Matrix Excelcon Sdn Bhd

Machinery Record May 2016


Company : Hong Hon Earthwork & Construction

Date Excavation Foundation Hours U/G Services Hours


3.5.2016
4.5.2016 excavate & backfill Dta-9 10
5.5.2016 excavate & backfill Dta-8a&8b 10
6.5.2016
7.5.2016 excavate & backfill Dta-8a&8b 2
8.5.2016 excavate foundation Dtb-2b 8
9.5.2016 excavate foundation Dtb-2b 10
10.5.2016 excavate foundation Dtb-1b 8
11.5.2016 excavate foundation Dtb-1b 4
12.5.2016 excavate foundation Dta-8b 10
13.5.2016 excavate foundation Dta-8b 4
16.5.2016 excavate foundation Dta-8b 10
17.5.2016 excavate foundation Dta-8b 6
18.5.2016 excavate foundation Dta-8a 10
19.5.2016 excavate &backfill Dta-10 10
20.5.2016 excavate & backfill Dta-10 2
21.5.2016
22.5.2016 excavate foundation Dta-10 8
23.5.2016 excavate foundation Dta-10 8
24.5.2016
25.5.2016 excavate foundation Dta-10 10
26.5.2016 excavate foundation Dta-10 10
27.5.2016 excavate foundation Dta-8a 7
28.5.2016 excavate foundation Dta-8a 6
29.5.2016 excavate foundation Dta-8a 6
30.5.2016 excavate foundation Dta-9 8
31.5.2016 excavate foundation Dta-9 10
Other Hours Total Hours
clearing debris and repairing access Dta-2b,Dtb-15,Dta-1b 8 8
10
10
level soil block Dtb-1b,clear balance of pile at elevated water tank 8 8
support house manhole,level soil Dtb-2b sidelane 6 8
8
10
support house manhole 2 10
transfer brc for Dtb-2a foundation,clear access for brickwork hoisting 4 8
10
4
10
remove soil at Dta-8b corner lot 2 8
10
10
repair main access,level soil at Dta-8b & Dtb-1b 6 8
support brickwork,relocate hisec fencing 8 8
8
8
repair access,support brickwork,excavate temporary drainage for water discharge 4 4
10
10
unloading Dtb-5a CTS F/F BRC,support material for concrete cover 3 10
support house manhole 2 8
repair access at elevated water tank 2 8
backfill soil at elevate water tank for crane parking 2 10
10
234