Sl.No. Description of work Electrical ACMV


1 Power receiving substation Nil
outdoor

2 Transformer Yard outdoor Nil

3 HT breakers indoor Check ventilation needs

4 Transformer indoor - Dry Check ventilation needs


type
5 Generators - outdoor Size Supply air
requirments
6 Generators - indoor Size Ventilation and
exhaust system
7 Main Electrical rooms Ventilation

8 Floor level Electrical rooms Ventilation

9 Bus ways / Cable shafts

8 UPS Rooms ACMV requirements

9 Battery rooms ACMV requirements

10 AHU Rooms Power, Lighting and Sizing, acoustics, fresh air


Grounding system design shaft etc.,
and connection up to
terminals.
11 Chillers Chiller panels, adopter Provide precise power
boxes for cable factor of chillers / THD at
terminations, extension of the input if declared by
grounding system and OEM.
connections.
12 Pumps Power and grounding power factor of pumps,
systems, remote push type of starting relevant
button stations if required details from OEM.
as per design, sizing of
motor control center
13 VAV's Power outlets through UPS
or inverter
14 Water pumps Motor control center, Ventilation requirements if
grounding system any
extention and connectivity

15 Treatment plants Motor control center, Ventilation and exhaust


grounding system
extention and connectivity
16 Fire pumps Continuity of power and Ventilation and exhaust
extention of grounding and
connectivity
17 Wet risers Grounding and bonding
18 External hydrants Grounding and bonding
19 Diesel storage Flameproof switchgear,
grounding and bonding
20 Building Management Field inputs / SCADA
upstream connectivity
21 Billing arrangements common for all services common for all services
22 Fire alarm / detection Continuity of power and ACMV for commond room
extention of grounding and
connectivity
23 Security systems Continuity of power and ACMV for commond room
extention of grounding and
connectivity
24 Public address system Continuity of power and ACMV for commond room
extention of grounding and
connectivity
25 IT duct bank co ordination co ordination

26 Sprinkler Co ordination Co ordination

27

Note Civil and Structural works M & E to provide static and


dynamic loading patterns
to structural consultant
along with probable
dimensions.
Civil FP, FA and PA PHE Security
Foundation co-ordination of fire lines co-ordination of PHE lines Co-ordination for security
with Electrical, PHE and IT with Electrical, Fire and IT system cabling with other
services
Foundation FP requirements

FP requirements

Foundation FP requirements

Foundation FP requirements

Foundation FP requirements

Cable trenches if any FP requirements

Closure of shafts after Fire seal between floors


installation

CW and Fresh air shafts. Tripping of AHU main or Drainage Access control if relevant
sub panels in the event of
fire. Consider relevant
relay modules in design
Foundations / steel Fire extinghishers if check drainage extension if Access control to Terrace /
structures mandatory any cameras based on need

Foundations

Foundations Fire extinghishers Drainage requirements Access control / CCTV


requirements

Fire extinghishers Access control / CCTV


requirements
Foundations Fire extinghishers Drainage requirements Access control / CCTV
requirements

pump sizing Access control / CCTV


requirements

common for all services common for all services


Access control / CCTV
requirements

Fire extinghishers / Integration with Fire panel


suppression system if any

Fire extinghishers /
suppression system if any

co ordination

Automation requirements,
evacuation anounciation
etc.,
IT Remarks
co-ordination for IT duct
bank with other services.

IT connectivity SCADA or BMS


connectivity
IT connectivity SCADA or BMS
connectivity
IT connectivity SCADA or BMS
connectivity
IT connectivity SCADA or BMS
connectivity
IT connectivity SCADA or BMS
connectivity
IT connectivity SCADA or BMS
connectivity

Interior projects / end user


buildings
Interior projects / end user
buildings
IO's if connected main
network

IO's if connected main


network

Interior projects

IO's if connected main shell and core


network

IO's if connected main shell and core


network
IO's if connected main shell and core
network

IO's if connected main shell and core


network

IO's if connected main


network

IO's if connected main


network

You might also like