You are on page 1of 7

Summary

CODE DESCRIPTION MATERIALS LABOR EQUIPMENT SUBCONTRACT TOTAL


01-000 General Requirements
01-300 Supervision
01-500 Temporary Utilities
01-510 Temporary Phone
01-520 Temporary Facilities
01-700 Cleanup
02-000 EXISTING CONDITIONS
02-400 Demolition
03-000 CONCRETE
03-200 Rebar
03-300 Footing and Foundations-Labor
03-310 Footing and Foundations- Concrete
03-320 Slab/Floor-Labor
03-330 Slab/Floor-Concrete
03-340 Concrete Pump
03-400 Pre-cast Concrete
03-500 Light Weight Concrete
04-000 MASONRY
04-200 Masonry
05-000 METALS
05-100 Structural Steel
05-200 Joist and Deck
05-500 Metal Fabrications
05-900 Erection
06-000 WOODS, PLASTICS, AND COMPOSITES
06-100 Rough Carpentry
06-110 Lumber
06-120 Trusses
06-200 Finish Carpentry

09/14/2017 00:36:14 Prepared by:__________


1 of 7
file:///conversion/tmp/scratch/365834114.xlsx Checked by:__________
Summary

CODE DESCRIPTION MATERIALS LABOR EQUIPMENT SUBCONTRACT TOTAL


06-210 Wood Trim
06-400 Cabinetry and Counter Tops
06-410 Counter Tops
07-000 THERMAL AND MOISTURE PROTECTION
07-100 Waterproofing
07-200 insulation
07-210 Ridgid Insulation
07-220 Stucco
07-400 Siding
07-500 Roofing
07-600 Sheet Metal
07-700 Roof Specialties
07-710 Rain Gutters
07-800 Fireproofing
07-900 Caulking and Sealants
08-000 OPENINGS
08-100 Metal Doors and Frames
08-110 Wood Doors
08-300 Overhead Doors
08-400 Store Fronts
08-500 Windows
08-700 Hardware
08-800 Glass and Glazing

09/14/2017 00:36:14 Prepared by:__________


2 of 7
file:///conversion/tmp/scratch/365834114.xlsx Checked by:__________
Summary

CODE DESCRIPTION MATERIALS LABOR EQUIPMENT SUBCONTRACT TOTAL


09-000 FINISHES
09-200 Drywall
09-210 Metal Studs
09-300 Ceramic Tile
09-500 Acoustical Ceilings
09-600 Floorings
09-700 Wall Coverings
09-900 Paint
10-000 SPECIALTIES
10-100 Signage
10-200 Toilet Partitions
10-210 Toilet and Bath Accessories
10-400 Fire Extinguishers and Cabinets
11-000 EQUIPMENT
11-300 Appliances
12-000 FURNISHINGS
12-200 Window Treatments
14-000 CONVEYING EQUIPMENT
14-200 Elevators
21-000 FIRE SUPRESSION
21-100 Fire Sprinklers
22-000 PLUMBING
22-100 Plumbing
23-000 HVAC
23-100 HVAC
26-000 ELECTRICAL
26-100 Electrical
27-000 COMMUNICATIONS

09/14/2017 00:36:14 Prepared by:__________


3 of 7
file:///conversion/tmp/scratch/365834114.xlsx Checked by:__________
Summary

CODE DESCRIPTION MATERIALS LABOR EQUIPMENT SUBCONTRACT TOTAL


27-100 Communications
31-000 EARTHWORK
31-100 Clearing and Grubbinh
31-200 Grading and Excavation
32-000 EXTERIOR IMPROVEMENTS
32-100 Asphalt
32-110 Site Concrete- Labor
32-120 Site Concrete- Concrete
32-130 Rebar
32-200 Fencing
32-310 Retaining Walls
32-320 Dumpster Enclosures
32-330 Signage
32-340 Outside Lighting
32-900 Landscapes
33-000 UTILITIES
33-100 Water Line
33-300 Sanitary Sewer
33-400 Storm Drain
33-500 Gas Lines
33-700 Power Lines
33-800 Telephone Lines
SUBTOTAL
Building Permit
Bond
SUBTOTAL
Profit and Overhead Markup
Profit and Overhead
TOTAL

09/14/2017 00:36:14 Prepared by:__________


4 of 7
file:///conversion/tmp/scratch/365834114.xlsx Checked by:__________
Detail

Materials Labor
Item Quantity $/Unit Cost LHR/UNIT LHR $/LHR

09/14/2017 00:36:14 Prepared by:__________


6 of 2
file:///conversion/tmp/scratch/365834114.xlsx Checked by:__________
Detail

or Equipment
Cost $/LHR Cost Total

09/14/2017 00:36:14 Prepared by:__________


7 of 2
file:///conversion/tmp/scratch/365834114.xlsx Checked by:__________

You might also like