CAREER TECHNICAL EDUCATION FACILITIES PROGRAM

COST ESTIMATE GUIDELINE

SCHOOL DISTRICT 5-DIGIT DISTRICT CODE:


SCHOOL NAME COUNTY:
ARCHITECT FIRM DATE OF ESTIMATE:
PREPARED BY
SIGNATURE:
APPLICATION NUMBER: Estimate Reference

Categor Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Unit Cost
y Estimate Comments Current Construction Costs
Construction Specification Institute
Division 1 General Requirements
District may itemize General Conditions or Apply a
a General Conditions percentage to the estimated subtotal of construction costs.
General Conditions 0
Mobilization, On & Off 0
Non-Distributable Labor 0
Permits, Licenses & Fees 0
Temporary Utilities, Structures & Fences 0
Equipment Rental 0
Other General Conditions 0
0
0
Sub Total 0
Division 2 Site Work
a Site work
Site Demolition: 1 ls 5,000.00 5,000
General Building Demolition: 0
Excavation, Fill & Grading: 0
Piling 0
Caissons & Drilling 0
Shoring & Bulkheading 0
Site Utilities 0
Storm Drainage & Sanitary Sewer 0
Water, Steam & Gas Distribution 0
Valves & Specialties 0
Mechanical Utilities, Accessories 0
Miscellaneous Site Equipment 0
Electrical Distribution, Underground 0
General Site Work, Paving & Walks 0
Miscellaneous Site Improvements 0
Irrigation, Sprinkler Head Systems 0
Landscaping 0
0
Sub Total 5,000

Page 1
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM
COST ESTIMATE GUIDELINE

APPLICATION NUMBER: Estimate Reference

Categor Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Unit Cost
y Estimate Comments Current Construction Costs
Division 3 Concrete
a
Precast Concrete 0
Specialty Concrete 0
Excavation & Backfill 0
Concrete Forms 0
Foundation forms 0
Footing Forms 0
Forms, Slab on Grade 0
Reinforcing steel 0
Concrete placement 0
Slab Finishes 0
Vertical surface Finishes 0
Insulating Decks 0
Fiber Deck 0
0
Sub Total 0
Division 4 Masonry
a
Brick Masonry 0
Concrete Unit Masonry 0
0
Sub Total 0
Division 5 Metals
a
Structural Steel 0
Decking & Siding 0
Misc Iron 0
0
Sub Total 0
Division 6 Carpentry
a
Rough Carpentry 0
Vertical Framing, Walls 0
Horizontal Framing 0
Misc. Framing & Materials 0
Sheathing 0
Carpentry Specialties 0
Finish Carpentry 0
Beams, trusses 0
Stairs, Wood 0
Rough Hardware 0
0
Sub Total 0

Page 2
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM
COST ESTIMATE GUIDELINE

APPLICATION NUMBER: Estimate Reference

Categor Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Unit Cost
y Estimate Comments Current Construction Costs
Division 7 Thermal & Moisture Protection
a
Waterproofing 0
Thermal & Sound Insulation 0
Roofing 0
Composite Building Panels 0
Sheet metal & Fabricated Skylights 0
Architectural Sheet Metal 0
Caulking & Sealants 0
0
Sub Total 0
Division 8 Doors, Windows & Glass
a
Hollow Metal Doors & Frames 0
Wood Doors & Frames 0
Wood Garage Doors 0
Wood Door Specialties 0
Special Doors 0
Vinyl, Windows & Doors 0
Aluminum, Windows & Doors 0
Wood Windows & Doors 0
Finish & Hardware 0
Glass & Glassing 0
Curtain Walls 0
0
Sub Total 0
Division 9 Finishes
a
Studs 0
Furring 0
Lathing 0
Plaster & Lath 0
Gypsum Wall board, Studding & Furring 0
Gypsum Wall board, Secularities 0
Ceramic Tile 0
Terrazzo 0
Acoustic Treatment 0
Wood Flooring 0
Resilient Flooring 0
Painting & Wall covering 0
Plastic & Factory Finish Wall Surfaces 0
Sub Total 0

Page 3
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM
COST ESTIMATE GUIDELINE

APPLICATION NUMBER: Estimate Reference

Categor Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Unit Cost
y Estimate Comments Current Construction Costs
Division 10 Specialties
a
Chalk & Tack Boards 0
Toilet Partitions & Compartments 0
Partitions Toilet Accessories 0
Misc. Building Specialties 0
0
Sub Total 0
Division 11 CTE Program Equipment to be supplied on separate sheet.
a
Sub Total 0
Division 12 Furnishings Indicate F&E included in a construction contract
(i.e., built-in equipment)
Blinds & Shades 0
Cabinets 0
Laminated& Plastic
Laminated Plastic Tops
& Simulated Marble
Tops 0
Carpets 0
Draperies & Curtains 0
Other 0 Must Provide a Description of "Other"
Sub Total 0
Division 13 Special Construction

Special Construction 0
Prefabricated Structures 0
0
Sub Total 0
Division 14 Conveying Systems

Conveying Systems 0
0
Sub Total 0
Division 15 Mechancial

Equipment 0
Fixtures 0
Piping 0
Valves & Specialties 0
Insulation, Piping 0
Miscellaneous Plumbing Specialties 0
Medical & Laboratory Equipment & Pipe 0
Fees, Permits & Sterilization 0
Industrial Piping Insulation 0
HVAC 0
Equipment, Furnaces 0

Page 4
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM
COST ESTIMATE GUIDELINE

APPLICATION NUMBER: Estimate Reference

Categor Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Unit Cost
y Estimate Comments Current Construction Costs
Equipment, Hot Water & Steam Boilers 0
Equipment, Cooling 0
Equipment, Heating & Cooling
Combinations 0
Auxiliary heating & Cooling Equipment 0
Air Handling Equipment, Primary 0
Distribution, Terminal Equipment 0
Miscellaneous Equipment 0
Controls 0
Duct Work, Grills & Registers 0
Piping & Insulation 0
Fittings 0
Valves & Specialties 0
Insulation, Piping 0
Fire Protection Systems 0
0
0
Sub Total 0
Division 16 Electrical

Total Electrical 0
Cost, Work
, Buildings
Electrical In-Place, Prelim
Estimates 0
Main Switchboards, 600v, Service &
Distribution 0
Distribution Panels to 600v 0
Transformers 0
Raceway & Wire, Combined 0
Under floor Distribution Systems 0
Lighting Fixtures, In-Place 0
Branch Circuit Runs, Sp Purpose
Conduit & Wire 0
Signal & Communications Systems 0
Branch Circuit Outlets & Devices 0
Fees, Permits, Testing 0
Equipment, Unit Substations 0
Equipment, Switchgear & Transformers 0
Equipment, High Voltage Transformers 0
Service Sections 0
Combination Service & Distribution,
Switchboards 0
Motor Control 600v
Centers 0
Panelboards, Max, Bolt-On
Breakers 0
Transformers, Dry, Low Voltage 0
Panelboards For Bolt-On Breakers,
1240/240v, 1ph, 3w 0
Load Circuits, Main Lug & Circuit
Breaker Types, 240v Max 0
Plug-In Circuit Breakers, Type So 0
Special Gear 0
PVC, RSC, IMC & AL Raceway 0

Page 5
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM
COST ESTIMATE GUIDELINE

APPLICATION NUMBER: Estimate Reference

Categor Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Unit Cost
y Estimate Comments Current Construction Costs
PVC,RSC,IMC, & AL Condit Term,
Elbows & Fittings 0
ENT Raceway, Terminations & Elbows 0

Page 6
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM
COST ESTIMATE GUIDELINE

APPLICATION NUMBER: Estimate Reference

Categor Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Unit Cost
y Estimate Comments Current Construction Costs
ENT MI Cable & Terminations 0
Special Raceway Assembly Systems 0
Conductor Only 0
Busways 0
Lighting Fixtures 0
Electric & Signal Intercom,
Devices Public 0
Communication,
Address 0
Special Hospital Systems 0
Soft Wire Systems,Management
3 Wire 0
Energy & Building
Systems 0
0
0
0
Sub Total 0
Estimate Sub-total 5,000
The percentage is allowed in lieu of all Division 1 line items
General Conditions (includes from above. If Division 1 is completed, then this section will
Soft Costs) 9% 450 automatically populate with "N/A".
General Requirements,
Overhead & Profit, Bonds 9% 491
Design Fees 8% 475
Inspection 1% 64
Escalation 4% 259
DSA fees 0.7% 47
Contingency 10.0% 679
Estimate Sub-Total 7,465

Equipment Total (Division 11) 0

Cost Estimate Total 7,465


* All percentages are compounded and apply to all Divisions, excluding Division 11- Equipment.
* Percentages are based on the industry standards in the Saylor Publications Guide and represent the maximum amount typically allowed.

Page 7