25MW PV Grid-Connected
Inverter Installation Manual
3.1 Diagram of the mounting hole sites at the inverter bottom .................. 5
system................................................................................... 36
11 Contact us .................................................................................................... 45
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
personnel of the inverter, and the installer and operator need to have certain
professional knowledge about electric and mechanism, and be familiar with the
product. The product purchased by the user shall prevail, and the user can
obtain a copy of the latest version of the manual through the sales channel.
user's personal and property safety when using the product, as well as the
efficient use of the product. Please read the following symbols explanation
carefully prior to using the product, to better make use of this manual.
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Warning!
Note!
Note provides tips that are valuable for the optimal installation
Electric shock hazard indicates that the part has the electric
shock hazard and may cause danger to users safety; and do not
touch!
Grounding!
Warning!
electric shock.
2
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
2 Safety instructions
Warning!
instructions carefully.
make sure to cut off all the switches inside the inverter.
Do not expose the inverter to rain, snow and frost, fog, oil and dust, etc.
The location to install the inverter should be kept in good ventilation; and
the air inlet should be not obstructed, in order to ensure that the control
Do not reversely connect the input positive (+) and negative (-) electrodes
electric shocks.
This inverter should keep off fire, and can be installed neither in
flammable materials.
Due to the relatively-larger current when the system is at work, all wiring
Do not touch any live parts of the inverter, do not connect or disconnect
Without the external power input, a high voltage may exist inside the
4
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
3 Inverter introductions
Figure 3-1 Diagram of the mounting hole sites at the inverter bottom
Note!
mm.
5
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
bAC-side terminals
6
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
PV array input positive This cooper bar is the output positive electrode
2
electrode (+) used to connect the PV array.
PV array input negative This cooper bar is the output negative electrode
3
electrode (-) used to connect the PV array.
Surge protection This surge protector is used for preventing the surge
side
AC output circuit inverter output end and grid, and is used for
5
breaker connecting or disconnecting the inverter and grid at
Surge protection This surge protector is used for preventing the surge
output side
7
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
4 Installation requirements
dusty places;
Due to the noise generated during the running process, the inverter should
inverter and the wall, and ensure good ventilation and heat dissipation
indoors;
The inverter should be easy for the personnel to operate and maintain after
the installation;
(25C~+60C);
The inverter should be provided with a certain seismic capacity after the
installation.
8
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
The inverter needs to be installed in the control room, and the ground,
space, cable trunk, air duct, ventilation and various protective measures are
required to be designed in a strict way and meet the requirements in table 4-1.
Items Requirements
Inclination of the ground 1 ;
0.4g,
Seismic capacity is greater than 8 level: horizontal
Installation site vertical 0.2g;
Be installed vertically on the solid base indoors, and the
cooling medium is the air.
Ambient -25C ~+60C (the air temperature change is less than
Working conditions
temperature 0.5C/min)
0%~95% (no condensation generated due to temperature
Relative humidity
changes)
Other climatic No ice, rain, snow, hail, etc., air pressure of 70~106kPa
conditions
Sand: <30mg/m3
Dust (floating): <0.2mg/m3
Dust and solid
Dust (deposition): <1.5mg/(m2h)
particle contents
The dust indoor is roughly comparable to that in the
atmosphere.
Note:
1. The dust prevention requirements specified in the environmental conditions should be
satisfied.
2. After the external cables (grounding wires, the main circuit cables and control signal
wires) are drawn into the inverter to connect, the drawing hole must be enclosed
completely with fire clays.
3. In the case of the installation of exhaust pipes, the exhaust pipes should be of
waterproof and ratproof, etc.
4. The filter net should be installed at the air inlet indoor.
9
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
1mm/1000 mm;
1mm/1000 mm;
The height difference between the front and rear bases should be
The inverter is required to be connected with the base by M12 bolts or the
welding manner, and the space between points welding cannot be more than
inverter with the outside should go along the cable trenches according to the
cables and other cables related to the project should all go along the cable
10
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
When laying the cables, the communication, control and power cables
separately too, in favor of the installation and maintenance, and reducing the
lines.
figure 4-1:
Ceiling
Min650
Air outlet
Extermal
Front air flue
Min1000 10001200
110-120mm 80-90mm
11
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
heat-dissipating method is used for the whole machine, and the specific
Note!
Air outlet
Air inlet
12
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Min650
Air outlet
Extermal
Front air flue
Min1000 10001200
80-90mm 80-90mm
Ventilation environment
a. The air duct should be avoided being installed at the places of poor
ventilation;
b. The air flow should be ensured to be smooth at the air inlet, and the
effective inlet air rate cannot be less than 7000m3/h, while the
c. The air inlet should be provided with the functions of sand and dust
prevention.
The cables used in the system can generally be divided into power, control
When laying the communication cables, the cables need to stay away
from the power cables, and the cables at the intersection need to maintain
as possible, and they should be kept a certain distance away from the
power cables.
separate cable trenches, in order to avoid the power and other cables being
14
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
leading wire, 90 degrees of the crossing angle should be used and the
recommended between the paralleled shielded data and power cables, and
Paralleling lengths
Minimum space distances (m)
(m)
200 0.3
300 0.5
500 1.2
Note: The data line should be as close to the earth surface or support laid-out wires such as
15
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
5 Installation procedures
connections
Mechanical
installation
Saling-up
Electrical
Check
Start
End
Figure 5-1 Installation procedures
16
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
17
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
7 Mechanical installations
Remove four side plates and one top plate of the wooden packing case;
First, move the inverter to the fixing location, and use the bolts (M12) or
After the inverter is installed and fixed, the inverter air duct should be
installed, which discharges the heat from the inverter via the way of
exchanging the cold and hot air in order to ensure that the internal temperature
18
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Note!
Fix the inverter at the installation location, so that the air outlet of the
inverter faces the air outlet position of the equipment room, and ensure a
19
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Drill the holes on the walls of the equipment room and embed rivet bolts
20
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Install the air duct bracket, air duct, hose and elbow
The air duct is connected with the inverter, the hose connects between the
air duct and the wall, and the bend is installed on the wall outside the air outlet
of the equipment room, the installation effects are as shown in the figure
below:
Cabinet
Bend Hose
Wall
Hose
Bend Inverter
Hose
Hose
Bend Inverter
Hose
21
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
8 Electrical connections
Warning!
product.
Warning!
installation standards.
Warning!
22
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
PV array
Three-phase grid
The inverter will detect whether the grid meets the grid-connected
The leading wires of the same size and type should be selected for the
23
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Cable size
Cables Terminal requirements
requirements (mm2)
M6 4.8 6
M8 4.8 14
M10 4.8 30
5/16-18UNC 4.8 20
24
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Warning!
Warning!
Note!
25
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Use the multimeter to confirm the positive and negative electrodes of the
PV array, and connect the PV+ and PV- cables of the PV array to the
cooper bars of the DC input PV+ and PV- of the inverter (if the PV array
has two groups of input, the PV+ and PV- cables of each group of PV
The cables used for the DC input are cooper wire cables of 300mm2,
The positive and negative electrode cables of the PV array are fixed to the
Select M16x45 boltsand for the tightening torques, refer to Table 8-3.
Note
insulation fault.
26
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
The AC-side output voltage of the inverter is 380Vac, and the voltage can
27
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Warning!
same time, the operator must get the permissions from the
confirmation);
cooper wire cables of 300mm2, and SC300-16 wiring cooper pig tails are
recommended to use;
the M16*45 bolts to connect the wiring cooper pig tails to the AC wiring
cooper bars by pressing, and then use the wrench to fasten the bolts, and
28
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Note!
cooper pig tail and cooper bar, if any parts are stuck,
Note!
be kept.
phase sequence.
29
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Six wiring holes are reserved at each phase at the AC-side for the user,
and each mounting hole can be connected with one cable of < 400mm2.
Warning!
personal safety.
The grounding cooper bars inside the inverter have been connected with
30
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
the inverter enclosure in a reliable way, so the user just needs to connect the
grounding cooper bars at the DC-side and AC-side, with the equipotential
devices at the installation site or electrical control room, and the contact must
be favorable, and the diameter of the cables used as the grounding wire should
be not less than 16mm2 and the grounding resistance should not exceed 0.1.
The inverter RS485 interface is located below the AC cabinet. Use the
twin-twisted shielded cable to draw out the communication cable from the
background monitoring system directly (if the user has the protocol
After connecting the shielding layer of the shielded cable, use the single
The terminals marked with 1 and 2 are of the external power input
AC220V;
The terminals marked with A and B are A and B terminals of the RS485.
32
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Background 485A
3
signal
Background 485B Input/ 485 twin-twisted
4 Communication output
signal output shielded cable
Background 485G
5
signal
Access control
6
switch signal 1 Dedicated for the
Input /
Access control equipment room
7
switch signal 2
Isolating
8 transformer
temperature PTA method single inverter,
Isolating with isolating
Typical
9 transformer transformer, connect
Input specifications
temperature PTB with the temperature
RVV30.5
PTB sensor of the
Isolating transformer
10
transformer
temperature PTB
Connect with
Equipment room Typical
equipment room
11 environment Input specifications
temperature sensor,
temperature PTA RVV30.5
signal + termina
33
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Position Cable
Name Type Function
No. requirements
Connect with
Equipment room
equipment room
12 environment
temperature sensor,
temperature PTB
signal + terminal
Connect with
Equipment room
equipment room
13 environment
temperature sensor,
temperature PTB
signal + terminal
Grid-connected Dry contact output,
14 Typical
output node signal 1 feedback the signal of
output specifications
Grid-connected whether grid-connected
15 RVV20.5
output node signal 2 or not to the monitor
Transformer Typical
16
cooling fan L specifications
output Reserved
Transformer RVV20.75
17
cooling fan N
Smoke detector
18 Dedicated for the Typical
signal 1
Input integrated equipment specifications
Smoke detector
19 room RVV20.5
signal 2
34
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
into crystalline silicon cell module and thin-film cell module according to the
material.
Due to the influences of the thin-film cell module's own structure and
sealing material, the cell body corrosion often occurs during use. To slow down
the corrosion of the thin-film cell module, the DC input negative electrode of
the inverter matching with the thin-film cell module should be grounded in the
actual application.
Figure 8-5 System of grid-connected inverter matching with thin-film cell module
35
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
whole circuit from the inverter's output side to the step-up transformer's low
voltage side, the device connected with the ground will withstand the peak
value sum of the inverter input DC bus voltage and the inverter output phase
voltage value of the device when selecting the type of device in the circuit.
Therefore, for the transformer connected with the inverter AC output side,
if the low voltage side of the transformer is provided with a surge protector, the
maximum withstand voltage value of the surge protector must be greater than
the peak value sum of the inverter's maximum DC input voltage and maximum
36
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
9 Installation check
Check the installation of the inverter before it is put into use, pay
Note!
After the check over the installation, conduct the power-on test
The inverter is transported as a whole, the user can use the forklift to lift
the inverter at the bottom, or use the crane and mobile crane to move it by
Warning!
Warning!
movement.
Note!
well, because the cables are relatively thick, once the inverter is
complete.
38
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
During the transport, the transport with packages should be used as far as
possible and the transport should be conducted according to the various marks
Do not place by
Place with the face up stacking for many
layers
Name Descriptions
MODEL NO Inverter model
39
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Crane handling
Cranes must be able to withstand the weight of more than 2.5T, and the
rated load of a single sling should be not less than 2.5T. Timbers or steel
structural members are required to support the sling at the top of the wooden
40
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Forklift handling
In forklift handling, the forklift tooth should go across the bottom of the
41
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
Note!
vehicles.
process.
42
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
The equipment should be not titled for more than 10 at all sides for the
safety.
Warning!
sunlight!
If the external packaging has been removed, it should return to the original
state, and the desiccants inside the package are required to be retained, but
not be abandoned.
43
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
If the storage time is longer than six months, the package should be opened
Neither can the equipment bear high pressures, nor absorb strong mechanical
44
1MW/1.25MW PV Grid-Connected Inverter Installation Manual
11 Contact us
If you have any questions on this product, please contact us, and the
Address: TBEA New Energy XIAN Industrial Park, No. 70 Shanglinyuan 4th
Hotline: 400-606-6029
E-mail: tbeapower@tbea.com
Fax: 029-68760500-042
URL: http://www.tbeapower.com
45