You are on page 1of 12

PART 1 SUBSTATION WORKS

SCHEDULE B OF REQUIREMENTS
SECTION 1 POWER, AUX TRANSFORMER AND NER

Item Number
Description
No. Required

The equipment to be supplied and installed under this section are the
Power Transformer and Neutral Earthing Resistor comprising :-

1. Two To design, supply and install 60/90MVA 132/33kV ONAN/ONAF


YNynOd11 tap +10% 15% in 1.67% steps Power Transformer complete
with marshalling kiosk, Vacuum Type of OLTC, tap changer control
equipment ( including remote On Load Tap Changer with binary output )
Maintenance free Dehydrating Breather, all internal wiring, HV Oil to SF6
gas bushing (to be install inside Bus Duct) and LV cable box, lamps,
earthing connections, oil trap system and other accessories to complete
including Pile Foundations.

2. One lot Insulating oil for Item No. 1 above transformers plus 5% spare.

3. Two To design, supply and install 300kVA, 11/0.415kV ONAN ZNyn Earthing
transformer connected to the above transformer Item No. 1 above
complete with marshalling cubicle, internal wiring, cable box (including
cable terminals, lugs and clamps), hold down bolts, earthing connections,
etc. to complete including Pile Foundations.

4. One lot Insulating oil for Item No. 3 above transformers plus 5% spare.

5. One To design, supply and install Neutral Earthing Resistors connected to the
above item No. 1 transformer at 12.1 Ohm or suitably calculated
resistance rated at 1600A for 10 seconds at 30 degree C ambient and 45
degree C or higher temperature rise of dry grid type enclosed in a free
standing steel outdoor enclosure complete with complete with wall
mounted isolating switches, polimeric air bushing , earthing connections
etc to complete including with Pile Foundations.

Signature:______________Company:___________________Date:________________

Schedule B of Requirements (Transformer and NER) Section 1 Vol 4 of 5 (Page 1 of 7)


PART 1 SUBSTATION WORKS
SCHEDULE B OF REQUIREMENTS
SECTION 1 POWER, AUX TRANSFORMER AND NER

Item Number
Description
No. Required

6. Two To design, supply and install 20/30MVA 132/11kV ONAN/ONAF YNd11


tap +10% 15% in 1.67% steps Power Transformer complete with
marshalling kiosk, Vacuum Type of OLTC, tap changer control equipment
( including remote On Load Tap Changer with binary output ) Maintenance
free Dehydrating Breather, all internal wiring, HV and LV cable box,
lamps, earthing connections, oil trap system and other accessories to
complete including Pile Foundations.

7. One lot Insulating oil for Item No. 6 above transformers plus 5% spare.

8. One To design, supply and install Neutral Earthing Resistors connected to the
above item No. 6 transformer at 4.0 Ohm or suitably calculated resistance
rated at 1600A for 10 seconds at 30 degree C ambient and 45 degree C
or higher temperature rise of dry grid type enclosed in a free standing
steel outdoor enclosure complete with complete with wall mounted
isolating switches, polimeric air bushing, earthing connections etc to
complete including with Pile Foundations.

Note :

This schedule on this Power Transformers requirement is good for


Tendering purposes only. They are only preliminary proposals. The
Contractor is required to engage a Professional Engineer to check the
designs of the Power Transformer requirements.

Signature:______________Company:___________________Date:________________

Schedule B of Requirements (Transformer and NER) Section 1 Vol 4 of 5 (Page 2 of 7)


PART 1 SUBSTATION WORKS
SCHEDULE B OF REQUIREMENTS
SECTION 1a POWER TRANSFORMER AND NER

Item
2 X 60/90MVA 132/33kV
No. Description
Power Transformer

TECHNICAL REQUIREMENTS

1. Number of Phases 3

2. Number of windings 3

3. Normal Ratio of transformation on no-load HV/LV 132/33kV

4. Corresponding highest system voltage 145/36kV

5. Continuous maximum rating 90MVA

6. Type of cooling ONAN/ONAF

7. Continuous ONAN / ONAF rating 60/90 MVA

8. External cooling medium Air

9. Impedance voltage at 75C, normal ratio and continuous 15%


maximum rating

10. Phase connection :

(a) HV Winding Star


(b) LV Winding Star
(c) Stabilitising Windings (tertiary) Delta
(d) Vector group HV/LV YNynOD11

11. Delta connected stabilitising windings:

(a) Whether required Yes


(b) Nominal voltage 11kV
(c) External load to be carried Yes

12. Maximum short circuit MVA infeed available from system

(a) HV terminals
(b) LV terminals
(c) Tertiary winding terminals

13 Temperature Rise according to IEC (for Tropical Climate)

(a) Oil Temperature 50C


(b) Winding Temperature 55C

Signature:______________Company:___________________Date:________________

Schedule B of Requirements (Transformer and NER) Section 1 Vol 4 of 5 (Page 3 of 7)


PART 1 SUBSTATION WORKS
SCHEDULE B OF REQUIREMENTS
SECTION 1a POWER TRANSFORMER AND NER

Item
2 X 60/90MVA 132/33kV
No. Description
Power Transformer

TECHNICAL REQUIREMENTS

14. On-Load tap selection required +10% -15% in 1.67% steps

15. Whether any reduces rating is permitted over taping range. No

16. Whether remote electrical control is required Yes

17. Whether automatic control is required. Yes

18. Whether remote control panel is required Yes

19. Bushing insulators or cable boxes with disconnecting


chambers for line and neutral terminals :

(a) HV ( i) Phases Oil to SF6 gas

(b) LV (i) Phases Cable Box

(ii) Neutral Cable Box

20. Whether transformer oil is to be supplied Yes

21. Whether transformer ladder required with lockable safety Yes


barrier

22. Set of Tools for Operation & Maintenance of Transformer and Yes
OLTC

23. Set of spares for Transformer and OLTC maintenance i.e Yes
bushings, fans,contactor, OLTC maintenance/repair kits.

Signature:______________Company:___________________Date:________________

Schedule B of Requirements (Transformer and NER) Section 1 Vol 4 of 5 (Page 4 of 7)


PART 1 SUBSTATION WORKS
SCHEDULE B OF REQUIREMENTS
SECTION 1a LOCAL AND REMOTE CONTROL OF POWER TRANSFORMER

Remote Control Panel


Facilities. Local Control at Transformer
(RTCC)

Tap Changer controls and


selection as follow :-

Raise/ Lower X X

AVR Setting rheostat X

Auto/Manual selector X

Parallel operation X

Remote /Local Control X


selector

Remote /Local/ Supervisory X


selector

Indication of Tap Changer as


follows :-

Tap Change in progress X X

Tap position X X

Tap Change in complete X

Tap Change out of Step X

Alarms as follows :

Bucholz Gas X

Bucholz Surge X

Winding and oil Temp. X

- 1st Stage X (Indication) X


- 2nd Stage X

Cooling Fan Failure X X

Conservator oil low X


Level Alarm

OLTC Vacuum type

Master/Follower/Independent MR Tapcon 260 or latest


(AVR)

Signature:______________Company:___________________Date:________________

Schedule B of Requirements (Transformer and NER) Section 1 Vol 4 of 5 (Page 5 of 7)


PART 1 SUBSTATION WORKS
SCHEDULE B OF REQUIREMENTS
SECTION 1b POWER TRANSFORMER AND NER

Item
2 X 20/30MVA 33/11kV Power
No. Description
Transformer

TECHNICAL REQUIREMENTS

1. Number of Phases 3

2. Number of windings 3

3. Normal Ratio of transformation on no-load HV/LV 33/11kV

4. Corresponding highest system voltage 36/12kV

5. Continuous maximum rating 30MVA

6. Type of cooling ONAN/ONAF

7. Continuous ONAN / ONAF rating 20/30 MVA

8. External cooling medium Air

9. Impedance voltage at 75C, normal ratio and continuous 15%


maximum rating

10. Phase connection :

(e) HV Winding Star


(f) LV Winding Delta
(g) Stabilitising Windings (tertiary) -
(h) Vector group HV/LV YNd11

11. Delta connected stabilitising windings:

(d) Whether required No


(e) Nominal voltage
(f) External load to be carried

12. Maximum short circuit MVA infeed available from system

(d) HV terminals
(e) LV terminals
(f) Tertiary winding terminals

13 Temperature Rise according to IEC (for Tropical Climate)

(a) Oil Temperature 50C


(b) Winding Temperature 55C

Signature:______________Company:___________________Date:________________

Schedule B of Requirements (Transformer and NER) Section 1 Vol 4 of 5 (Page 6 of 7)


PART 1 SUBSTATION WORKS
SCHEDULE B OF REQUIREMENTS
SECTION 1b POWER TRANSFORMER AND NER

Item
2 X 20/30MVA 33/11kV Power
No. Description
Transformer

TECHNICAL REQUIREMENTS

14. On-Load tap selection required +10% -15% in 1.67% steps

15. Whether any reduces rating is permitted over taping range. No

16. Whether remote electrical control is required Yes

17. Whether automatic control is required. Yes

18. Whether remote control panel is required Yes

19. Bushing insulators or cable boxes with disconnecting


chambers for line and neutral terminals :

(a) HV ( i) Phases Cable Box

(b) LV (i) Phases Cable Box

(ii) Neutral Cable Box

20. Whether transformer oil is to be supplied Yes

21. Whether transformer ladder required with lockable safety Yes


barrier

22. Set of Tools for Operation & Maintenance of Transformer and Yes
OLTC

23. Set of spares for Transformer and OLTC maintenance i.e Yes
bushings, fans,contactor, OLTC maintenance/repair kits.

Signature:______________Company:___________________Date:________________

Schedule B of Requirements (Transformer and NER) Section 1 Vol 4 of 5 (Page 7 of 7)


PART 1 SUBSTATION WORKS
SCHEDULE B OF REQUIREMENTS
SECTION 1b LOCAL AND REMOTE CONTROL OF POWER TRANSFORMER

Remote Control Panel


Facilities. Local Control at Transformer
(RTCC)

Tap Changer controls and selection as


follow :-

Raise/ Lower X X

AVR Setting rheostat X

Auto/Manual selector X

Parallel operation X

Remote /Local Control selector X

Remote /Local/ Supervisory selector X

Indication of Tap Changer as follows :-

Tap Change in progress X X

Tap position X X

Tap Change in complete X

Tap Change out of Step X

Alarms as follows :

Bucholz Gas X

Bucholz Surge X

Winding and oil Temp. X

- 1st Stage X (Indication) X


- 2nd Stage X

Cooling Fan Failure X X

Conservator oil low X


Level Alarm

OLTC Vacuum Type

Master/Follower/Independent MR Tapcon 260 or latest


(AVR)

Signature:______________Company:___________________Date:________________

Schedule B of Requirements (Transformer and NER) Section 1 Vol 4 of 5 (Page 8 of 7)


PART 1 SUBSTATION WORKS
SCHEDULE B OF REQUIREMENTS
SECTION 1c EARTHING TRANSFORMERS

2 X 300kVA
Item No. Description 11/0.415kV Earthing
Transformer

1 Number of Phases 3

2 Number of Windings 2

3 Nominal ratio of transformation on no-load HV/LV kV 11/0.415

4 Corresponding highest system voltage kV 12/0.433

5 Continious maximum rating kVA 300

6 Type of cooling ONAN

7 Continuous ONAN/ONAF rating kVA 300

8 External cooling medium Air

9 Impedance voltage at 75 C, nominal ratio and continuous 4.5%


maximum rating

10 Phase Connections :

(a) HV Winding Star


(b) LV Winding Star
(c) Stabilising Winding(tertiary) -
(d) Vektor group HV/LV ZNyn

11 Delta connected Stabilising Windings :

(a) Whether required No


(b) Nominal Voltage kV -
(c) External load to be carried kVA -

Signature:______________Company:___________________Date:________________

Schedule B of Requirements (Transformer and NER) Section 1 Vol 4 of 5 (Page 9 of 11)


PART 1 SUBSTATION WORKS
SCHEDULE B OF REQUIREMENTS
SECTION 1c EARTHING TRANSFORMERS

Item No. Description 2 X 300kVA


11/0.415kV Earthing
Transformer

12 Maximum short circuit kVA infeed available from system.

(a) HV Terminals kVA 350


(b) LV Terminals kVA -
(c) Tertiary Winding Terminals kVA -

13 Off-Load tap selection required

14 Whether any reduced rating is permitted over tapping range No

15 Whether remote electrical control is required No

16 Whether automatic control is required, if so, reference voltage No

17 Winding of transformer from which reference voltage is


obtained -

18 Whether remote control panel is required No

19 Estimate distance between remote control point and -


transformer

20 Auxiliary supplies available :

(a) AC 50Hz Volts 415/240


(b) Dc Volts 110

21 Whether provision for supervisiory control is required No

22 Bushing insulators or cable boxes with disconnecting


chambers for line and neutral terminal.
(a) HV (i) Phases Air insulated cable box
complete with terminals
and lugs suitable for
thermofit termination of 6
x 1C 185mm2 11kV XLPE
copper cable from Delta
connection of Power
Transformer.

Signature:______________Company:___________________Date:________________

Schedule B of Requirements (Transformer and NER) Section 1 Vol 4 of 5 (Page 10 of 11)


PART 1 SUBSTATION WORKS
SCHEDULE B OF REQUIREMENTS
SECTION 1c EARTHING TRANSFORMERS

Item No. Description 2 X 300kVA


11/0.415kV Earthing
Transformer

(b) LV (i) Phase and Neutral Air insulated cable


box complete with
terminals and lugs
suitable for 2 x 4C
185 mm 415V
XLPE copper cable
to Distribution panel

23 Accommodation for ring type current transformers in bushing


turrets/cables boxes :

(a) At HV line terminals None


(b) At LV line and neutral terminals None

24 Whether wheels, skid or flat base required Skid or Flat

25 Whether transformer oil is to supplied by Contractor Yes

26 Impulse withstand level HV/LV kVp 75

Signature:______________Company:___________________Date:________________

Schedule B of Requirements (Transformer and NER) Section 1 Vol 4 of 5 (Page 11 of 11)


Signature:______________Company:___________________Date:________________

Schedule B of Requirements (Transformer and NER) Section 1 Vol 4 of 5 (Page 12 of 11)

You might also like