Document Check list

Civil
Concrete Foundation
Project No. Project Title

Document No. Document Title

Issue Purpose: IFA IFC ORGR. CHKR.


Initial
Issuing Date: / / Sign
Date
Item No. DESCRIPTION 100% 100%
1 TITLE BLOCK AND DRAWING PRESENTATION
a Correct template
b Drafting Standards (Layers, colors, linetypes, units, scale etc.)
c Titles, Drawing Nos., Revision, Date
d Prepared / Checked / Approved initials
e Description
f Issue for Review / Approval / Construction
g Revision clouds and diamonds, Legend, Key Plan, Reference Drawings
h General Notes
j Orientation or North Mark
k Drawing professionally presented and well balanced
2 DESIGN INFORMATION
a Architectural Info.
b Equipment or Vendor Info and Load Data
c Engineering Correspondence
d Calculation Results
e Design Input Quality 5

f Design optimization performed


g BOQ verified against proposal-stage BOQ
3 LOCATION
a Orientation / Grids / Coordinates
b Centre-lines and Grid Marks
4 STRUCTURAL DESCRIPTION
a Necessary views (plan, section, elevation) and details included
b Dimensions & sizes as per calculations
c Elevations / Levels (TOF, BOF, NSL)
d Anchor bolts (Quantity, size, BCD, projection)
e Box out (Quantity, size, location)
f Grout type & base plate
g Piles (Quantity, size, location, cap thickness)
5 REBAR ARRANGEMENT
a Rebars as per calculations
b Rebars mark, size & spacing tally in plan, elevation and sections
c Reinforcement around openings / box outs / grooves
d Concrete cover
e Development length and hooks
f Location of lap splices
6 MISCELLANEOUS
a Coating / Water proofing
b Blinding Concrete (Indication, Extent, Thickness)
c Embedded items (Quantity, Location, Type)
d Construction Joints
e Expansion / Contraction Joints
f Bill of Materials / Bill of Quantities

Notes:
1) Abbreviations: IFA=Issued for Approval; IFC=Issued for Construction; ORGR.=Originator; CHKR.=Checker; APPR.=Approver
2) Please tick "" the checked item, in case if not applicable or not available then write N/A with reasons in 'Remarks' column.
3) In case Client instructed a major change in any stage of document, document for next issuance must be checked again as per checklist.
4) Checklist shall always be used on first issuance to the Client.
5) If design input quality is low e.g. values are assumed from some past experience instead of project-specific vendor data, the reasons shall be note
6) Darkened cell means that check is not compulsory for that person.
cument Check list Doc. No:
Rev. :
Civil Date: August 1, 2017
ncrete Foundation Page: 1 of 1

Project Title

APPR.

Spot Remarks
rience instead of project-specific vendor data, the reasons shall be noted in 'Remarks' column.