List of AIM Deliverables

Business Requirements Definition (RD)

RD.010 - Identify Financial and Operating Structure


In this task, the project team develops a complete picture of the organizations financial and
operating structure.
Deliverable
The deliverable for this task is the Financial and Operating Structure. This document portrays the
legal entity structure, business organizations, financial operating environment, revenue (and/or
cost) centers, and consolidation path. It may also catalog other business entities.

RD.020 - Conduct Current Business Baseline


In this task, the project team examines current processes and practices to identify how the
existing business system meets current business requirements.
Deliverable
The deliverable for this task is the Current Business Baseline. It consists of the Current Business
Process model, Process Questionnaires, and the Process Improvement and Redesign List. You
may need to include other business process documentation as well.

RD.030 - Develop Future Process Model


This task defines the future business model in the form of integrated process flows built upon the
business processes supported by the new applications. Identify the complete set of events to
which the business function responds in order to meet its objectives, describe the future
processes that the business performs in order to respond to each of the events, and identify each
of the steps in those processes.
Deliverable
The deliverable for this task is the Future Process Model. It consists of the Event Catalog,
Process Listing and Descriptions, and Process Flow Diagrams. Optionally, it may include Process
Step Catalogs.

RD.040 - Develop Future Business Function Model


In this task you create a hierarchical model of the functions identified by the Future Process
Model. This classification process assists you in checking the completeness of your future
business process model You usually conduct this task in parallel with and in support of Develop
Future Process Model (RD.030).
Deliverable
The deliverable for this task is the Future Business Function Model. The Future Business
Function Model deliverable shows all the business functions arranged in a hierarchy diagram. It
also specifies the data usage at each function.

RD.050 - Establish Process and Mapping Summary


During this task you create the repository for key project findings and decisions that occur during
the implementation.
Deliverable
The deliverable for this task is the Process and Mapping Summary. It provides a single source of
information on key implementation decisions for new project members and executive

______________________________________________________________________________________
AIM Deliverables 1
management. The Project Manager can also use it to maintain a status on the progress of
deliverables in requirements definition through build and test.

RD.060 - Gather Business Volumes


In this task you research the current business volumes and estimate the future projected
operational processing volumes, transaction patterns, and data storage volume requirements.
This information provides the basis for determining the size and performance of the new
production system.
Deliverable
The deliverable for this task is the Business Volume Requirements.

RD.070 - Create Business Requirements Scenarios


In this task you define detailed business requirements and perform an initial assessment of
application fit to these requirements.
Deliverable
The deliverable for this task is the Business Requirements Scenarios (BRS). At least one BRS is
created for each business process, linking requirements to process steps.

RD.080 - Determine Audit and Control Requirements


This task identifies the high levels and policies that affect business and system security, control,
and procedures.
Deliverable
The deliverable for this task is the Audit and Control Requirements.

RD.090 - Identify Business Availability Requirements


This task identifies the business operating requirements that the operating functions and
information systems functions agree are necessary to support the business processes. It also
summarizes contingency situations the company must guard against and documents the
approach to managing delay, failure, or other unexpected results that could imperil daily business
operations.
Deliverable
The deliverable for this task is the Business Availability Requirements document.

RD.100 - Develop Reporting Requirements


In this task you develop the reporting requirements. Reports are typically outputs of business
processes that are used as tools in support of business process operations.
Deliverable
The deliverable for this task is the Master Report Tracking List. It is the primary repository for all
information collected about a report requirement. It should contain system and report name,
business purpose, frequency, priority, user name and contact information.

Business Requirements Mapping (BR)

BR.010 - Prepare Mapping Environment


During this task, you either install a new application or prepare an existing application
environment for mapping activities.

______________________________________________________________________________________
AIM Deliverables 2
Deliverable
The deliverable for this task is a Configured Mapping Environment.

BR.020 - Map Business Requirements


In this task you assess the fit of standard application and system features to detailed business
requirements.
Deliverable
A Business Requirements Mapping Form (BRM) is the deliverable for this task. There is one BRM
per key business requirement or gap. The BRM is an extension of the BRS, since it shows the
result of the mapping activity.

BR.030 - Map Business Data


For this task you map the data elements from the legacy system to the target application
module(s), business objects, and attributes. The primary purpose of this task is to discover at an
early point in the project life cycle whether any business objects or attributes in the legacy system
are not being stored in the application. This task should also determine whether the application
stores any required attributes that the legacy system does not currently store.
Deliverable
The deliverable for this task is the Business Data Mapping Form. The deliverable records the
standard application module, business object, and attribute. Also record the legacy system file
name and fields for each business object in the table provided in the deliverable template.

BR.040 - Conduct Integration Fit Analysis


In this task you identify the new integration points that you require, based on your conceptual
architecture and the mapping of the new applications onto the existing architecture. This mapping
may also include distributed data external integration points between standard applications and
other third party applications. Once you agree on the business solution for each integration point
gap, this task will result in a complete listing of all new integration points for which you must
design and build interfaces. At this stage there has been no specification of interfaces; this task is
merely a recognition that an integration point exists and requires attention.
Deliverable
The deliverable for this task is the Integration Fit Analysis document.

BR.050 - Develop Information Flow Model


This task specifies the future information usage and flow requirements across business functions,
business organizations, applications and data centers. The information flow model visually
depicts information flows in the business, resulting from and driven by the business events and
business processes that form the business model. This task, together with the Develop
Information Access Model task, creates an information view of the business.
Deliverable
The deliverable for this task is an Information Flow Model for the business.

BR.060 - Develop Information Access Model


In this task you analyze and define the Information Access Model, which describes information
sharing and information partitioning requirements across organizations for the key business
objects and business process information. This will assist in the definition of how information will
be controlled from a security standpoint and what information can be accessed for reporting and
consolidation. This task, together with the previous Develop Information Flow Model task, creates
an information view of the business.

______________________________________________________________________________________
AIM Deliverables 3
Deliverable
The deliverable for this task is a model for the information access requirements of the business. It
is described in an Information Access Model document and analyzes the business organization
access and security requirements. It is a major source document for these requirements for any
of the processes in the project.

BR.070 - Conduct Reporting Fit Analysis


This task requires you to analyze and map every reporting requirement to both a Future Business
Process and standard application report, determine the final disposition of every report
requirement, and reduce the number of potential reporting customizations through requirement
reduction analysis.
Deliverable
The deliverable for this task is an updated Master Report Tracking List.

BR.080 - Test Business Solutions


In this task you perform an extended test of the proposed business solutions and validate
integrated business processes based on the mapping decisions. Demonstrate the BRSs and
BRMs for each business process, and demonstrate integration across processes to be feasible.
Deliverable
The deliverable for this task is the Mapping Scenario document.

BR.090 - Confirm Integrated Business Solutions


In this task you secure approval for proposed business solutions. It is a prerequisite to estimating
and developing detailed designs.
Deliverable
The deliverable for this task is a signed Acceptance Certificate for each set of related Business
Requirements Scenarios.

BR.100 - Create Process Narratives


In this task you create narrative, job-level descriptions of business process designs.
Deliverable
The deliverable for this task is a series of Process Narratives.

BR.110 - Define Application Setups


As you map business requirements to application features, you also begin to define the
configuration you need to support the solution. Your solution may include a number of user-
defined codes, system and application level parameters, and enabled features. During this task,
you capture the setup decisions and implement them in the appropriate environment.
Deliverable
The deliverable for this task is an Application Setup Document.

BR.120 - Design Security Profiles


As business requirements are established and mapped to application features, you also begin to
define the user security necessary to support the solution in a controlled environment. During this
task, you gather role and function information and relate them to application security and
responsibilities.

______________________________________________________________________________________
AIM Deliverables 4
Deliverable
The deliverable for this task is a Security Profiles document.

Application and Technical Architecture (TA)

TA.010 - Define Architecture Scope, Objectives, and Approach


In this task, you outline the scope, objectives, and approach you will use for architecture design of
the system you are implementing. This task may not require the creation of a separate deliverable
for all types and sizes of architectural processes, but you should consult with the project manager
to determine its effect on the project.
Deliverable
The deliverable for this task is Architecture Scope, Objectives, and Approach. It is a statement of
the scope and the objectives of Application and Technical Architecture, and the approach that the
architectural team will take to perform the work.

TA.020 - Prepare Architecture Strategy


In this task, you create the strategy for the architecture project. This integrates the existing
company information systems strategies, standards and policies with the precise method and
techniques to be employed in the present architecture process. Application of the strategy will
help to realize all or part of the information systems vision of the company and should enable the
creation of an architecture in compliance with the high-level scope, objectives, and approach
previously defined.
Deliverable
The deliverable for this task is an Architecture Strategy that describes the strategy to be used for
the work performed in the application and technical architecture process.

TA.030 - Establish Architecture Requirements


In this task, you establish the major requirements that will underpin the information systems
architecture design project. The architecture team needs to bear these requirements in mind
throughout the project and ensure that they create an architecture that is compatible with them.
Deliverable
The deliverable for this task is an Architecture Requirements document. This contains a list of
major requirements that the architecture design should meet.

TA.040 - Develop Conceptual Architecture


In this task, you identify possible candidate conceptual architectures for the new information
systems you are implementing, and select the preferred architecture that best fits the overall
needs of the business subject to the project constraints.
Deliverable
The deliverable for this task is the Conceptual Architecture document.
This describes the conceptual architecture design(s) for the new system. It may contain several
designs, if there is more than one possible conceptual architecture, but will also indicate the
conceptual architecture model that is preferred. If there is only one possible conceptual
architecture model, it will only describe this one model.

TA.050 - Conduct Technical Architecture Baseline


In this task you determine the current application and technical architecture for existing systems.
This includes identifying existing applications, interfaces, databases, networks, and hardware.
The information gathered in this task can be used both in the subsequent architecture analysis
and design tasks and also in other project processes. You can also use this task as an
______________________________________________________________________________________
AIM Deliverables 5
opportunity to identify improvements to existing maintenance and operations procedures, and to
identify which system components you can reuse in the future architecture configuration.
Deliverable
The deliverable for this task is the Technical Architecture Baseline document, an inventory of the
systems, applications, hardware, and networks that constitute the existing technical infrastructure
for the business.

TA.060 - Develop System Availability Strategy


In this task, you develop a strategy to provide the minimum level of systems availability that the
business demands.
Deliverable
The deliverable for this task is the System Availability Strategy document, a study of the systems
and approaches that will be incorporated into the technical architecture of the new system to
provide the required level of system availability.

TA.070 - Define Future Application Deployment


In this task you determine the details of the future deployment of applications across data centers
within the scope of the new architecture.
Deliverable
The deliverable for this task is the Future Application Deployment document, which is a map for
the future deployment of the applications.

TA.080 - Develop Reporting Strategy


In this task, you analyze the reporting requirements for the new business and specify at a high
level how you will meet these in the new architecture. This is a systems view of how the reporting
requirements will be satisfied in the new architecture, in contrast to the approach taken in the
Business Requirements Definition and Mapping processes.
Deliverable
The deliverable for this task is a Reporting Strategy document.

TA.090 - Revise Conceptual Architecture


In this task, you review information that you have gathered and analyzed since you created the
initial draft of the Conceptual Architecture deliverable and incorporate any relevant new findings
and decisions into the deliverable. If you need to make drastic changes to the original conceptual
architecture model because of subsequent findings and decisions, present it again to project
management to obtain management acceptance. If the changes are relatively minor in impact,
you can present it to select members of the project team to solicit feedback and acceptance.
After incorporation of changes suggested during the final review procedure, the revised
deliverable becomes the final, agreed upon conceptual architecture model for the new business
system. This deliverable is important for downstream activities and marks a key milestone in the
project. Notify project management when you have completed the task, and publish the resulting
deliverable.
Deliverable
The deliverable for this task is a revised and accepted Conceptual Architecture document.

TA.100 - Define Architecture Subsystems


In this task you identify requirements for components or systems to support the architecture.
Examples of architecture subsystems include enterprise-wide data distribution (interface)

______________________________________________________________________________________
AIM Deliverables 6
systems, (global) data registries, data warehouses, and operational reporting databases. You
may have either purchased the subsystems from Oracle or from another vendor, or you may
design and built them in-house as custom development projects, but even systems that are
purchased will often require at least some degree of custom integration work. Custom
development projects will use the requirements from this task as a starting point in their definition,
analysis and design phases.
Deliverable
The deliverable for this task is the Architecture Subsystems document, which identifies the set of
architecture subsystems that need to be incorporated into the architecture.

TA.110 - Propose Architecture Subprojects


In this task, you formally propose subsystems of the information systems architecture that may be
suitable for organization and management as subprojects within the overall architecture design
project.
Deliverable
The deliverable for this task is an Architecture Subproject Proposal document for each
architecture subsystem, component and technical area that is most suitably managed within a
separate subproject.

TA.120 - Design Application Security Architecture


In this task, you design the application and database security architecture, incorporating the
requirements generated by the business mapping process and the security requirements
identified during the design of the conceptual architecture.
Deliverable
The deliverable for this task is an Application Security Architecture document. This deliverable will
be highly dependent upon the nature and functionality of the applications being implemented.

TA.130 - Design Application Functional Architecture


In this task, you design the functional architecture for the applications. This involves identifying
those key setup parameters in the applications that are relevant to your particular implementation
and establishing the values for those parameters across all applications. This task is related to,
but distinct from, normal application setups because it deals with setup parameters that have a
profound effect on the way the application database is laid out and the basic functioning of
applications. It may also affect the technical architecture design because some types of physical
partitioning of data and processing are much easier to implement technically than others. You
may define the critical parameters as part of the Business Requirements Mapping process, but
this task is where you define the relationships between the key architecture parameters and
create the overall architecture for the different application installation sites or data centers in your
business.
Deliverable
The deliverable for this task is the Application Functional Architecture document. The deliverable
will be very dependent upon the nature and functionality of the applications being implemented.

TA.140 - Design Logical Application and Database Architecture


In this task, you design the new logical application and database architecture for the system. This
task refines the conceptual architecture using information about the future deployment of the
applications and the application functional architecture to create an implementation blueprint that
shows the specific application installations and logical database architecture for each data center.
It does not include the detailed physical layout of databases nor the hardware and networks that
are addressed in other specific tasks.
Deliverable
______________________________________________________________________________________
AIM Deliverables 7
The deliverable for this task is the Logical Application and Database Architecture document. The
deliverable is a blueprint for the logical application installation and database architecture. It
specifies all installations of applications and databases incorporating the analysis and design
from functional mapping, custom application and database extensions, security, and reporting
systems.

TA.150 - Design Physical Database Architecture


In this task, you design the physical database architecture to support your logical application and
database architecture. You design a physical layout for the database files and map the logical
database objects onto specific system hardware devices, taking into account projected future
data volumes and the system requirements for performance, cost, and availability.
Deliverable
The deliverable for this task is the Physical Database Architecture document. It specifies storage
structures and parameters necessary for placement and management of all identified database
objects.

TA.160 - Design Hardware and Network Architecture


In this task, you define the physical hardware and network configuration to support your final
application and database architecture. You map the physical application and database
architecture onto specific computing platforms.
Deliverable
The deliverable for this task is the Hardware and Network Architecture document. The deliverable
describes the deployment of the key hardware and network components of the new system and
their relationship to the application and database architecture.

TA.170 - Develop System Capacity Plan


In this task, you plan the capacity for the new information systems at production cutover and for
some prescribed period of future operations, allowing for business growth and any other known
factors that could affect the system capacity requirements. The general term system capacity
refers to the ability of a system to support numbers of user processing sessions, transaction rates
and data volume without unacceptable detriment to the performance of the system.
Deliverable
The deliverable for this task is a System Capacity Plan document. It contains the system capacity
requirements for database servers, networks, client desktop machines, and application client file
servers.

TA.180 - Assess Performance Risks


In this task you identify any performance risks that are apparent based on the proposed
architecture and suggest techniques to mitigate the risks.
Deliverable
The deliverable for this task is the Performance Risk Assessment document. This is an
assessment of the performance risks associated with the application and technical architecture.

TA.190 - Design System Management Procedures


In this task, you design the procedures and specify the tools that the IS operations staff will need
to manage the new system. After you design the procedures in this task, you need to test and
refine them later in the project, prior to incorporating them into the system management guide
and training the system support staff.

______________________________________________________________________________________
AIM Deliverables 8
Deliverable
The deliverable for this task is the System Management Procedures document. This is a list of
system management procedures and tools that the IS Operations Staff will use to manage and
monitor the new system.

Module Design and Build (MD)

MD.010 - Prepare Customization Strategy


In this task, prepare a strategy document that describes how your project responds to
customization requests.
Deliverable
The deliverable for this task is the Customization Strategy document.

MD.020 - Define and Estimate Custom Extensions


When the solution determined during Business Requirements Mapping requires custom
components, you must estimate the effort required to complete them. Management must then
decide whether the benefits of the customization are worth the time and expense (now and during
upgrades) to build and maintain it.
Deliverable
The deliverable for this task is a Solution Document. A Solution Document summarizes the
business need that Oracle Applications features cannot meet and proposes a solution that
includes a combination of custom components, manual workarounds, and existing application
features. It also includes work estimates for designing, building, and testing the solution.

MD.030 - Define Design Standards


In this task, you define the standards that designers will follow when designing custom
extensions. Clear and detailed design standards ensure that all designs are in a consistent format
and include the appropriate level of detail. Standards enforce a high level of quality.
Deliverable
The deliverable for this task is a Design Standards document.

MD.040 - Define Build Standards


During this task you define the standards that programmers follow to build customizations to the
applications.
Deliverable
The Build Standards document is the deliverable for this task.

MD.050 - Design Database Extensions


When customizations require new tables, indexes, views, and sequences, you must design the
new database objects and illustrate how the extensions integrate with the existing applications
database schema.
Deliverable
The deliverable for this task is the Database Extensions Design. It includes an Entity Relationship
(ER) diagram, definitions of new database objects, and a description of how the new modules will
access these objects.

______________________________________________________________________________________
AIM Deliverables 9
MD.060 - Produce Module Functional Design
In this task you document the functional features, use, and behavior of required customizations.
The Functional Design confirms that you understand the user requirements and allows users to
evaluate and approve the resulting features that the new modules will provide.
Deliverable
The deliverable for this task is a Module Functional Design document that describes each
customization in business and user terms. Users and business analysts are the audience for this
deliverable. Therefore, it must communicate all the features provided by the customization in non-
technical terms.

MD.070 - Produce Module Technical Design


During this task you document the technical specifications for custom and modified forms,
reports, database triggers, zooms, and other custom components.
Deliverable
The deliverable for this task is a Module Technical Design document for each customization that
includes all the technical details for each module. The audience for this document is a
programmer. It must provide all the information that a programmer needs to code the custom
components.

MD.080 - Review Detailed Designs


This task is a design review meeting between business analysts, key users, module designers,
and programmers. The goal is to secure final sign off of the complete designs from all interested
parties. Everyone must agree that the designs represent solutions that will adequately satisfy the
business requirements and can be built with the available technology in the allocated time frame.
Deliverable
The deliverable for this task is Approved Designs. Confirmation of the approvals is an Acceptance
Certificate (PJM.CR.080) for each design. The Acceptance Certificate should be signed by at
least the following individuals:
business analyst who identified the requirements user (a representative of the people who
will be using the new functionality)
programmer who will code the modules (or an alternate representative who can confirm that
the design contains adequate technical detail)

MD.090 - Prepare Development Environment


This task establishes a hardware and software environment supporting custom development.
Deliverable
The deliverable for this task is a Development Environment with supporting documentation.
Document the new environment by creating an Installation Plan and Record (PJM.RM.050)
document.

MD.100 - Implement Database Extensions


In this task you create new tables, indexes, views, grants, and synonyms to support custom
module development.
Deliverable
The deliverable for this task is a set of Custom Database Objects in the development
environment and the supporting Data Definition Language (DDL) scripts to create the database
objects in the production environment.

______________________________________________________________________________________
AIM Deliverables 10
MD.110 - Create Custom Modules
During this task you produce the modules to support custom extensions to the Applications. You
also perform the first round of testing as part of this task.
Deliverable
The deliverable for this task is a completed Module Source Code with corresponding executables.

MD.120 - Create Installation Routines


In this task you develop automated functions and detailed instructions to install custom
extensions in a target environment.
Deliverable
The deliverable for this task is a set of Installation Routines and documented instructions to install
all of the custom modules in the production environment. Not all customizations can be installed
with an automated script, so the instructions may include manual steps as well.

Data Conversion (CV)

CV.010 - Define Conversion Scope, Objectives, and Approach


During this task, you define the conversion project scope, objectives, and high-level approach for
performing the conversion. Part of defining the scope is to document your conversion
requirements at the application and business object level.
Deliverable
The deliverable for this task is the Conversion Scope, Objectives, and Approach document It is
the basis for all other conversion project deliverables and should be signed by a designated
approver. Use this deliverable to record your conversion requirements and to track any scope
changes that may impact the conversion project.

CV.020 - Prepare Conversion Strategy


During this task, you define the strategy for converting information from the legacy systems to the
new application environment. The Data Conversion Strategy provides a roadmap for performing
the conversion of data from the legacy system(s) to the new Oracle system. This deliverable also
covers the task steps and resources needed to fulfill this strategy.
Deliverable
The deliverable for this task is the Data Conversion Strategy. Use it to record the strategy for
meeting the conversion requirements defined in the Conversion Scope, Objectives, and Approach
(CV.010). The strategy includes a discussion of a recommended conversion method, tools, tasks,
and testing procedures.

CV.030 - Prepare Conversion Standards


During this task, you create the Conversion Standards that the conversion team will follow when
performing conversion tasks. This task documents the file structure and naming conventions for
the legacy and target systems, as well as for any automated tools you are using to facilitate the
conversion process.
Deliverable
The deliverable for this task is the Conversion Standards. It documents the legacy system, target
system, and automated tool conversion standards.

______________________________________________________________________________________
AIM Deliverables 11
CV.040 - Prepare Conversion Environment
During this task, you create the Conversion Environment, including the hardware and software
required to support the design and build activities of the conversion process.
Deliverable
The deliverable for this task is the Conversion Environment. It is a working computer system with
all databases, applications, and development tools required to develop and test conversion
programs.

CV.050 - Perform Conversion Data Mapping


During this task, you map the data elements from the legacy system to the target Oracle
Applications. In addition to identifying the data sources and target tables and columns, also
identify data defaults, validation, processing, translation, filter, and foreign key rules. The
conversion mapping and the extract file layout are prerequisites for designing the conversion
programs.

Deliverable
The deliverable for this task is the Conversion Data Mapping. The deliverable records the detailed
data mapping and extract file layout for each legacy data element you plan to convert to Oracle.
Prepare one document for each business object you are converting.

CV.060 - Design Manual Conversion Strategy


During this task, you define the plan to convert the business objects that require manual
conversion. This strategy provides a plan for manually converting data to successfully meet
conversion project milestones.
Deliverable
The deliverable for this task is the Manual Conversion Strategy. The primary purpose of this
deliverable is to define how to manually convert a business object. In addition, you will discuss
the impact if you do not successfully convert business objects in the required timeframe. You
should produce one deliverable for each manually converted business object. Use this deliverable
as a roadmap for those who will be performing the manual conversion.

CV.070 - Design Conversion Programs


During this task, you design and document the conversion programs. The Conversion Program
Design document provides the programmer with the necessary information for writing an accurate
conversion program.
Deliverable
The deliverable for this task is the Conversion Program Design. It defines the key assumptions,
rules, and logic needed to create the conversion modules.

CV.080 - Prepare Conversion Test Plans


During this task, outline the testing plans for the unit, business object, and validation testing for
conversion. The unit tests confirm that each module successfully completes the task it is defined
to perform. For example, a unit test should verify that the download program has extracted the
expected number of records from the legacy system. The business object test verifies that the
quality of the data converted to the Oracle system is accurate and functions properly in the
individual Oracle Application to which it has been converted. Validation testing verifies that the
converted legacy data performs accurately within the entire suite of Oracle Applications.
Deliverable

______________________________________________________________________________________
AIM Deliverables 12
The deliverable for this task is the Conversion Test Plans. This document provides a plan for
conversion unit, business object, and validation tests. Subsequent data conversion tasks perform
each of these three levels of testing and then record the results as described in the deliverable
guidelines.

CV.090 - Develop Conversion Programs


During this task, you create the conversion programs that perform the following functions:
Download the data from the legacy system and create an ASCII flat file that can be uploaded
to Oracle tables.
Create interface tables that store the legacy data before the data is validated and inserted
into the production tables of the Oracle Application.
Upload legacy ASCII flat file data to the interface tables.
Perform any data-required translation, transformation, or manipulation before moving the data
to the production tables. Interface and validate, then insert or update the data into the
Oracle production tables.
Deliverable
The deliverable for this task is the Conversion Programs. This is the actual program code for the
programs defined in the Conversion Program Design (CV.070). Record the program name,
description, purpose, location, and programmer name of each program in a Conversion Program
Log.

CV.100 - Perform Conversion Unit Test

During this task, you actually test the conversion programs to ensure that all programs work
without errors and according to the conversion testing specifications pre-defined in the conversion
unit testing components of the Conversion Test Plans (CV.080).
Deliverable
The deliverable for this task is the Unit Tested Conversion Programs. To support this deliverable,
provide a checklist to record that the test was completed, the date that each conversion program
was tested, the programmer who tested each program, and the sequence in which the modules
were tested.

CV.110 - Perform Conversion Business Object Tests


During this task, you test the complete conversion of each business object by executing all
conversion modules for the business object in an end-to-end fashion and verifying that the
resulting data is correct.
Deliverable
The deliverable for this task is the Business Object Tested Conversion Programs. To support this
deliverable, record that the test has been completed, the business object test number, the
associated Oracle target table, the test completion date, and the tester. As with the test
procedures, prepare one deliverable for each business object being converted.

CV.120 - Perform Conversion Validation Test


During this task, you validate that the target applications function correctly with the converted
business objects.
Deliverable
The deliverable for this task is the Validation Tested Conversion Programs. To support this
deliverable, record the tests completion, the Oracle target applications, the test completion date,

______________________________________________________________________________________
AIM Deliverables 13
and the tester. As with the Conversion Test Plans, prepare one deliverable for each business
object being converted.

CV.130 - Install Conversion Software


During this task, you perform and document the installation of the conversion programs in the
production environment. This task presumes that the conversion programs have been tested. If
you are using an automated conversion tool, this task requires that you install the software, tested
conversion templates, and conversion maps needed for Convert and Verify Data (CV.140).

Deliverable
The deliverable for this task is the Installed Conversion Software. This deliverable records the
following information about the installed conversion software:
description of the production environment
directory structure for the production environment
location of each conversion program in the production environment file structure
location of conversion tools in the production environment

CV.140 - Convert and Verify Data


During this task, you convert and migrate the production data from the old system to the new
Oracle production environment. Completion of this task provides data that is ready for production
use.
Deliverable
The deliverable for this task is Converted and Verified Data. It consists of the converted
production data. This deliverable, along with the production environment, includes everything
required to use the applications in production. This includes properly installed and configured
hardware, system software, application software, documentation, and converted production data.

Documentation (DO)

DO.010 - Prepare Glossary


This task documents the definitions of the project terms that may be unfamiliar or confusing.
Including these in the glossary removes questions about their meaning.
Deliverable
The deliverable for this task is the Glossary. It contains business terms, acronyms, synonyms,
and entities that will be used in the application but may be unfamiliar or confusing. The Glossary
is a living document and will be continuously revised and supplemented throughout the project life
cycle.

DO.020 - Specify Documentation Requirements


In this task you outline the overall requirements for creating documentation and specify the
deliverables to be produced.
Deliverable
The deliverable for this task is the Documentation Requirements. It specifies the documentation
deliverables that will be produced, how each is to be used, and the format to be used when
document ownership is transferred to the users. It also includes the plan for producing the
documents and the required staffing.

______________________________________________________________________________________
AIM Deliverables 14
DO.030 - Determine Documentation Standards and Procedures
The purpose of this task is to specify the standards for all documentation deliverables. This task
determines the look and feel of the project documentation. In this task, you also specify the
procedures that the team uses to develop documentation.
Deliverable
The deliverable for this task is the Documentation Standards and Procedures. It specifies the
textual style, editing conventions and development procedures to be used in creating the projects
documentation.

DO.040 - Prepare Documentation Environment


In this task you prepare a hardware and software environment that supports documentation
development. You must procure, install, and test the environment. At the end of this task, you are
ready to begin the job of developing documentation.
Deliverable
The deliverable for this task is the Documentation Environment. It includes all hardware, software,
and utilities needed to support documentation development.

DO.050 - Produce Documentation Prototypes and Templates


In this task you build and review a single prototype for each type of documentation deliverable.
The result should be agreement on the look and feel of each documentation deliverable, as well
as a clear expectation of what will be delivered. You also create templates for later use.

Deliverable
The deliverable for this task is the Documentation Prototypes and Templates. For each type of
documentation deliverable, a prototype document and a working, tested template will be
produced.

DO.060 - Produce Initial User Reference Manual


In this task you generate the first draft of the User Reference Manual which supplements the
standard application user reference. Material for the Initial User Reference Manual comes from
the Module Functional Design (MD.060) which defines the custom extensions.
Collect these documents as input and combine them into a consolidated reference.
Deliverable
The deliverable for this task is the Initial User Reference Manual. It contains a draft description of
the detailed functionality of each custom extension. It is a reference for more experienced users
of the application system. Later, it will be updated to incorporate any functional modifications or
details that may have been added.

DO.070 - Produce Initial User Guide


This task requires you to produce the Initial User Guide.
Deliverable
The deliverable for this task is the Initial User Guide. This guide describes how the application
system interrelates with manual procedures in order to adequately respond to business events. It
is an instruction manual for the business and is the basis for training new application users.

______________________________________________________________________________________
AIM Deliverables 15
DO.080 - Produce Initial Technical Reference Manual
The information for the custom modules and extensions are contained in the Technical Reference
Manual. This information is intended to supplement the standard Oracle Technical Reference
Manual and is usually consistent in format and content to Oracle Documentation Standards.
Deliverable
The deliverable for this task is the Initial Technical Reference Manual. It is a precursor to the
Technical Reference Manual that explains the design and structure of the custom modules and
extensions to those who maintain them after the transition to production.

DO.090 - Produce Initial System Management Guide


In this task you create an initial version of the System Management Guide.
Deliverable
The deliverable for this task is the Initial System Management Guide. It is the first draft of the
System Management Guide. Although called an initial deliverable, it should be as final as
possible, given the current information. The later update should only incorporate any changes to
processes and module functionality.

DO.100 - Complete User Reference Manual


In this task you revise the Initial User Reference Manual and create the final version. Changes
have probably been introduced into the custom modules and extensions as an outcome of testing
and review. These must be reflected as changes or additions in the final User Reference Manual.
Also, the completed modules can be used to extract information (for example, screen layouts)
that were not previously available. This task should be executed in parallel with module and
module integration testing.
Deliverable
The deliverable for this task is the User Reference Manual. It contains the final description of the
detailed functionality of each custom module and extension. It is a reference for more
experienced users of the application system. Preparing this deliverable includes generating the
format to be used in transferring document ownership to the user. Once the project team has
completed this task, the User Reference Manual becomes a highly-controlled deliverable.

DO.110 - Complete User Guide


In this task you revise the Initial User Guide and create the final version.
This task should be performed in parallel with the business system test.
Deliverable
The deliverable for this task is the User Guide. It contains the final set of procedures for using the
application system in response to business events and is a guide for new users. It is a critical
document for the business. Once the project team has completed this task, the User Guide
becomes a highly-controlled deliverable.

DO.120 - Complete Technical Reference Manual


In this task you update the content of the Initial Technical Reference Manual. The size of this task
depends on the extent of the technical changes that were made during testing.
Deliverable
The deliverable for this task is the Technical Reference Manual. It explains the components and
the design of the customizations and extensions. It is a reference document for application
maintenance personnel.

______________________________________________________________________________________
AIM Deliverables 16
DO.130 - Complete System Management Guide
In this task you revise the Initial System Management Guide and create the final version. Perform
this task in parallel with the execution of the business system test.
Deliverable
The deliverable for this task is the System Management Guide. It contains the final set of
procedures for operating the application system. It is a guide for system administrators and the
internal support staff and becomes a critical document for the business. Once the project team
has completed this task, the System Management Guide becomes a highly-controlled deliverable.

DO.140 - Provide Online Help Text


In this optional task you use standard Application Object Library forms to create Online Help Text
for end-users using the User Reference Manual and User Guide as input.
Deliverable
The deliverable for this task is the Online Help Text.

Business System Testing (TE)

TE.010 - Develop Testing Strategy


The goal of the test strategy is to develop the high-level direction for testing the applications.
Deliverable
The deliverable for this task is the Testing Strategy. Based on the characteristics of the system to
be built, specific testing activities may be more or less important to a successful implementation.
Specific considerations include the number of custom modules, availability and reliability of
converted data, system performance, number of system interfaces, scope of testing, testing
standards, types of testing, and the significance, or critical nature, of the system to the business.

TE.020 - Develop Unit Test Scripts


In this task you develop the scripts to test individual custom modules. Design your tests to
validate that module inputs, outputs, and processing logic function as designed with no errors.
Deliverable
The deliverable for this task is the Unit Test Scripts. These take the form of standard checklists
and step-by-step instructions to test specific functionality.

TE.030 - Develop Link Test Scripts


In this task you develop scripts to test custom modules as part of a business flow. This will reveal
any integration problems with other modules that provide or use the data manipulated by the
target modules.
Deliverable
The deliverable for this task is the Link Test Scripts. The name comes from the fact that they test
the connections, or links, between modules.

TE.040 - Develop System Test Scripts


In this task you develop the scripts to test the systems support of business processes.
Deliverable
______________________________________________________________________________________
AIM Deliverables 17
The deliverable for this task is System Test Scripts.

TE.050 - Develop Systems Integration Test Scripts


In this task you develop the scripts that validate the integration between your target application
system and other systems.
Deliverable
The deliverable for this task is the Systems Integration Test Scripts.

TE.060 - Prepare Testing Environments


In this task you install and configure one or more environments to support all testing activities.
Deliverable
The deliverable for this task is the configured Testing Environments. Your Testing Strategy
(TE.010) determines the number and timing of the environments.

TE.070 - Perform Unit Test


In this task, you test program modules on an individual basis to ensure that the inputs, outputs,
and processing logic of each module functions as designed with no errors. The goal is to find
errors in the smallest unit of software before you logically link it into larger units. If successful,
subsequent link testing will only reveal errors related to the integration between modules.
Deliverable
The deliverable for this task is the Unit Tested Modules. The actual results you record in the Unit
Test Scripts (TE.020) serve as confirmation that the custom modules execute without errors.

TE.080 - Perform Link Tests


During this task, you test custom modules as part of a business flow. This will reveal any
integration problems with other modules that provide or use the data manipulated by the target
modules. The name comes from the fact that you are testing the connections, or links, between
modules. Link testing should reveal all potential problems with the custom code.
The scope of each link test typically includes the set of modules that support or are affected by a
single customization. A customization is defined for each gap identified during requirements
mapping and is described by a functional design and corresponding technical design document.
Deliverable
The deliverable for this task is Link Tested Modules. Once modules pass link testing, they are
ready for the system test. Document your results in the Expected Results column provided in the
Link Test Specification component of the Link Test Script (TE.030).

TE.090 - Perform Installation Test


In this task, you install custom modules in the system test environment to test the installation
routines and refine them for the eventual production environment. This task serves as a dry run of
the installation steps in preparation for configuring the production system. This task is not
required if you have not developed custom extensions. It also does not cover installation of the
Oracle database, tools, and Applications. These steps took place during Prepare Testing
Environments (TE.060).
Deliverable
The deliverable for this task is Tested Installation Routines. Another important result of this test is
that you install and configure custom modules in the system test environment.

______________________________________________________________________________________
AIM Deliverables 18
TE.100 - Prepare Key Users for Testing
In this task you will provide basic training to key users participating in the Business System Test.
Deliverable
The deliverable for this task is Prepared Users, trained in specific standard and custom
applications functionality.

TE.110 - Perform System Testing


In this task you will test the integration of all business system flows within the target application
system, including all standard and custom processes and reports. This task is equivalent to a full
conference room pilot (CRP), where the environment simulates the future production
environment.

Deliverable
The deliverable for this task is the System Tested Applications. The summarized results of the
System Test should appear in a System Test Results document for review by management.

TE.120 - Perform Regression Testing


In this task you will re-test modules in order to validate that prior module defects have been
corrected.
Deliverable
The deliverable for this task is the Regression Tested Custom Modules.

TE.130 - Perform Systems Integration Testing


In this task you will test the systems integration with other application systems in a production-
like environment.
Deliverable
The deliverable for this task is the Integration Tested System.

TE.140 - Support Acceptance Test


In this task you support the acceptance test performed by users of the production system. The
scope of acceptance testing and specific acceptance criteria is defined in the Quality Plan. This
task also involves scheduling the acceptance test team, support staff, and user facilities.
You may omit this task if users are participating substantially in the System Test and the company
chooses to evaluate user acceptance upon successful completion of that task.
Deliverable
The deliverable for this task is the Acceptance Test Results. It includes both detailed and
summary results from the acceptance test.

Performance Testing (PT)

PT.010 - Define Performance Testing Scope, Objectives, and


Approach
In this task, you outline the scope, objectives, and approach you will use for the performance
testing of the system you are implementing. This task may not require the creation of a separate
deliverable for all types and sizes of Performance Testing, but you should consult with the project
manager to determine its effect on the project.
______________________________________________________________________________________
AIM Deliverables 19
Deliverable
The deliverable for this task is the Performance Testing Scope, Objectives, and Approach
document. It is a statement of the scope and objectives of Performance Testing, and the
approach that the performance testing team will take to perform the work.

PT.020 - Prepare Performance Testing Strategy


In this task, you outline the strategy that you will use to conduct the performance test to satisfy
the high-level scope, objectives, and approach you have previously defined.
Deliverable
The deliverable for this task is the Performance Testing Strategy. It is a strategy for the work to be
performed in Performance Testing.

PT.030 - Identify Performance Test Scenarios


In this task, you define the performance test scenarios that you wish to include in Performance
Testing. These are either scenarios that business management has dictated for inclusion or that
you identify from an analysis of the performance quality objectives for the project, coupled with
detailed input of business solutions and processing business volumes. Performance test
scenarios are point-in-time snapshots of the processing that occurs in a real system.
Deliverable
The deliverable for this task is the Performance Test Scenarios document. It describes the
processing situations (point-in-time processing snapshots) in the future production system where
there will be critical performance requirements. These performance test scenarios form the basis
of models of the system transactions in future tasks.

PT.040 - Identify Performance Test Transaction Models


In this task, you define in more detail the sets of transactions that will execute during the
performance test, and the detailed transaction rate metrics for each transaction. Each
performance test scenario will have a different collection of online and batch processing that
comprises the test transaction model of the scenario and the transactions and rate metrics need
to be identified for each. A transaction model for a scenario is the precise mix of transactions
included in the performance test for that particular scenario. The separate test transaction models
will translate into the execution of the test scenario under differing sets of test parameters.
The other part of this task is to identify the specific application configuration you will need to
support the test transaction models. This is less of concern if the performance testing process is
being used for a system that is already in production operations, but if the applications are to be
reconfigured in some way, or the application configuration of the system has not been fully
defined, you will need define how you will set up the applications to support the test models.
Deliverable
The deliverable for this task is the Performance Test Transaction Models document. This defines
the detailed mixes of transactions in the performance tests.

PT.050 - Create Performance Test Scripts


In this task, you define the detailed test scripts for entering the data to perform online and batch
transactions, inquiries, and reports that will model the processing occurring during a test scenario.
The test scripts define the exact manner in which each scenario transaction model will execute
during the performance test. The result of this break down into individual transaction steps is a
deliverable that can be used by the developer of the test transaction programs, or by the users
involved in the performance test.
The other component of the task is to define the detailed transaction response measurements
you will make as part of each scripted transaction flow. These measurements are part of the

______________________________________________________________________________________
AIM Deliverables 20
script and will either be collected by the automated testing tool if you are using one, or may
require some recording of response by the user executing the performance test script.
Deliverable
The deliverable for this task is the Performance Test Scripts document. It is a set of scripts for
the transactions that will execute during the performance tests and the lists the specific
measurements made within each script transaction flow.

PT.060 - Design Performance Test Transaction Programs


In this task, you design the test transaction programs that will execute the transactions, reports,
and inquiries against the performance test database. If you are using an automated load testing
tool, the programs may simulate multiple online users working concurrently within the business
system. You can bypass this task if you do not need to build any special programs to execute
transactions within the performance test, additional to the modules that will constitute the
production system. This would be the case if you are conducting a manual system performance
test that will use standard batch scheduling and manual online transaction entry, or if you are just
testing a batch processing scenario.
Deliverable
The deliverable for this task is the Test Transaction Program Designs document. It is a set of
designs for the special test programs needed to execute transactions during the performance
tests.

PT.070 - Develop Performance Test Transaction Programs


In this task, you create the special test transaction programs that will execute the transactions,
reports, and inquiries against the performance test database.
Deliverable
The deliverable for this task are the Test Transaction Programs. At the completion of this task,
these programs will be built and tested.

PT.080 - Design Performance Test Data


This task initiates the detailed design work on the database for performance testing. Typically, you
will not have a fully populated database available for performance testing. You will probably need
to define the data for the database and determine how to populate it. You specify the data and
volumes for the performance test database, the source of the data, and the proposed mechanism
for getting the data into the test database.

Deliverable
The deliverable for this task is the Performance Test Data Design document. It is a design for the
data in the performance test database that will support the transaction models of the test.

PT.090 - Design Test Database Load Programs


In this task, you design the programs that will load test data into the performance test database.
You can bypass this task if you do not need to build any extra test database load programs
specifically to load data into the performance test database. This would be the case if, for
example, you are conducting a performance test against a copy of an existing production
database that has the approximate volumes of data you need, or, if you can use existing data
conversion programs to load all transaction and setup data.
Deliverable
The deliverable for this task is the Test Database Load Program Designs document. It is a set of
designs for special programs needed to load data into the performance test database.

______________________________________________________________________________________
AIM Deliverables 21
PT.100 - Develop Test Database Load Programs
In this task, you develop and test the programs that you will use to populate the performance test
database with data.
Deliverable
The deliverable for this task is the Test Database Load Programs. At the completion of the task,
these programs will be built and tested.

PT.110 - Construct Performance Test Database


In this task, you populate the Performance Test Database up to the full desired volume in
preparation for subsequent migration of the database to the testing environment.
Deliverable
The deliverable for this task is the fully populated Performance Test Database.

PT.120 - Prepare Performance Test Environment


In this task, you prepare and document the separate environment where Performance Testing will
take place. This involves configuring the hardware and networks, installing the Performance Test
Database, verifying that the Test Transaction Programs execute correctly against the database,
initial tuning of the environment, installing any monitoring tools needed, and documenting the test
execution procedures. After this task is complete, the Performance Test Environment should be
ready to support execution of performance test cycles in which measurements are made.
Deliverable
The deliverable for this task is the fully configured and documented Performance Test
Environment. The deliverable consists of a the physical environment plus a document of the
same name which describes the initial parameter settings for the environment and the test
execution procedures.

PT.130 - Execute Performance Test


This task is the culmination of the development and environment preparation effort. You execute
the Test Transaction Programs against the test database and measure various performance
metrics for individual transactions and system components. This task is very interactive and may
require multiple test cycles for each transaction model and hardware configuration that you intend
to test. You may decide that you need to change certain system parameters for tuning purposes
or because you wish to study the effects of system parameters on the test results. In complex
automated tool tests, you may find that the test execution model needs rework.
Execute the test programs for each transaction model within each test scenario and take the
prescribed measurements of system performance. Repeat for each hardware configuration. This
task yields the test results that you document in the final Performance Test Report.
Deliverable
The deliverables for this task are Performance Test Results. These are documented in a
Performance Test Log, which records the test date and time, specific test or configuration
parameters, as well as the individual measurements made.

PT.140 - Create Performance Test Report


In this task, you document the results and the description of Performance Testing in a format
suitable for presentation to project managers, executive sponsors, and the wider project team.
Deliverable
The deliverable for this task is a Performance Test Report document. It details the approach used
in the project, tests performed, results, conclusions, and recommendations.

______________________________________________________________________________________
AIM Deliverables 22
Training (TR)

TR.010 - Prepare Training Strategy


This task assesses the education and training needs of the project team and user community and
plans the delivery of these classes based on common areas of responsibility, interests, and skills.
Deliverable
The deliverable for this task is the Education and Training Plan.

TR.020 - Prepare Project Team Training Environment


During this task, you either install a new application environment or prepare an existing
application environment for Project Team Training.
Deliverable
The deliverable for this task is the Project Team Training Environment.

TR.030 - Conduct General Education Classes


This task educates the team on fundamental business concepts. It exposes the project team to
new business approaches practiced in industry and also provides each team member with a
common understanding of business issues. This task is optional, but is beneficial when you
desire business process changes or improvements.
Deliverable
The deliverable for this task is the Trained Project Team.

TR.040 - Conduct High-Level Overview of Application Features


This task provides overviews that explain key application concepts and provide a general
understanding of selected features.
Deliverable
The deliverable for this task is a Trained Project Team.

TR.050 - Prepare Project Team Training


In this task, you plan the resources for project team training.
Deliverable
The deliverable for this task is a completed Training Preparation Checklist.

TR.060 - Train Project Team


This task provides technical and functional application training to the immediate project team
members. It includes specific training segments for defining and using the applications as well as
maintaining the system.
Deliverable
The deliverable for this task is the Trained Project Team.

TR.070 - Develop User Training Materials


This task produces the end-user training materials.
______________________________________________________________________________________
AIM Deliverables 23
Deliverable
The deliverable for this task is the completed User Training Materials.

TR.080 - Prepare User Training Environment


During this task, you either install a new application or prepare an existing application
environment for end-user training. If you install a new application, you must go through the
appropriate pre- and post-installation steps. If you are converting an existing environment for end-
user training, you only need to adjust the application setup and add training-specific data.
Deliverable
The deliverable for this task is the User Training Environment.

TR.090 - Train Users


During this task, the project team trains users to use the new system.
Deliverable
The deliverable for this task is the Trained Users, who understand the features of the new system
and how to use those features on the job.

Production Migration (PM)

PM.010 - Prepare Transition Strategy


This task outlines the business transition approach for migrating the people, company, and
system to production status.
Deliverable
The Transition Strategy document is the deliverable for this task.

PM.020 - Design Production Support Infrastructure


This task identifies the operational infrastructure for managing and maintaining the application
environment, database, and network communications in production. Implement the support
infrastructure in parallel with configuring the final production environment during production
cutover.
Deliverable
The Production Support Infrastructure document is the deliverable for this task.

PM.030 - Develop Detailed Transition and Contingency Plan


This task develops the detailed transition plan for moving onto the production system. It also
includes an implementation contingency plan if problems arise during transition. Do not confuse
implementation contingency with system contingency failure.
Deliverable
The Detailed Transition and Contingency Plan for the implementation with contingency
alternatives is the deliverable for this task.

PM.040 - Prepare Production Environment


In this task you will set up, configure, and install the database and application software for the
Production environment. This task creates a production environment that is available to all
potential system users but cannot actually be used until production readiness is verified.

______________________________________________________________________________________
AIM Deliverables 24
Deliverable
The deliverable for this task is a configured Production Environment without application setup
data.

PM.050 - Set Up Applications


In this task you implement the required setups in all the applications as part of your configuration.
The Application Setup documents prepared during the Business Requirements Mapping process
defines the correct setups for each application.
Deliverable
The deliverable for this task is Configured Applications with all required company-specific setups
and seed data. The applications are ready for accepting converted live data.

PM.060 - Implement Support Infrastructure


In this task you will activate the support personnel and procedures for the new business system.
You also review requirements for support-related services from any software suppliers and
contractors.
Deliverable
The deliverable for this task is a tested support system with Documented Support Procedures for
getting help, logging problems, and resolving issues.

PM.070 - Verify Production Readiness


With this task you formally verify that the companys systems and people are prepared for
production using a detailed verification checklist. Although the predecessor to this task is
acceptance criteria, the true system certification occurs after Perform Business System Test.
Success with this task means that project leadership can request approval for transition activities.
This is the final approval step before the cutover to the new production system.
Deliverable
The deliverable for this task is a Production-Ready System, where the system, management, and
users are prepared for production cutover. Use the detailed transition plan task lists to evaluate
production readiness with regard to key activities that must be complete prior to cutover. You can
also use an Acceptance Certificate if the team wishes to formalize signoff confirming that the
company is ready for production.

PM.080 - Commence Production


This task signifies that company-wide use of all aspects of the production system is in place. You
must anticipate issues and quickly remedy them. Priorities may shift during a production state and
therefore you must set expectations with users on what types of problems to resolve first.
Deliverable
The deliverable for this task is a fully operational Production System.

PM.090 - Audit Production System


This task provides an assessment of how well the production system meets the business
objectives set at the beginning of the project. It lets you measure the new business, using revised
key performance indicators.
Deliverable
The Post-Implementation Production System is the deliverable for this task.

______________________________________________________________________________________
AIM Deliverables 25
PM.100 - Measure System Performance
This task measures the performance of the system in the production environment. This may
include transactions processing performance, system response time, and system usage. The
purpose of this task is twofold. Firstly, by measuring the actual production system performance,
closure can be achieved on the performance quality programs and methods employed during the
implementation of the system. It is possible to assess the effectiveness of the programs and
establish where continuing performance problems may have originated. Secondly, there may be
continuing opportunities to refine and tune the performance of the system, which can only be
identified by system metrics gathering.
Deliverable
The System Performance Assessment is the deliverable for this task.

PM.110 - Maintain System


This task is an ongoing system maintenance or management task. The system management
procedures are put into practice and executed by the IS Operations Staff.
Deliverable
A Maintained Production Environment with updated documentation is the deliverable for this task.

PM.120 - Refine Production System


This task solicits end-user feedback and acts upon any requests relative to the implementation,
production system, or support.
Deliverable
The Refined Production Environment is the deliverable for this task.

PM.130 - Decommission Former System


This task involves the full analysis and execution of decommissioning former business systems.
Decommissioning former systems can begin after the team has decided that the new production
environment is stable and that the Detailed Transition and Contingency Plan is no longer needed.
Deliverable
The Decommissioned Former System is the deliverable for this task.

PM.140 - Propose Future Business Direction


This task identifies opportunities and challenges for the company and proposes a future business
direction for the new implementation.
Deliverable
The Business Direction Recommendations document is the deliverable for this task.

PM.150 - Propose Future Technical Direction


In this task you will identify innovations and advancements in software and technology that can
enhance the efficiency, functionality, distributed nature, performance, and cost of maintaining the
new production environment.
Deliverable
The Technical Direction Recommendations document is the deliverable for this task.

______________________________________________________________________________________
AIM Deliverables 26