You are on page 1of 10

02/03/2017

20/02/2017
PETROVIETNAM FERTILIZER AND CHEMICALS CORPORATION (PVFCCo)
AMMONIA PLANT REVAMP PROJECT

Project N Unit Document Code Serial N Rev. Page

2539 00 PP 884 0 2/5


The present document or drawing is property of PetroVietnam Technical Services Corporation (PTSC) and shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of

TABLE OF CONTENTS

1. GENERAL 3
2. SCOPE 3
3. DEFINITIONS AND ABBREVIATION. 3
4. SAFETY 3
5. PREPARATION. 3
5.1. Quality Control. .................................................................................................................3
5.2. Material Control .................................................................................................................4
6. PROCEDURE 4
7. RECORD. 4
APPENDIX A: PIPING ABOVEGROUND INSTALLATION PROCEDURE 5
the agreed upon right of use.

PETROVIETNAM TECHNICAL SERVICES CORPORATION (PTSC)


1-5 Le Duan Street, District 1, Ho Chi Minh City (VIETNAM)
PETROVIETNAM FERTILIZER AND CHEMICALS CORPORATION (PVFCCo)
AMMONIA PLANT REVAMP PROJECT

Project N Unit Document Code Serial N Rev. Page

2539 00 PP 884 0 3/5


The present document or drawing is property of PetroVietnam Technical Services Corporation (PTSC) and shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of

1. GENERAL
- This procedure is built based on method/ procedure issued by NUOVA SGUASSERO SRL,
the Vendor of GRP.
2. SCOPE
- This procedure describes the general requirements for ABOVEGROUND PIPES fabrication,
installation and inspection in respect with GRP materials only
- In addition to, the information contained in this procedure, SUBCONTRACTOR will carry out
fabrication/ installation work to meet the requirements of drawings, technical specifications,
standards and codes, as set out in the contract, should there be any conflict between this
procedure and contract document, the latter shall govern.
- Direct instructions of Vendor at site will be strickly following.
3. DEFINITIONS AND ABBREVIATION.
Owner: Petrovietnam Fertilizer and Chemical Corporation (PVFCCo).
Contractor: Consortium of Technip Italia S.P.A and Petrovietnam Technical
Services Corporatio
Subcontractor: Southern Petroleum Construction J.S.C (Alpha Ecc).
Vendor: Nuova Sguassero S.r.l
QA/QC: Quality Assurance / Quality Control
Fabrication team: a body, who has responsibility to fabricate and install pipe works
4. SAFETY
- Fabrication team shall ensure that all fabrication and installation activities on safe, effective
and timely operation in strictly compliance with Project HSE Plan
- Fabrication team shall work closely with HSE personnel to ensure the safe, effective
performance of the activities by all members
- To ensure a safe working environment for all personnel through the whole of the project
period including sub-contractors, equipment vendors
- All personnel working at fabrication site shall participate weekly HSE meetings and
Superintendents and/or Supervisors shall conduct tool-box meeting daily for direct
workforces to ensure safe performance for installation activities of GRPs Underground pipe
works
- All equipment, tools used for installation works shall be valid calibrated certificates in
accordance with Project safety rules and all lifting equipment with suitable color code. To
ensure equipment, tools shall be calibrated and inspected periodically in accordance with
Equipment Protection & Preservation Procedure.
5. PREPARATION.
5.1. Quality Control.
- Contractor will supervise the works executed by Subcontractor to ensure compliance with
specification requirements and the relevant codes and standards.
the agreed upon right of use.

- All procedures such as butt and strap lamination, butt and branch welding, Site Material
Management Procedure etc shall be available at fabrication area or in hand prior to
commencement of the works.

PETROVIETNAM TECHNICAL SERVICES CORPORATION (PTSC)


1-5 Le Duan Street, District 1, Ho Chi Minh City (VIETNAM)
PETROVIETNAM FERTILIZER AND CHEMICALS CORPORATION (PVFCCo)
AMMONIA PLANT REVAMP PROJECT

Project N Unit Document Code Serial N Rev. Page

2539 00 PP 884 0 4/5


The present document or drawing is property of PetroVietnam Technical Services Corporation (PTSC) and shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of

5.2. Material Control


- All material shall be fully inspected upon receipt to ensure that the correct as required in
design of material has been supplied and that identification, dimensions, material quality and
preparation are in accordance with the requisite standards and specifications.
- Material found to be defective or incorrectly marked shall be immediately placed in a
quarantine area separate from accepted material with sufficient safeguards to preclude it
being used and should be marked with Hold label.
- All materials, whether loose or prefabricated will be stored as per the Site Material
Management Procedure (PP-806).
- Materials which have been damaged or found to have defects will not be used except where
there are only minor surface marks, in which case CONTRACTOR will obtain approval from
Owner. The materials shall be dressed provided the min wall thickness is not reduced and
the manufacturing tolerances defined in the appropriate material or purchasing specification
are complied with.
6. PROCEDURE
- Subcontractor will strickly follow to manufactures procedure in Apendix A
7. RECORD.
- All reports shall be reviewed by Owners Representative and must be kept by
CONTRACTOR for Final Documentation.
the agreed upon right of use.

PETROVIETNAM TECHNICAL SERVICES CORPORATION (PTSC)


1-5 Le Duan Street, District 1, Ho Chi Minh City (VIETNAM)
The present document or drawing is property of PetroVietnam Technical Services Corporation (PTSC) and shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of
the agreed upon right of use.

PROCEDURE
2539
Project N

00
Unit

PP
AMMONIA PLANT REVAMP PROJECT

Document Code

1-5 Le Duan Street, District 1, Ho Chi Minh City (VIETNAM)


PETROVIETNAM TECHNICAL SERVICES CORPORATION (PTSC)
884
Serial N

0
Rev.

APPENDIX A: PIPING ABOVEGROUND INSTALLATION


PETROVIETNAM FERTILIZER AND CHEMICALS CORPORATION (PVFCCo)

5/5
Page
Doc. n: N/A
Date: 19/12/2016
Sheet: 1 of 6
Rev. : 0

Piping aboveground installation


Doc. n N/A
Date: 19/12/2016
Sheet 2 of 5
Rev. 0

Index
1. Scope.. 3
2. Application 3
3. Procedure...3
Doc. n N/A
Date: 19/12/2016
Sheet 3 of 5
Rev. 0

1. Scope
Scope of the present document is to supply the guidelines for a correct installation of above ground
GRP pipes.

2. Application
The present procedure is applicable to above ground GRP pipelines for the transport of fluids with or
without pressure.

3. Procedure
Above ground installations can be roughly divided into two categories:
a) lines which laid directly on the surface of the ground
b) lines which are hung or supported as in a typical plant

In case a) it is anyway advisable to support the pipe by means of wooden or concrete sleepers, in order to
avoid pipe damage by stones and another sharp object. In nearly all aboveground applications tensile
resistant couplings should be used. Only in case of well supported pipe lines for non-pressure applications a
non-tensile resistant system can be used.

Horizontal pipe should be supported at intervals suggested by the support spacing data.

For the supporting of pipe systems several types of pipe clips can be used. Line contacts and point loads
should be avoided, therefore between pipe and steel collar, a PVC saddle or a protective rubber layer should
be provided to minimize abrasion. The PVC saddle is inserted when free axial sliding of the pipe must be
permitted (axial guide). The width of the clamp should be in accordance with ASA or equivalent.
The clips must fit firmly but must not apply excessive force to the pipe wall. This could result in
deformations and excessive wall stresses. The pipe must be allowed to expand within its clamps.

Heavy equipment (valves etc.) have to be supported independently from the pipe to avoid overloading in
both horizontal and vertical directions. Excessive loading in vertical runs are to be avoided. Changes of
temperature, due to operating conditions or ambient, give changes of length and end loading on GRP pipe,

.
Doc. n N/A
Date: 19/12/2016
Sheet 4 of 5
Rev. 0

which have to be properly manufactured in order to keep values of stress and strain lower than the allowable
ones. In case of long pipeline or excessive changes of temperature, expansion loops or expansion joints will
be necessary. An anchor must positively restrain the movement of the pipe against all applied forces.
Anchors can be installed in both horizontal and vertical directions.

Pipe anchors divide a pipe system into sections and must be attached to structural material capable of
withstanding any applied forces. In some cases pumps, tanks and other similar equipment function as
anchors. Additional anchors are usually located at valves, changes in direction of piping and major branch
connections.

When applying unrestrained joints or mechanical couplers, pipe lines must be anchored at each change of
direction.

Anyway, the correct location of anchor points shall be settled after a detailed stress analysis. For securing
clamp, it is suggested to apply a GRP lamination on each side of the clamp. If the movement of the pipe
shall be restrained only in one direction, it is sufficient to apply just one overlay in the opposite position.
Sideways movement is to be prevented by clamping. When installing Double O-Ring Lock Joint, these
must be fully stretched in order to prevent movement of pipe sections and overloading at points of changes
in direction such as bends and tees. It is preferable to apply mechanical stretch but stretching can also be
done by pressurising the main line (0.8 x Working Pressure). The results can be observed by inspection of
the position of the locking strip through the insert hole. Stretching should be applied before installing
branch connections.

Should connections be necessary with machinery or bodies subject to vibrations, such as pumps or other
equipment, it is a good engineering practice to avoid a direct link with such systems, because vibrations
induce stresses on GRP pipe, which may prevail over the allowable value. A severe condition of vibration
occurs when the generating frequency is equal or near the natural frequency of the pipeline. A usual method
to avoid vibrations is to install a flexible joint between the source of vibration and the pipe. GRP pipe
exposed to sunlight is not subject to resin degradation, due to ultraviolet radiation, because pipe contains,
through the whole wall thickness, inhibitors which prevent said degradation.
Doc. n N/A
Date: 19/12/2016
Sheet 5 of 5
Rev. 0

You might also like