foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
symbols and conventions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
as per iso 3864---2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
distribution rules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
safety rules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

general description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
circuit breaker and switch function . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
fuse---switch and switch function . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
switchboard coupling switch and circuit breakers . . . . . . . . . . . . . 6
cable connection function . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
metering cubicle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
single---line diagramms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

instructions for putting the RM6 into operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9


prior to energising . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
pressure check of unit in operation . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
unit with pressure switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
position of the VPIS or VDS voltage indicator units (optional) . . . . . 12
phase concordance unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
rules for the use of phase concordance unit . . . . . . . . . . . . . . . . . . . . 13
RM6 equipped with VDS voltage detection units . . . . . . . . . . . . . . . . 16
choosing the HV fuses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
sealing of DE---Mt cubicle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

Instructions for putting into operation the protection relay for circuit ---breaker . . . . . . 23
setting the VIP---30/VIP---35 relays . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
setting value of the phase operating current ls . . . . . . . . . . . . . . . . . . 23
VIP 30 HV/LV transformer protection . . . . . . . . . . . . . . . . . . . . . . . . . . 23
changing rating of the VIP 30 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
VIP 35 HV/LV transformer protection . . . . . . . . . . . . . . . . . . . . . . . . . . 25
changing rating of the VIP 35 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
setting the VIP 300 relay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
VIP 300 HV network protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
changing rating of the VIP 300 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
VAP 6 test portable box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
VIP relay operating tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
VIP400 presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
presentation of VIP 40/45 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Sepam series 10 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
standard assignment of inputs/outputs . . . . . . . . . . . . . . . . . . . . . . . . 45
and customised configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
human---machine interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
operating instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
1
operating instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
operating and viewing substation condition . . . . . . . . . . . . . . . . . . . . 53
operating safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
key---locking (optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
padlocking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
overcurrent indicator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
LV connection indicator Flair 2xD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Detector pending fault . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
ammeter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
standard operating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Connection of CTs to the 3 MV cables . . . . . . . . . . . . . . . . . . . . . . . . . 64
Voltage detection Relay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
detection sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Configuration of thresholds and time delays . . . . . . . . . . . . . . . . . . . . 66
suggested choice for VD23 settings . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
access to the cable compartments . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
access to the MV compartment of the DE---Mt cubicle . . . . . . . . . . . 68

preventive maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
standard operating conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
harsh operating conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70

corrective maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
maintenance summarising table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
replacing a fuse . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
access to the LV compartment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
replacing a motor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
replacing the LV contacts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79

processing when dismantling the equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80


processing of SF6 gas when dismantling the equipment . . . . . . . . . 80

Released for Manufacturing


Printed on 2013/10/15
2 07897073EN01 revision : 09
foreword

symbols and conventions Caution:


you will find all the symbols
below throughout the document,
indicating the hazard levels
depending on the different types
of situation.

DANGER

DANGER: failure to follow this


instruction will result in death or serious injury.

AVERTISSEMENT

WARNING: failure to follow this instruction may


result in death or serious injury.

as per iso 3864-- 2


ATTENTION

CAUTION: failure to follow this instruction may


result in injuries.
This alert signal can also be used to indicate
practices that could damage the SM6 unit.

INFORMATION--ADVICE
We draw your attention to this specific point.

contact the Schneider


Electric service unit for You can log on to:
diagnosis and advice
WWW.SCHNEIDER---ELECTRIC.COM
Call your sales representative who will put
you in contact with the closest
SCHNEIDER-- ELECTRIC service centre.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
3
distribution rules
CAUTION CAUTION

The aim of this publication This document is not a commercial


is to enable the RM6 unit document.It is a strictly technical
to be installed correctly. document drawn up by
Schneider Electric.

safety rules
CAUTION

All the operations described below


must be performed in compliance
with applicable safety standards,
under the responsibility
of a competent authority.

WARNING

The contractor must be certified


and authorised to manipulate and
perform work on the RM6 unit.

WARNING

Only undertake the work after


having read and understood
all the explanations given in this
document.
If you have any difficulty complying
with these rules, please contact
Schneider Electric.

protective equipment
P. P. E
For each operation, it is mandatory
to use safety equipment
appropriate:
--- Personal Protective Equipment
(PPE)
--- Collective Protection Equipment
(CPE)

maintenance rules
NEVER USE SOLVENTS AND ALCOHOL

WE DRAW YOUR ATTENTION TO THE RISK


OF USING HIGH PRESSURE CLEANING
PROCESSES

Released for Manufacturing


Printed on 2013/10/15
4 07897073EN01 revision : 09
general description

circuit breaker and switch G C DKL N F E P


function
B
A

M
H

IDI

A : operating mechanism front F : voltage indicator M : rating plate


plate comprising the mimic G : LV connection access trunking N : pressure switch or gauge
diagram label
H : connection bushing access
B : information plates panel P : pressure switch or gauge
C : earthing switch operating K : VIP30/35 and VIP300
shaft protection relays
D : switch operating shaft L : D function opening
E : function position indicator pushbutton

fuse ---switch and switch G C D N F E P


function
B
A

IQI

A : operating mechanism front E : function position indicator J : rating plate


plate comprising the mimic F : voltage indicator N : pressure switch or gauge
diagram label
G : LV connection access trunking
B : information plate P : pressure switch or gauge
H : connection bushing access
C : earthing switch operating shaft panel
D : switch operating shaft

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
5
switchboard coupling D
switch and circuit D
B
breakers G B
F C
Example presented : A C A F
1 : DE-- BC station with earthing
switch E
E
2 : DE-- IC station with earthing
switch

1 2

A : control panel A : control panel


featuring the mimic panel featuring the mimic panel
B : earthing switch operating B : earthing switch operating
shaft shaft
C : switch operating shaft C : switch operating shaft
D : voltage indicator D : voltage indicator
E : connection bushing access E : connection bushing access
panel panel
F : rating plate F : plate characteristics
G : characteristics plates

cable connection
function A
Exemple presented : DE-- O
B
A : characteristics plate
B : rating plate
C : connection bushing access
panel
C
metering cubicle

with LV compartment

1 1 5
without LV compartment

3
2

1 : LV compartment 4 : access panel to current


2 : voltage transformer access transformer
panel 5 : LV compartment
3 : characteristics plate Released for Manufacturing
Printed on 2013/10/15
6 07897073EN01 revision : 09
single---line diagramms

NE = No Extensible LE = Left Extensible


DE = Double Extensible RE = Right Extensible

NE ---D RE ---DIDI DE ---IIBI

TRANSFORMER PROTECTION TRANSFORMER PROTECTION BY CIRCUIT--- BREAKER LINE PROTECTION BY CIRCUIT--- BREAKER
BY CIRCUIT--- BREAKER

DE ---III NE ---IQI NE ---IDI

NETWORK SWITCH TRANSFORMER PROTECTION BY FUSE--- SWITCH COMBINAISON TRANSFORMER PROTECTION BY CIRCUIT--- BREAKER

DE ---DD DE ---IDD DE ---IIBc

TRANSFORMER PROTECTION BY CIRCUIT--- BREAKER TRANSFORMER PROTECTION BY CIRCUIT--- BREAKER SWITCHBOARD COUPLING CIRCUIT--- BREAKER

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
7
.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................
Released for Manufacturing
Printed on 2013/10/15
8 07897073EN01 revision : 09
instructions for putting
the RM6 into operation

prior to energising

Check that the connection Check that the RM6 is connected


bushings are fitted with connectors to the substation earth.
or with insulating caps.

pressure check of unit


in operation

CAUTION ENERGISED RM6 UNIT

unit with manometer H The RM6 unit is operating nor-


mally.
Case 1:
needle in green zone

Case 2: H The RM6 unit must be replaced


urgently.
WARNING H It can remain energised until
replacement.
H All opening or closing opera-
needle in red zone
tions are forbidden.
H To replace the RM6, power off
the unit.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
9
warning label
recalls the safety rules

unit with pressure


switch
LCD display check H If nothing is displayed, check
that the 8---point connector on the
Press the TEST button. The LCD pressure switch wiring harness at
screen should display: the rear of the LCD display is cor-
rectly connected.
H Contact the after sales service.
www.schneider-- electric.com
Note: The LCD display is self---
powered by piezoelectric buttons
(TEST and DENSITY SWITCH).
Pressing on one of these buttons
will turn on the display for a few
seconds.

pressure check
Press the DENSITY CHECK but-
ton. The LCD screen displays:

Case 1: OK
H The RM6 unit is operating nor-
mally.

Released for Manufacturing


Printed on 2013/10/15
10 07897073EN01 revision : 09
Cas n2 : LOW / OK H The RM6 unit must be repla-
ced.
H It can remain energised until
CAUTION replacement.
H All operations can be perfor-
med while energised.

Case 3: VERY LOW / NOT OK H The RM6 unit must be replaced


urgently.
H It can remain energised until
WARNING replacement.
H All opening or closing opera-
tions are forbidden.
H To replace the RM6, power off
the unit.

warning label
recalls the safety rules

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
11
position of the VPIS or 1 2 3
VDS voltage indicator
units (optional)

1 and 3 :voltage presence on 2 : voltage presence downstream


network cables. of fuses for a switch combination
or on the outgoing cable
for a circuit ---breaker.

VPIS
presentation of VPIS---V1
and VPIS---V2
VPIS :Voltage Presence Indicating
System, a case with 3 built ---in
lights.
VPIS-- V1 : production until VPIS-- V2 : production starting
February 2009. from March 2009.

characteristics Conforming to IEC 61958, relative


to voltage presence.

operating instructions A A

WARNING

The indication provided by a


VPIS-- V1 or V2 alone is not suffi-
cient to ensure that the system is
de---energised.
B
B
INFORMATION
A : voltage presence indicator
When the ambient lighting is parti- light (one for each phase)
cularly bright, it may be necessary B : connection point designed for
to improve visibility by protecting the connection of a phase
the indication. concordance unit (one for
each phase)

Released for Manufacturing


Printed on 2013/10/15
12 07897073EN01 revision : 09
phase concordance Phase concordance testing for It is a way of making sure that all
VPIS-- V1 and VPIS-- V2 must be three cables are each connected
unit carried out each time a cable is to the corresponding phase of
connected to a functional unit. the substation.

principle
The principle of the phase
concordance unit is that it allows
a check of the phase concor-
dance between 2 energised
functional input units on the
same substation.

reminder of accessories that


can be used for phase
concordance test

Phase concordance unit V1. Phase concordance unit V2.


(51191954FA) (VPI62421

rules for the use of


phase concordance WARNING
unit
IT IS IMPOSSIBLE TO CARRY
OUT A PHASE CONCORDANCE
TEST WITH 2 VPIS OF
DIFFERENT
TYPES

Balanced phases :
---the phase concordance unit light
(1) is untit.
Unbalanced phases :
---the phase concordance unit light
(1) is lit.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
13
rules for choosing phase
concordance unit

phase functional unit functional unit compatibility


corrective actions
concordance 1 2 result
unit
V1 V1
OK

V1 V2 Replace VPIS-- V1 by VPIS-- V2.


OK Use a phase concordance unit V2.

V2 V2
OK Use a phase concordance unit V2.

V1 V1 Replace VPIS-- V1 units by VPIS-- V2 units


OK OR test with 1 phase concordance unit
V1.

V1 V2
OK Replace VPIS-- V1 with VPIS-- V2

V2 V2
OK

check before phase Please refer to the previous chapters


concordance test in the event of test malfunctioning.

TEST RESULT ACTION


The 3 indicator lights of each VPIS The 2 functional units are energi-
are on. sed, the VPIS units are operating
and the check can continue.
The 3 indicator lights of the VPIS Apply power to the functional unit.
1 2 are off. The functional unit is not If VPIS---V1 remains unlit, replaced
Visual checking of the indicator energised or the VPIS is defective. it by a VPIS---V2.
lights on the VPIS units of functional One or 2 indicator lights unlit. The VPIS is probably defective.
unit 1 and of functional unit 2 Replace by a VPIS---V2.
Phase concordance unit functional unit 1 functional unit 2 You can test.
check choice
On each
functional
unit test
phases 1 You cannot test them.
and 3.
The choice of the p phase concor-
d
dance unitit iis wrong or it iis nott
functionning correctly.

Released for Manufacturing


Printed on 2013/10/15
14 07897073EN01 revision : 09
phase condordance test
The 3 indicator lights of the 2 VPIS are lit and the phase concordance unit is correct, meaning that phase concor-
dance test can be performed.
lexique phase concordance unit LED lit LED unlit
or

Functional unit n2

Conclusion regarding phase concordance


L1 L2 L3

L1

L2
Connection
Co ect o is
s satisfactory.
sat s acto y
L3

L1
Reverse the MV cables connected to L1 and L2
L2 on one of the 2 functional units

L3

L1
n1
ctionall unit n

L2 Reverse the MV cables connected to L2 and L3


on one of the 2 functional units
L3
Func

L1
Reverse the MV cables connected to L1 and L3
L2 on one of the 2 functional units

L3

L1
Change the position of each MV cable on one of
L2 the 2 functional units

L3

L1
Change the position of each MV cable on one of
the 2 functional units
L2

L3

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
15
RM6 equipped with
VDS voltage detection B B
units
VDS: Voltage Detecting System,
unit with connectors used to plug
in individual indicators.

A : protective covers.
B : connections points used
to connect an individual A A A
indicator.

characteristics The voltage detector system It complies with standard


equipping your RM6 is of the IEC 61243-- 5.
separate VDS type, HR system.

instructions for using the Each time the interface is used, Do not use connectors enabling
interface put back the protective covers. short ---circuiting of the interface,
in networks with unearthed or
earthed neutral by resonant circuit.

accessories usable at the Individual voltage indicator for HR to use them, follow the instructions
interface system. of the accessory manufacturer.
Universal phase concordance unit. Other devices must only be used
at the interface if they exhibit the
same dielectric strength as an
CAUTION indicator.

The reliability of the information


provided is guaranteed only by
use of accessories conform to
standard IEC 61243-- 5:

Released for Manufacturing


Printed on 2013/10/15
16 07897073EN01 revision : 09
choosing the HV fuses For installation of fuses of other 45

manufacturers, please consult


The rating of the fuses to be fitted us.
in the RM6 protection function
depends on the following factors Dimensions of the Solfuse 33 L 33. 27
(among others): fuses (UTE)
H operating voltage. rating rating to lenght diamater
H transformer rating. voltage (A) (mm) to (mm)
55 (kV)
H fuse technology (manufacturer).
450 35 12 10 20 292 50,5
H Various fuse types with striker 25 40 292 57
with average energy can be fitted : 50 100 292 78,5
rated voltage rating rating to (A)
---as per standard UTE NFC (kV) 125 442 86
13.100, UTE NFC 64.210
6,3 63 24 10 20 442 50,5
of the Solfuse type. 7,2 24
25 40 442 57
---as per recommendation
IEC 282.1 and dimensions 50 63 442 78,5

DIN 43.625 of the Fusarc CF type. 80 100 442 86


Example: general case for
protection of a 400 kVA 10 kV Our products are guaranteed only with
transformer, 63 A Solfuse fuses or the fuses mentioned in this document.
50A Fusarc CF fuses will be To install fuses of other brands, please
chosen. ask Schneider Electric support.
IEC & UTE standards require that all
3 fuses are to be replaced after the
fusion of one fuse.
Dimensions of the Fusarc CF
fuses (DIN)

selection table () In the case of an external trip system Please consult us.
(eg.:overcurrent relay). For any values inclued in the table, please
(rating in A, use without overload A calculation must be carried out to consult us.
at 25C < < 40C). guarantee coordination of fuse In this case of an overload beyond 40C,
fuse---switches. please consult us.
(*)SIBA types fuses at 160A/12kV
refrence 30---020---13.
fuse type operating Transformer rating (kvA) Rated
voltage voltage
(kV) 50 75 100 125 160 200 250 315 400 500 630 800 1000 1250 1600 2000 (kV)
Solefuse (norme UTE NFC : 130.100, 64.210)
5,5 16 31,5 31,5 63 63 63 63 63 7,2
10 16 16 31,5 31,5 31,5 63 63 63 63 24
15 16 16 16 16 16 43 43 43 43 43 63
20 16 16 16 16 16 16 43 43 43 43 43 63

Fusarc CF et SIBA (*) (General case, IEC 60282--- 1, standard CEI62271--- 105 (to replace IEC 60420) and DIN 43625 standard)
3 20 31,5 40 50 50 63 80 100 125* 160
3,3 20 25 40 40 40 63 80 80 125* 125* 160
4,2 20 25 25 40 50 50 63 80 80 100 125* 160
5,5 16 20 25 25 40 40 50 63 80 80 100 125* 160 12
6 16 20 25 25 31,5 40 50 50 63 80 100 125* 160
6,6 10 20 25 25 31,5 40 50 50 63 63 80 100 125* 160
10 10 10 16 20 25 25 31,5 40 50 50 63 80 100 125*
11 10 10 16 20 20 25 25 40 40 50 50 63 80 100 125*
13,8 10 10 10 16 16 20 25 31,5 40 40 50 50 63 100* 24
15 10 10 10 10 16 20 25 31,5 31,5 40 50 50 63 80 100*
20 10 10 10 10 16 16 20 25 25 31,5 40 40 63 63 80 100*
22 10 10 10 10 10 16 16 20 25 31,5 40 40 50 63 80 100*

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
17
fitting HV fuses
CAUTION CAUTION

Before performing these Repeat the operations below for


operations, close the earthing all 3 fuses.
switch.
To remove the cover: lift it and pull
it towards you.
The instructions are visible
on the cover.

Release the plug and push the Fit the plug as far as it will go and
extraction handle manually to swivel it to the left to extract it.
release the plug (tap with the palm
of your hand to detach the plug
seal if necessary).

Let the plug hang.


Ensure the plugs are clean before
fitting them.

To clean the plugs, consult the


preventive maintenance section.

Released for Manufacturing


Printed on 2013/10/15
18 07897073EN01 revision : 09
fitting a DIN fuse
(Fusarc CF) rm6

On no account must a fuse that


has been knocked be installed.
A test prior to installation using
a monitor is recommended.

Recover the centring devices in the Insert the fuse in the


bag supplied with the substation. compartment.Fit the centring
device on the fuse.
Insert the plug pins in the plinth
and swivel it round to the right.

fitting an UTE fuse


(Solefuse)

CAUTION

On no account must a fuse that


has been knocked be installed.
A test prior to installation using
a monitor is recommended.

Fix the fuse on the plug using a Insert the plug and fuse assembly
torque wrench with end BTR no. 5 in the compartment.Insert the plug
and insert the fuse in the pins in the plinth and swivel it
compartment. round to the right.
Tightening torque: 15 Nm. Press to insert the assembly in the
downstream clamp.

direction for mounting


a fuse with striker

CAUTION
Percuteur
Striker pin
Fuse blowing releases a striker Schlagstift
that causes three---phase opening Percussore
of the switch and prevents it from
reclosing.

The end of the fuse equipped with The technical data and mounting
the striker is marked. direction of the fuse are printed on
the body.(striker facing upwards).

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
19
locking the plug

Make sure that the handle Plug with fuse blowing release,
trunnions are inserted in the plinth used to cause three---phase
slots and lock the plug manually opening of the switch.
by folding down the operating Press the switch to position it.
handle.

sealing of DE---Mt A : rear sealing


cubicle B : front sealing
C : seal + wire; steel
without LV compartment

C
B
A

Released for Manufacturing


Printed on 2013/10/15
20 07897073EN01 revision : 09
with LV compartment A : sealing of the LV compartment
B : seal + wire steel

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
21
.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................
Released for Manufacturing
Printed on 2013/10/15
22 07897073EN01 revision : 09
Instructions for putting into operation
the protection relay for
circuit-- breaker

The VIP parameters must be set


CAUTION correctly in order for the circuit
breaker function well.

setting the VIP---30/VIP---35 Phase protection: Earth protection:


relays Phase protection is provided the earth fault protection is
by an inverse time threshold which provided by measurement of
trips on 1.2 times operating residual current performed from
The RM6 circuit-- breakers are current. the sum of the secondary currents
equipped with a fully Is : operating current is directly set of the sensors.
autonomous protection channel according to transformer rating I0 : earth current threshold is set
requiring no auxiliary source of and operating voltage. according to the network technical
supply. data.

setting value of the phase operating current ls


power transformer ( kVA ) rated
operating
voltage
lt
voltage 50 75 100 125 160 200 250 315 400 500 630 800 1000 1250 1600 2000 2900 3000 (kV)

3 10 15 20 25 36 45 55 68 80 140 140 170 200 12

3,3 10 15 18 22 28 36 45 56 70 90 140 140 200

4,2 8 12 15 18 22 28 36 45 56 70 90 140 140 200


5,5 8 12 15 18 22 28 36 46 55 68 90 140 140 200
6 10 12 18 20 25 36 46 55 68 80 140 140 200 200
6,6 10 12 15 18 22 28 36 45 56 70 90 140 140 200
10 8 10 12 15 20 25 30 37 55 68 80 140 140 170 200
11 10 12 15 18 22 28 36 45 55 68 90 140 140 170
13,8 8 10 12 15 18 22 28 36 46 55 68 90 140 140 24
15 8 10 15 18 20 25 36 45 55 68 80 140 140
20 8 10 12 15 20 25 30 37 55 68 80 140
22 8 10 12 15 18 22 28 36 45 55 68 80

VIP 30 HV/LV
transformer protection
inverse time phase-- to -- phase
fault protection 1
1 : phase protection zone.
The elements concerning phase 2
protection are grouped in the top 4
half of the front face.
2 : courant de service Is.
Setting is directly in amperes
(primary current).Time delayed 3
tripping takes place as from 1.2
times operating current ls.

3 : Test receptacle with the VP6 4 : Plate marked with the


portable box. selector switch graduations ls.
This receptacle is used for simple, (printed on both sides)
fast testing of the relay. 1) 8---80 A
2) 20---200 A
Released for Manufacturing
07897073EN01 revision : 09 Printed on 2013/10/15
23
changing rating The sensor used has two ratios Turn over the two---side graduated
at its outlet. plate of selector switch ls
of the VIP 30 -- S1-- S2 ratio 200/1 (found behind the transparent part
-- S1-- S3 ratio 500/1 of the front face) and extract it from
the top using the hole on its top
CAUTION part.

Perform the suitable cabling


for the rating, as in the diagram
below.

cabling for 8 to 80 A
with ratio 200/1 VIP 30
A : shutter release (mitop) 3
B : wiring coming from the sensors A
2
1

12
9
11
10
CAUTION 22
7
21
8
B 32
In order for the CB to work 5
correctly, choose the CT in 31
6
accordance with the VIP. 13
clips
The VIP30 and VIP35 work 23 insultated
with the corresponding CT (CRc) 33
only.

cabling for 20 to 200 A


with ratio 500/1 VIP 30
A : shutter release (mitop) 3
B : wiring coming from the sensors A
2
1

13
9

11
10
23
7
21
8
B 33
5
31
6
12
clips
22 insultated
32

Released for Manufacturing


Printed on 2013/10/15
24 07897073EN01 revision : 09
VIP 35 HV/LV
transformer protection
Inverse time phase-- to -- phase
fault protection.
Independent time earth fault
protection.

13 2 7 4 5 6 8
1 : phase protection zone: When the VIP 35 is supplied
The elements concerning phase for more than one second, the
protection are grouped in protection is time delayed as
the top half of the front face. per setting (6).
2 : operating current ls. Starting up the energising time
Setting is directly in amperes delay.
(primary current). If the time delay setting is less than
Time delayed tripping takes place the values given in the table, start
as from 1.2 times operating current up the energising time delay.
ls. threshold lo>. time delay to>.
3 : earth protection zone
The elements concerning earth 0,8 to 0,9 Ia 0,2 s
protection are grouped in the
bottom half of the front face. 0,6 to 0,8 Ia 0,3 s
4 : earth protection threshold 0,2 to 0,4 Ia 0,4 s
lo>. 0,4 to 0,6 Ia 0,5 s
Setting is directly in amperes. Ia : nominal current of the
5 : Energising time delay. transformer to be protected.
This selector switch starts up 6 : time delay of the earth
an energising time delay (1s). protection to>.
The purpose of this time delay The earth protection time delay
is to prevent tripping by the earth is set in seconds.
protection on circuit ---breaker 7 : plate marked with selector
closing. It is only active on the switch graduations.
earth protection. ls and lo> (printed on both sides).
-- in OFF position:
1) 8---80 A
The energising time delay is
not in operation. Earth protection 1) 20---200 A
operates as per the setting of 8 :Test receptacle with
selector switch (6). the VAP 6 box.
-- in ON position: This receptacle allows simple, fast
The energising time delay testing of the relay.
is in operation.In this case when
the circuit ---breaker closes, tripping
by the earth protection is time
delayed by 1s.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
25
changing rating of the The sensor used has two ratios Turn over the two---side graduated
at its outlet. plate of selector switch ls
VIP 35 ---S1---S2 ratio 200/1 (found behind the transparent part
---S1---S3 ratio 500/1 of the front face) and extract it from
the top using the hole on its top
CAUTION part.

Perform the suitable cabling


for the rating, as in the diagram
below.

cabling for 8 to 80 A VIP 35


with ratio 200/1 A
3
A : shutter release (mitop) 2
B : wiring coming from the sensors 1
1
13
2
1 2 12
11
10
CAUTION
12
9
21
In order for the CB to work 8
correctly choose the CT in 22
7
accordance with the VIP. B 31
The VIP30 and VIP35 work with 6
the corresponding CT (cRc) only. 32
5
13
clips
23 insultated
33

cabling for 20 to 200 A VIP 35


with ratio 500/1 A 3
A : shutter release (mitop) 2
B : wiring coming from the sensors 1
1
13
2
1 2 12
11
10

13
9
21
8
23
B 7
31
6
33
5
12
22 clips
insultated
32

Released for Manufacturing


Printed on 2013/10/15
26 07897073EN01 revision : 09
setting the VIP 300 phase protection earth protection :
relay Phase protection has two Earth fault protection is provided
separately adjustable thresholds. by measurement of residual
I> : low threshold can be chosen current from the sum of the
with independent or dependent secondary currents of the sensors.
time. Just like phase protection, earth
The dependent time curves protection has two separately
comply with standard IEC 255-- 3 adjustable thresholds:
and are of the inverse, very inverse I0> : low threshold
and extremely inverse type. I0>> : high threshold
I>> : high threshold is with
independent time.

VIP 300 HV network 3 1 2 4 7 5 8 6 10 9


protection
Phase-- to -- phase fault
protection.
Earth fault protection.
Protections have two thresholds:
-- low threshold with
independent, dependent and
specific time
-- high threshold with
independent time

21 11 12 13 14 15 17 18 16 19 20 22

1 : phase protection zone. 3 : tripping indicator. The threshold is set in multiples


The elements concerning phase It is normally black and turns of operating current.This setting is
protection are grouped in the top yellow to indicate that the phase only active for the threshold with
half of the front face. protection has tripped. independent time (selector switch
It maintains its status even when 5 on DT).For the other curves,
2 : threshold overshoot this selector switch has no effect.
indicator. the relay is no longer supplied.
4 : choosing operating 7 : setting the low threshold
When this red indicator flashes, time delay t>.
then the time delay of the phase current ls.
protection low threshold Setting is directly in amperes. If the tripping threshold is at
is in progress. independent time (DT), this
selector switch sets the low
In this case, if the current does 5 : choosing the type of low threshold time delay.
not decrease, the relay will trip. threshold curve.
If the curve is at dependent time
---for curves with dependent time DT (definite time) for a current (RI, SI, VI, EI), the
(SI, VI, EI), it comes on if the SI (inverse time) value displayed is the tripping time
current is greater than 1.2 for a phase current equal to 10
operating current ls. VI (very inverse time)
EI (extremely inverse time) times operating current.
---for the curve with dependent 8 : low threshold time delay
time RI, it comes on if current RI (specific curve)
multiplier.
is greater than the setting ls. OFF (low threshold is inhibited) In position x10, the time delay
---for the curve with independent 6 : choosing the low threshold displayed on selector switch 7
time DT, it comes on when the low l>. is multiplied by 10.
threshold is overshot.
Released for Manufacturing
07897073EN01 revision : 09 Printed on 2013/10/15
27
9 : setting the top threshold 17 : setting the low threshold
l>>. time delay to>.
The top threshold is chosen in ---If the tripping threshold is
multiples of operating current. at independent time (DT), this
In the OFF position, the top selector switch sets the low
threshold is disabled. threshold time delay.
10 : setting the top threshold ---If the curve is at dependent time
time delay t>>. for a current (RI, SI, VI, EI), the
value displayed is the tripping time
The time delay is set directly in s. for a phase current equal to 10
11 : earth protection zone. times operating current.
The elements concerning earth 18 : low threshold time delay
protection are grouped in the multiplier.
bottom half of the front face. In position x10, the time delay
12 : threshold overshoot displayed on selector switch
indicator. 17 is multiplied by 10.
When this red indicator flashes, 19 : setting the top threshold
then the time delay of the earth lo>>.
protection low threshold is in The top threshold is chosen in
progress. multiples of setting current los.
In this case, if the current does In the OFF position, the top
not decrease, the relay will trip. threshold is disabled.
---for curves with dependent time 20 : setting the top threshold
(SI, VI, EI), it comes on if the time delay to>>;
current is greater than 1.2 The time delay is set directly in s.
operating current ls.
21 : resetting the indicators.
---for the curve with dependent
time RI, it comes on if current This button is accessible when
is greater than the setting ls. the transparent cover is closed.
Pressing this pushbutton triggers
---for the curve with independent two actions.
time DT, it comes on when
the low threshold is overshot. 1) It resets the 2 tripping
indicators.If the relay is no longer
13 : tripping indicator. supplied, the indicators can be
It is normally black and turns reset for roughly 48 hours.
yellow to indicate that the phase Beyond this period, resetting is
protection has tripped. possible once the VAP6 has been
It maintains its status even when plugged in.
the relay is no longer supplied. 2) It trips ignition of the 2 red
14 : choosing setting current los. indicators (3s).
Setting is directly in amperes. This means that
the relay is supplied.
15 : choosing the type of low The relay self---tests are
threshold curve. satisfactory.
DT (definite time) This function allows brief testing
SI (inverse time) of the relay.
VI (very inverse time) 22 : Test receptacle with
the VAP 6 portable box.
EI (extremely inverse time)
This receptacle is used for simple,
RI (specific curve) fast testing of the relay.
OFF (low threshold is inhibited)
16 : choosing the low threshold
l0>
The threshold is set in multiples
of setting current.
This setting is only active for the
threshold with independent time

Released for Manufacturing


Printed on 2013/10/15
28 07897073EN01 revision : 09
changing rating Two types of sensors are used: To change rating :
of the VIP 300 ---CRa ratio 200/1. ---Cable according to the rating.
---CRb ratio 500/1. ---Turn over the two---side
These sensors are mounted in the graduated plate of the selector
factory and are customised on switch ls and los.
CAUTION ordering. This plate is found behind the
transparent part of the front face.
Extract it from the top using the
Perform the suitable cabling hole in the top part.
for the rating, as in the diagram
below.

cabling for 10 to 50 A VIP 300


with cRa sensors
mitop 16
cabling for 63 to 312 A 15
with cRb sensor
14
13
wiring coming from the sensors

12
12
22
11
32
10
9
11
8
CAUTION 21 7
6
5
31
The VIP300 works with 4
the corresponding CT
(cRa---cRb )only. 3
All incorrect association between 2
VIP/CT will cause the CB to function
incorrectly. 1

cabling for 40 to 200 A VIP 300


with cRa sensors
mitop 16
cabling for 250 A to 630 A 15
with cRb sensors
14
13
wiring coming from the sensors

12
12
22
11
32
10
9
11 8
7
The VIP300 works with the 6
corresponding CT (cRa---cRb) 21
only. 5
4
31
3
2
1

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
29
VAP 6 test portable box The portable box VAP6 connected
to the VIP 30, 35 or 300
for simplified testing.
Testing is possible in the following
2 cases:
H the VIP 30, 35 or 300 is already
supplied by the sensors,
H the VIP 30, 35 or 300
is not supplied.
In this case, the VAP6 batteries
supply the relay.

pushbuttons battery test : phase overcurrent :


If the batteries are OK, the on this ends the phase protection test
indicator light comes on when stimulus.
this button is pressed. Stimulus is equivalent to 20 times
trip inhibition : operating current ls.
Press this button if the VIP must earth fault :
be tested without tripping the it sends the earth protection test
circuit ---breaker. stimulus.
While this button is depressed, Stimulus is equivalent to a current
circuit ---breaker tripping greater than the largest of the
is inhibited, even if the tripping settings of threshold lo>
order is the result of a real fault. (for the VIP 30/35) or 20 times
the earth setting current los
(for VIP 300).

indicator lights on : trip :


Indicates that the batteries are Comes on when the VIP 30/35
working. sends a tripping order
Also comes on during the battery (whether or not the circuit ---breaker
test by pressing battery test. is inhibited).
test in progress : Ignore this for the VIP 300 test
(it comes on intermittently when
Confirms sending of test stimulus the VIP 300 sends a tripping
on the VIP. order, whether or not the
circuit ---breaker is inhibited).

sortie external mitop This can be used to connect This mitop is tripped at the same
an auxiliary mitop, designed for time as the circuit ---breaker
example to stop a chronometer mitop.It is not inhibited by pressing
during operating tests. on the trip inhibition button.

Released for Manufacturing


Printed on 2013/10/15
30 07897073EN01 revision : 09
batteries The batteries are normally put into H press the battery test
and out of operation automatically pushbutton
when the VAP6 is connected to a Open the box, to replace
VIP30, 35 or 300 as well as in the batteries (4 screws on the
the following cases: bottom surface). Ensure you
respect polarities
(3 x 9V 6LR61 batteries).

VIP relay operating VIP 30/35 relays VIP 300 relay


H inject a stimulus to simulate start performing the self---tests
tests a phase fault
H
on the VIP 300 central processing
test description H inject a stimulus to simulate unit
an earth fault (VIP 35) H inject a stimulus to simulate
H check tripping a phase fault
H inject a stimulus to simulate
an earth fault
H check tripping.

performing the test This test can be performed


whether or not current is present in
the sensors.
During test operations, all the
settings of the VIP 30/35 VIP 300
relays are performed. The relay
should behave according to its
settings.
During testing, the relay is always
operational and will give a tripping
order in event of a fault (except if
the trip inhibition button is
pressed;
Connect the VAP6 to the VAP6
test plug connector.
From then on, the VAP6 batteries
are working and its on indicator
light is on.

testing the VIP30 and VIP35


relays VAP 6 If the phase overcurrent button
Press the trip inhibition button is kept held down after tripping,
if the test has to be performed the VIP30/35 maintains its tripping
without circuit ---breaker tripping. order.
Keep the trip inhibition button This operation is normal.In this
depressed throughout while the case:
stimulus is being sent. H the trip indicator light of the
Press phase overcurrent to send VAP6 remains on.
the phase protection test stimulus. H the circuit ---breaker mitop is
H the test in progress indicator supplied by the trippng order.
light on the VAP6 comes on to Press earth fault to test the
confirm sending of the stimulus to operation of the earth protection
the VIP30/35 relay. (VIP35).
H the trip red indicator light of The procedure is the same
the VAP6 comes on to indicate as for phase protection testing.
that the relay has tripped. Unplug the VAP6.To save the
H the circuit ---breaker trips if batteries, do not leave it pointlessly
it is not inhibited. plugged into the relay.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
31
VIP300 relay test VIP 300 If the phase overcurrent button
Press reset on the VIP300. is kept held down after tripping,
H if the 2 trip indicators were the VIP300 resumes its time
yellow, they move to black. delay/tripping cycle.
H the 2 indicators l> and lo> This operation is normal :
come on for 3 seconds to indicate H the trip red indicator light
that the central processing unit of the VAP6 comes on briefly
has correctly performed its at each tripping
self---tests. H the l> red indicator light of
the VIP300 may, according to
VAP 6 the time delay setting, remain OFF
Press the trip inhibition button or flash quickly.
if the test has to be performed
without the circuit ---breaker Press earth fault to test earth
tripping. protection operation.
Keep the trip inhibition button The injected stimulus is equal 20
depressed throughout while times setting current los.
the stimulus is being sent.
the procedure is the same as for
Press phase overcurrent to the phase protection test.
send the phase protection test
stimulus. Unplug the VAP6.To save the
batteries, do not leave it pointlessly
plugged into the relay.operating
H keep the button depressed instructions.
while the stimulus is being sent.
H the test in progress indicator
light on the VAP6 comes on to
confirm sending of the stimulus
to the VIP300 relay.
H the red indicator light I> of
the VIP300 flashes during the time
delay
H the trip phase tripping
indicator of the VIP300 moves
to yellow.
H the circuit ---breaker trips
if it is not inhibited.

Released for Manufacturing


Printed on 2013/10/15
32 07897073EN01 revision : 09
VIP400 presentation
The User---Machine Interface (UMI)
on the front panel of VIP relays
consists of a display, LEDs and
keys.
A sealable pivoting flap can
prevent access to the setting keys
by unauthorized persons.

1 Display Flap closed


2 Status LEDs
3 Fault indication LEDs
4 Zone for a user---customizable
label with pictograms of the
fault indication LEDs
5 Acknowledgement key
6 Identification label
7 Sealing ring
8 Selection keys
9 Key for selecting menus and
testing LEDs. When the VIP is
not supplied with power, this
key can also be used to
start the VIP from the battery
in order to enter settings
10 Menu pictograms
11 Menu selection pointer
12 Battery compartment and Flap open
socket for connecting the
pocket battery module
13 Settings protective flap
14 Confirm entry key
15 Abort entry key
16 Setting keys

Status LEDs
H The status LEDs provide
information about the VIP : general
status:
PICTOGRAMM FUNCTION
Red LED permanently on: VIP unavailable (VIP
in the fail---safe position).
Red LED flashing: a failure has been detected
but does not involve the VIP going into the
fail---safe position.

INFORMATION---ADVICE
you in contact with the clostest SCHNEIDER ELECTRIC service center
NRJED311206EN : reference manual is available on : www.schneider---electric.com
or call your sales representative who will put you in contact with the closet SCHNEIDER-- ELECTRIC
service center

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
33
Operation VIP relays have fault indication
LEDs. They flash to indicate a fault,
Fault Indication LEDs as shown in the table below :

Pictogram Fault
Detection of a fault by the phase overcurrent protection or in the event of tripping by the tempory
test mode

Detection of a fault by the earth protcection

Detection of a fault by the thermal overload protection

After a trip, the fault indication H Automatically after 24 hours


LEDs are powered by the battery For the first 3 LEDs, faster flashing
integrated in the VIP. may occur before the protection
Fault indication by the LEDs can trips, to indicate the following
be stopped: information :
H By pressing the Reset key
H Automatically by the reappea-
rance of a current in the network
higher than the pick ---up current

Pictogram Overshoot
Overshoot of the instantaneous set point for phase
overcurrent protection (I> or I>> or I>>> pickup out-
puts
Overshoot of the instantaneous set point for earth fault
protection (Io> or Io>> pick ---up outputs)
Overshoot of the alarm set point for thermal overload
protection

Note In custom mode, the protection set Depending on the application, this
points may not be assigned to the can indicate the presence of a fault
Mitop trip unit output. without tripping the circuit breaker
In this case, the fault indication The fault indication LED picto-
LED may be active, without being grams can be customized by sti-
associated with the circuit breaker cking a label to the right of the
trip. LEDs

Released for Manufacturing


Printed on 2013/10/15
34 07897073EN01 revision : 09
Display H First line: Symbols for electrical
values or function name
The display is an LCD unit.
H Second line: Displays the
values of measurements or
parameters associated with the
function
Each VIP function is presented in a
screen consisting of the following H A menu pointer, on the left, it is
items: pointing to the pictogram for the
selected menu

Menu Organization H The protection menu When a VIP is new, all the parame-
contains the essential settings ters in this menu have a default
All the data available in the VIP value.
relay is divided between 3 menus: for setting up the protection func-
tions The protection functions are opera-
H The metering menu tional even with the parameters
contains the current measure- H The parameters menu
contains the parameters that menu default values.
ments, peak demand currents,
load history, are used to adapt VIP operation to
event records, fault trip counter particular applications.
and the breaking current history.

Selecting a Screen in a
Menu
Etape Action
1
press the key to select one of the 3 menus
The menu pointer indicates the selected menu :

: Metering menu
: Protection menu
: Parameters menu
2 Press the or keys to scroll through the screens in the select menu, until
lthe desired screen is displayed

Default Screen A default screen is displayed auto- This default screen is the
matically 3 minutes after the last screen displaying the phase
keystroke. currents.

Operation According to the The VIP400 is a stand---alone pro- If current appears, the protection
Power Supply Mode (VIP400) tection relay powered by its cur- functions are activated and trip the
rent sensors. circuit breaker --- or not --- accor-
When current is present in the ding to their settings.
medium---voltage (MV) network, Theadditional time taken by the
the protections and the display VIP to start when current appears
work and it is possible to enter set- is called the pick ---up time.
tings and view measurements. More information on the value of
The current in the MV network on the pick ---up current and the pick ---
which the VIP operates is called up time are available in the VIP
the pick ---up current. Function Characteristics
When no current is flowing through Please consult the reference
the circuit breaker (for example cir- NRJED311207EN.
cuit breaker open), or when the
current in the MV network is too
low, the VIP is off and nothing
appears on its display.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
35
Integral Battery The VIP has an integral battery. It H The protection functions are
is used to: activated automatically if the cur-
H Activate the user---machine rent reappears.
interface in order to enter settings The integral battery plays no part
when the VIP is not supplied with in operating the protection func-
power tions. The protection functions
H Illuminate the fault indication work even when there is no bat-
LEDs when the VIP is no longer tery.
supplied with power after giving
theopening order to the circuit NOTE :
breaker
H In battery operation mode, the
H Power the internal calendar VIP processor runs with a reduced
When the VIP is not supplied with clock frequency to ensure the bat-
power: tery life is maintained. As a result,
Pressing and holding down the the user---machine interface may
be slower to react.
key will activate battery---powered
operation of the user---machine
interface. It is then possible to H During a setting operation with
access the menus in order to enter the VIP powered by its internal
settings. battery alone, the clock display is
In this case, the display not refreshed on screen. However
turns off automatically after 3 the internal clock increments nor-
minutes of inactivity on the key- mally.
pad.

Pocket Battery Module The pocket battery module is an H Test the VIPplease consult the
accessory that can be connected reference NRJED311207EN.
to the front panel of VIP relays. It H Display the cause of the last
contains a battery that can be trip by the VIP please consult the
used to power the VIP in order to: reference NRJED311207EN.
H Enter settings if the integral H More information on connecting
battery is missing and if the VIP is the pocket battery module to the
not powered by the current sen- VIP is available in the Connection
sors to the VIP please consult the refe-
H Enter settings if the integral bat- rence NRJED311207EN.
tery is missing and if the VIP is not
powered by the current sensors

Battery Module
The pocket battery module should
only be used during maintenance
or commissioning by
qualified personnel and must
never be left permanently connec-
ted to a running VIP. LV434206

Released for Manufacturing


Printed on 2013/10/15
36 07897073EN01 revision : 09
presentation of VIP
40/45

1 Display
2 Lugs for opening the
transparent protective flap
3 Transparent protective flap
4 Imax. peak demand display
button
5 Sealing ring
6 Test/Reset button
7 Status LED
8 Space for a user---customizable
label
9 Trip fault indication LED
12
10 Identification label
11 Symbol indicating that it is
necessary to read the manual
12 battery

Display H The display is an LCD unit The display is in amps, on three


H During operation, the display digits.
indicates the value of the current NOTE = If the phase current is
on each phase in succession less than the pick ---up current
Each phase (Please you consult the reference
remains displayed for 3 seconds NRJED311207EN.), the VIP is not
before automatically changing to activated and the display is off.
the next. The display is in amps,
on three digits.

Lugs for Opening the To open the flap, pull both lugs The flap pivots open on its 2 bot-
Transparent Protective Flap simultaneously. tom hinges.

Imax. Button: Peak Demand Pressing the Imax. button triggers After this sequence, the VIP auto-
Display a sequence displaying the peak matically returns to displaying the
demand currents for all 3 phases phase currents.
in succession.

INFORMATION---ADVICE
INFORMATION---CONSEIL
you in contact with the clostest SCHNEIDER ELECTRIC service center
NRJED311207EN : reference manual is available on : www.schneider---electric.com
or call your sales representative who will put you in contact with the closet SCHNEIDER-- ELECTRIC
service center

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
37
Test/Reset Button After a trip, pressing this button H Perform the lamp test if the
stops the flashing trip indication. relay is supplied with power. Pres-
This button can also be used to: sing the Test/Reset button for
5 seconds causes all the display
H Test the built ---in battery. When
segments and the status LED to
pressing the Test/Reset button, the
fault indication LED lights up light up, and displays the software
immediately to indicate that the version number.
battery is OK.

voyant dtat
Pictogram Color Event
LED permanently on: the VIP has gone into the
Red fail---safe position following detection by the
embedded self---tests of the failure of one of its
internal components, involving a risk of nui-
sance tripping. In this case, the VIP is no lon-
ger operational

NOTE: This LED may light up briefly when the


VIP is energized: this is normal and does not
indicate a failure.

LED flashing: the VIP has detected a failure not


involving a risk of nuisance tripping. In this
case, the VIP has not gone into the fail---safe
position.Intervention is required as soon as
possible (Please you consult the reference
NRJED311207EN.) The LED stops flashing as
soon as the failure disappears.

Space for User---Customi- There is a special space for a


zable Label user---customizable label for the
Trip LED.

Trip LED: Fault Indication The fault indication LED flashes to H When the Test/Reset button is
indicate that the VIP has sent a trip pressed
order to the circuit breaker. H When the pocket battery
Aftercircuit breaker opening, when module is connected then discon-
the VIP is no longer supplied with nected
power by its sensor, the built ---in NOTE : The VIP built ---in battery
battery makes the LED flash. only supplies power to the fault
The LED stops flashing: indication LED and displays the
H Automatically after 24 hours type of fault.
H When the current returns, on It has no role in operating the pro-
circuit breaker closing (if the cur- tection functions.
rent is higher than the pick ---up
current)

Identification Label The identification label on the front H Product reference


panel is used to identify the VIP: H Serial number
H Product name

symbole : lecture du The symbol indicates that it


manuel ncessaire
is necessary to read the VIP refe-
rence manual before working on
the product.

Released for Manufacturing


Printed on 2013/10/15
38 07897073EN01 revision : 09
VIP 40/45 settings When the protective flap is ope- To do this, use a 3 mm flat blade
ned, you can enter the protection screwdriver
front panel settings by means of the rotary
switches.

VIP40 VIP45

1 Phase overcurrent protection adjustment dial 1 Phase overcurrent protection adjustment dial
2 Setting range selector switch
2 Setting range selector switch
3 Advanced settings protective cover
3 Earth fault protection set point adjustment dial
4 Connection port for the pocket battery module
4 Earth fault protection time delay adjustment dial
5 Trip test button
5 Advanced settings protective cover
6 Connection port for the pocket battery module
7 Trip test button

Phase Overcurrent Protec- The setting is entered directly in The range is selected using the
tion Adjustment Dial Amps using the 9---position setting range selector switch.
switch.(I>)
The selector switch has 2 gradua-
ted rings,

Earth Fault Protection The set point is set directly in NOTE : The earth fault protection
Adjustment Dial Amps using the 9---position adjustment dials are only found on
switch..(Io>) the VIP45.
The time delay setting is entered
directly in seconds using the
9---position switch.(to>)

Temporary Display of the When VIP relays are energized,


Changed Setting they display temporarily the value
of the setting after a switch has
changed position.

Advanced Settings To access the advanced settings, H Earth fault protection inrush
remove the advanced settings pro- current delay
tective cover.
Both settings can be entered using
a single selector switch:
H Discrimination with the LV CB
Released for Manufacturing
07897073EN01 revision : 09 Printed on 2013/10/15
39
Connection Port for the The connector is used to connect
Pocket Battery Module the pocket battery module so that
the VIPs can be energized and
tested.
Please consult the reference
NRJED311207EN
NOTE :The pocket battery module
should only be used during
maintenance or commissioning by
qualified personnel and must
never be left permanently connec-
ted to a running VIP.

Trip test Button The Trip test button is used for


testing VIPs.
A 5 mm diameter pointed tool is
needed to activate it.
More information is available in the
section describing Commissioning.
Please consult the reference
NRJED311207EN

Frequency The network frequency (50 Hz or


60 Hz) is a parameter that must be
known for operation of the VIP40
and VIP45 signal processing algo-
rithms.
They therefore have an automatic
frequency recognition system.
The recognized value
(50 Hz or 60 Hz) is stored and the
VIP works permanently with this
value.
This stored value will be used each
time the VIP starts
For the VIP to recognize the net-
work frequency and store it, it has
to detect a current on phase 1 for
a minimum period of 5 seconds in
the range 50 Hz +/-- 2 Hz or 60
Hz +/-- 2 Hz.
This detection happens when
the VIP starts.

Released for Manufacturing


Printed on 2013/10/15
40 07897073EN01 revision : 09
For further information on the
Sepam series10, download the
reference manual from our web-
site:
www.schneider-- electric.com

Sepam series 10 Sepam 10A : Sepam 10B :


--- provides protection against ---provides protection against
protection of HV/LV trans- overloads (thermal overload pro- overloads (thermal overload pro-
formers tection), phase---phase faults and tection), phase---phase faults and
phase---earth faults. phase---earth faults.
protection of HV networks It has: It has:
--- 4 logic inputs and 7 confi- --- 3 configurable relay outputs
Sepam 10 relays fitted to RM6 cir- gurable relay outputs
cuit breakers require an auxiliary --- a communication port
power supply.

Functions

Protection types
Earth current maximum protection Standard
Very sensitive
Phase current maximum protection
Thermal overload protection
Cold load pickup (low sensitivity of phase and
earth current maximum protection settings)
Logic discrimination Await logic emission
Await logic reception
External tripping
Measurements
Measurement of earth current
Measurement of phase currents
Phase current maximum readings
Control and monitoring
Circuit breaker tripping and rearmament locking
Trip signalling
Tripping circuit monitoring
Circuit breaker remote control
Recording of last fault
Recording of last 5 events
Communication
Modbus
IEC 60870--- 5--- 103

Function available
Function available depending of Sepam model

Inputs / Outputs (Number)


Earth current inputs
Phase current inputs
Relay logic outputs
Logic inputs
RS 485 communication port

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
41
earth current (ANSI Earth current maximum protection 2 independent thresholds (Io>
50N--- --- ---51N) enables overcurrents due to and Io>>)
phase---to---earth faults to be H the lower threshold (Io>) can
detected. It makes use of the mea- be set to either a definite time (DT)
surement of the earth currents or an inverse time (IDMT) curve,
fundamental component. with the choice of standardised
curve (IEC, IEEE, RI) and the pos-
sibility of activating an inverse time
duration.
H the upper threshold (Io>>) has
only a definite time (DT) setting.
The minimum setting gives instan-
taneous operation (ANSI 50 func-
tion).

Depending on the level of sensiti-


vity required, there are 2 types of
Sepam:

Sensitivity Sensor
Standard 3 CT CRa 200/1 or CRb 1250/1
Very sensitive CSH200 core balance CT

phase current maximum Phase current maximum protection 2 independent thresholds (I>
protection (ANSI enables overcurrents due to and I>>)
phase---to---phase faults to be H the lower threshold (I>) can be
50--- --- ---51) detected. It makes use of the mea- set to either a definite time (DT) or
surement of the fundamental com- an inverse time (IDMT) curve, with
ponent of the currents from the 3 the choice of standardised curve
phase CTs. (IEC, IEEE, RI) and the possibility
of activating an inverse time dura-
tion.
H the upper threshold (I>>) has
only a definite time (DT) setting.
The minimum setting gives instan-
taneous operation (ANSI 50 func-
tion).

thermal overload protection This protection enables cables and This protection has 2 settings:
(ANSI 49RMS) HV/LV transformers to be protec- H maximum allowable continuous
ted against overloads based on current, which corresponds to the
the measurement of absorbed cur- maximum thermal withstand of the
rent. equipment to be protected (this
This protection uses a thermal allowable continuous current cor-
model based on current measure- responds to a temperature rise of
ments to evaluate temperature 100%)
rise. The current used for this pro- H heating/cooling time constant of
tection is a 3---phase RMS current the equipment.
that takes into account up to 13th
order harmonics.

Released for Manufacturing


Printed on 2013/10/15
42 07897073EN01 revision : 09
low sensitivity of phase and The cold load pickup function High currents at cold load pic-
earth current maximum avoids nuisance tripping when the kup may be due to:
equipment is powered---up, espe- H simultaneous powering---up of
protection settings (Cold cially after a long break in opera-
Load Pick ---Up) all the loads in an installation.
tion. It allows the protection thres-
H power transformer magnetising
holds to be temporarily increased.
currents.
H motor starting currents.

Protection concerned Operating means


Phase current maximum protection After circuit breaker closing, the tripping thresholds (I> or I>>) are
increased or blocked for the set duration.
Earth current maximum protection After circuit breaker closing, the tripping thresholds (Io> or Io>>) are
increased or blocked for the set duration.
Or
The protection is restrained by the detection of sensor saturation (measu-
rement of 2nd order harmonic level).

logic discrimination This function achieves: All Sepam series 10B and 10A
(ANSI 68) H tripping discrimination in the are able to emit an await logic
event of a short ---circuit between order should a fault be detected
phases, or from phase to earth, for by the phase and earth current
all network types maximum protection functions.
H reduced tripping time of the cir- Only the Sepam series 10A is
cuit breaker that is closest to the able to receive an await logic
source. order that blocks its tripping
signal. A safety mechanism ensu-
res the protection operates in the
event of a fault with the blocking
signal wiring.

external tripping The Sepam series10A enables,


via a logic input, a tripping order
from an external protection means
to be taken into account.

earth current measurement This measurement enables the


value of the fundamental compo-
nent of the earth current to be dis-
played.

phase current measure- These measurements enable the This function displays the 3 phase
ments RMS value of the phase currents to currents.
be displayed; it takes into account
up to 13th order harmonics.

phase current maximum This function enables the largest


readings average current value of each of
the 3 phases to be displayed, as
well as giving the highest absor-
bed current during load peaks.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
43
latching / resetting ANSI 86 Output relay latching can be confi- Resetting can be done:
gured. Latch tripping orders are --- by pressing the Reset button;
memorised and must be reset in --- via the Sepam 10A communica-
order to put the equipment back tion port.
into service.

circuit breaker remote This function enables remote ope-


control --- Sepam 10A ration of the circuit breaker via the
communication. A Sepam logic
input allows the operating mode
(local or remote) to be selected.

recording of the last fault --- This function enables the characte- Cause of faults recorded: I>,
Sepam 10B ristics of the last fault to be dis- I>>, Io>, Io>> and thermal pro-
played. The Sepam indicates the tection.
cause of the fault, the value of the
phase currents and the earth cur-
rent when the fault occurred, and
the time and date of the fault.
This information is memorised until
the next fault occurs.

recording of the last 5 This function enables the characte- The following events are recor-
events --- Sepam 10A ristics of the last 5 events to be dis- ded:
played. For each event, the Sepam H tripping due to I>, I>>, Io> or
indicates its cause, the value of the Io>>, thermal protection
3 phase currents and the earth
H tripping by external input
current when the event occurred,
and the time and date of the event. H tripping circuit fault
Events are numbered in the order H circuit breaker opening and clo-
they occur and the last 5 can be sing via the communication
displayed. H tripping due to logic discrimina-
tion safety protection.

communication --- Sepam One RS 485 communication port. Communication enables the follo-
10A 2 protocols available, chosen by wing functions to be carried out
configuration: Modbus, IEC remotely:
60870--- ---5--- ---103. H measurement readings,
H status readings
H event readings and time---stam-
ped measurements (2 tables of
100 events available)
H time setting and synchronisa-
tion
H remote control orders.

operating language When delivered, the default lan-


guage is English. The following
languages can be selected: UK
English, US English, Spanish,
French, Italian, German, Turkish,
Portuguese.

Released for Manufacturing


Printed on 2013/10/15
44 07897073EN01 revision : 09
standard assignment of The configuration is customised
using the Sepam human---
inputs/outputs machine interface, without the
need for a PC.
and customised confi-
guration

Sepam 10 A
Logic inputs Standard assignment Configurable

I1 Circuit breaker open No


I2 Circuit breaker closed No
I3 External tripping Yes
I4 Local---Remote Yes
Relay outputs Standard assignment Configurable

O1 Circuit breaker tripping Yes


O2 Locking of circuit breaker latching Yes
O3 Trip signalling Yes
O4 Circuit breaker remote closing Yes
O5 Await logic emission Yes
O6 Trip circuit fault signalling Yes
O7 Watchdog No

Sepam 10 B
Relay outputs Standard assignment Configurable

O1 Circuit breaker tripping Yes


O2 Locking of circuit breaker latching Yes
O3 Trip signalling Yes

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
45
human---machine inter- The Human---Machine Interface on Access to the setting buttons by
the Sepam front panel is made up unauthorised personnel can be
face of a display, indicator lamps and prohibited using the pivoting and
buttons. lead---sealable cover. The illustra-
front panel tions below show the 2 positions of
this cover.

1 Display
2 Status indicator lamps
3 Fault indicator lamps
4 Zone for a customised
pictogram label of fault
indicator lamps
5 Button for resetting the
Sepam and the maximum
value readings
6 Identification zone
7 Lead sealing ring
8 Selection buttons
9 Menu selection and indicator
lamp test button
10 Menu pictograms
11 Menu selection pointer
12 Battery compartment
(Sepam series 10A)
13 Settings protection cover
14 Entry validation button
15 Entry abort button
16 Setting buttons

status indicator lamps The status indicator lamps provide


information on the Sepam status.

Pictogram Function Sepam series 10


Green lamp: Sepam powered ---up
Red lamp: Sepam unavailable
(Sepam in fall---back position)
Yellow lamp: communication active

Released for Manufacturing


Printed on 2013/10/15
46 07897073EN01 revision : 09
fault indicator lamps The fault indicator lamps flash as
described in the table below to
signal a fault:

Pictogram FThreshold exceeded Sepam series 10


Phase current maximum protection instantaneous threshold
exceeded (I> or I>> pickup output)
Earth current maximum protection instantaneous threshold
exceeded (Io> or Io>> pickup output)
Thermal protection alarm threshold exceeded

The fault indicator lamp is latched For the first 3 lamps, they may
in standard operating mode. flash at a faster rate before the pro-
If, when customising the operating tection trips to signal the following
mode (at the time of commissio- information:
ning), the latching of a fault indica-
tor lamp has been cancelled, the
fault indicator lamp goes out as
soon as the fault is no longer pre-
sent.
Pictogram Fault Sepam series 10

Detection of a fault by the phase current maximum protection

Detection of a fault by the earth current maximum protection


Detection of a fault by the thermal protection

External tripping

identification zone
The identification zone on the front
panel enables a Sepam to be iden-
tified:

1 : Identification code
2 : Reference
3 : Supply voltage
4 : Serial number

Refer to the Identification section


for the identification code key.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
47
identification The identification code of a Sepam
series10 is an alphanumeric code
identification code that defines the main functions of
the Sepam. It is made up of seve-
ral fields:

Sepam 10 family
Model
B: phase and earth current maximum protection
settings
A: phase and earth current maximum protection
settings, logic inputs and communication port
Number of current inputs
4: 3 phase current inputs + 1 earth current input
Sensitivity of earth current maximum protec-
tion
1: standard (0.1...24 In) CT
3: very sensitive (0.2...24 A and 2...240 A)
CSH200
Supply voltage
A: 24...125 V DC and 100...120 V AC
E: 110...250 V DC and 100...240 V AC

operating instructions During operation, when the set-


tings protection cover is closed,
accessing information the user has access to the follo-
wing:
H Reading of measurements, set-
tings, protection types and para-
meters.
H Local fault signalling.
H Last fault resetting.
H Reading of last recorded faults.
H Resetting of maximum values.
H Testing of indicator lamps and
the display.

display 1. Press to select one of the 3


menus.
2. The pointer shows the selec-
ted menu:
Measurements
Protection types
Parameters
3. Press and to select
the information to be displayed.

Released for Manufacturing


Printed on 2013/10/15
48 07897073EN01 revision : 09
resetting 1. A fault detected by the Sepam
is signalled by:
--- a message on the display
--- a flashing indicator lamp
2. Press to reset the fault.
3. The indicator lamp goes out
and the message disappears

setting instructions Knowledge of electrical network


protection is required for choosing
appropriate settings.
CAUTION Only those people with the requi-
red skills are authorised to set the
Sepam.
Not abiding by this instruction
may cause injury and damage to
equipment and property.
All protection is inhibited by
default. To make the protection
operational, it must be activated
and set ---up when commissioning
the RM6.

accessing parameters and 1. Open the settings protection


settings cover.
2. Press to select the protec-
tion or parameter menu.
3. Select the protection type or
parameter to be set using
and .
4. Enter the password if reques-
ted.
5. Press to select the value to
be modified.
6. The selected value flashes.
7. Press or to increment or
decrement the value.
8. Press to validate the new
value or press to cancel.
9. The value stops flashing.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
49
setting ranges The setting ranges that can be
used for the lower threshold
depend on the circuit breaker type:
D or B, and the type of sensors fit-
ted to the RM6.

Circuit breaker type D B


Type of sensors Cra 200/1 CRb 1250/1
Functions Code ANSI
Phase current 50---51 20---200A 125---630A
Earth current 50N---51N 20---200A 125---630A
2---240A 2---240A
Very sensitive earth current 50G---51G 0,2---24A 0,2---24A

factory set parameters The transformer ratios of the phase


and earth CTs (Io by summing) are
Sepam 10A and 10B standard factory set. If by error you have
earth deleted the settings, you can find
the type of CT fitted to your RM6 in
the inspection report supplied with
the equipment and on the CT sup-
port, where a label with the infor-
mation can be found (see image
aside).

Sepam 10A and 10B very sensi- The factory set measurement
tive earth range is 2---240A; this can be
changed.

To change to the 0.2---24A range,


you should:
1--- Bring up Io 0.2---24A in the
RATING screen.

2--- Change the wiring at the CSH


input, terminals 11---21 on the
Sepam connector marked B.

Released for Manufacturing


Printed on 2013/10/15
50 07897073EN01 revision : 09
configuring the logic inputs For the Sepam series10 A, logic
input operation must be adapted
to the type of voltage: AC or DC.
The type of voltage must be confi-
gured in the LOG INPUTS screen
of the parameter menu. The
default value is DC.

accessing phase current Connector B for connecting the


B
inputs current sensors is a short ---circui-
ting connector. It can be discon-
nected on---load; disconnecting it
does not open the sensors secon-
dary circuit. Remove the short ---cir-
cuiting connector without discon-
necting the wires connected to it.
Use another connector to connect
your generator.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
51
.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

.....................................................................................................................................................................

Released for Manufacturing


Printed on 2013/10/15
52 07897073EN01 revision : 09
operating instructions

operating and viewing A E


substation condition
description
A : earthing switch operating D
shaft
B : switch function operating
shaft F
C : fuse---switch combination
function operating shaft
D : position indicator B
E : fuse---switch combination
function opening pushbutton C
F : padlocking handle

closing a switch
Initial state:
H switch open
H earthing switch open

The indicator moves to the closed


Left the operating shaft protective position, and access to the
cover. earthing switch operating shaft is
Activate the switch operating blocked.
mechanism to the right.

opening a switch
Initial state
H switch closed
H earthing switch open

Activate the switch operating The indicator moves to the open


mechanism to the left. position, and access to the
earthing switch operating shaft is
freed.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
53
closing an earthing switch
Initial state :
H earthing switch open
H switch or circuit ---breaker open

DANGER

If the incoming line is powered Lift the operating shaft protective The indicator moves to the earth
on, do not close the earthing cover. position and access to the earthing
switch. Separate the pallet with the end of switch operating shaft is
the lever, then activate the blocked.
earthing switch operating
mechanism to the right.

opening an earthing switch


Initial state :
H earthing switch closed
H switch or circuit ---breaker open

Separate the pallet with the end of The indicator moves to the open
the lever, then activate the switch position, and access to the switch
operating mechanism to the left. or circuit ---breaker operating shaft
is freed.

closing a circuit ---breaker


or fuse ---switch
combination
Initial state :
H circuit ---breaker or fuse---switch
open
H earthing switch open

Lift the operating shaft protective The indicator moves to the closed
cover. position, and access to the
Activate the switch operating earthing switch is blocked.
mechanism to the right.

opening a circuit ---breaker


or fuse ---switch
combination
Initial state :
H circuit ---breaker or fuse---switch
open
H earthing switch open

Press the opening pushbutton of The indicator moves to the open


the circuit ---breaker or fuse---switch position, and access to the
combination. earthing switch is freed.

Released for Manufacturing


Printed on 2013/10/15
54 07897073EN01 revision : 09
operating safety

Switch or circuit ---breaker closed... ...the earthing switch is blocked.

Earthing switch closed... ...the switch or circuit ---breaker


is blocked.

key---locking (optional) The switches and the


circuit ---breaker are locked
in the open position. The earthing
switches are locked in position :
H open
H open/closed
There are various possible locking
diagrams.
H network switch and network
outgoing circuit ---breaker
---semi---crossed locking
---crossed locking
H Transformer outgoer :
---RM6/ transformer
---RM6/ low voltage
---RM6/ ransformer/low voltage

padlocking Switch and earthing switch with


a degree of protection IP3X,
operating shaft padlocking fit a padlock
handle 6mm < handle diameter < 8 mm.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
55
padlocking the opening A
pushbutton A
Fit the padlock on the opening
pushbutton
6mm < handle diameter < 8 mm.
A : fuse---switch combined func-
tion or circuit breaker opening
push botton.

with motorization lock


option VERSION NEUTRALISEE
B : circuit ---breaker motorized ON
C : position of the switch
C
C
OFF
C
ON : MOTORISATION AUTORISEE
OFF : MOTORISATION BLOQUEE
C

OFF

padlocking the operating


shafts of the switch with the
operating mechanism front
plate removed
fit a padlock
6mm < handle diameter < 8 mm.
in one of the 2 marked holes.
A
A : padlocking the earthing switch
in the open or closed position B
B : padlocking the switch in the
open or closed position

padlocking the operating A


shafts of the
circuit ---breaker with the
operating mechanism front
plate removed
fit a padlock
6mm < handle diameter < 8 mm.
in one of the 2 marked holes.
A : padlocking the earthing switch B
in the open or closed position
B : padlocking the switch in the
open or closed position
Released for Manufacturing
Printed on 2013/10/15
56 07897073EN01 revision : 09
overcurrent indicator
An overcurrent indicator of the
Alpha M or Alpha E type can be
optionally fitted one of the line
switch.
4 detection thresholds are possible
400 A, 600 A, 800 A, 1000 A.

Alpha M type indicator

1 2

operation If the reaction current exceeds the 1) Threshold overshoot optical


pre---set threshold, the indicator signal, one for each phase.
will send an optical signal on the 2) Rotary resetting and operating
faulty phase. The signal will remain test button (turn quickly).
visible until it is manually reset.

Alpha E type indicator

1 3
2

operation If the reaction current exceeds the 1) Threshold overshoot optical


pre---set threshold, the indicator signal, one for each phase.
will send an optical signal on the 2) Time during which the signal
faulty phase. The signal will remain remains visible.
visible for a time that can be Resetting is automatic.
pre---set.
3) Resetting and operating test
2 hours or 4 hours. pushbutton.
Manual resetting is possible.

threshold change for Alpha


M and Alpha E type
indicator

CAUTION

To change threshold, cable


appropriately according to the
diagram opposite. The terminal
block is placed behind the device.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
57
LV connection indicator
Flair 2xD

The Flair 21D, 22D and 23DV fault Flair 23DV has to be supplied
passage indicator is self---powered from 24Vdc to 48 Vdc for a perma-
by the measurement sensors. nent display operating and for the
A minimum 2A current is required outdoor lamp supply.(With a single
in the MV cable to start up the zero sequence CT, self powering is
Flair 21D display, an energy sto- not possible).
rage guarantees a 4 hours mini-
mum autonomy.
The Flair devices have an output
contact for interfacing with a
SCADA system.
FLAIR 21D
Flair 22D/23DV can be connected
to a voltage presence indicating
system (VPIS) provided with a vol-
tage output (VPIS---VO). In this
case, for greater reliability, fault
detection is confirmed by voltage
absence without taking into
account the current.

FLAIR 22D, et 23DV

Detector pending fault In the absence of a fault, a load current indication is displayed.
The amperage of each phase L1 --- L2 --- L3 is displayed in succession
Ammeter mode with its reference on the left of the display.
Example,
For a load current of 80 A : for L1
then for L2
and for L3
When Flair 22D/23DV is provided with an earth CT (B type mounting),
display of M2 and M3 only.
For each phase: if I>720A display: :
if I2A display : (Low Power).

Released for Manufacturing


Printed on 2013/10/15
58 07897073EN01 revision : 09
Maximeter mode To access the maximeter function, press once the Imax. button.
For each phase, an indication of the maximum load currents since the
last reset is displayed.
Example
for a max. current of 500 A in phase 1: then ,
followed by M2 and M3.
The maximeters scroll only once.
All the maximeter values are reset by simultaneous actuation of the
Test/Reset and Imax. buttons during scrolling.
When Flair 22D is provided with an earth CT (B type mounting), display
of M2 and M3 only.

Detector in fault indication Event A :


the current exceeds one of the thresholds set for
a period acknowledge time.
Event B :
the line current disappears (or absence of U with VPIS---VO option, on
Flair 22D/23DV)
Fault indication is active when A is followed by B within a lapse of time of
less than 70 s.
H Phase-- to -- earth fault detected :
display of or or , (or if earth CT).
the indicator lamp flashes (1 flash every 3 s) and the output contact is
activated.
H Phase-- to -- phase fault detected:
display of (Over current),
the indicator lamp flashes (2 flashes every 6 s) and the output
contact is activated.
For these 2 types of faults, the indicator lamp remains flashing until it is
reset (Reset), which can be achieved by:
H current recovery > 70 s, configurable time delay on Flair 22D/23DV
(Reset active if Automatic reset is not on OFF)
H U recovery, if VPIS---VO option on Flair 22D/23DV (Reset active if
Automatic reset is not on OFF)
H end of the time delay, (4 hours on Flair 21D, configurable on Flair
22D/23DV)
H a press on external Reset
H manual actuation of the Test/Reset button.

Maintenance H The Flair 21D fault passage indicator requires no maintenance (no
electric cells or batteries to be changed regularly)
H The lithium battery of the Flair 22D indicator should be changed about
every 15 years. ( for the battery replacement process, call your sales
representative who will put you in contact with the closest :
SCHNEIDER-- ELECTRIC group service centre. You can log on to :
www.schneider-- electric.com
H The lithium battery of the BVP option (external indicator unit with
incorporated battery) is to be changed every 15 years.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
59
Settings The Flair devices (>2010) are a fault passage indicator without settings
(automatic mode).
However, it is possible to perform specific override settings.
In manual mode, settings are made :
H using the 3 buttons located under the display, (Flair 22D/23DV).
H by micro---switches (drawing opposite).(Flair 21D) The changes are
taken into account after a press on the Test/Reset button.

In AUTO mode I>; I0>, the manual settings are not active.

Test mode H A press on the Test/Reset button activates Test mode.


H The indicator lamp flashes, and the BVP and the OUT output are
activated until the end of the test.
H The display successively shows and and (software
version)

Setting parameter scrolling Setting of Network Imax threshold Zero sequence timer reset
sequence in Test mode for automatic fault frequency I > threshold Io>
Flair 21D (automatic on test detection (*) (Over Current) (Earth Fault) (A)
(A)
mode)
or or to to
ammeter mode

10s or Test/Reset

When Auto is ON:


Flair 21D uses the following values for fault detection:

H frequency = self--- detection


H zero sequence threshold = automatic fault detection for any fault > 20 A
H Imax threshold = automatic fault detection for any fault > 200 A
H acknowledge time = 40 ms
H Inrush= 3s
H CT type = CT1 ( can be changed to CT2 by actualing the buttoms)
H Automatic reset = 70s (if automatic reset =on)
H Timer reset= 4h

Released for Manufacturing


Printed on 2013/10/15
60 07897073EN01 revision : 09
Settings mode (Flair 22D
and Flair 23DV)
During the Test mode, a press on the button provides access to
Settings mode (display ).
1) A press on the button displays the first parameter to be set
2) Several presses on the button scroll the parameters in a loop.
At this stage, with no actuation of or during 10 s,
the indicator returns to ammeter mode.
3) Press the button to display the current value of the
selected parameter
4) Press the button again to activate setting of this value:
the display flashes for 5 s
5) During flashing, press successively to display the desired value
6) Confirm by pressing the button; without confirmation within a
period of 15 s, return to display of the parameters without change
in the value.
Each press on the Esc (Return) button takes you back to the preceding
stage.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
61
connection BVP:
External indicator
Connection of CTs to the 3 MV unit with
cables incorporated battery
H Cable Length : 3 m max.
H Cross section: max. 1.5 mm2 CTs connection

H CTR2200 : mounting without


common point (6 wires)
H MF1 : mounting with or without SCADA
common point (4 or 6 wires) output

Important note
(for MF1 split core CTs):
H Mount the 3 CTs facing in the
same direction
H Run the screen earth braid of
the MV cable back inside the CT.

Type Rf. Product Description


Common
point
EMS58351 Flair 21D
Fault passage
EMS58352 Flair 22D
indicator
EMS58353 Flair 23DV

CT1 59925 CTR2200 Phase CT for RM6 6---wire mounting 4---wire mounting
cubicle bushing CTR2200 or MF1 CTs MF1 CTs
CT2 59963 MF1 Phase CT for cable
(split toroidal core)

59928 MFC3 3 crimp--- on


(pour MF1) connectors for
6--- wire mounting
(wires not supplied) Flair 22D and Flair 23DV CTs connexion

59962 Faisceau MF1 CT connector cable BVE:


or MFH for 4--- wires External indicator
mounting (A or B
unit
type)

59922 Flair 21D BVP External indicator unit


59988 Flair 22D BVE
SCADA
59927 MFH2200 Earth CT output

(split toroidal core)


VPIS---Vo

Common
point

6---wire mounting 4---wire mounting


Type A Type A Type B Type A
MF1 CTs CTR2200 CTs MF1/MFH CTs MF1 CTs

Type C mouting single zero sequence CTpossible only with flair 23DV

Released for Manufacturing


Printed on 2013/10/15
62 07897073EN01 revision : 09
ammeter
Test

The Amp 21D is an ammeter, for L1 Test button


cubicle, automatic and self -- L2
A
I max.

powered. L3
I max. button
The Amp 21D comes into opera-
tion whenever the current is grea-
ter than 3 A on the network.
Easergy
Amp21D
EMS58401

Load current indication

standard operating Equipments standard operating


mode.
Measuring mode The AMP 21D ammeter displays in
succession, by scrolling, the cur-
rents on phases L1,
L2 and L3, and saves to memory
the maximum values.

Maximeter mode Maximeter mode (I max.) A press


on the I max. button activates
the Maximeter mode.
This mode allows display of the I
maximum values occurring on the
three network phases since the
previous initialization.

At the end of the maximetersdis-


play cycle, the Amp 21D automati-
cally returns to Measuring mode.
The maximeter is reset by simulta-
neously pressing the Test and I
max. buttons.
Released for Manufacturing
07897073EN01 revision : 09 Printed on 2013/10/15
63
Test Mode

Choice of CT type:
H The CT1 option corresponds to
( ref.59925) phase CTs
H The CT2 option corresponds to
( ref.59963) phase CTs
H Factory setting: CT1.

Connection of CTs
to the 3 MV cables
H Cable length: max. 3 m
H Cross section: max. 1.5 mm2
H 3 phase CTs without common
point on a screw ---on terminal
block (6 wires) CT connection
H MF1: mounting with or without
common point (4 or 6 wires)

IMPORTANT

(for MF1 split core CTs)


H Mount the 3 CTs facing in the
same
direction
H Run the earth braid of the MV Assembly 6 wires
Common
cable screen back inside the CT. CTR2200 or MF1 point Assembly 4 wires
phase CTs MF1 phase CTs

References
Type Ref. Product Description
EMS58401 Amp21D MV ammeter
CT1 59925 CTR2200 Phase CT for RM6 cubicle
CT2 59963 MF1 Phase CT for cable (split toroid)
3 crimp
crimp---on
on connectors (wires not
59928 Set of 3 connectors for MF1
supplied)
Cconnecting harness for MF1 for
59962 CONNECTING HARNESS FOR MF1
assembly 4 wires (A or B type)

Released for Manufacturing


Printed on 2013/10/15
64 07897073EN01 revision : 09
Voltage detection Relay
The VD23 is a voltage presence
and absence detection relay.
It uses the VPIS V2-- V0 as sensor,
and operates with a 24 or 48 Vdc
external power supply.

Operation : automatic frequency detection


Calibration:
At power up, the VD23 automati-
cally detects voltage presence and : calibration performed
the network frequency, and then
performs self---calibration.

Measuring mode : Line-- to -- neutral voltages


3 seconds after calibration, the
VD23 displays, by scrolling, the 3s 3s 3s 3s
percentages of the nominal
voltage detected on each phase

Line-- to -- line voltages


3s 3s 3s 3s

Detection of Voltage presence: Detection of Voltage absence:


When the voltage percentage When the voltage percentage
becomes greater than the set thre- becomes less than the set thre-
shold for all the configured shold for all the configured
phases, then the VD23 lights the phases, then the VD23 lights the
voltage presence indicator and voltage absence indicator and
activates (or releases in inverted activates (or releases in inverted
mode) relay R1. mode) relay R2.

detection sequence threshold paramater


Configuration: voltages V1,V2,V3,
direct mode
R1: terminal = relay rest posi-
tion: voltage loss on at least one of
the phases
R2: terminal = relay rest
position: voltage presence on at
least one of the phases
A configurable time delay is
applied for control of R1
and R2:T12 = time delay for R1
changeover upon voltage loss indicator
T11 = time delay for R1
changeover upon voltage recovery indicator
T21 = time delay for R2
changeover upon voltage lossT22
= time delay for R2 changeover
upon voltage recovery

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
65
Mode selection Measuring
mode
Product Software Digits
Test mode name version
Network frequency
test

or

Type of Relay Phase Phase Phase Residual


measurement output 1 2 3 voltage
Configuration mode
Parameters defined line---to---line inverted measured measured measured measured
by micro switches

line---to---neutral direct not not not not


measured measured measured measured
Phase voltage % of nominal voltage
Parameters setup threshold
to
(10% increments)
mode
Voltage Residual voltage % of nominal voltage
To set the parameter to
(10% increments)
presence threshold
values, see the
section below Activation time to 0 to 1 s (0.1s increments)
delay R1 (direct) 1 to 21 s (2s increments)
Release time delay to 0 to 1 s (0.1s increments)
R1 (direct) 1 to 3 s (0.5s increments)

Phase voltage % of nominal voltage


to
threshold (10% increments)
Voltage Activation time to 0 to 1 s (0.1s increments)
absence delay R2 (direct) 1 to 21 s (2s increments)
Release time delay 0 to 1 s (0.1s increments)
to 1 to 3 s (0.5s increments)
R2 (direct)

Automatic Set to OFF to retain the last calibration


Calibration mode or
calibration performed

Forced Calibration performed normally


1s
calibration Error in calibration:
voltage levels too low

Configuration of H When the value of the Confirm this value by pressing the
parameter is displayed, a press on button; without confirmation
thresholds and time the key causes the display to within a period of 15 s, return
delays flash for 5 s to display of the parameters
The parameter values (white H During flashing, press without change in the value.Each
screen in the above diagram) can successively to display the press on the Esc button takes
be modified as follows: desired value you back to the preceding stage.

EARTH FAULT DETECTION


suggested choice for VD23
settings

VOLTAGE EARTHED OR IMPEDANT ISOLATED NEUTRAL COMPENSATED NEUTRAL


DETECTOR GROUNDING

3 4 5 6
SW 1 V1+V2+V3+V0
V1.V2.V3.V0
SW 2
R1

SW 1 3 4 5 6 3 4 5 6
U12+U13+U23 U12+U13+U23

SW 2 U12.U13.U23. U12.U13.U23.
R1
Released for Manufacturing
Printed on 2013/10/15
66 07897073EN01 revision : 09
access to the cable
compartments
access to the cable
connection compartments
without interlocking

CAUTION

The HV cables must be


de-- energised for access
to the compartments.

Open the switch and close the To remove an access panel,


earthing switch. remove the 2 upper screws, lift
and pull towards you.

access to the cable


compartments
connection on busbar (O WARNING THE COMPETE SWITCHBOARD
function and T function) (ALL THE RM6 CONNECTED TOGETHER)
MUST BE DE-- ENERGISED
OPEN ALL SWITCHES CONNECTED TO THE BUSBAR
CLOSE ALL ASSOCIATED EARTHING SWITCHES

access to the cable


connection compartments
with interlocking
(optional)

Functional unit in operation, Open the switch.


switch closed. The access panel remains locked.
The access panel is locked.

Optionally.
Switch and circuit ---breaker closing
is inhibited if the access panel
is removed.

Close the earthing switch. Access panel removed,


The access panel is released. the earthing switch can now
be re---opened.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
67
Earthing switch open: the access
panel cannot be put back.
If the connectors so allow,
DC current can be injected to
monitor cable insulation or search
for faults.

Close the earthing switch.

Put back the access panel. Open the earthing switch.

access to the MV
compartment of the
DE---Mt cubicle

DANGER

(B)
H Opening of panel (A)
authorized only if : En optional :
---all upstream connection(s) a key lock exists
locked---out in OPEN position (example B)
---all downstream connection(s)
locked---out in OPEN position.

DANGER

Intervention inside the DE-- Mt


cubicle is authorised only if:
To remove the access panel (A),
the 3 busbars are grounded, (A) remove the 3 upper screws,
via a temporary connection or via then raise and pull toward yourself.
an earthing switch (upstream or
downstream).

Released for Manufacturing


Printed on 2013/10/15
68 07897073EN01 revision : 09
preventive maintenance

standard operating
conditions
maintenance summarising
table

CAUTION

description operation material


panelling
cleaning cloth
earthing covers
cleaning sponge, clear water

device panelling The main drawbacks of this


CAUTION process are:
H deterioration due to jet pressure
and impossibility of relubricating
We draw your attention to the risk the inaccessible fixing points
of using high pressure cleaning H risk of overheating due to
processes. presence of solvent on the contact
Schneider Electric cannot zones.
therefore guarantee the H elimination of special
reliability of equipment that have protections.
been cleaned in this manner,
even if cleaning was followed by
lubrication.

Clean using a dry cloth.

earthing covers This operation can be performed


in event of excessive soiling.
Clean using a sponge and clear
water. Do not use alcohol or other
CAUTION solvents to clean.

maintenance cycle and This device is designed to operate The following are recommended
operations for 30 years or for 1000 operations :---an O/C operation every 6 years
in normal conditions of use as per for motorised functional units
standard CEI 694. and/or functional units with
a latching mechanism
(Q and D/B function)
---replacement of batteries is
recommended every 4 years
---inspection every 5 years of the
condition of the mechanisms (pol-
lution, corossion) and the cleanli-
ness of the earthing covers (pollu-
tion).
Released for Manufacturing
07897073EN01 revision : 09 Printed on 2013/10/15
69
harsh operating conditions
To ensure proper operation of the RM6 in harsh operating conditions, we strongly recommend
regular maintenance of the cubicle and its installation.

Recommended inspection frequency : at least once a year


During the inspection, check the 6 following points:

1 LV compartment 2 earthing covers


symptoms : condensation, presence of humidity
symptoms : humidity, dust
check : for rust on the LV electric
and electronic parts check : surface cleanliness

solutions : solutions :
dry the environment dry the environment
replace the damaged parts
fit heating resistances (optional) clean using a clean cloth and water (no alco-
hol or solvent)

3 mechanical operating mechanisms


11 symptoms : humidity, condensation on live parts

2
3 check : for red rust on moving parts

3 solutions :
find and treat the origin of condensation
phenomena
follow up the damage
14
replace the operating mechanism if required
(refer to reference: 07897270)

55 4 MV socket and cable


symptoms : presence of corona discharge
or odours
check : connections (may be damaged)

6 solutions :
fit new sockets

6 trench 5 fuse compartments


symptoms : humidity symptoms : humidity + dust
check : for presence of check : proper operation of the VPIS
water in the trench
solutions : solutions :
pump out water clean the outside surface of the fuse compartments
drain the trench using a cloth and clear water
(if necessary add sand)
In case sand is added in the trench,
take care that the cables
are still fixed correctly and that no additional
stress is added to the bushings Released for Manufacturing
Printed on 2013/10/15
70 07897073EN01 revision : 09
corrective maintenance

foreword After each operation, perform -- Nylstop (self -- locking nut)


the electrical tests according to -- Contact washer
The corrective maintenance current standards. -- Locking rings
operations enable replacement of -- Mechanical pin
subassemblies.
The operations quoted in the To access the various devices:
following summarising table can CAUTION H open the switches
be performed by the customer or
by Schneider Electrics H close the earthing switches
On replacement, all the H cut the supply to the LV circuits
after---sales representatives. accessories below must be
For any other maintenance replaced with new equipment.
operations, contact the
representatives of your nearest
Groupe Schneider.

maintenance summarising table


description ralisation
replacing a voltage indicator SCHNEIDER ELECTRIC or Customer
replacing a fuse (MV) SCHNEIDER ELECTRIC or Customer
replacing the charging motor SCHNEIDER ELECTRIC or Customer
replacing a printed circuit SCHNEIDER ELECTRIC or Customer
replacing the indicating contact SCHNEIDER ELECTRIC or Customer

replacement of the voltage VPIS-- V1: production until VPIS-- V2: production from March
presence unit (VPIS) type February 2009 2009 onwards
VPIS---V1 by type VPIS---V2

removing the VPIS---V1


voltage presence unit B
A

CAUTION

The screws (A) must be retained.

Unscrew the 2 self---tapping Remove the VPIS 1 voltage pre-


screws (A). sence box (B).

Disconnect the VPIS1 voltage pre-


sence unit (B).

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
71
contents of the kit
VPIS---V2
1 2
1 : indicator unit
2 : cable gland seals
3 : surge arrestor
4 : screws (x4)
3 4
The screws removed earlier are
reused. (2 self -- tapping screws)

mounting the voltage 3


presence unit (VPIS---V2) 2

5
5

Position the cable gland seal (2) Clip the cable harness connector
on the voltage presence connec- (5) onto the VPIS protection (3)
tion (5). Check that the seal is in and fit the seal
the correct position.

checks to be made before Check the condition of the wiring tool (VPI62420) (not included in
continuing with the opera- harness (5) and the VPIS 2 rating the kit) or see correspondence
using the optional diagnostic table below.
tion

VPI62403 VPI62404 VPI62406 VPI62408


RM6 7,4 A 10,7 A 22,4 A 47,2 A
Min Max Min Max Min Max Min Max

RM6 50 ---60Hz
standard 2,5 kV 3,2 kV 3,3 kV 7,7 kV 8,8 kV 16,0 kV 16,1 kV 23,0 kV

Un : network
RM6 50 ---60Hz voltage
BUSHING 5.3 kV 10.6 kV 7.6 kV 15.4 kV 16 kV 32.5 kV
WELL only

Key Minimum and maximum network


voltage in 50Hz and 60Hz.

Released for Manufacturing


Printed on 2013/10/15
72 07897073EN01 revision : 09
Please refer to the chapter entit-
led contents of the kit

Screw the indicator unit (1) onto


the VPIS surge arrestor (3) using
the 4 screws. CAUTION

Tighten the screws to exert slight


pressure on the cable gland seal
without distorting it.

Install the voltage presence unit in


the correct position using the 2
self---tapping screws removed ear-
lier.

ATTENTION

The screws removed earlier are


reused.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
73
replacement of the voltage
presence unit (VPIS) type CAUTION
VPIS---V2 by type VPIS---V2
removing the VPIS 2 The screws must be retained.
voltage presence unit
Remove the 2 screws from the
front panel.

mounting the new


VPIS 2 voltage presence
unit

ATTENTION
Discard the faulty indicator unit.
Only the indicator unit is to be Leave the existing surge arrestor
changed. and seal.
Contact the Schneider Electric
administration for recycling pro-
ducts at the end of their service
life. Remove the unit.
Remove the 4 screws from the
indicator unit.

Screw up the 4 screws.


Tighten the screws to exert slight
Install the new voltage presence pressure on the cable gland seal
indicator unit. without distorting it.

CAUTION

The screws removed earlier are


reused.

Install the voltage presence unit in


the correct position using the 2
self---tapping screws removed ear-
lier.

Released for Manufacturing


Printed on 2013/10/15
74 07897073EN01 revision : 09
replacing a fuse Standard IEC 252 paragraph 23.2
recommends replacement of
the 3 HV fuses after blowing
of one of the fuses.

removal
CAUTION CAUTION

Before performing these Repeat the following operations


operations, remember that you for all 3 fuses.
close the earthing switch.
To remove the cover: lift it and pull
it towards you.
The instructions are visible on the
cover.

Release the plug and push the Move the plug up to the limit stop,
extraction handle manually to swivel it towards the left to remove it.
unlock the plug (tap with the palm
of your hand to separate the seal
from the plug if necessary).

removing a DIN fuse


(Fusarc CF)

Recover the centring device at the Extract the fuse.


top of the fuse.
Released for Manufacturing
07897073EN01 revision : 09 Printed on 2013/10/15
75
removing a UTE fuse
(Solefuse)

Loosen the fuse using a wrench Let the plug hang down from
with end BTR n. 5. its supporting string.

cleaning the plugs

If the fuse plugs are dirty, clean the Talc the clean surface with natural
conical surface using silicon oil. talc to avoid clinging between the
Then wipe it down with a clean plug and fuse compartment.
cloth to dry it. The surface must appear smooth
Huile Rhodorsil 47V50. without lumps.
Distributed by Rhone Poulenc TALC : westmin 8.
(chimie Lyon) FRANCE Distributed by Ets Ledoux
Bordeaux FRANCE

fitting a DIN fuse Insert the fuse in the compartment.


Fit the centring device on the fuse.
Insert the plug pins in the plinth
CAUTION and swivel it round to the right.

On no account must a fuse that


has been knocked be installed.
A test prior to installation using
a monitor is recommended.

Released for Manufacturing


Printed on 2013/10/15
76 07897073EN01 revision : 09
fitting a fuse with striker
Fuse blowing releases a striker
that causes three---phase opening
of the switch and prevents it from
reclosing. Percuteur
Striker pin
Schlagstift
Percussore

The end of the fuse equipped with The technical data and mounting
the striker is marked. direction of the fuse are printed on
the body.
(striker facing upwards).

fitting a UTE fuse

CAUTION

15 Nm
On no account must a fuse that
has been knocked be installed.
A test prior to installation using
a monitor is recommended.

Fix the fuse on the plug using Insert the plug and fuse assembly
a torque wrench with end in the compartment.
BTR n. 5 and insert the fuse Insert the plug pins in the plinth
in the compartment. and swivel it round to the right.

locking the plug

Make sure that the handle For replacement of a fuse that has
trunnions are inserted in the plinth struck, press the switch to put it
slots and lock the plug. back in position.
Never use the operating lever to
lock the plug.

Released for Manufacturing


07897073EN01 revision : 09 Printed on 2013/10/15
77
access to the LV compartment
dismantling

1-- Remove the fuse compartment


cover
(pull towards you) 2
2---Remove the LV cable trough
6 screws (HM6x16)
3---Remove the self---cutting
screws 3
1

reassembling H Reassemble in opposite order


to disassembly.

replacing a motor
removal

CAUTION

LV circuit de-- energized.

Remove the 3 nuts fixing Remove the motor support by


the motor support. pulling it backwards.
Disconnect the motor
supply wiring.

fitting Fit the new motor in the opposite Fit the trunking and the cover.
order to removal.
Tightening torque: 28 Nm.

Released for Manufacturing


Printed on 2013/10/15
78 07897073EN01 revision : 09
replacing the LV
contacts
Disassemble the pilot light
support.
removal
B
CAUTION
S1
LV circuit de-- energized A

Remove the position indicator A. Remove contact support S1


Remove interlocking B. without disconnecting the wiring.
(elastic ring and spring)

S2 S3 S41 S5

Remove contact S3 without Remove the contact support


disconnecting the wiring. S2, S4, S5, S6 and S7 without
disconnecting the wiring.

fitting the contacts and


wiring connection

13 Nm

S1

Fit contacts S1 to S7 to replace the Disconnect the contact wiring


former contacts. S1 disassembled, and connect
Fit the position indicator and it to the new contact.
interlocking. Repeat this operation for all
the contacts (S2 to S7).
Released for Manufacturing
07897073EN01 revision : 09 Printed on 2013/10/15
79
processing when
dismantling the equipment

processing of SF6 gas The SF6 gas must be removed The after sales of SCHNEIDER
before any dismantling operation ELECTRIC can propose a com-
when dismantling the can be carried out, according to plete offer.
equipment the procedures described in ---dismantling and recycling of the
IEC-- 61634 and according to the RM6 units
conformity rules following instructions. The remo-
ved gas must be processed in --- treatment of the SF6 gas.
compliance with IEC-- 60480. _Finally a certificate will be provied
to you.

processing method

A
A

Unscrew the vacuum/filling plug Remove the plug (A).


(A).

Dont remove the valve (B) which Plug removed.


allows to slow gas discharge.

REMINDER

Empty unit absolute pressure


will be 0,1 bar

Connect the SF6 vacuum/filling


device (M24 x 1,5).

Released for Manufacturing


Printed on 2013/10/15
80 07897073EN01 revision : 09
group Schneider Electric service
centers are there for:
engineering and technical
assistance
start-up
training
preventive and corrective
maintenance
adaptation work
spare parts
Call your sales representative
who will put you in touch with
your nearest group Schneider
Electric service centers.

Schneider Electric Industries SAS As standards, specifications and designs change from time
to time, please ask for confirmation of the information given
in this publication.
89, boulevard Franklin Roosevelt
F--- 92500 Rueil--- Malmaison (France)
Tel : +33 (0)1 41 29 85 00
Conception, rdaction: Service Documentation
http://www.schneider--- electric.com Technique T&D
Released for Manufacturing
Printed on 2013/10/15
07897073EN01 revision : 09 Edition du : SEPTEMBRE 2013

You might also like