Unit Rate

Item Description Unit


Materials Labor Others

Division - 02 Existing Condition Markup = 15.00%

02 40 00 Demolition and Structure Moving

02 41 00 Demolition

To CHB Wall m2 - 209.00 31.35

To Concrete Pavement m2 - 208.00 31.20

To Concrete Pavement m2 - 86.00 12.90

To Retaining Wall m2 - 250.00 37.50

To Suspended Slab m2 - 208.00 31.20

To Beam m3 - 1,696.00 254.40

To Column m3 - 1,696.00 254.40

To Stairs m3 - 1,696.00 254.40

To Board Partitions m2 - 46.00 6.90

02 42 00 Removal of Construction Materials

To ceramic / homogeneous tiles m2 - 46.00 6.90

To granite / marble tiles m2 - 46.00 6.90

To vinyl tiles m2 - 16.00 2.40

To board ceiling m2 - 25.00 3.75

To wood panels m2 - 28.00 4.20

Division - 03 Concrete Markup = 15.00%

03 10 00 Concrete Forming and Accessories

03 11 00 Concrete Forming

To foundation/footing m2

To slab on grade/fill m2

To columns/shearwall m2

To beams m2

To suspended slab m2

To retaining walls m2
To reinforced concrete walls m2

To stairs m2

03 20 00 Reinforcing Steel

To all structures ( Grade 40/60 ) kgs 37.00 7.00 6.60

03 30 00 Cast-In-Place Concrete Markup = 15.00%

At concrete design 8,000 psi

To suspended slab,slab on Grade and pavement m3 6,150.00 331.00 972.15

To beam,column,footing / foundations,stairs and m3 6,150.00 301.00 967.65


R.C. walls / retaining walls

At concrete design 7,000 psi

To suspended slab,slab on Grade and pavement m3 5,750.00 331.00 912.15

To beam,column,footing / foundations,stairs and m3 5,750.00 301.00 907.65


R.C. walls / retaining walls

At concrete design 6,000 psi

To suspended slab,slab on Grade and pavement m3 5,450.00 331.00 867.15

To beam,column,footing / foundations,stairs and m3 5,450.00 301.00 862.65


R.C. walls / retaining walls

At concrete design 5,000 psi

To suspended slab,slab on Grade and pavement m3 5,150.00 331.00 822.15

To beam,column,footing / foundations,stairs and m3 5,150.00 301.00 817.65


R.C. walls / retaining walls

At concrete design 4,000 psi

To suspended slab,slab on Grade and pavement m3 4,300.00 331.00 694.65

To beam,column,footing / foundations,stairs and m3 4,300.00 301.00 690.15


R.C. walls / retaining walls

At concrete design 3,000 psi

To suspended slab,slab on Grade and pavement m3 3,950.00 331.00 642.15

To beam,column,footing / foundations,stairs and m3 3,950.00 301.00 637.65


R.C. walls / retaining walls

At concrete design 2500 psi


To Sidewalk, and Curb m3 3,550.00 106.00 548.40

Division - 04 Masonry Markup = 15.00%

04 20 00 Unit Masonry

4 " CHB 350 psi (Non-load bearing) m2 459.00 109.00 85.20

4 " CHB 700 psi (Load bearing) m2 555.00 109.00 99.60

6 " CHB 350 psi (Non-load bearing) m2 642.00 109.00 112.65

6 " CHB 700 psi (Load bearing) m2 773.00 109.00 132.30

150 mm lintel beams m 496.00 33.00 79.35

100 mm lintel beams m 404.00 33.00 65.55


DIVISION 09 - FINISHES Markup = 15.00%

09 24 00 Cement Plastering m2 107.00 98.00 30.75

m2 76.00 93.00 25.35

m2 71.00 92.00 24.45

m2 66.00 92.00 23.70

m2 37.00 87.00 18.60

09 90 00 Painting and Coating Markup = 15.00%

Using Premium Water Based Paints / Latex Paint (To Exterior Walls)

To Exterior Walls (RC vwalls and Masonry Walls) m2 161.00 90.00 37.65

To Exterior Walls (RC vwalls and Masonry Walls) m2 167.00 90.00 38.55

To Interior Walls, (Masonry, Columns, Beams and Slab Soffits) m2 134.00 90.00 33.60

To Gypsum Board m2 122.00 90.00 31.80

To Roofing (New Galvanized Iron Sheets ) m2 69.00 90.00 23.85

To Roofing (New Galvanized Iron Sheets ) m2 77.00 90.00 25.05

To Roofing (Unglazed Tiles ) m2 81.00 90.00 25.65

Alkyd Enamel / Oil Based Coatings

To Interior and Exterior Wood Surfaces m2 182.00 90.00 40.80

To Interior and Exterior Wood and Metal Surfaces

To Interior and Exterior Wood m2 182.00 90.00 40.80

To Metal
1 m2 111.00 90.00 30.15

2 m2 119.00 90.00 31.35

To Interior and Exterior Wood and Metal Surfaces (superior for)

To Interior and Exterior Wood m2 212.00 90.00 45.30

To Metal
1 m2 142.00 90.00 34.80
2 m2 150.00 90.00 36.00

To Exterior and Interior Metal


1 m2 71.00 90.00 24.15

2 m2 78.00 90.00 25.20

To Metal Surfaces of Equipment, Radiators and Machinery m2 255.00 90.00 51.75

Tor Storage tanks, Structural Steel and other Industrial Metal Surfaces. m2 28.00 90.00 17.70

To Traffic Paint for use on Road Markings and Pavement Linings &
To be used only on areas in Direct Contact to Wheel Traffic m2 167.00 90.00 38.55

To Use on Street Markings, Curbs, Traffic Lanes and


Safety Zone Lining. m2 147.00 90.00 35.55

To Enhances Wood Grain of Furniture, Fixtures, Cabinets, Doors,


Doorjambs and Panels. m2 117.00 450.00 85.05

Using Oil Wood Stains

To Enhancing Wood Grain on Interior Wood Works and other m2 168.00 450.00 92.70
Surfaces such as Cabinets, Furniture, Paneling, etc.

Using Nitrocellulose Lacquer Based Coatings

To Interior Sealed Wood such as Furnitures, Fixtures, Cabinets,


Doors and Panels.
1 m2 103.00 450.00 82.95

2 m2 75.00 450.00 78.75

For Lacquer Finishing of Interior Wood Walls, Furniture, Fixtures,


Cabinets, Doors and Panels. m2 75.00 450.00 78.75

To Indoor Wood Surfaces such as Doors, Doorjambs, Cabinets,


and Shelves. m2 211.00 450.00 99.15

Using Hi-Performance Exterior Paint

To New and Previously Painted Exterior and Interior Masonry,


Wood and Properly Primed Steel
To Plain Finish m2 233.00 90.00 48.45

To Textured Finish m2 287.00 90.00 56.55

To Plain Finish m2 234.00 90.00 48.60

To Textured Finish m2 289.00 90.00 56.85


Using Two-component Epoxy Based Coatings

As a topcoat for Boysen Epoxy Primer that can be applied on interior


surfaces such as metal, galvanized iron, wood and masonry.

To Concrete m2 194.00 123.00 47.55

To Metal m2 146.00 100.00 36.90

To Water Tank (Interior) m2 146.00 100.00 36.90

To Floorings, Walls, Metal Substrates and other well Primed Surfaces

To Concrete m2 212.00 123.00 50.25

To Metal m2 182.00 100.00 42.30


DIVISION 31 - Earthwork Markup = 15.00%
31 05 00 Common Work Results For Earhthwork

To Structure (Foundations and Slab on Grade)

31 05 16 Aggregates for Earthwork

Base Course/Gravel Bidding (G1) m3 1,300.00 102.00 210.30

31 05 19 Geosynthectics for Earhtwork

Geotextiles for Earthwork m2

Geomembranes for Earthwork m2

Geogrids for Earthwork m2

31 08 00 Commissioning of Earthwork

31 08 13 Pile Load Testing lot

31 10 00 Site Clearing

31 11 00 Clearing and Grubbing m2 - 17.00 2.55

31 20 00 Earth Moving

31 22 13 Rough Grading

31 22 16 Fine Grading

31 22 19 Finish Grading

31 23 16 Excavation

To Bulk m3 - 235.00 35.25

To Bulk m3 - 152.00 22.80

To Structure m3 - 257.00 38.55

To Structure m3 - 169.00 25.35

To Trench m3 - 169.00 25.35


Depth = 1m, Width = 0.7, Length = 3m < 2.8 m

31 23 19 Dewatering m3

31 23 23 Fill

Backfill m3 - 166.00 24.90

Compaction m3 - 57.00 8.55

Flowable Fill m3

Geofoam m3

Hauling and Disposal m3 - 150.00 22.50


31 30 00 Earthwork Methods

31 31 00 Soil Treatment m2

31 32 26 Soil Nailing

Driven Soil Nailing m2

Grouted Soil Nailing m2

Corrosion-Protected Soil Nailing m2

31 36 00 Gabions

31 37 00 Riprap

31 40 00 Shoring and Underpinning

31 60 00 Special Foundations and Load-Bearing Elements

31 62 00 Driven Piles

31 62 13 Concrete Piles

Cast-in-Place Concrete Piles

Concrete Displacement Piles

Precast Concrete Piles

Prestressed Concrete Piles

31 62 16 Steel Piles

Sheet Steel Piles

Steel H Piles

Unfilled Tubular Steel Pipes

31 62 19 Timber Piles

31 62 23 Composite Piles

Concrete-Filled Steel Piles

Wood and Cast-in-Place Concrete Piles

31 63 00 Bored Piles

31 63 23 Bored Concrete Piles

Bored and Belled Concrete Piles

Bored Friction Concrete Piles


32 00 00 Exterior Improvements Markup = 15.00%

32 10 00 Bases, Ballasts, and Paving

Subgrade Preparation and Compaction m2 - 78.00 11.70

32 11 16 Subbase Courses

Filling Materials/ Anapog m3 375.00 91.00 69.90

Gravel G-1 m3 1,300.00 91.00 208.65

Crushed Gravel - 3/4" m3 1,400.00 91.00 223.65

32 11 23 Aggregate Base Courses

32 13 00 Rigid Paving

To Concrete Pavement (Varies) m2 593.00 54.00 97.05


Amount

241.00

240.00

99.00

288.00

240.00

1,951.00

1,951.00

1,951.00

53.00

53.00

53.00

19.00

29.00

33.00
51.00

7,454.00

7,419.00

6,994.00

6,959.00

6,649.00

6,614.00

6,304.00

6,269.00

5,326.00

5,292.00

4,924.00

4,889.00
4,205.00

654.00

764.00

864.00

1,015.00

609.00

503.00
236.00

195.00

188.00

182.00

143.00

289.00

296.00

258.00

244.00

183.00

193.00

197.00

313.00

313.00

232.00

241.00

348.00

267.00
276.00

186.00

194.00

397.00

136.00

296.00

273.00

653.00

711.00

636.00

604.00

604.00

761.00

372.00

434.00

373.00

436.00
365.00

283.00

283.00

386.00

325.00
1,613.00

20.00

271.00

175.00

296.00

195.00

195.00

191.00

66.00

173.00
90.00

536.00

1,600.00

1,715.00

745.00
Item Description Cost /
Division - 03 Concrete

03 20 00 Reinforcing Steel

Deformed Bars (G 40 / 60) PHP 36.40 /

Deformed Bars (G 33) PHP 36.40 /

#16 GI Tie Wire PHP 70.00 /

03 30 00 Cast-In-Place Concrete

Portland Cement PHP 200.00 /

Pozzo Cement PHP 195.00 /

Washed Sand PHP 1,300.00 /


Crushed Sand PHP 1,400.00 /
Fine Sand PHP 1,350.00 /

Gravel - 3/4" PHP 1,300.00 /


Crushed Gravel - 3/4" PHP 1,400.00 /
Gravel - 1" PHP 1,300.00 /

Division - 04 Masonry

04 20 00 Unit Masonry

4 " CHB 350 psi (non-load bearing) PHP 11.00 /


700 psi (load-bearing) PHP 18.00 /

6 " CHB 350 psi (non-load bearing) PHP 13.50 /

700 psi (load-bearing) PHP 23.00 /

Division - 05 Metals

05 12 00 Structural Steel Framing

Wide Flange/ I-Beam

W14 x 34 x 6 PHP 40.64 /


PHP 47.23 /
W14 x 257 x 6 PHP 50.80 /

Angle Bar
L x W x thk.

" " " Commercial Length

4 X 4 X 3/8 6m PHP 44.00 /


3 X 3 X 3/8 6m PHP 45.00 /
2 X 2 X 3/8 6m PHP 39.00 /
1 X 1 X 3/8 6m /

4 X 4 X 1/4 6m PHP 51.00 /


3 X 3 X 1/4 6m PHP 47.00 /
2 X 2 X 1/4 6m PHP 38.00 /
1 X 1 X 1/4 6m PHP 46.00 /

4 X 4 X 1/8 6m /
3 X 3 X 1/8 6m /
2 X 2 X 1/8 6m PHP 23.00 /
1 X 1 X 1/8 6m PHP 20.00 /
Flat Bar
W x thk. Commercial Length

" "
4 x 3/8 6m /
3 x 3/8 6m /
2 x 3/8 6m /
1 x 3/8 6m /

4 x 1/4 6m PHP 58.00 /


3 x 1/4 6m PHP 44.00 /
2 x 1/4 6m PHP 30.00 /
1 x 1/4 6m PHP 50.00 /

4 x 1/8 6m
3 x 1/8 6m
2 x 1/8 6m PHP 28.00 /
1 x 1/8 6m PHP 23.00 /

Square Bar
D Commercial Length

"
1 6m PHP 57.00 /
3/4 6m PHP 46.00 /
5/8 6m PHP 51.00 /
1/4 6m PHP 37.00 /

Steel Plate

3 Checkered Plate
ft. ft. mm /
4 x 8 x 2 /
4 x 8 x 2.5 /
4 x 8 x 3 /
4 x 8 x 4 /
4 x 8 x 4.5 /
4 x 8 x 5 /
4 x 8 x 6 /
4 x 8 x 9 /

4 M.S. Plate
ft. ft. mm
4 x 8 x 2 /
4 x 8 x 3 /
4 x 8 x 6 /
4 x 8 x 6 /
4 x 8 x 9 /
4 x 8 x 12 /
4 x 8 x 16 /
4 x 8 x 19 /
4 x 8 x 20 /
4 x 8 x 22 /
4 x 8 x 25 /
4 x 8 x 30 /
4 x 8 x 35 /

Rectangular Tube
L x W x thk.

" " mm

2 X 6 X 1.2 6m /
2 X 6 X 1.5 6m /
2 X 6 X 3 6m /
2 X 6 X 2 6m /
2 X 5 X 2 6m /
2 X 4 X 1.5 6m /
2 X 4 X 2 6m /
2 X 3 X 1.2 6m /
2 X 3 X 1.5 6m /
2 X 3 X 2 6m /
1-1/2 X 3 X 1.2 6m /
1-1/2 X 3 X 1.5 6m /
1-1/2 X 3 X 2 6m /
1-1/2 X 2 X 1.2 6m /
1-1/2 X 2 X 1.5 6m /
1-1/2 X 2 X 2 6m /

Square Tube
L x W x thk.

" " mm

3/8 X 3/8 X 0.9 6m /


3/8 X 3/8 X 1.2 6m /
1/2 X 1/2 X 0.9 6m /
1/2 X 1/2 X 1.2 6m /
1/2 X 1/2 X 1.5 6m /
5/8 X 5/8 X 0.9 6m /
5/8 X 5/8 X 1.2 6m /
3/4 X 3/4 X 0.9 6m /
3/4 X 3/4 X 1.2 6m /
3/4 X 3/4 X 1.5 6m /
3/4 X 3/4 X 2 6m /
3/4 X 3/4 X 2.5 6m /
1 X 1 X 0.9 6m /
1 X 1 X 1.2 6m /
1 X 1 X 1.5 6m /
1 X 1 X 2 6m /
1 X 1 X 2.5 6m /
1 X 1 X 3 6m /
1-1/4 X 1-1/4 X 0.9 6m /
1-1/4 X 1-1/4 X 1.2 6m /
1-1/4 X 1-1/4 X 1.5 6m /
1-1/4 X 1-1/4 X 2 6m /
1-1/2 X 1-1/2 X 0.9 6m /
1-1/2 X 1-1/2 X 1.2 6m /
1-1/2 X 1-1/2 X 1.5 6m /
1-1/2 X 1-1/2 X 2 6m /
1-1/2 X 1-1/2 X 3 6m /
1-1/2 X 1-1/2 X 4 6m /
1-3/4 X 1-3/4 X 1.5 6m /
1-3/4 X 1-3/4 X 2 6m /
1-3/4 X 1-3/4 X 2.5 6m /
1-3/4 X 1-3/4 X 3 6m /
1-3/4 X 1-3/4 X 4 6m /
2 X 2 X 0.9 6m /
2 X 2 X 1.2 6m /
2 X 2 X 1.5 6m /
2 X 2 X 2 6m /
2 X 2 X 2.5 6m /
2 X 2 X 3 6m /
2 X 2 X 4 6m /
2 X 2 X 6 6m /
2-3/8 X 2-3/8 X 1.5 6m /
2-3/8 X 2-3/8 X 2 6m /
2-3/8 X 2-3/8 X 2.5 6m /
2-3/8 X 2-3/8 X 3 6m /
2-3/8 X 2-3/8 X 4 6m /
3 X 3 X 1.5 6m /
3 X 3 X 2 6m /
3 X 3 X 2.5 6m /
3 X 3 X 3 6m /
3 X 3 X 4 6m /
3 X 3 X 6 6m /
4 X 4 X 2 6m /
4 X 4 X 2.5 6m /
4 X 4 X 3 6m /
4 X 4 X 4 6m /
4 X 4 X 6 6m /

C- Channel

w" d" t (mm)


1-1/2 x 3 x 2.8 6m
1-1/2 x 4 x 4 6m
2 x 3 x 1.2 6m
2 x 3 x 1.4 6m
2 x 3 x 1.8 6m
05 14 00 Structural Aluminum Framing

Aluminum Angle
w" d" t"
1-1/2 x 1-1/2 x 1/8 6m
Aluminum Square Tube
1-1/2 x 1-1/2 x 1/8 6m

Powder Coating
Wood Look 6m
Plain Look 6m

DIVISION 06 - WOOD, PLASTICS AND COMPOSITES

Weather Wood (MATIMCO)

" " '


1 x 6 x 8 PHP 845.50 /

Armour Wood (CLC)

" " '


1 x 6 x 8 PHP 452.00 /
Division - 09 Finishes

Paint Materials

Boysen Products

Boysen Products

Premium Water Based Paints

Boysen Permacoat Latex PHP 656.25 /

Boysen Permacoat Flat Latex #701 PHP 476.35 /

Boysen Wallguard Dirt Resisting Latex PHP 730.25 /

Boysen Roofgard PHP 563.70 /

Boysen Permatex #3101 PHP 582.40 /

Boysen Primeguard PHP 662.50 /


Boysen Clear Acrylic Emulsion #700 PHP 556.40 /

Boysen Masonry Putty #7311 - F PHP 270.40 /


Boysen Masonry Putty #7311 - S PHP 270.40 /

Boysen Plexibond #7760 PHP 725.95 /

Boysen Latex Colors


Boysen Latex Tinting Colors - 1 L PHP 136.50 /
Boysen Latex Tinting Colors - 1/4 L PHP 42.00 /

Specialty Water Based Paint

Boysen Healthy Home Odor-less Antibacterial Latex Paint /

Virtuoso Silk Touch /

Boysen EcoPRIMER #105 /

KNOxOUT Air Cleaning Paint PHP 1,341.60 /

Boysen Cool Shades /

Alkyd Enamel / Oil Based Coatings

Boysen Flatwall Enamel #800 PHP 535.60 /

Boysen Semi-Gloss Enamel #200 PHP 535.60 /

Boysen Quick Drying Enamel - W PHP 591.00 /


Boysen Quick Drying Enamel - C PHP 815.40 /

Boysen Schoolboard Slating Paint, Green #655 PHP 546.00 /

Boysen Plasolux Glazing Putty #311 - F PHP 548.00 /


Boysen Plasolux Glazing Putty #311 - S PHP 548.00 /
Boysen Red Oxide Primer #310 PHP 372.75 /

Boysen Silver Finish Aluminum Paint #75 PHP 577.00 /

Boysen Heat Resisting Aluminum #95 PHP 1,522.00 /

Boysen Bridge and Tank Aluminum Paint #85 /

Boysen Reflectorized Traffic Paint


Boysen Reflectorized Traffic Paint #19-101 White PHP 741.00 /
Boysen Reflectorized Traffic Paint #19-161 Yellow PHP 860.00 /

Boysen Alkyd Traffic Paint


Boysen Alkyd Traffic Paint #1901 White PHP 628.20 /
Boysen Alkyd Traffic Paint #1961 Yellow PHP 682.25 /

Boysen Oil Tinting Colors PHP 57.75 /

Boysen Spar Varnish #58 PHP 478.40 /

Boysen Paint Thinner #0340 - G PHP 393.15 /


Boysen Paint Thinner #0340 - L PHP 98.29 /
Boysen Paint Thinner #0340 - 0.5 L PHP 49.14 /

Oil Wood Stains

Boysen Xyladecor PHP 920.40 /

Boysen Oil Wood Stain PHP 416.00 /

Nitrocellulose Lacquer Based Coatings

Boysen Lacquer Primer Surfacer #305 PHP 618.80 /

Boysen Lacquer Spot Putty #306 - F PHP 606.25 /


Boysen Lacquer Spot Putty #306 - S PHP 606.25 /

Boysen Clear Gloss Lacquer #1250 PHP 549.15 /

Boysen Clear Dead Flat Lacquer #1253 PHP 561.60 /

Boysen Lacquer Sanding Sealer #1254 PHP 536.65 /

Boysen Water White Clear Gloss Lacquer #1258 PHP 558.50 /

Boysen Automotive Lacquer #1300 PHP 809.15 /

Boysen Lacquer Tinting Colors - 1 L PHP 256.40 /


Boysen Lacquer Tinting Colors - 1/4 L PHP 61.15 /

Boysen Lacquer Flo PHP 581.40 /

Boysen Lacquer Thinner #50 - G PHP 393.15 /


Boysen Lacquer Thinner #50 - 0.5 L PHP 49.14 /

Hi-Performance Exterior Paint

Boysen Acrytex

Boysen Acrytex Primer #1705 PHP 709.30 /

Boysen Acrytex Flat #1701 - P PHP 746.75 /


Boysen Acrytex Flat #1701 - T PHP 746.75 /

Boysen Acrytex Semi-Gloss #1715 - P PHP 844.50 /


Boysen Acrytex Semi-Gloss #1715 - T PHP 844.50 /

Boysen Acrytex Gloss #1710 - P PHP 859.05 /


Boysen Acrytex Gloss #1710 - T PHP 859.05 /
Boysen Acrytex Cast #1711 - S PHP 416.00 /
Boysen Acrytex Cast #1711 - F PHP 416.00 /
Boysen Acrytex Cast #1711 - T PHP 416.00 /

Boysen Acrytex Tinting Colors PHP 92.40 /

Boysen Acrytex Reducer #1750 - G PHP 364.00 /


Boysen Acrytex Reducer #1750 - 0.5L PHP 45.50 /

Hi-Performance Elastomeric Paint

Boysen Elasti-kote Elastomeric Wall Covering


Boysen Elasti-Kote (Elastomeric Wall Covering) Sealer B-5800 /
Boysen Elasti-Kote (Elastomeric Wall Covering) Basecoat B-5805 /
Boysen Elasti-Kote (Elastomeric Wall Covering) Topcoat B-5815 /

Two-component Epoxy Based Coatings

Boysen Epoxy Primer


Boysen Epoxy Primer Gray #2230 PHP 645.85 /
Boysen Epoxy Primer White #2200 PHP 711.40 /

Boysen Epoxy Enamel PHP 971.40 /

Boysen Acqua Epoxy PHP 1,123.20 /

Boysen Epoxy Reducer #55 PHP 431.60 /


Boysen Epoxy Reducer #55 (1:1 ratio) PHP 431.60 /

Two-component Polyurethane Based Coatings

Hudson Polyurethane Floor Varnish Sealer /

Hudson Polyurethane Floor Varnish Catalyst - 1 L /


Hudson Polyurethane Floor Varnish Topcoat /

Surface Preparation Chemicals

Boysen Skimkote #7750 PHP 1,703.65 /

Boysen Masonry Neutralizer #44 PHP 463.05 /

Boysen Metal Etching Solution #71 PHP 658.90 /

Boysen Paint and Varnish Remover #141 PHP 504.60 /

Boysen Chalk Blocker #7304 /

Boysen Aquaseal #99 PHP 556.85 /

Konstrukt Permaplast K 201 PHP 362.10 /

Konstrukt Permaplast K 202 /

Konstrukt Durafill K101 Gypsum Putty PHP 201.85 /

Konstrukt Durafill K103 Fast-Setting Gypsum Compound PHP 520.90 /

Konstrukt Tileworks K302 All-purpose Tile Adhesive PHP 349.35 /

Premium Economy

Nation Wood Bleach 1 & 2 /

Nation Fast Dry Enamel /

Nation Flatwall Enamel #800 /

Nation Dreamcoat Latex


Nation Dreamcoat Latex Paint White #1540 /

Nation Dreamcoat Gloss Latex White #1541 /

Nation Latex

Nation Latex Paint Flat White /

Nation Gloss Latex White /

Elastomeric Paint

Titan Superflex PHP 550.00 /

Special Finishes

Boysen DECORe Classic

B-4605 DECORe Undercoat /

B-4610 DECORe Base + Toner /

B-4700 DECORe Toner /

Boysen DECORe Suede /

B-4605 DECORe Undercoat /

B-4600 DECORe Matte Clearcoat /

B-4501 DECORe Suede Base /

Boysen DECORe Perlescente /

Perlescente Undercoat /
Perlescente base /

PErla Di Luce /

Boysen Marmorino Italian Marble Finish

Boysen Marmorino Primer

BOYSEN Marmorino Natural Wax Protection

Marmorino Trowel

Fiber Cement board Primaflex 4.5 mm 4' x 8' PHP 325.00 /


3.5 mm 4' x 8' PHP 270.00 /
6 mm 4' x 8' PHP 440.00 /

density of hardiflex = 1.40 grams / cubic centimeter

hardi Lite 3.50 mm


hardiflex 4.50 mm
hardiflex 6.00 mm
hardiflex 9.00 mm
hardiflex 12.00 mm

Note: Primaflex products are 15% - 20% cheaper than James Hardiflex

Gypsum Board 9.00 mm 4' x 8' PHP 260.00 /


Gypsum Board 12.00 mm 4' x 8' PHP 290.00 /
Gypsum Board Fire- 12.00 mm 4' x 8' PHP 520.00 /
Rated
Gypsum Board Fire- 15.00 mm 4' x 8' PHP 570.00 /
Rated

Acoustic Boards 15.00 mm 2' x 4' PHP 220.00 /

Boral Products
Standard Core 9.00 mm
Standard Core 12.00 mm

Meduim Density Fiber


Standard Core 12.00 mm
Standard Core 18.00 mm

Sheraboard 8.00 mm

metal studs 0.6 mm


32 mm x 51mm 3.00 m PHP 105.00 /
35 mm x 76mm 3.00 m PHP 128.10 /
35 mm x 92mm 3.00 m PHP 143.22 /
50 mm x 100mm 3.00 m
50 mm x 150mm 3.00 m

metal tracks 0.6 mm


32 mm x 51mm 2.40 m
35 mm x 76mm 2.40 m
35 mm x 92mm 2.40 m
50 mm x 100mm 2.40 m
50 mm x 150mm 2.40 m
75mm x 32 mm 3.00 m PHP 94.00 /
65 mm x 32 mm 3.00 m PHP 90.00 /
d. furring 50 mm x 19mm 5.00 m PHP 70.00 /

carrying -channel 0.8mm x 5.0m 5.00 m PHP 85.00 /

Tile Adhesive PHP 229.50 /


Tile Grouts PHP 55.00 /
PHP 67.00 /
31 05 00 Common Work Results For Earhthwork

31 05 16 Aggregates for Earthwork

Gravel G-1 PHP 1,300.00 /


Filling Materials/ Anapog PHP 375.00 /
Boulders PHP 1,300.00 /
Per Unit Hardware

kg Vic Enterprises

kg Vic Enterprises

kg PICA Enterprises

bag Vic Enterprises

bag Vic Enterprises

m3 ROCKMASTER/HESREAL
m3 ROCKMASTER/HESREAL
m3 ROCKMASTER/HESREAL

m3 ROCKMASTER/HESREAL
m3 ROCKMASTER/HESREAL
m3 ROCKMASTER/HESREAL

pcs 7C Concrete Aggregates, Inc.


pcs ECONTECH

pcs 7C Concrete Aggregates, Inc.

pcs ECONTECH

Cost/m Cost/Comm.Lenght
kg PHP 2,060.83 PHP 12,365.00 Regan Industrial Sales
kg PHP 2,395.17 PHP 14,371.00 Multi Metal Distributor
kg PHP 19,470.00 PHP 116,820.00 Regan Industrial Sales

Cost/m Cost/Comm.Lenght

kg PHP 625.00 PHP 3,750.00 Tokyu Hardware And Industrial Supply


kg PHP 475.00 PHP 2,850.00 Tokyu Hardware And Industrial Supply
kg PHP 266.67 PHP 1,600.00 Tokyu Hardware And Industrial Supply
kg

kg PHP 491.67 PHP 2,950.00 Tokyu Hardware And Industrial Supply


kg PHP 337.50 PHP 2,025.00 Tokyu Hardware And Industrial Supply
kg PHP 180.00 PHP 1,080.00 Tokyu Hardware And Industrial Supply
kg PHP 100.00 PHP 600.00 Tokyu Hardware And Industrial Supply

kg
kg
kg PHP 55.17 PHP 331.00 Federal North Hardware, Incorporated
kg PHP 22.67 PHP 136.00 Federal North Hardware, Incorporated
Cost/m Cost/Comm.Lenght

kg
kg
kg
kg

kg PHP 291.67 PHP 1,750.00 Tokyu Hardware And Industrial Supply


kg PHP 165.83 PHP 995.00 Tokyu Hardware And Industrial Supply
kg PHP 75.00 PHP 450.00 Tokyu Hardware And Industrial Supply
kg PHP 62.50 PHP 375.00 Tokyu Hardware And Industrial Supply

kg PHP 35.33 PHP 212.00 Federal North Hardware, Incorporated


kg PHP 14.17 PHP 85.00 Federal North Hardware, Incorporated

Cost/m Cost/Comm.Lenght

kg PHP 288.38 PHP 1,730.30 CEBU ATLANTIC HARDWARE, INC.


kg PHP 129.93 PHP 779.60 CEBU ATLANTIC HARDWARE, INC.
kg PHP 100.77 PHP 604.60 CEBU ATLANTIC HARDWARE, INC.
kg PHP 11.67 PHP 70.00 CEBU ATLANTIC HARDWARE, INC.

Cost/Comm. Dim.

kg PHP 2,375.00 CEBU ATLANTIC HARDWARE, INC.


kg
kg
kg PHP 3,080.00 Cebuano Construction Supply, Incorporated
kg PHP 4,001.99 CEBU ATLANTIC HARDWARE, INC.
kg
kg PHP 4,800.00 CEBU ATLANTIC HARDWARE, INC.
kg PHP 5,600.00 Tokyu Hardware And Industrial Supply
kg

kg PHP 1,840.00 CEBU ATLANTIC HARDWARE, INC.


kg PHP 2,991.00 Multi Metal Distributor
kg PHP 5,515.00 CEBU ATLANTIC HARDWARE, INC.
kg PHP 6,070.00 Regan Industrial Sales
kg PHP 8,420.00 CEBU ATLANTIC HARDWARE, INC.
kg PHP 11,250.00 CEBU ATLANTIC HARDWARE, INC.
kg PHP 17,573.00 Multi Metal Distributor
kg
kg PHP 15,640.00 Regan Industrial Sales
kg
kg PHP 28,830.50 Multi Metal Distributor
kg
kg

Cost/m Cost/Comm.Lenght

kg
kg PHP 385.50 PHP 2,313.00 CEBU ATLANTIC HARDWARE, INC.
kg
kg PHP 511.88 PHP 3,071.30 CEBU ATLANTIC HARDWARE, INC.
kg
kg PHP 174.17 PHP 1,045.00 Cebu Oversea Hardware Company, Incorporated
kg
kg
kg PHP 220.83 PHP 1,325.00 Tokyu Hardware And Industrial Supply
kg
kg
kg
kg
kg
kg PHP 158.33 PHP 950.00 Tokyu Hardware And Industrial Supply
kg

Cost/m Cost/Comm.Lenght

kg
kg
kg
kg PHP 27.08 PHP 162.50 CEBU ATLANTIC HARDWARE, INC.
kg
kg
kg PHP 33.33 PHP 200.00 CEBU ATLANTIC HARDWARE, INC.
kg
kg PHP 37.50 PHP 225.00 CEBU ATLANTIC HARDWARE, INC.
kg PHP 45.42 PHP 272.50 Multi Metal Distributor
kg
kg
kg
kg PHP 58.88 PHP 353.25 Multi Metal Distributor
kg PHP 73.97 PHP 443.80 CEBU ATLANTIC HARDWARE, INC.
kg
kg
kg
kg
kg PHP 63.33 PHP 380.00 CEBU ATLANTIC HARDWARE, INC.
kg PHP 94.38 PHP 566.30 CEBU ATLANTIC HARDWARE, INC.
kg
kg
kg PHP 88.71 PHP 532.25 Multi Metal Distributor
kg PHP 136.67 PHP 820.00 Tokyu Hardware And Industrial Supply
kg PHP 216.00 PHP 1,296.00 Tokyu Hardware And Industrial Supply
kg
kg
kg
kg
kg
kg
kg
kg
kg PHP 100.85 PHP 605.12 CEBU ATLANTIC HARDWARE, INC.
kg PHP 148.33 PHP 890.00 CEBU ATLANTIC HARDWARE, INC.
kg PHP 215.83 PHP 1,295.00 Tokyu Hardware And Industrial Supply
kg PHP 260.50 PHP 1,563.00 Tokyu Hardware And Industrial Supply
kg PHP 313.33 PHP 1,880.00 Tokyu Hardware And Industrial Supply
kg
kg
kg
kg
kg
kg
kg
kg PHP 220.00 PHP 1,320.00 CEBU ATLANTIC HARDWARE, INC.
kg PHP 414.58 PHP 2,487.50 Multi Metal Distributor
kg
kg
kg
kg
kg
kg
kg
kg
kg

Cost/m Cost/Comm.Lenght

PHP 275.00 PHP 1,650.00 Tokyu Hardware And Industrial Supply


PHP 325.00 PHP 1,950.00 Tokyu Hardware And Industrial Supply
PHP 81.45 PHP 488.70 CEBU ATLANTIC HARDWARE, INC.
PHP 94.67 PHP 568.00 CEBU ATLANTIC HARDWARE, INC.
PHP 122.33 PHP 734.00 CEBU ATLANTIC HARDWARE, INC.
Cost/m Cost/Comm.Lenght

PHP 125.78 PHP 754.66 Cebu MMF Glass & Aluminum Supply

PHP 79.96 PHP 479.74 Cebu MMF Glass & Aluminum Supply

PHP 234.64 PHP 1,407.86 Cebu MMF Glass & Aluminum Supply
PHP 139.05 PHP 834.29 Cebu MMF Glass & Aluminum Supply

length CEBU ATLANTIC HARDWARE, INC.

length CENTRAL LUMBER CORPORATION


Capacity (m2) cost/m2

gal 25 PHP 26.25 CENTRAL LUMBER CORPORATION

gal 25 PHP 19.05 CENTRAL LUMBER CORPORATION

gal 25 PHP 29.21 CENTRAL LUMBER CORPORATION

gal 25 PHP 22.55 CENTRAL LUMBER CORPORATION

gal 5 PHP 116.48 CENTRAL LUMBER CORPORATION

gal 30 PHP 22.08 CENTRAL LUMBER CORPORATION


gal 20 PHP 27.82 CENTRAL LUMBER CORPORATION

gal 10 PHP 27.04 CENTRAL LUMBER CORPORATION


gal 25 PHP 10.82 CENTRAL LUMBER CORPORATION

gal 5 PHP 145.19 CENTRAL LUMBER CORPORATION

liter 1 PHP 136.50 CENTRAL LUMBER CORPORATION


1/4 liter 1 PHP 42.00 CENTRAL LUMBER CORPORATION

gal 25 PHP 0.00

gal 25 PHP 0.00

gal 25 PHP 0.00

gal 25 PHP 53.66

gal 25 PHP 0.00

gal 20 PHP 26.78 CENTRAL LUMBER CORPORATION

gal 20 PHP 26.78 CENTRAL LUMBER CORPORATION

gal 20 PHP 29.55 CENTRAL LUMBER CORPORATION


gal 20 PHP 40.77 CENTRAL LUMBER CORPORATION

gal 25 PHP 21.84 Cebuano Construction Supply, Incorporated

gal 10 PHP 54.80 Cebuano Construction Supply, Incorporated


gal 25 PHP 21.92 Cebuano Construction Supply, Incorporated
gal 25 PHP 14.91 Cebuano Construction Supply, Incorporated

gal 25 PHP 23.08 Cebuano Construction Supply, Incorporated

gal 20 PHP 76.10 Cebuano Construction Supply, Incorporated

gal 20 PHP 0.00

gal 20 PHP 37.05 Cebuano Construction Supply, Incorporated


gal 20 PHP 43.00 Cebuano Construction Supply, Incorporated

gal 20 PHP 31.41 CENTRAL LUMBER CORPORATION


gal 20 PHP 34.11 CENTRAL LUMBER CORPORATION

1/4 liter 1 PHP 57.75 CENTRAL LUMBER CORPORATION

gal 25 PHP 19.14 CENTRAL LUMBER CORPORATION

gal CENTRAL LUMBER CORPORATION


liter
0.5 liter 2.5 PHP 19.66

gal 20 PHP 46.02 CENTRAL LUMBER CORPORATION

gal 25 PHP 16.64 CENTRAL LUMBER CORPORATION

gal 25 PHP 24.75 CENTRAL LUMBER CORPORATION

gal 12 PHP 50.52 CENTRAL LUMBER CORPORATION


gal 25 PHP 24.25 CENTRAL LUMBER CORPORATION

gal 25 PHP 21.97 CENTRAL LUMBER CORPORATION

gal 25 PHP 22.46 CENTRAL LUMBER CORPORATION

gal 25 PHP 21.47 CENTRAL LUMBER CORPORATION

gal 25 PHP 22.34 CENTRAL LUMBER CORPORATION

gal 25 PHP 32.37 CENTRAL LUMBER CORPORATION

1 liter 1 PHP 256.40 CENTRAL LUMBER CORPORATION


1/4 liter 1 PHP 61.15 CENTRAL LUMBER CORPORATION

gal 15 PHP 38.76 CENTRAL LUMBER CORPORATION

gal 1 PHP 393.15 CENTRAL LUMBER CORPORATION


0.5 Liter 2.5 PHP 19.66 CENTRAL LUMBER CORPORATION

gal 25 PHP 28.37 CENTRAL LUMBER CORPORATION

gal 25 PHP 29.87 CENTRAL LUMBER CORPORATION


gal 15 PHP 49.78 CENTRAL LUMBER CORPORATION

gal 25 PHP 33.78 CENTRAL LUMBER CORPORATION


gal 15 PHP 56.30 CENTRAL LUMBER CORPORATION

gal 25 PHP 34.36 CENTRAL LUMBER CORPORATION


gal 15 PHP 57.27 CENTRAL LUMBER CORPORATION
gal 25 PHP 16.64 CENTRAL LUMBER CORPORATION
gal 10 PHP 41.60 CENTRAL LUMBER CORPORATION
gal 5 PHP 83.20 CENTRAL LUMBER CORPORATION

1/4 liter 1 PHP 92.40 CENTRAL LUMBER CORPORATION

gal 1 PHP 364.00 CENTRAL LUMBER CORPORATION


0.5 Liter 2.5 PHP 18.20 CENTRAL LUMBER CORPORATION

gal 25 PHP 0.00


gal 25 PHP 0.00
gal 25 PHP 0.00

gal 20 PHP 32.29 CENTRAL LUMBER CORPORATION


gal 20 PHP 35.57 CENTRAL LUMBER CORPORATION

gal 20 PHP 48.57 CENTRAL LUMBER CORPORATION

gal 25 PHP 44.93 CENTRAL LUMBER CORPORATION

gal 1 PHP 431.60 CENTRAL LUMBER CORPORATION


gal 20 PHP 21.58 CENTRAL LUMBER CORPORATION

gal 20 PHP 0.00

1 liter 1 PHP 0.00


gal 20 PHP 0.00

pail 10 PHP 170.37 CENTRAL LUMBER CORPORATION

gal 20 PHP 23.15 CENTRAL LUMBER CORPORATION

gal 25 PHP 26.36 CENTRAL LUMBER CORPORATION

gal 15 PHP 33.64 CENTRAL LUMBER CORPORATION

gal 25 PHP 0.00

gal 8 PHP 69.61 CENTRAL LUMBER CORPORATION

gal 25 PHP 14.48 CENTRAL LUMBER CORPORATION

gal

gal 12.5 PHP 16.15 CENTRAL LUMBER CORPORATION

bag 80 PHP 6.51 CENTRAL LUMBER CORPORATION

bag 80 PHP 4.37 CENTRAL LUMBER CORPORATION

gal 25 PHP 0.00

gal 20 PHP 0.00

gal 20 PHP 0.00


gal 25 PHP 0.00

gal 25 PHP 0.00

gal 25 PHP 0.00

gal 25 PHP 0.00

gal 18 PHP 30.56 CENTRAL LUMBER CORPORATION

gal 20

gal 25

gal 1

gal

gal

gal

gal

gal

gal
gal

gal

sheet Cebu Evergreen


sheet Cebu Evergreen
sheet Cebu Evergreen

sheet Cebu Evergreen


sheet Cebu Evergreen
sheet
sheet Cebu Evergreen

sheet Cebu Evergreen

length Jea Steel Industries Inc.


length Jea Steel Industries Inc.
length Jea Steel Industries Inc.

length CEBU ATLANTIC HARDWARE, INC.


length CEBU ATLANTIC HARDWARE, INC.
length CEBU ATLANTIC HARDWARE, INC.

length CEBU ATLANTIC HARDWARE, INC.

bag CEBU ATLANTIC HARDWARE, INC.


2 kls. CEBU ATLANTIC HARDWARE, INC.
2 kls. CEBU ATLANTIC HARDWARE, INC.
m3 ROCKMASTER/HESREAL
m3 ROCKMASTER/HESREAL
m3 ROCKMASTER/HESREAL
Contact No. Remarks

P134.50/6m 10
P193.94/6m 12

grand cement

grand cement

with delivery
with delivery
with delivery

with delivery
with delivery
with delivery

delivered price
delivered price

delivered price

delivered price

100x100x9.5mm
75x75x9.5mm
50x50x9.5mm
25x25x9.5mm

100x100x6mm
75x75x6mm
50x50x6mm
25x25x6mm

100x100x3mm
75x75x3mm
50x50x3mm
25x25x3mm
Incorporated
7976.5 Multi metal

pany, Incorporated
261-5000

261-5000

261-5000
261-5000
Includes Wastage per capcity

1 gal = 4 liters

light color

Texture
Full Putty
Spot Putty

white
orange/colored

Incorporated

Incorporated Full Putty

Incorporated Spot Putty


Incorporated

Incorporated

Incorporated

Incorporated
Incorporated

0.5 liter of Paint Thinner = 1 gallon of paint

Full Putty
Spot Putty

Assume 1 gal = 15 m2

Plain Finish
Textured Finish

Plain Finish
Textured Finish

Plain Finish
Textured Finish
Spot Putty
Full Putty
Textured Putty
25 kg per pail(25 kg*0.4/kg/sq.m)

7kg/4liter, 12.5m/liter

20kg/bag

25kg/bag
600 delivery

light - 500 plus


darker - 500- higher depends how dark the color

4 Liters

4 Liters

200 ml

4 Liters

4 Liters

4 Liters

4 Liters
2.5 Liters

200g

Consumption: 150-200 g/m

Consumption: 30-50 g/m


ABC Brand
white
Green or colored
with delivery
4500/TRUCK, truck=12 m3
with delivery
DAILY WAGE RATE FOR CONTRACTED PROJECTS

BASIC SSS CONT PAG-IBIG CONT 13TH MO. PAY TOTAL


DESIGNATION
RATE A B C D (A/12) A+B+C+D

Foreman 450.00 31.64 9.00 37.50 528.14


Backhoe Opr 350.00 28.92 7.00 29.17 415.09
Crane Opr 350.00 28.92 7.00 29.17 415.09
Dozer Opr 350.00 28.92 7.00 29.17 415.09
Loader Opr 350.00 28.92 7.00 29.17 415.09
Roller Opr 350.00 28.92 7.00 29.17 415.09
Grader Opr 350.00 28.92 7.00 29.17 415.09
Pipefitter 350.00 24.85 7.00 29.17 411.01
Welder 375.00 24.85 7.50 31.25 438.60
Mason 375.00 24.85 7.50 31.25 438.60
Steelman 375.00 24.85 7.50 31.25 438.60
Painter 375.00 24.85 7.50 31.25 438.60
Rough Carpenter 320.00 24.85 6.40 26.67 377.91
Finish Carpenter 375.00 24.85 7.50 31.25 438.60
Tile Setter 375.00 24.85 7.50 31.25 438.60
Jackhammer Opr 320.00 24.85 6.40 26.67 377.91
Bagger-Mixer Opr 320.00 22.13 6.40 26.67 375.19
Rammer Opr 320.00 22.13 6.40 26.67 375.19
Pressure Pump Opr 320.00 22.13 6.40 26.67 375.19
Plate Compactor Opr 320.00 22.13 6.40 26.67 375.19
Concrete Cutter Opr 320.00 22.13 6.40 26.67 375.19
Concrete Vibrator Opr 320.00 22.13 6.40 26.67 375.19
Dumptruck Driver 320.00 22.13 6.40 26.67 375.19
Truck Driver 320.00 22.13 6.40 26.67 375.19
Service Driver 320.00 22.13 6.40 26.67 375.19
Flagman 275.00 18.05 5.50 22.92 321.47
Watchman 275.00 18.05 5.50 22.92 321.47
Laborer 275.00 18.05 5.50 22.92 321.47
Helper 275.00 18.05 5.50 22.92 321.47

Notes:
1.0 Minimum Wage Rate (Wage Order No. ROVII-12)
Classification Non-Agricultural Sector
Class A 241.00

2.0 The SSS Contribution (Employer Share) is based from the SSS Contribution which took effect 1 Jan 2007.

3.0 The Pag-ibig Contribution (Employer Share) is 2.0% of the employee's basic rate.
Prepared by:
WITHOUT
BENEFITS

450.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
375.00
375.00
375.00
375.00
320.00
375.00
375.00
320.00
320.00
320.00
320.00
320.00
320.00
320.00
320.00
320.00
320.00
275.00
275.00
275.00
275.00
FLYWHEEL/
EQUIPMENT
TYPE/DESCRIPTION HORSE-
NAME
POWER

I. EARTHWORKS

Dozer Crawler Dozer, D6H PS/DD/PSDS, 165hp 165.00


Dozer Crawler Dozer, D6R STD, 165hp 165.00
Dozer Crawler Dozer with Ripper, D7G PS* 200.00
Loader Crawler Loader,1.76 cu.m. 953 LGP 110.00
Loader Wheel Loader, 2.0 cu.m., 928G 125.00
Loader Wheel Loader, 3.0 cu.m., 950G 180.00
Backhoe Backhoe Crawler, 1.09 cu.m. EL 200B 118.00
Backhoe Backhoe w/ pavement breaker, 1.50 cu.m. 320 C/CL 138.00
Grader Motor Grader, 135hp, komatsu, GD511R-1 135.00
Grader Motor Grader, 125hp, Caterpillar 120G 125.00
Roller Pneumatic Tire Roller, Bomag, BW20R 8wheels, 24M.T. 85.50
Roller Pneumatic Tire Roller, Bomag, BW16R 8wheels, 20M.T. 85.50
Roller Vibratory Single Smooth Drum Roller, CA252D, 12.55M.T. 125.00
Roller Vibratory Tandem Roller, CC421, 10.10M.T. 123.40
Roller Vibratory Tamping Foot Roller, CA250PD, 13.65M.T. 104.60
Plate Compactor Vibratory Plate Compactor (550-700) 13.50
Dump Truck Dump Truck, 9.0 cu.m. 275.00
Dump Truck Dump Truck, 11.50 cu.m. 380.00
Cargo Truck Cargo Truck, 13 - 15 M.T. 320.00
Cargo Truck Cargo Truck, 6 - 8 M.T. 195.00
Water Truck Water Truck, 500 - 1000 gals. 360.00

II. CONCRETE/ ASPHALT PAVEMENT

Aggregate Crusher, Parker Model 1208, 100TPH 200.00


Aggregate Crusher, Svedala Jawmaster 907HD, 175-275TPH 222.00
Washing / Screening Plant, 100TPH 180.00
Concrete Batch Plant, ROSS UNIPLANT, 80 cu.m./hr. 180.00
Transit Mixer, 5.0 cu.m. 195.00
Transit Mixer, 7.0 cu.m. 290.00
Concrete Saw, self-propelled 10 3/4 in 25.00
Concrete Paver/Finisher, Gomaco III/GT-6300, 42" Trimming width 169.00
Concrete Screeder, Roller Screed, Triple Tube 25.00
Asphalt Distributor, Etnyre BT - RS/ 5 Tons, 3000 USG 100.00
Power Broom, Self Propelled, Towed Type, 30km/hr. 120.00
Asphalt Paver/ Finisher, CMI AP 1100/ 10 ft. width 142.00

III. STRUCTURES

Truck Mounted Crane, Hydraulic Telescopic Boom, 21-25 MT 200.00


Truck Mounted Crane, Hydraulic Telescopic Boom, 51-60 MT 280.00
Crawler Crane, 21 - 25MT 145.00
Crawler Crane, 51 - 60MT 275.00
Diesel Pile Hammer, Mitsubishi, MH35 - DSL, 10,500KG-M 220.00
Pile Vibratory Hammer
Concrete Mixer, 1 - Bagger 22.00
Concrete Mixer, 2 - Bagger 28.00
Concrete Vibrator-24 5.00
Drill Rig, mech. rotary, CMV, Model TRM35/21, 600-2000mm dia 175.00
Vibratory Extractor
Power Pack
Service Pick-up, Nissan Frontier, 3.2AT II (4x4) 80.00
Service Pick-up, Nissan Frontier, 2.7S (4x2) 80.00
Air Compressor, 251-315 cfm 92.00
Chipping Hammer Pneumatic Breaker 80.00
Water Pump, 3" dia 1500lpm 6.70
Water Pump, 4" dia 2500lpm 10.00
Bar Shear, 42mm 10.00
Bar Bender, 42mm (Circular) 10.00
Chainsaw with Blade 10.00
Generator Set, 51-100kw 40.00
Generator Set, 251-300kw 50.00
Welding Machine, 300Amp 48.00
Paint Stripping Machine 10.00
Crawler Drill 40.00
Tamping Rammer, 16KN 5.00
Applicator Machine
Kneading Machine

23 - ACEL 23 IV. OTHER EQUIPMENT (From Canvass and ACEL 23)


C - Canvass
A - Assumed
I - From Internet Concrete Vibrator - 23
Water Truck, 10cum. cap.
Backhoe w/ Breaker, Crawler - 23
Plate Compactor, Vibratory - 23
Tamping Rammer - 23
Dewatering Pump - 23
Jack Hammer Pionjar - 23

Pumcrete Charge - C
Jack Hammer - C
Bagger Mixer - C
Concrete Vibrator - C
Concrete Cutter - C
Plate Compactor - C
Welding Machine - C
Mini Backhoe w/ Breaker - C
with breaker Mini Backhoe - C
Backhoe - C
Chipping Hammer - I

Chipping Hammer - A
Mortar Gun - A
Conc. Trowel Machine - A
Paint Spray Gun
Sand Blastering
PHP 47.00
8 15% 5% 6.0%
HOURLY DAILY BARE REPAIR AND
DAILY FUEL DAILY OIL AND EQUIPMENT
BARE RENTAL RENTAL MAINTENANCE
COST LUBRICANTS OPERATOR
(Pesos) (Pesos) (Pesos)

1,691.69 13,533.52 1,163.25 676.68 812.01 Dozer Opr


3,218.22 25,745.76 1,163.25 1,287.29 1,544.75 Dozer Opr
2,523.95 20,191.60 1,410.00 1,009.58 1,211.50 Dozer Opr
1,549.41 12,395.28 775.50 619.76 743.72 Loader Opr
1,794.65 14,357.20 881.25 717.86 861.43 Loader Opr
2,701.99 21,615.92 1,269.00 1,080.80 1,296.96 Loader Opr
1,451.45 11,611.60 831.90 580.58 696.70 Backhoe Opr
2,725.87 21,806.96 972.90 1,090.35 1,308.42 Backhoe Opr
1,150.44 9,203.52 951.75 460.18 552.21 Grader Opr
1,233.38 9,867.04 881.25 493.35 592.02 Grader Opr
1,199.06 9,592.48 602.78 479.62 575.55 Roller Opr
1,137.57 9,100.56 602.78 455.03 546.03 Roller Opr
1,319.28 10,554.24 881.25 527.71 633.25 Roller Opr
1,073.93 8,591.44 869.97 429.57 515.49 Roller Opr
1,579.44 12,635.52 737.43 631.78 758.13 Roller Opr
274.50 2,196.00 95.18 109.80 131.76 Plate Compactor Opr
783.12 6,264.96 1,938.75 313.25 375.90 Dumptruck Driver
1,062.36 8,498.88 2,679.00 424.94 509.93 Dumptruck Driver
894.66 7,157.28 2,256.00 357.86 429.44 Truck Driver
553.02 4,424.16 1,374.75 221.21 265.45 Truck Driver
692.12 5,536.96 2,538.00 276.85 332.22 Truck Driver

1,961.25 15,690.00 1,410.00 784.50 941.40


4,777.12 38,216.96 1,565.10 1,910.85 2,293.02
1,780.35 14,242.80 1,269.00 712.14 854.57
2,610.80 20,886.40 1,269.00 1,044.32 1,253.18
958.62 7,668.96 1,374.75 383.45 460.14
1,159.08 9,272.64 2,044.50 463.63 556.36
396.25 3,170.00 176.25 158.50 190.20
2,988.70 23,909.60 1,191.45 1,195.48 1,434.58
2,253.68 18,029.44 176.25 901.47 1,081.77
696.41 5,571.28 705.00 278.56 334.28
87.03 696.24 846.00 34.81 41.77
1,700.27 13,602.16 1,001.10 680.11 816.13

927.36 7,418.84 1,410.00 370.94 445.13 Crane Opr


1,621.62 12,972.96 1,974.00 648.65 778.38 Crane Opr
899.47 7,195.76 1,022.25 359.79 431.75 Crane Opr
1,641.64 13,133.12 1,938.75 656.66 787.99 Crane Opr
921.64 7,373.08 1,551.00 368.65 442.38 Crane Opr
452.60 3,620.76 - 181.04 217.25 Crane Opr
111.54 892.32 155.10 44.62 53.54 Bagger-Mixer Opr
123.70 989.56 197.40 49.48 59.37 Bagger-Mixer Opr
65.63 525.00 35.25 26.25 31.50 Concrete Vibrator Opr
2,500.36 20,002.84 1,233.75 1,000.14 1,200.17
- - - - -
- - - - -
279.54 2,236.28 564.00 111.81 134.18
174.99 1,399.92 564.00 70.00 84.00
399.69 3,197.48 648.60 159.87 191.85
50.72 405.72 564.00 20.29 24.34 Jackhammer Opr
111.83 894.60 47.24 44.73 53.68
223.65 1,789.20 70.50 89.46 107.35
210.94 1,687.48 70.50 84.37 101.25
278.44 2,227.48 70.50 111.37 133.65
166.25 1,330.00 70.50 66.50 79.80
166.87 1,334.96 282.00 66.75 80.10
484.93 3,879.44 352.50 193.97 232.77
240.96 1,927.64 338.40 96.38 115.66 Welder
54.96 439.68 70.50 21.98 26.38
12.36 98.84 282.00 4.94 5.93
164.87 1,318.92 35.25 65.95 79.14 Rammer Opr

with fuel 1,200.00 60.00 72.00 Concrete Vibrator Opr


with fuel 8,550.00 427.50 513.00 Truck Driver
with fuel 8,950.00 447.50 537.00 Backhoe Opr
with fuel 2,600.00 130.00 156.00 Plate Compactor Opr
with fuel 1,800.00 90.00 108.00 Rammer Opr
with fuel 2,100.00 105.00 126.00 Pressure Pump Opr
with fuel 650.00 188.00 32.50 39.00 Jackhammer Opr

2,500.00 470.00 125.00 150.00 Jackhammer Opr


1,000.00 470.00 50.00 60.00 Bagger-Mixer Opr
2,000.00 470.00 100.00 120.00 Concrete Vibrator Opr
3,800.00 470.00 190.00 228.00 Concrete Cutter Opr
1,500.00 470.00 75.00 90.00 Plate Compactor Opr
1,200.00 72.00 Welder
8,000.00
1,000.00 8,000.00
1,800.00 14,400.00
2,150.00 470.00 107.50 129.00 Jackhammer Opr

2,500.00 470.00 125.00 150.00 Jackhammer Opr


500.00
2,500.00 470.00 125.00 150.00 Concrete Vibrator Opr
500.00
500.00
DAILY
DAILY OPERATING
OPERATOR REFERENCE/SOURCE MONTHLY BARE
COST (Pesos/Day)
COST RENTAL (Pesos)

350.00 16,600.00 ACEL EDITION 24


350.00 30,100.00 ACEL EDITION 24
350.00 24,200.00 ACEL EDITION 24
350.00 14,900.00 ACEL EDITION 24
350.00 17,200.00 ACEL EDITION 24
350.00 25,700.00 ACEL EDITION 24
350.00 14,100.00 ACEL EDITION 24
350.00 25,600.00 ACEL EDITION 24
350.00 11,600.00 ACEL EDITION 24
350.00 12,200.00 ACEL EDITION 24
350.00 11,700.00 ACEL EDITION 24
350.00 11,100.00 ACEL EDITION 24
350.00 13,000.00 ACEL EDITION 24
350.00 10,800.00 ACEL EDITION 24
350.00 15,200.00 ACEL EDITION 24
320.00 2,900.00 ACEL EDITION 24
320.00 9,300.00 ACEL EDITION 24
320.00 12,500.00 ACEL EDITION 24
320.00 10,600.00 ACEL EDITION 24
320.00 6,700.00 ACEL EDITION 24
320.00 9,100.00 ACEL EDITION 24

- 18,900.00 ACEL EDITION 24


- 44,000.00 ACEL EDITION 24
- 17,100.00 ACEL EDITION 24
- 24,500.00 ACEL EDITION 24
- 9,900.00 ACEL EDITION 24
- 12,400.00 ACEL EDITION 24
- 3,700.00 ACEL EDITION 24
- 27,800.00 ACEL EDITION 24
- 20,200.00 ACEL EDITION 24
- 6,900.00 ACEL EDITION 24
- 1,700.00 ACEL EDITION 24
- 16,100.00 ACEL EDITION 24

350.00 10,000.00 ACEL EDITION 24 185,471.00


350.00 16,800.00 ACEL EDITION 24 324,324.00
350.00 9,400.00 ACEL EDITION 24 179,894.00
350.00 16,900.00 ACEL EDITION 24 328,328.00
350.00 10,100.00 ACEL EDITION 24 184,327.00
350.00 4,400.00 ACEL EDITION 24 90,519.00
320.00 1,500.00 ACEL EDITION 24 22,308.00
320.00 1,700.00 ACEL EDITION 24 24,739.00
320.00 1,000.00 ACEL EDITION 24 13,125.00
- 23,500.00 ACEL EDITION 24 500,071.00
- -
- -
- 3,100.00 ACEL EDITION 24 55,907.00
- 2,200.00 ACEL EDITION 24 34,998.00
- 4,200.00 ACEL EDITION 24 79,937.00
320.00 1,400.00 ACEL EDITION 24 10,143.00
- 1,100.00 ACEL EDITION 24 22,365.00
- 2,100.00 ACEL EDITION 24 44,730.00
- 2,000.00 ACEL EDITION 24 42,187.00
- 2,600.00 ACEL EDITION 24 55,687.00
- 1,600.00 ACEL EDITION 24 33,250.00
- 1,800.00 ACEL EDITION 24 33,374.00
- 4,700.00 ACEL EDITION 24 96,986.00
375.00 2,900.00 ACEL EDITION 24 48,191.00
- 600.00 ACEL EDITION 24 10,992.00
- 400.00 ACEL EDITION 24 2,471.00
320.00 1,900.00 ACEL EDITION 24 32,973.00

blank = included

320.00 1,700.00 ACEL EDITION 23


320.00 9,900.00 ACEL EDITION 23
350.00 10,300.00 ACEL EDITION 23
320.00 3,300.00 ACEL EDITION 23
320.00 2,400.00 ACEL EDITION 23
320.00 2,700.00 ACEL EDITION 23
320.00 1,300.00 ACEL EDITION 23

225 /m3 C.S.I (Conc. Sol'ns. Inc.)


320.00 3,600.00 FELMAN BUILDER'S AND CONSTRACTOR 10 li./day
320.00 1,900.00 FELMAN BUILDER'S AND CONSTRACTOR 10 li./day
320.00 3,100.00 FELMAN BUILDER'S AND CONSTRACTOR 10 li./day
320.00 5,100.00 FELMAN BUILDER'S AND CONSTRACTOR
320.00 2,500.00 FELMAN BUILDER'S AND CONSTRACTOR
375.00 1,700.00 FELMAN BUILDER'S AND CONSTRACTOR
8,000.00 Hesreal Devt. Corp.
8,000.00 FELMAN BUILDER'S AND CONSTRACTOR
14,400.00 FELMAN BUILDER'S AND CONSTRACTOR
320.00 3,200.00 From internet (AAA Rentals Redwood City)

320.00 3,600.00 ASSUMED Assumed to be equal with Jackhammer


- 500.00 ASSUMED
320.00 3,600.00 ASSUMED
- 500.00 ASSUMED
500.00 ASSUMED
Vic Enterprises
M.J. Cuenco Ave. cor. f. Gochan St. Mabolo Cebu City Cebu, Tel # +63.32.232-4637 | +63.32.412-8504
Category: Construction Supplies
2329270

CENTRAL LUMBER CORPORATION


270 Magallanes St. Cebu City Cebu
Tel # +63.32.254-7248 | +63.32.255-0507 | +63.32.418-4566 | 345- 4234-35 | 238-7975
Category: Construction Supplies

CEBU TRISTAR CORP.


168 Ouano Ave. Mandaue City Cebu

Category: Construction Supplies

ANDORRA TILE ROOFINGS INC.


119 Gorordo Avenue Cebu City Cebu
roofings@globelines.com.ph
Category: Roofing Supply
Tel # +63.32.232-6777 | +63.32.231-3888

SUMMIT GRANITE CENTER


Maria Luisa Rd., Banilad Cebu City Cebu
Category: Natural Stone Suppliers
Tel # +63.32.343-7293 | +63.32.343-7294 (F) | +63.32.415-9719

TREASURE ISLAND
Pilit Cabancalan Mandaue City Cebu
Category: Paints
Tel # +63.32.346-2954 - 58 | +63.32.346-1367 (F)

KIMA GLASS SUPPLY CORP., INC.


22 F. Cabahug Street, Mabolo Cebu City Cebu
Tel # +63.32.231-0245 | +63.32.412-7371
Category: Glass and Aluminum Suppliers

CEBU ATLANTIC HARDWARE, INC.


66-72 B. Aranas St. Cebu City Cebu
Tel # +63.32.261-4692 - 98
Category: Hardware

B Benedicto And Sons Company


Address: plaridel street, Cebu
Category: CHB Supplier
Tel # 255-0941-42

Cherry Rose Builders & Construction Supply


Address: 264 Sikatuna Cebu City
Tel # 412 6530
Category: Construction Supplies

7C Concrete Aggregates, Inc.


Lagtang Talisay
Tel# 273-2651
Category: Construction Supplies

Toledo Aggregates & Const. Dev. Corp.


Inayagan Naga
Tel# 272-6622
Category: Construction Supplies

PICA Enterprises
V. Rama Avenue Cebu City
Tel # 254-1624
Category: Construction Supplies

ROCKMASTER/HESREAL
304 V.Rama Ave., Cebu City
Tel # 262-4266,261-2315, 238-3231
Category: Construction Supplies

WENC Enterprises
Lagtang, Talisay
Tel #
Category: Construction Supplies

FELMAN BUILDER'S AND CONSTRACTOR


MJ Cunco Avenue, Cebu City
Category: Equipment Rental
Tel # 232-8859
Category: Equipment Rental and Const. Supplies

ECONTECH (Enecio Construction Technology, Inc.)


Molave St,.Tayud Liloan Cebu
Tel # 424-8445 I 424-6870
Category: Construction Supplies

Cebu Evergreen
P. Remedio St. Cabancalan, Mandaue City
Tel # 346 1186
Category: Ceilings Gypsum, Fiber Cement Board

Jea Steel Industries Inc.


Address: Warehouse E8 Traders Arcade, Hernan Cortes St. , Hernan Cortes St. , Mandaue City, Cebu, Philippines
Tel # (6332) 343-7254, 343-7255, 344-2821
Category: Steel Products,light frames

Puyat Steel Plant


Warehouse 4 Quano Ave. F.F. Cruz Mandaue Reclamation Area, Mandaue City Cebu
Telephone :(032) 323-7081 , (032) 345-0552
Telefax: (032) 344-9914

Multi Metal Distributor


176-177 M.J. Cuenco Avenue, Cebu City
Tel # 232-8239
Category: Steel Product

Cebu MMF Glass & Aluminum Supply


Lakandula Cebu City
Tel # 261-5000
Category: Aluminum Product

True Value Hardware Corporation


Ayala Ctr , Cebu City, Philippines - 032 232 1689
Website - Directions

Filmon Hardware, Inc.


Legaspi St, Cebu, Central Visayas 6000, Philippines - 032 253 0093
Directions

Cebu Oversea Hardware Company, Incorporated


82 Plaridel Street Ermita , Cebu City, Philippines - 032 254 1519
Directions

Alliance Hardware, Incorporated


Legaspi Corner Lapu Lapu Streets , Cebu City, Philippines - 032 253 2508
Directions

Octagon Computer Superstore


424 Gorordo Avenue Lahug, Cebu, Philippines - 035 231 8582
Category: Computer Hardware
Website - Directions

Octagon Computer Superstore


North Reclamation Area Barangay Dela Montana, Cebu, Philippines - 035 231 7355
Category: Computer Hardware
Website - Directions

Budget Builders, Incorporated


235 N. Bacalso Avenue , Cebu City, Philippines - 032 261 0297
Category: Hardware
Directions

Tokyu Hardware And Industrial Supply


79 Magallanes Street Sto. Nino , Cebu City, Philippines - 032 255 1855

Ho Tong Hardware, Incorporated


45 Mc Briones Street Corner Gonzales , Cebu City, Philippines - 032 256 0964
Directions

Yale Hardware
M.J. Cuenco Avenue Corner M.C. Briones Avenue , Cebu City, Philippines - 032 412 1673
Directions

Cebu Hardware Corporation.


Manalili St, Cebu, Central Visayas 6000, Philippines - 032 253 1422
Directions

Cathay Hardware Inc.


Plaridel St, Cebu, Central Visayas 6000, Philippines - 032 256 1170
Directions

Cebu Champion Hardware Inc.


Plaridel St, Cebu, Central Visayas 6000, Philippines - 032 253 0046
Directions

Federal North Hardware, Incorporated


T Padilla Extension , Cebu City, Philippines - 232-8334,
Directions

iCenter
Unit 28, Crossroads Mall, Cebu City, Central Visayas, Philippines - 032 416 4675
Category: Computer Hardware
Directions

Hewlett Packard Philippines - Hp


Clavano Corner Escario Street , Cebu City, Philippines - 032 412 5300
Category: Computer Hardware
Directions

Unihom
P. Rodriguez Street Corner A. Pedroza Street Poblacion Bogo , Cebu City, Philippines - 032 434 8120
Category: Hardware
Directions

Aulga Hardware
Cebu City, Central Visayas, Philippines
Directions

PC Express
Visitacion Street, Sambag II, Cebu City, Central Visayas, Philippines
Category: Computer Hardware
Directions
CBX Corporation
J. De Veyra Avenue, North Reclamation Area, Cebu City, Central Visayas 6000, Philippines - 032 231 4369
Category: Computer Hardware
Directions

Cebu Albert Merchandising


43 T. Padilla , Cebu City, Philippines - 032 415 5388
Category: Hardware
Directions

Star PC Computers
N. Bacalso Avenue, Kamagayan, Cebu City, Central Visayas, Philippines
Category: Computer Hardware
Directions

Cebu Bionic Builder Supply, Incorporated


South Road Mambaling , Cebu City, Philippines - 032 418 9191
Category: Hardware
Directions

Pentax Hardware, Inc.


Progreso St, Cebu, Central Visayas 6000, Philippines - 032 413 7031
Directions

Banilad Cebu Trade Center Inc.


Archbishop Reyes Ave, Cebu, Central Visayas 6000, Philippines - 032 232 6168
Category: Hardware
Directions

Moduletech Rack Center


Door 1,Ef Jimenez Building,, Subangdaku,, Mandaue, Cebu 6014, Philippines - 032 346 6752
Category: Hardware
Directions

Arkay Marketing Corporation


Lobogon, Basak, Mandaue, Cebu 6000, Philippines - 032 344 0475
Category: Hardware
Directions

Citi Hardware
Mandaue City, Central Visayas, Philippines
Website - Directions

New Millennium Hardware, Incorporated


131 Subangdaku , Mandaue City, Philippines - 032 345 3865
Directions

Cebu Home & Builders Centre


Banilad, Mandaue City, Central Visayas, Philippines
Category: Retail Stores - Hardware
Directions

Cebuano Construction Supply, Incorporated


840 As Fortuna Street Banilad , Mandaue City, Philippines - 032 346 2699
Category: Hardware
Directions

Build It! Building Materials Sales, Inc.


Basak Rd, Lapu-Lapu, Central Visayas 6014, Philippines - 032 422 9461
Category: Hardware
Directions

Cebu Furniture Support


Plaridel Alang Alang , Mandaue City, Philippines - 032 343 3653
Category: Hardware
Directions

Atlantic Hardware
Talisay City, Central Visayas, Philippines
Directions

Mzjt Marketing
National Road Bulacao , Talisay, Philippines - 032 272 1002
Category: Hardware
Directions

Cebu Belmont, Inc.


M.C. Briones Highway, Maguikay, Mandaue, 6014, Philippines - 032 346 1143
Category: Tools and hardware, mail order
Website - Directions

Juasing Hardware, Inc.


Mc Arthur Blvd., Cebu, Cebu 6000, Philippines - 032 254 9799
Directions

New Yutek Hardware & Industrial Supply Corporation


44 Zulueta Street, Pari-An, Cebu, Cebu 6000, Philippines - 032 255 5406
bu, Philippines
Item Equipment Type Equipment Operator Rental/Day Rental/Hr.
1.0 Backhoe Backhoe Opr PHP 8,950.00 PHP 1,800.00
2.0 Mini Backhoe PHP 1,000.00
3.0 Dumptruck Dumptruck Driver PHP 3,050.00 PHP 1,500.00
4.0 Payloader PHP 10,000.00
5.0 Vibratory Roller PHP 10,000.00
6.0 Grader PHP 3,500.00
7.0 Sheep's Foot Roller PHP 10,000.00
8.0 Bulldozer PHP 10,000.00 PHP 5,500.00
9.0 Compactor PHP 10,000.00
10.0 Chipping Hammer PHP 2,500.00
10.0 Chipping Hammer PHP 2,159.00
11.0 Jack Hammer PHP 2,500.00
12.0 Bagger Mixer PHP 1,000.00
13.0 Concrete Vibrator PHP 2,000.00
14.0 Conc. Trowel Machine PHP 1,500.00
15.0 Pumcrete Charge PHP 225.00
15.0 Pumcrete Charge PHP 280.00
16.0 Bar Cutter PHP 1,500.00
17.0 Tamping Rammer PHP 1,800.00
18.0 Mortar Gun PHP 300.00
19.0 Concrete Cutter PHP 3,800.00
20.0 Plate Compactor PHP 1,500.00
21.0 Welding Machine PHP 1,200.00
22.0 Mini Backhoe w/ Breaker PHP 1,000.00
23.0
Operator
Fuel Cost/ Day Total Cost/ Day Reference/ Quotations
Cost/Day
PHP 14,400.00 FELMAN BUILDER'S AND CONSTRACTOR
FELMAN BUILDER'S AND CONSTRACTOR
PHP 12,000.00 FELMAN BUILDER'S AND CONSTRACTOR
PHP 10,000.00
PHP 10,000.00
PHP 28,000.00 Cebu Ace Trucking Corporation
PHP 10,000.00 Assume cost & optr is included
PHP 44,000.00 Cebu Ace Trucking Corporation
PHP 10,000.00 Assume cost & optr is included
PHP 2,500.00 Assume cost & optr is included
PHP 2,159.00 From internet (AAA Rentals Redwood City)
PHP 430.00 PHP 2,930.00 FELMAN BUILDER'S AND CONSTRACTOR
PHP 430.00 PHP 1,430.00 FELMAN BUILDER'S AND CONSTRACTOR
PHP 430.00 PHP 2,430.00 FELMAN BUILDER'S AND CONSTRACTOR
PHP 1,500.00 Assume cost & optr is included
PHP 225.00 CSI -225/m3
PHP 280.00 WTG Dev. Corp.
PHP 1,500.00 Assume cost & optr is included
PHP 1,800.00
PHP 300.00 Assume cost
PHP 3,800.00 FELMAN BUILDER'S AND CONSTRACTOR
PHP 1,500.00 FELMAN BUILDER'S AND CONSTRACTOR
PHP 1,200.00 FELMAN BUILDER'S AND CONSTRACTOR
PHP 8,000.00 Hesreal Devt. Corp.
Remarks
Description of Equip.
Backhoe w/ Breaker,excavator,20 tonner
STRACTOR
Dump Truck, 6.0cum. cap.

10/ liters
10/ liters
10/ liters

STRACTOR
STRACTOR
STRACTOR
3.5 m3 per trip
56

You might also like