
metallic sheath
200 mm braid
or 4
3 metallic sheath

To connect the earth cable:


1. Crimp an adapted lug at the site side, then a 90 6 lug at the rack side
of the GND yellow / green cable.
2. Before connecting to the rack, connect the yellow / green GND cable to
the site earth plate.
3. For a 2-wire system, the bracket is connected between the GND and BAT.
RET
The BAT. RET black cable replaces the yellow / green cable.
4. For a 3-wire system, the bracket is removed and attached to the frame of
rack with a tie wrap.
The yellow / green cable is installed.

3BK 17251 0001 RJZZA Ed.06 33 / 64


2 Install A9125 TC

2.4.5 Connect DC 48 Volts Power Cables

Nr Materials Reference Kit

1 Labels 3BK 07695 AAAA Basic kit 3BK 25283 AAAA


(JDTC)
2 90 bent lugs Depends on the diameter of the cables

3 Tie wraps - Consumable supplies

Rack side
sleeve
BAT A
BAT B
BATRET

GND

12
12
12
12
12 12345678901
12 12345678901
12345678901234567890
12 12345678901234567890
12 12345678901234567890
12345678901234567890
Bracket
12345678901234567890
3 4

To install the power cables:


1. Crimp a 90 bent 6 lug at the rack side for each power cable.
2. Fit the sleeves and connect the power cables (the example shown is
a 3-wire system).
3. Screw the lugs as shown in the screwing detail of a 2-wire bracket (removed
in 3-wire system).
4. Fix the cables to the rack with a tie wrap.
5. Close the connection box.

34 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

T
RE
T
BA T
A
B
BA T
BA

Figure 13: Crimp an Adapted Lug at Site Side and Connect the Cables to
Site Fuse Breakers

6
(b lue)
BAT A BAT A

6
(b lue)
BAT B BAT B

6
(black)
BAT RET BAT RET

Figure 14: Label the Power Cables

At Rack Side 1. Connect the black cable to the BAT RET stud.
2. Connect the two blue cables -48 Volts to the BAT A and BAT B studs.

At Site Side 1. Connect the black cable to the 0 volt.


2. Connect the two blue cables to -48 volts.
3. Label the two extremities of each cable.

3BK 17251 0001 RJZZA Ed.06 35 / 64


2 Install A9125 TC

2.4.6 Test Power Supply

0V 48V 48V
1 2

0V 48V 48V 3 4

V V

0V 48V 48V 5 0V 48V 48V 6

To test the power supply:


1. At the site power cabinet, check that the DC 48 volts fuse breakers are
switched OFF (BAT A and BAT B).
2. At the rack side, on the connection box, with an ohmmeter, test that there
is no short circuit between -48 volts (BAT A or BAT B) and 0 volt (BAT RET).
3. At the rack side, do the same test between both -48V cables.
4. At the site power cabinet, switch ON the DC 48 volts fuse breakers
(BAT A and BAT B).
5. At the rack side, measure if 48 V is present on BAT A and verify the
correct polarity.
6. At the rack side, measure if 48 V is present on BAT B and verify the
correct polarity.
7. At the site power cabinet, switch OFF the site fuse breakers.

36 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.5 Install JSTCIF Subrack


2.5.1 Install JSTCIF Subrack in JRTC Rack
To install the JSTCIF subrack:
1. Unpack the JSTCIF subrack
2. Check that the subrack is not damaged
3. Fit the subrack in the TC rack at 3U under the lower JCTC subrack.

Figure 15: JSTCIF Subrack Position

Help: 1U = 44.45 mm
4. Install the cage nuts on the fixation rails.
5. Secure the subrack with the provided screws and washers.

3BK 17251 0001 RJZZA Ed.06 37 / 64


2 Install A9125 TC

2.5.2 Connect Cables


To connect the cables:
1. Identify the two ALBAC power cables
2. At rear side of JSTRU remove the plug from position A5 and B5.
3. At rack rear side, connect first ALBAC cable between the A5 position on
JSTRU rear side and top T connector on JSTCIF backplane rear side
4. At rack rear side, connect second ALBAC cable between the B5 position
on JSTRU rear side and bottom T connector on JSTCIF backplane rear
side. See Figure 16.

"T" Power
Connectors

Ethernet
Connectors

Figure 16: JSTCIF Power and Ethernet Connectors

5. Identify the HSI cables


6. At rack rear side, connect the HSI cables as given in the following table.
Three HSI cables must be connected between each JSTC subrack and the
JSTCIF subrack.

Cable From... To JSTCIF...

JSTC No. Position Row Column

1AB 06054 0041 1 Left 1 1

Middle 2 1

Right 3 1

1AB 06054 0039 2 Left 1 2

Middle 2 2

Right 3 2

3 Left 1 3

Middle 2 3

Right 3 3

1AB 06054 0038 4 Left 1 4

Middle 2 4

Right 3 4

38 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

Column 1

Row 1

Figure 17: JSTC Backpanel HSI Connectors

7. Connect the two Ethernet JLCAT6 cables to the Ethernet connectors on


the JSTCIF backpanel. See Figure 16. One cable must be connected to
the upper position corresponding the JBTCIF 0, the second one must be
connected to the lower position corresponding the JBTCIF 1.

2.5.3 Complete Installation


To complete the installation:
1. Insert the JBTCIF boards in the slots in JSTCIF subrack.
2. Insert the SFP modules in the slots in JBTCIF boards.
3. Connect the optical fiber cables to the SFP modules.

Figure 18: SFP Modules on JBTCIF

3BK 17251 0001 RJZZA Ed.06 39 / 64


2 Install A9125 TC

2.6 Install PCM Cables


These procedures cover installing 75-Ohm PCM cables ( C3) and 120-Ohm
PCM cables ( C4).

2.6.1 Install Cables in Cable Way

Refer to Site-Specific Information (Section 1.2.2) for the number of PCM


cables to install.

Nr Materials Reference Kit

1 Tie wraps - Consumable supplies

1m

1 2

3 4

To install the cables in the cable way:


1. Install the cables in the PCM compartment of the cable tray.
2. Attach the cables with plastic tie wraps.
3. Mark the cables with a marker.
4. Cut the cables to a good length.

40 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.6.2 Route Cables


The routing of the 120-Ohm and 75-Ohm cables at the back of the rack
depends on which of the following cases apply:

C1: The equipment is installed on a concrete floor and the cables run by
the top entry of the rack.

C2: The equipment is installed on a raised floor and the cables run by the
bottom entry of the rack.

2.6.2.1 Route Cables by Top Entry of Rack (C1)

Figure 19: Top Rack Cables Entry General View

3BK 17251 0001 RJZZA Ed.06 41 / 64


2 Install A9125 TC

Figure 20: Routing of Cables (Rear View)

42 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

Subrack 1

Subrack 2

FRONT REAR
Subrack 3

Subrack 4

Figure 21: Routing of Cables (Side View)

3BK 17251 0001 RJZZA Ed.06 43 / 64


2 Install A9125 TC

2.6.2.2 Route Cables by Bottom Entry of Rack (C2)

1234567
123 1234
1234
1234567
123 1234
1234
1234567
123 1234
1234

Figure 22: Routing of Cables (Rear View)

44 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

Subrack 1

Subrack 2

FRONT REAR
Subrack 3

Subrack 4

12345
123456789
123
12
12 12345
123
12345
123456789
123 12345
123

Figure 23: Routing of Cables (Side View)

3BK 17251 0001 RJZZA Ed.06 45 / 64


2 Install A9125 TC

2.6.2.3 Install EMI Cable Gland (C3, C4)

50 mm 20 mm

50 mm 20 mm

Figure 24: Preparing 75 - Ohm Cable (C3)

50 mm

Figure 25: Preparing 120 - Ohm Cable (C4)

46 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

Cable

Tie wrap Opening for


with braid tie wrap fixing

12 12
12345 1 12312 123
12 123
123
12345
12345
123
1212
12
123
12123
123
123123
12
123
123 123
123
123
12345
123
123451212
123
12123
123
12
123
123
123
123
12345678901234567890123
123
1212
123
12123
123
12
123
123
123
123

Figure 26: Passing Cable Gland Cable (75 - Ohm Cable Example)

To pass the cables:


1. Remove screws (2) and screws (3).
2. Remove the first cable gland.
3. Remove the spacings (4).

3BK 17251 0001 RJZZA Ed.06 47 / 64


2 Install A9125 TC

4. Repeat steps 1 to 3 for the all cable glands (refer to Figure 27, below).

Figure 27: Pass the Cables

Remark : The head of screw (2) is 5.5 mm Hexagon.


FRONT OF RACK

123456789012345678901234567890121234
123456789012345678901234567890121234
12345678901234567890123456789012
12345678901234567890123456789012
12345678901234567890123456789012
PCM PCM

12345678901234567890123456789012
POWER SUPPLY

123456789012345678901234567890121234
12345678901234567890123456789012
123456789012345678901234567890121234
12345678901234567890123456789012
12345678901234567890123456789012
12345678901234567890123456789012
PCM X21

12345678901234567890123456789012
12345678901234567890123456789012
123456789012345678901234567890121234
12345678901234567890123456789012
12345678901234567890123456789012
12345678901234567890123456789012
12345678901234567890123456789012
12345678901234567890123456789012
123456789012345678901234567890121234
12345678901234567890123456789012
12345678901234567890123456789012
12345678901234567890123456789012
12345678901234567890123456789012
12345678901234567890123456789012
123456789012345678901234567890121234
12345678901234567890123456789012
REAR OF RACK
Figure 28: Example : Case With Only the First Subrack

48 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.6.3 Connect to Back of Subracks


Twelfth MT 120 of subrack
(number 12) First MT 120 of subrack
(number 1)

12 10 7 8 6 1 4 2

11 9 12 7 5 6 3 1

Ater Ater
Mux Mux
boards 7 to 12 boards 1 to 6

A A
boards 9 & 10 boards 3 & 4
A
boards 7 & 8
A A A
boards 11 & 12 boards 5 & 6 boards 1 & 2

Figure 29: Rear View For One Subrack

Remark : The MT 120 board is also called JBMTE2.

RX TX
1 Interface A1

2 Interface A2 (for MT120 N 24681012


of each subrack)
3 Interface A3
4 Interface A4

5 Interface A1

6 Interface A2 (for MT120 N 1357911


of each subrack)
7 Interface A3

8 Interface A4

Figure 30: A Interface Connector

3BK 17251 0001 RJZZA Ed.06 49 / 64


2 Install A9125 TC

RX TX
1 Interface Ater MUX 1

2 Interface Ater MUX 2

3 Interface Ater MUX 3

4 Interface Ater MUX 4

5 Interface Ater MUX 5

6 Interface Ater MUX 6

7 Not used

8 Not used

Figure 31: Ater Mux Connector

2.6.3.1 Connect L907 Multipair Cables (C3)


RX TX

12
12
1
2
1
1
12
123
12 3 1
12
1
12
123
12
123
4 1
12
11
12
1
12
123
12
123
5
6
1
12
11
12
1
12
123
12
123 7 1
12
12
11
12
1
12
123
12
123
8 12
11
12
12
11
12
1
12
123
12
123 1
12
11
12
12
11
12
1
12
123
12
123 1
12
11
12
12
11
12
1
RX
123
123 1
12
11
12
11
12
123
12
1
TX 12
123
123
Figure 32: A Interface

RX TX
1
12
12 2 12
12
12
12 3 1
12
12
1
Ater Positions 12
12
123
4 12
1
12
12
1
7 and 8 not 123
12 12
12
1
5
12
123 12
12
1
connected 123
12 1
12
12
1
6
12
123
12
123 7 1
12
112
1
12
12
1
12
123
12
123
8 1
12
112
1
12
12
1
12
123
12
123 1
12
112
1
12
12
1
12
123
12
123 1
12
112
1
12
12
1
RX 12
123
123 1
12
1212
1
123
1
12
12
1
TX 12
1234
123
1
1212
1
1234
123
1234
123
Figure 33: Ater Mux Interface

50 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

L907 Cable (120 ohms) Interface A Interface A


Connector Mux Connector
Position Position

Quad 1 Pair 1 White 5 1


Grey

Pair 2 Blue 6 2
Purple

Quad 2 Pair 3 Yellow 7 3


Grey

Pair 4 Brown 8 4
Violet

Quad 3 Pair 5 Black 1 5


Grey

Pair 6 Red 2 6
Purple

Quad 4 Pair 7 Green 3 Not connected


Grey

Pair 8 White 4 Not connected


Purple

3BK 17251 0001 RJZZA Ed.06 51 / 64


2 Install A9125 TC

Figure 34: Cable Connection at the Back of the Rack

1
12
12
12 2
121
121
121
12 3
121
12
121
12
121
12 4
121
121
121
121
Figure 35: 120 - Ohm L907 Cable Detail

52 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

IMPORTANT

Figure 36: End of Wire in One Hand and Tool in the Other Hand

1. Prepare the head of the cables.


2. Using a KRONE insertion tool, insert the pairs into the connectors. (To
avoid a short circuit with the little cut wire, hold the end of wire in one
hand.) (Refer to the above figure.)
3. Attach the cables to the rack.
4. Label the cables near the connectors.

2.6.3.2 Connect FLEX3 75 - Ohm Multipair Cable (C4)

Drain
GND
Core 1
GND
2
GND
3

Figure 37: Connecting 75 - Ohm FLEX 3 Cables

3BK 17251 0001 RJZZA Ed.06 53 / 64


2 Install A9125 TC

50 mm

1 123456

10 mm

2 123
123
Shrink sleeve
reference 1AC 00330 0002

3 123
123
Figure 38: Preparing 75 - Ohm Head Cable

Remark:
Do not bare the core wire

Use the supplied ST 75 heat shrinking sheath.

FLEX 3 Cable (75 Ohms) Interface A Connector Position Interface A Mux Connector
Position

Coax 1 5 1

Coax 2 6 2

Coax 3 7 3

Coax 4 8 4

Coax 5 1 5

Coax 6 2 6

Coax 7 3 Not connected

Coax 8 4 Not connected

1. Using a KRONE insertion tool, insert the pairs into the connectors. (To
avoid a short circuit with the little cut wire, hold the end of the wire in
one hand.) (Refer to Figure 36.)
2. Attach the cables.
3. Label the cables near the connectors.

54 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.6.4 Test PCM Cables

For 75-ohm cables, each coaxial must be considered as a pair.

1. Begin with the cables of the first MT120 board (equipped or not).
2. Extract the MT120 a little from the subrack.
3. At the DDF, identify the terminal blocks to which the cable is connected.

1 2 3 4 5 6 7 8
16
15
14 12
13 11
10
9 7 8
6 4
5 3
2
1

Figure 39: Testing Tool Kit From Alcatel ( Reference 3BK 25832 AAAA )

The Alcatel Testing Tool Kit contains: Injecting box + control box + A9125
interface cable + user manual n 3BK 25832 ADAA.
4. Using the Alcatel PCM testing tool kit, verify the cabling according to the
Installation Method of DDF for BSS Equipment (Reference 3DF 00435
0033 RJZZA).

Wire colors and wire connections are indicated in this document.

5. After testing the cables of the first MT120 board, test the rest of the cables.

3BK 17251 0001 RJZZA Ed.06 55 / 64


2 Install A9125 TC

2.7 Install X.21 Cables (O1)


Use this procedure to fit the X.21 cables at the rear of the rack.

Nr Materials Reference Kit

1 Labels X.21 - Basic kit 3BK 25283 AAAA


(JDTC)

2 X.21 Cable 3BK 25285 AAAA -


(JLX21)

12
12
12
12

12345123 123123
12345123 123123

Figure 40: Example of X.21 Cable With Raised Floor

To connect the X.21 cables:


1. Refer to the Site-Specific Information (Section 1.2.2) for the quantity and
cabling of X.21 cables.
2. With a marker, mark the cables (X01, X02, ...).
3. Remove 5 cm of skin at cable gland level.
4. Pass the cables in the cable gland the same way as for PCM cables.
5. Attach the cable as shown in the figure above.
6. If the connecting position is unknown, do not connect the cables.
7. Label the cables at each extremity, near the connectors.

56 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.8 Install STM1 Optical Fiber Cables (O3)

This task must be performed only if the STM1 option was selected at TC side.

2.8.1 Install Cables in Cable Way


Refer to Site-Specific Information (Section 1.2.2) for the number of STM1
cables to install.

Nr Materials Reference Kit

1 Tie wraps - Consumable supplies

1m

1 2

To install the cables in the cable way:


1. Install the cables in the STM1 compartment of the cable tray.
2. Attach the cables with plastic tie wraps.
3. Mark the cables with a marker.

3BK 17251 0001 RJZZA Ed.06 57 / 64


2 Install A9125 TC

2.8.2 Route the Cables


2.8.2.1 Route the Cables by Top Entry of Rack (C1)
To run the cables from the top of rack:
1. Run the cables at top rack entry

Figure 41: Cables at Rack Top Entry

58 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2. Run the cables at the back of the rack up to the JSTCIF subrack. The STM1
optical fiber cables must reach the front side of the JSTCIF subrack.

JSTC 1

JSTC 2

JSTC 3
FRONT REAR

JSTC 4

JSTCIF

Figure 42: Cables Routing Top Entry - Side View

3BK 17251 0001 RJZZA Ed.06 59 / 64


2 Install A9125 TC

Figure 43: Cables Routing Top Entry - Rear View

60 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.8.2.2 Route the Cables by Bottom Entry of Rack (C2)


1. Run the cables at bottom rack entry
2. Run the cables at the back of the rack up to the JSTCIF subrack. The STM1
optical fiber cables must reach the front side of the JSTCIF subrack.

1234567
123 1234
1234
1234567
123
1234567
123 1234
1234
1234
1234

Figure 44: Cables Routing Bottom Entry - Rear View

3BK 17251 0001 RJZZA Ed.06 61 / 64


2 Install A9125 TC

JSTC 1

JSTC 2

JSTC 3
FRONT REAR

JSTC 4

JSTCIF

12345
123456789
123
12
12 12345
123
12345
123456789
123 12345
123

Figure 45: Cables Routing Bottom Entry - Side View

2.9 Install Ethernet Cables (O3)

This task must be performed only if the STM1 option was selected at TC side.

Install the Ethernet cables as described in Install STM1 Optical Fiber Cables
(O3) (Section 2.8). The Ethernet cables must reach the rear side of the
JSTCIF subrack.
Refer to Site-Specific Information (Section 1.2.2) for the number of Ethernet
cables to install.

62 / 64 3BK 17251 0001 RJZZA Ed.06


2 Install A9125 TC

2.10 Before You Leave


1. Fit the bottom cover plate of the rack.

2. Close the doors.

3. Fit the labels to the rack (example A9125 TC n12)


4. Clear away packaging.
5. Leave the rack key to the door.
6. Clean the site. Do not put packages in the customer bin.

7. Leave the site tidy.

3BK 17251 0001 RJZZA Ed.06 63 / 64