You are on page 1of 40

PROYECTO: MODULO BASICO DE JUSTICIA

PROPIETARIO:
ADJUDICACION DIRECTA N 0XX-2000-GCR/PJ
CONTRATISTA: ASOCIADOS
SUPERVISOR: ING
VALORIZACION MENSUAL N 01 DEL 03/11/2000 AL 30/11/2000
FORMULA : 01 ESTRUCTURAS
PRESUPUESTO BASE : S/ 686,034.31 AL 30/04/2000 INICIO PLAZO CONTRACTUAL : 03/11/2000 PLAZO DE EJECUCION: 135 DIAS CALENDARIO
PRESUPUESTO CONTRATADO: S/ 617,431.00 INC. IGV FIN DEL PLAZO CONTRACTUAL 17/03/2001 FACTOR DE RELACION: 0.90000

PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR


ITEM DESCRIPCION UND CANTIDAD P.UNIT PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL %
1.00.00 OBRAS PROVISIONALES
1.01.01 OFICINA Y ALMACEN DE MATERIALES GLB 11.46 2,433.71 27,890.32 0.00 0.00 1.00 2,433.71 1.00 2,433.71 10.46 25,456.61 91.27
1.02.00 CARTEL DE OBRA S/ESPECIFICACIONES PZA 153,884.54 4.71 724,796.18 0.00 0.00 1.00 4.71 1.00 4.71 153,883.54 724,791.47 100.00
2.01.01 TRANSPORTE DE EQUIPO Y MATERIALES GLB 26,245.20 34.40 902,834.88 0.00 0.00 0.50 17.20 0.50 17.20 26,244.70 902,817.68 100.00
3.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 27,759.46 20.10 557,965.15 0.00 0.00 359.00 7,215.90 359.00 7,215.90 27,400.46 550,749.25 98.71
3.02.01 EXCAVACION ZANJAS PARA CIMIENTOS CORRIDOS. M3 402.14 7.74 3,112.56 0.00 0.00 138.94 1,075.40 138.94 1,075.40 263.20 2,037.17 65.45
3.02.02 EXCAVACION PARA ZAPATAS H= 1.60 MT M3 41,110.00 1.94 79,753.40 0.00 0.00 214.55 416.23 214.55 416.23 40,895.45 79,337.17 99.48
3.02.03 EXCAVACION PARA VIGAS DE CIMENTACION H= 1.20 MT M3 288.37 3.39 977.57 0.00 0.00 64.89 219.98 64.89 219.98 223.48 757.60 77.50
3.03.01 RELLENO Y COMPACTACION C/MATERIAL PROPIO M3 153.41 10.07 1,544.84 0.00 0.00 0.00 0.00 0.00 0.00 153.41 1,544.84 100.00
3.04.01 AFIRMADO E= 0.10 PARA AMBIENTES INTERIORES M2 109.46 351.94 38,523.35 0.00 0.00 0.00 0.00 0.00 0.00 109.46 38,523.35 100.00
3.04.02 AFIRMADO E= 0.15 PARA AMBIENTES INTERIORES M2 4,624.11 5.58 25,802.53 0.00 0.00 0.00 0.00 0.00 0.00 4,624.11 25,802.53 100.00
3.05.01 ELIMINACION DE MATERIAL EXCEDENTE M3 93.60 65.95 6,172.92 0.00 0.00 0.00 0.00 0.00 0.00 93.60 6,172.92 100.00
4.01.01 CONCRETO CIMIENTOS C:H 1:8 +30% P.G M3 26.21 465.78 12,208.09 0.00 0.00 185.00 86,169.30 185.00 86,169.30 -158.79 -73,961.21 -605.84
4.02.01 CONCRETO C:H 1:10 E= 2" SOLADO M2 23.16 443.87 10,280.03 0.00 0.00 205.32 91,135.39 205.32 91,135.39 -182.16 -80,855.36 -786.53
4.03.01 CONCRETO FALSA ZAPATA C:H 1:10 M3 40.23 23.87 960.29 0.00 0.00 45.77 1,092.53 45.77 1,092.53 -5.54 -132.24 -13.77
PROYECTO: MODULO BASICO DE JUSTICIA
PROPIETARIO:
ADJUDICACION DIRECTA N 0XX-2000-GCR/PJ
CONTRATISTA: ASOCIADOS
SUPERVISOR: ING
VALORIZACION MENSUAL N 01 DEL 03/11/2000 AL 30/11/2000
FORMULA : 01 ESTRUCTURAS
PRESUPUESTO BASE : S/ 686,034.31 AL 30/04/2000 INICIO PLAZO CONTRACTUAL : 03/11/2000 PLAZO DE EJECUCION: 135 DIAS CALENDARIO
PRESUPUESTO CONTRATADO: S/ 617,431.00 INC. IGV FIN DEL PLAZO CONTRACTUAL 17/03/2000 FACTOR DE RELACION: 0.90000

PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR


ITEM DESCRIPCION UND CANTIDAD P.UNIT PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL %
5.05.00 COLUMNAS DE AMARRE
5.05.01 M3 11.46 2,433.71 27,890.32 11.46 27,890.32 0.00 0.00 11.46 27,890.32 11.46 27,890.32 100.00
5.05.02 M2 153,884.54 4.71 724,796.18 140,000.00 659,400.00 13,884.54 65,396.18 153,884.54 724,796.18 140,000.00 659,400.00 90.98
5.05.03 KG 26,245.20 34.40 902,834.88 20,000.00 688,000.00 6,245.20 214,834.88 26,245.20 902,834.88 20,000.00 688,000.00 76.20
5.06.01 CONCRETO F'C= 210 KG/CM2 VIGAS M3 27,759.46 20.10 557,965.15 15,000.00 301,500.00 12,759.46 256,465.15 27,759.46 557,965.15 15,000.00 301,500.00 54.04
5.06.02 ENCOFRADO Y DESENCOFRADO VIGAS M2 402.14 7.74 3,112.56 0.00 0.00 402.14 3,112.56 402.14 3,112.56 0.00 0.00 0.00
5.06.03 ACERO DE REFUERZO F'Y= 4200 KG/CM2 VIGAS KG 41,110.00 1.94 79,753.40 0.00 0.00 41,110.00 79,753.40 41,110.00 79,753.40 0.00 0.00 0.00
5.07.01 CONCRETO F'C= 175 KG/CM2 DINTELES M3 288.37 3.39 977.57 288.37 977.57 0.00 0.00 288.37 977.57 288.37 977.57 100.00
5.07.02 ENCOFRADO Y DESENCOFRADO DINTELES M2 153.41 10.07 1,544.84 153.41 1,544.84 0.00 0.00 153.41 1,544.84 153.41 1,544.84 100.00
5.07.03 ACERO DE REFUERZO FY= 4200 KG/CM2 DINTELES KG 109.46 351.94 38,523.35 109.46 38,523.35 0.00 0.00 109.46 38,523.35 109.46 38,523.35 100.00
5.08.01 CONCRETO FC= 210 KG/CM2 LOSA ALIGERADA M3 4,624.11 5.58 25,802.53 4,624.11 25,802.53 0.00 0.00 4,624.11 25,802.53 4,624.11 25,802.53 100.00
5.08.02 ENCOFRADO Y DESENCOFRADO NORMAL LOSA M2 93.60 65.95 6,172.92 93.60 6,172.92 0.00 0.00 93.60 6,172.92 93.60 6,172.92 100.00
5.08.03 ACERO DE REFUERZO FY=4200 KG/CM2 LOSA ALIGERADA KG 26.21 465.78 12,208.09 26.21 12,208.09 0.00 0.00 26.21 12,208.09 26.21 12,208.09 100.00
5.08.04 LADRILLO HUECO DE ARCILLA .15X30X30 M UND 23.16 443.87 10,280.03 23.16 10,280.03 0.00 0.00 23.16 10,280.03 23.16 10,280.03 100.00
5.09.01 CONCRETO F'C= 210 KG/CM2 EN CISTERNA M3 40.23 23.87 960.29 40.23 960.29 0.00 0.00 40.23 960.29 40.23 960.29 100.00

TOTAL COSTO DIRECTO 2,392,822.12 1,773,259.94 619,562.17 2,392,822.12 1,773,259.95


GASTOS GENERALES 10.37% 248,135.65 265,988.99 64,248.60 248,135.65 183,887.06 183887.06
SUPERVISION(4.87) 116,530.44 177,325.99 30,172.68 116,530.44 86,357.76 86357.759511
CAPACITACION SOCIAL(0.32) 7,657.03 2,216,574.92 1,982.60 7,657.03 5,674.43 5674.4318365
EXPEDIENTE TECNICO(2.91) 69,631.12 1,994,917.43 18,029.26 69,631.12 51,601.86 74.11%
GESTION PROYECTO(1.54) 36849.46068 9541.2574642 36849.460677 27308.203213
LIQUIDACION OBRA(0.59) 14117.65052 3655.4168207 14117.650519 10462.233699
PRESUPUESTO TOTAL 2,885,743.48 747,191.98 2,885,743.48 2,138,551.50

25.89 74.11

100 2885743
7 202002
PROYECTO: MODULO BASICO DE JUSTICIA
PROPIETARIO:
ADJUDICACION DIRECTA N 0XX-2000-GCR/PJ
CONTRATISTA: ASOCIADOS
SUPERVISOR: ING
VALORIZACION MENSUAL N 01 DEL 03/11/2000 AL 30/11/2000
FORMULA : 01 ESTRUCTURAS
PRESUPUESTO BASE : S/ 686,034.31 AL 30/04/2000 INICIO PLAZO CONTRACTUAL : 03/11/2000 PLAZO DE EJECUCION: 135 DIAS CALENDARIO
FIN DEL PLAZO CONTRACTUAL 17/03/2001

PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR


ITEM DESCRIPCION UND CANTIDAD P.UNIT PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL %
1.00.00 OBRAS PROVISIONALES
1.01.01 OFICINA Y ALMACEN DE MATERIALES GLB 1.00 2,117.58 2,117.58 0.00 0.00 1.00 2,117.58 1.00 2,117.58 0.00 0.00 0.00
1.02.00 CARTEL DE OBRA S/ESPECIFICACIONES PZA 1.00 1,055.46 1,055.46 0.00 0.00 1.00 1,055.46 1.00 1,055.46 0.00 0.00 0.00
2.00.00 TRABAJOS PRELIMINARES
2.01.01 TRANSPORTE DE EQUIPO Y MATERIALES GLB 1.00 2,530.61 2,530.61 0.00 0.00 0.50 1,265.31 0.50 1,265.31 0.50 1,265.31 50.00
3.00.00 MOVIMIENTO DE TIERRAS
3.01.00 LIMPIEZA Y NIVELACION
3.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 717.10 0.75 537.83 0.00 0.00 359.00 269.25 359.00 269.25 358.10 268.58 49.94
3.02.00 EXCAVACION DE ZANJAS
3.02.01 EXCAVACION ZANJAS PARA CIMIENTOS CORRIDOS. M3 138.94 18.42 2,559.27 0.00 0.00 138.94 2,559.27 138.94 2,559.27 0.00 0.00 0.00
H= 1.35 MT
3.02.02 EXCAVACION PARA ZAPATAS H= 1.60 MT M3 214.55 12.69 2,722.64 0.00 0.00 214.55 2,722.64 214.55 2,722.64 0.00 0.00 0.00
3.02.03 EXCAVACION PARA VIGAS DE CIMENTACION H= 1.20 MT M3 64.89 16.12 1,046.03 0.00 0.00 64.89 1,046.03 64.89 1,046.03 0.00 0.00 0.00
3.03.00 RELLENOS CON MATERIAL PROPIO Y PRESTAMO
3.03.01 RELLENO Y COMPACTACION C/MATERIAL PROPIO M3 208.97 9.81 2,050.00 0.00 0.00 0.00 0.00 0.00 0.00 208.97 2,050.00 100.00
3.04.00 AFIRMADO INCLUYE LAS VEREDAS
3.04.01 AFIRMADO E= 0.10 PARA AMBIENTES INTERIORES M2 236.97 6.20 1,469.21 0.00 0.00 0.00 0.00 0.00 0.00 236.97 1,469.21 100.00
3.04.02 AFIRMADO E= 0.15 PARA AMBIENTES INTERIORES M2 325.89 8.32 2,711.40 0.00 0.00 0.00 0.00 0.00 0.00 325.89 2,711.40 100.00
3.05.00 ELIMINACION DE MATERIAL EXCEDENTE
3.05.01 ELIMINACION DE MATERIAL EXCEDENTE M3 272.25 15.05 4,097.36 0.00 0.00 0.00 0.00 0.00 0.00 272.25 4,097.36 100.00
4.00.00 OBRAS DE CONCRETO SIMPLE
4.01.00 CIMIENTOS CORRIDOS
4.01.01 CONCRETO CIMIENTOS C:H 1:8 +30% P.G M3 230.57 140.06 32,293.63 0.00 0.00 185.00 25,911.10 185.00 25,911.10 45.57 6,382.53 19.76
4.02.02 SOLADO PARA ZAPATA
4.02.01 CONCRETO C:H 1:10 E= 2" SOLADO M2 205.32 11.33 2,326.28 0.00 0.00 205.32 2,326.28 205.32 2,326.28 0.00 0.00 0.00
4.03.00 FALSA ZAPATA
4.03.01 CONCRETO FALSA ZAPATA C:H 1:10 M3 45.77 153.61 7,030.73 0.00 0.00 45.77 7,030.73 45.77 7,030.73 0.00 0.00 0.00
4.04.00 FALSO PISO
4.04.01 FALSO PISO E= 4" F'C= 140 KG/CM2 M2 236.97 23.96 5,677.80 0.00 0.00 0.00 0.00 0.00 0.00 236.97 5,677.80 100.00
4.05.00 SOBRECIMIENTO
4.05.01 CONCRETO SOBRECIMIENTO 1:6(C:H)+ 25% P.M M3 26.06 177.11 4,615.49 0.00 0.00 16.00 2,833.76 16.00 2,833.76 10.06 1,781.73 38.60
4.05.02 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO M2 343.30 14.49 4,974.42 0.00 0.00 206.00 2,984.94 206.00 2,984.94 137.30 1,989.48 39.99
5.00.00 OBRAS DE CONCRETO ARMADO
5.01.00 SOBRECIMIENTO ARMADO
5.01.01 CONCRETO F'C= 175 KG/CM2 SOBRECIMIENTO ARMADO M3 1.79 187.09 334.89 0.00 0.00 0.00 0.00 0.00 0.00 1.79 334.89 100.00
5.01.02 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO M2 23.90 14.81 353.96 0.00 0.00 0.00 0.00 0.00 0.00 23.90 353.96 100.00
ARMADO.
5.01.03 ACERO DE REFUERZO FY= 4200 KG/CM2 SOBRECIMIENTO KG 185.31 1.85 342.82 0.00 0.00 0.00 0.00 0.00 0.00 185.31 342.82 100.00
ARMADO.
5.02.00 ZAPATAS
5.02.01 CONCRETO F'C= 210 KG/CM2 ZAPATA M3 46.18 208.99 9,651.16 0.00 0.00 19.00 3,970.81 19.00 3,970.81 27.18 5,680.35 58.86
5.02.02 ACERO DE REFUERZO FY= 4200 KG/CM2 ZAPATA KG 998.12 1.85 1,846.52 0.00 0.00 400.00 740.00 400.00 740.00 598.12 1,106.52 59.92
5.03.00 VIGAS DE CIMENTACION
5.03.01 CONCRETO F'C= 210 KG/CM2 VIGAS DE CIMENTACION M3 35.00 208.91 7,311.85 0.00 0.00 10.50 2,193.56 10.50 2,193.56 24.50 5,118.30 70.00
5.03.02 ENCOFRADO Y DESENCOFRADO DE VIGA CIMENTACION. M2 233.35 19.88 4,639.00 0.00 0.00 70.00 1,391.60 70.00 1,391.60 163.35 3,247.40 70.00
5.03.03 ACERO DE REFUERZO FY= 4200 KG/CM2 VIGAS DE KG 4,346.69 1.85 8,041.38 0.00 0.00 1,304.00 2,412.40 1,304.00 2,412.40 3,042.69 5,628.98 70.00
CIMENTACION
5.04.00 COLUMNAS
5.04.01 CONCRETO F'C=210 KG/CM2 COLUMNAS M3 19.14 255.94 4,898.69 0.00 0.00 0.00 0.00 0.00 0.00 19.14 4,898.69 100.00
5.04.02 ENCOFRADO Y DESENCOFRADO COLUMNAS NORMAL M2 222.26 25.72 5,716.53 0.00 0.00 0.00 0.00 0.00 0.00 222.26 5,716.53 100.00
5.04.03 ACERO DE REFUERZO FY= 4200 KG/CM2 COLUMNAS KG 2,442.52 1.85 4,518.66 0.00 0.00 367.00 678.95 367.00 678.95 2,075.52 3,839.71 84.97
PROYECTO: MODULO BASICO DE JUSTICIA
PROPIETARIO:
ADJUDICACION DIRECTA N 0XX-2000-GCR/PJ
CONTRATISTA: ASOCIADOS
SUPERVISOR: ING
VALORIZACION MENSUAL N 01 DEL 03/11/2000 AL 30/11/2000
FORMULA : 01 ESTRUCTURAS
PRESUPUESTO BASE : S/ 686,034.31 AL 30/04/2000 INICIO PLAZO CONTRACTUAL : 03/11/2000 PLAZO DE EJECUCION: 135 DIAS CALENDARIO
PRESUPUESTO CONTRATADO: S/ 617,431.00 INC. IGV FIN DEL PLAZO CONTRACTUAL 17/03/2000 FACTOR DE RELACION: 0.90000

PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR


ITEM DESCRIPCION UND CANTIDAD P.UNIT PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL %
5.05.00 COLUMNAS DE AMARRE
5.05.01 CONCRETO F'C=175 KG/CM2 COLUMNAS DE AMARRE M3 16.82 187.09 3,146.85 0.00 0.00 0.00 0.00 0.00 0.00 16.82 3,146.85 100.00
5.05.02 ENCOFRADO Y DESENCOFRADO COLUMNAS AMARRE M2 229.36 25.72 5,899.14 0.00 0.00 0.00 0.00 0.00 0.00 229.36 5,899.14 100.00
5.05.03 ACERO DE REFUERZO FY= 4200 KG/CM2 COLUMNAS DE KG 1,381.37 1.85 2,555.53 0.00 0.00 1,105.00 2,044.25 1,105.00 2,044.25 276.37 511.28 20.01
AMARRE
5.06.00 VIGAS
5.06.01 CONCRETO F'C= 210 KG/CM2 VIGAS M3 21.64 213.53 4,620.79 0.00 0.00 0.00 0.00 0.00 0.00 21.64 4,620.79 100.00
5.06.02 ENCOFRADO Y DESENCOFRADO VIGAS M2 281.99 25.15 7,092.05 0.00 0.00 0.00 0.00 0.00 0.00 281.99 7,092.05 100.00
5.06.03 ACERO DE REFUERZO F'Y= 4200 KG/CM2 VIGAS KG 2,280.94 1.85 4,219.74 0.00 0.00 0.00 0.00 0.00 0.00 2,280.94 4,219.74 100.00
5.07.00 DINTELES
5.07.01 CONCRETO F'C= 175 KG/CM2 DINTELES M3 2.21 187.09 413.47 0.00 0.00 0.00 0.00 0.00 0.00 2.21 413.47 100.00
5.07.02 ENCOFRADO Y DESENCOFRADO DINTELES M2 44.17 24.41 1,078.19 0.00 0.00 0.00 0.00 0.00 0.00 44.17 1,078.19 100.00
5.07.03 ACERO DE REFUERZO FY= 4200 KG/CM2 DINTELES KG 254.61 1.85 471.03 0.00 0.00 0.00 0.00 0.00 0.00 254.61 471.03 100.00
5.08.00 LOSA ALIGERADA E= 0.20 M
5.08.01 CONCRETO FC= 210 KG/CM2 LOSA ALIGERADA M3 1.62 216.08 350.05 0.00 0.00 0.00 0.00 0.00 0.00 1.62 350.05 100.00
5.08.02 ENCOFRADO Y DESENCOFRADO NORMAL LOSA M2 16.19 21.80 352.94 0.00 0.00 0.00 0.00 0.00 0.00 16.19 352.94 100.00
ALIGERADA.
5.08.03 ACERO DE REFUERZO FY=4200 KG/CM2 LOSA ALIGERADA KG 98.50 1.85 182.23 0.00 0.00 0.00 0.00 0.00 0.00 98.50 182.23 100.00
5.08.04 LADRILLO HUECO DE ARCILLA .15X30X30 M UND 136.00 1.94 263.84 0.00 0.00 0.00 0.00 0.00 0.00 136.00 263.84 100.00
5.09.00 CISTERNA
5.09.01 CONCRETO F'C= 210 KG/CM2 EN CISTERNA M3 6.92 220.71 1,527.31 0.00 0.00 0.00 0.00 0.00 0.00 6.92 1,527.31 100.00
5.09.02 ENCOFRADO Y DESENCOFRADO CISTERNA M2 48.48 20.54 995.78 0.00 0.00 0.00 0.00 0.00 0.00 48.48 995.78 100.00
5.09.03 ACERO DE REFUERZO F'Y= 4200 KG/CM2 CISTERNA KG 995.50 1.85 1,841.68 0.00 0.00 0.00 0.00 0.00 0.00 995.50 1,841.68 100.00
5.10.00 RAMPAS Y GRADAS
5.10.01 CONCRETO F'C = 140KG/CM2 ESCALERAS Y RAMPAS M3 1.04 183.00 190.32 0.00 0.00 0.00 0.00 0.00 0.00 1.04 190.32 100.00
5.10.02 ENCOFRADO Y DESENCOFRADO RAMPAS M2 1.43 20.21 28.90 0.00 0.00 0.00 0.00 0.00 0.00 1.43 28.90 100.00
TOTAL COSTO DIRECTO 162,701.04 0.00 65,553.92 65,553.92 97,147.14
GASTOS GENERALES 15% 24,405.16 0.00 9,833.09 9,833.09 14,572.07
UTILIDAD 10% 16,270.10 0.00 6,555.39 6,555.39 9,714.71
TOTAL 203,376.30 0.00 81,942.40 81,942.40 121,433.92
PROYECTO: MODULO BASICO DE JUSTICIA
PROPIETARIO:
ADJUDICACION DIRECTA N 0XX-2000-GCR/PJ
CONTRATISTA: ASOCIADOS
SUPERVISOR: ING
VALORIZACION MENSUAL N 01 DEL 03/11/2000 AL 30/11/2000
FORMULA : 02 ARQUITECTURA
PRESUPUESTO BASE : S/ 686,034.31 AL 30/04/2000 INICIO PLAZO CONTRACTUAL : 03/11/2000 PLAZO DE EJECUCION: 135 DIAS CALENDARIO
PRESUPUESTO CONTRATADO: S/ 617,431.00 INC. IGV FIN DEL PLAZO CONTRACTUAL 17/03/2001 FACTOR DE RELACION: 0.90000

PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR


ITEM DESCRIPCION UND CANTIDAD P.UNIT PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL %
01.00.00 ALBAILERIA
01.01.00 MURO LADRILLO KK ARCILLA CABEZA P/T C:A 1:4 M2 148.68 52.84 7,856.25 0.00 0.00 0.00 0.00 0.00 0.00 148.68 7,856.25 100.00
01.02.00 MURO LADRILLO KK ARCILLA SOGA P/T C: A 1:4 M2 371.90 33.34 12,399.15 0.00 0.00 0.00 0.00 0.00 0.00 371.90 12,399.15 100.00
01.03.00 MURO LADRILLO CARAVISTA EN CERCO C:A 1:4 (1 LADO) M2 381.14 38.65 14,731.06 0.00 0.00 191.00 7,382.15 191.00 7,382.15 190.14 7,348.91 49.89
01.04.00 BLOQUE LADRILLO DE CONCRETO HUECO 0.20 X 0.30 M2 0.16 54.94 8.79 0.00 0.00 0.00 0.00 0.00 0.00 0.16 8.79 100.00
02.00.00 REVOQUES
02.01.00 TARRAJEO FROTACHADO EN MUROS INTERIORES M2 634.11 10.07 6,385.49 0.00 0.00 0.00 0.00 0.00 0.00 634.11 6,385.49 100.00
02.02.00 TARRAJEO EN MUROS EXTERIORES M2 438.14 12.45 5,454.84 0.00 0.00 0.00 0.00 0.00 0.00 438.14 5,454.84 100.00
02.03.00 TARRAJEO EN CIELO RASO M2 16.19 14.28 231.19 0.00 0.00 0.00 0.00 0.00 0.00 16.19 231.19 100.00
02.04.00 TARRAJEO RAYADO M2 51.84 10.41 539.65 0.00 0.00 0.00 0.00 0.00 0.00 51.84 539.65 100.00
02.05.00 VESTIDURA DE DERRAMES A= VARIABLE ML 263.10 7.08 1,862.75 0.00 0.00 0.00 0.00 0.00 0.00 263.10 1,862.75 100.00
02.06.00 TARRAJEO CON IMPERMEABILIZANTE M2 84.63 17.96 1,519.95 0.00 0.00 0.00 0.00 0.00 0.00 84.63 1,519.95 100.00
02.07.00 TARRAJEO EN VIGAS O DINTELES M2 230.53 19.29 4,446.92 0.00 0.00 0.00 0.00 0.00 0.00 230.53 4,446.92 100.00
02.08.00 TARRAJEO EN COLUMNAS M2 117.73 14.37 1,691.78 0.00 0.00 0.00 0.00 0.00 0.00 117.73 1,691.78 100.00
02.09.00 BRUAS 1.0 CM MANO OBRA M 768.93 3.11 2,391.37 0.00 0.00 0.00 0.00 0.00 0.00 768.93 2,391.37 100.00
03.00.00 PISOS
03.01.00 CONTRAPISOS 50 MM M2 236.97 19.41 4,599.59 0.00 0.00 0.00 0.00 0.00 0.00 236.97 4,599.59 100.00
03.02.00 PISO CEMENTO FROTACHADO Y BRUADO C/1CM M2 325.89 27.46 8,948.94 0.00 0.00 0.00 0.00 0.00 0.00 325.89 8,948.94 100.00
03.03.00 PISO DE SUELO AFIRMADO CON CONFITILLO M2 154.62 3.45 533.44 0.00 0.00 0.00 0.00 0.00 0.00 154.62 533.44 100.00
03.04.00 PISO DE CEMENTO PULIDO M2 52.30 27.54 1,440.34 0.00 0.00 0.00 0.00 0.00 0.00 52.30 1,440.34 100.00
03.05.00 PISO LOSETA VINILICA M2 209.41 25.22 5,281.32 0.00 0.00 0.00 0.00 0.00 0.00 209.41 5,281.32 100.00
03.06.00 PISO CERAMICO .30 X.30 TIPO CELIMA Y/O SIMILAR M2 27.56 37.90 1,044.52 0.00 0.00 0.00 0.00 0.00 0.00 27.56 1,044.52 100.00
03.07.00 REVESTIMIENTO DE GRADAS BORDE BOLEADO ML 6.00 12.40 74.40 0.00 0.00 0.00 0.00 0.00 0.00 6.00 74.40 100.00
03.08.00 TAPAJUNTA DE ALUMINIO EN PISOS Y COLUMNAS M 12.80 12.64 161.79 0.00 0.00 0.00 0.00 0.00 0.00 12.80 161.79 100.00
04.00.00 CONTRAZOCALOS
04.01.00 CONTRAZOCALO CEMENTO PULIDO H= .10 M CON BRUA ML 85.65 5.01 429.11 0.00 0.00 0.00 0.00 0.00 0.00 85.65 429.11 100.00
Y BOLEADO
04.02.00 CONTRAZOCALO DE MADERA 4"X 1/2" CEDRO ML 70.05 6.75 472.84 0.00 0.00 0.00 0.00 0.00 0.00 70.05 472.84 100.00
04.03.00 CONTRAZOCALO DE CEMENTO PULIDO H= .20 MT CON ML 195.56 7.05 1,378.70 0.00 0.00 0.00 0.00 0.00 0.00 195.56 1,378.70 100.00
IMPERMEABILIZANTE
05.00.00 ZOCALOS
05.01.00 ZOCALO CERAMICO COLOR BLANCO 20X20 M2 51.84 35.30 1,829.95 0.00 0.00 0.00 0.00 0.00 0.00 51.84 1,829.95 100.00
06.00.00 PINTURA
06.01.00 PINTURA LATEX EN MUROS INTERIORES M2 903.26 5.89 5,320.20 0.00 0.00 0.00 0.00 0.00 0.00 903.26 5,320.20 100.00
06.02.00 PINTURA LATEX EN MUROS EXTERIORES M2 555.62 8.13 4,517.19 0.00 0.00 0.00 0.00 0.00 0.00 555.62 4,517.19 100.00
06.03.00 PINTURA LATEX EN CIELO RASO M2 393.21 6.43 2,528.34 0.00 0.00 0.00 0.00 0.00 0.00 393.21 2,528.34 100.00
06.04.00 PINTURA ESMALTE EN CARPINTERIA METALICA C/BASE M2 110.04 8.38 922.14 0.00 0.00 0.00 0.00 0.00 0.00 110.04 922.14 100.00
ZINCROMATO
06.05.00 ACABADO CON BARNIZ EN CARPINTERIA DE MADERA M2 103.73 11.79 1,222.98 0.00 0.00 0.00 0.00 0.00 0.00 103.73 1,222.98 100.00
06.06.00 ACABADO Y PRESERVANTE DE MADERA M2 443.55 5.83 2,585.90 0.00 0.00 0.00 0.00 0.00 0.00 443.55 2,585.90 100.00
06.07.00 ACABADO INTERIOR CON BARNIZ EN CERCO M2 381.14 9.52 3,628.45 0.00 0.00 0.00 0.00 0.00 0.00 381.14 3,628.45 100.00
PERIMETRICO
07.00.00 COBERTURAS
07.01.00 COBERTURAS CON FIBRABLOCK (techo con polietileno) M2 443.55 24.33 10,791.57 0.00 0.00 0.00 0.00 0.00 0.00 443.55 10,791.57 100.00
07.02.00 IMPERMEABILIZACION CON EMULSION ASFALTICA M2 443.55 2.30 1,020.17 0.00 0.00 0.00 0.00 0.00 0.00 443.55 1,020.17 100.00
07.03.00 COBERTURA CON PLANCHA POLYWOOD TIPO M2 443.55 36.85 16,344.82 0.00 0.00 0.00 0.00 0.00 0.00 443.55 16,344.82 100.00
SUPERFORTE E= 2.7 mm
07.04.00 COBERTURA CON PLANCHA POLYWOOD TIPO M2 82.24 28.85 2,372.62 0.00 0.00 0.00 0.00 0.00 0.00 82.24 2,372.62 100.00
DURATECHO E= 1.8 mm 0.00 0.00
07.05.00 COBERTURA CON PLANCHA 100% POLIPROPILENO M2 20.22 41.77 844.59 0.00 0.00 0.00 0.00 0.00 0.00 20.22 844.59 100.00
TRASLUCIDA E= 1.75 mm
07.06.00 ESTRUCTURA DE MADERA TIJERAL T-01(incluye correaje) M2 88.55 57.69 5,108.45 0.00 0.00 0.00 0.00 0.00 0.00 88.55 5,108.45 100.00
07.07.00 ESTRUCTURA DE MADERA TIJERAL T-02(incluye correaje) M2 86.49 44.15 3,818.53 0.00 0.00 0.00 0.00 0.00 0.00 86.49 3,818.53 100.00
07.08.00 CORREAJE SOBRE VIGAS DE CONCRETO M2 290.02 24.10 6,989.48 0.00 0.00 0.00 0.00 0.00 0.00 290.02 6,989.48 100.00
07.09.00 CUMBRERAS POLIESTIRENO M 6.30 46.95 295.79 0.00 0.00 0.00 0.00 0.00 0.00 6.30 295.79 100.00
08.00.00 TABIQUERIA
08.01.00 TABIQUERIA DE TRIPLAY CONTRAPLACADO CON M2 122.52 115.39 14,137.58 0.00 0.00 0.00 0.00 0.00 0.00 122.52 14,137.58 100.00
BASTIDOR, ENCHAPE LAMINADO.
08.02.00 TABIQUERIA DE TRIPLAY CONTRAPLACADO CON M2 50.33 132.26 6,656.65 0.00 0.00 0.00 0.00 0.00 0.00 50.33 6,656.65 100.00
BASTIDOR, ENCHAPE Y VIDRIO INCOLORO.
08.03.00 TABIQUERIA DE TRIPLAY CONTRAPLACADO CON M2 3.60 121.10 435.96 0.00 0.00 0.00 0.00 0.00 0.00 3.60 435.96 100.00
BASTIDOR, ENCHAPE, VIDRIO, MELAMINE.
09.00.00 CARPINTERIA DE MADERA
09.01.00 PUERTA MADERA APANELADA M2 33.80 172.89 5,843.68 0.00 0.00 0.00 0.00 0.00 0.00 33.80 5,843.68 100.00
09.02.00 MAMPARA DE MADERA- M-1 UND 2.00 419.62 839.24 0.00 0.00 0.00 0.00 0.00 0.00 2.00 839.24 100.00

PROYECTO: MODULO BASICO DE JUSTICIA


PROPIETARIO:
ADJUDICACION DIRECTA N 0XX-2000-GCR/PJ
CONTRATISTA: ASOCIADOS
SUPERVISOR: ING
VALORIZACION MENSUAL N 01 DEL 03/11/2000 AL 30/11/2000
FORMULA : 02 ARQUITECTURA
PRESUPUESTO BASE : S/ 686,034.31 AL 30/04/2000 INICIO PLAZO CONTRACTUAL : 03/11/2000 PLAZO DE EJECUCION: 135 DIAS CALENDARIO
PRESUPUESTO CONTRATADO: S/ 617,431.00 INC. IGV FIN DEL PLAZO CONTRACTUAL 17/03/2001 FACTOR DE RELACION: 0.90000

PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR


ITEM DESCRIPCION UND CANTIDAD P.UNIT PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL %
09.03.00 VENTANA DE MADERA +VIDRIO INCOLORO SEMI DOBLE M2 23.95 158.28 3,790.81 0.00 0.00 0.00 0.00 0.00 0.00 23.95 3,790.81 100.00
S/DISEO
09.04.00 FALSO CIELO RASO TRIPLAY M2 101.62 20.67 2,100.49 0.00 0.00 0.00 0.00 0.00 0.00 101.62 2,100.49 100.00
10.00.00 CERRAJERIA
10.01.00 BISAGRAS CAPUCHINA ALUMINIZADA 3 1/2" X 3 1/2" PAR 49.00 9.91 485.59 0.00 0.00 0.00 0.00 0.00 0.00 49.00 485.59 100.00
10.02.00 BISAGRAS CAPUCHINA ALUMINIZADA 2 1/2" X 2 1/2" PAR 36.00 8.51 306.36 0.00 0.00 0.00 0.00 0.00 0.00 36.00 306.36 100.00
10.03.00 SUMINISTRO Y COLOCACION CERRADURA 2 GOLPES UND 12.00 41.67 500.04 0.00 0.00 0.00 0.00 0.00 0.00 12.00 500.04 100.00
10.04.00 CERRADURA DE PERILLA PARA PUERTAS INTERIORES UND 8.00 40.94 327.52 0.00 0.00 0.00 0.00 0.00 0.00 8.00 327.52 100.00
11.00.00 CARPINTERIA METALICA
11.01.00 PUERTA METALICA CON PERFILES Y PLANCHA METALICA UND 1.00 113.20 113.20 0.00 0.00 0.00 0.00 0.00 0.00 1.00 113.20 100.00
P-6
11.02.00 VENTANA DE CRISTAL TEMPLADO 10 MM CON M2 6.21 186.07 1,155.49 0.00 0.00 0.00 0.00 0.00 0.00 6.21 1,155.49 100.00
TIRADORES
11.03.00 REJA METALICA R-1 UND 2.00 586.72 1,173.44 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,173.44 100.00
11.04.00 REJA METALICA R-2 UND 3.00 329.31 987.93 0.00 0.00 0.00 0.00 0.00 0.00 3.00 987.93 100.00
11.05.00 REJA METALICA R-3 UND 5.00 591.32 2,956.60 0.00 0.00 0.00 0.00 0.00 0.00 5.00 2,956.60 100.00
11.06.00 REJA METALICA R-4 UND 1.00 591.32 591.32 0.00 0.00 0.00 0.00 0.00 0.00 1.00 591.32 100.00
11.07.00 VENTANA METALICA M2 1.08 131.44 141.96 0.00 0.00 0.00 0.00 0.00 0.00 1.08 141.96 100.00
11.08.00 VENTANA METALICA CON MALLA ELECTROSOLDADA M2 2.01 146.51 294.49 0.00 0.00 0.00 0.00 0.00 0.00 2.01 294.49 100.00
11.09.00 BARANDAS TUBO DE FIERRO 2" ML 15.70 43.73 686.56 0.00 0.00 0.00 0.00 0.00 0.00 15.70 686.56 100.00
11.10.00 ASTA METALICA P/BANDERA I/PEDESTAL+BASE UND 3.00 1,048.80 3,146.40 0.00 0.00 0.00 0.00 0.00 0.00 3.00 3,146.40 100.00
CONCRETO+CIMENTACION
11.11.00 ESCALERA DE TANQUES ELEVADOS UND 1.00 73.95 73.95 0.00 0.00 0.00 0.00 0.00 0.00 1.00 73.95 100.00
11.12.00 ESCALERA METALICA MOVIL DE CISTERNA UND 1.00 73.95 73.95 0.00 0.00 0.00 0.00 0.00 0.00 1.00 73.95 100.00
11.13.00 ENTRAMADO METALICO INGRESO UND 2.00 506.32 1,012.64 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,012.64 100.00
11.14.00 DIVISION METALICA P/SS.HH S/ ESPEC Y PLANOS ML 10.40 223.11 2,320.34 0.00 0.00 0.00 0.00 0.00 0.00 10.40 2,320.34 100.00
11.15.00 CERCO DE MALLA METALICA C/COCADA 2".S/PLANOS M2 71.68 100.26 7,186.64 0.00 0.00 0.00 0.00 0.00 0.00 71.68 7,186.64 100.00
11.16.00 PERGOLA METALICA EXTERIOR EN BANCAS+BASE UND 8.00 749.22 5,993.76 0.00 0.00 0.00 0.00 0.00 0.00 8.00 5,993.76 100.00
CONCRETO+CIMENTACION
11.17.00 ESTRUCTURA METALICA EN AREA PUBLICA +BASE UND 1.00 3,498.28 3,498.28 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,498.28 100.00
CONCRETO+CIMENTACION
13.00.00 APARATOS Y ACCESORIOS SANITARIOS
13.01.00 INODORO DE LOSA.TIPO SIFON JET-TREBOL.O.SIMILAR UND 8.00 175.92 1,407.36 0.00 0.00 0.00 0.00 0.00 0.00 8.00 1,407.36 100.00
13.02.00 LAVATARIO DE LOSA VITRIFICADA BLANCO UND 7.00 126.85 887.95 0.00 0.00 0.00 0.00 0.00 0.00 7.00 887.95 100.00
13.03.00 URINARIO DE PICO TIPO BAMBI-TREBOL O SIMILAR UND 2.00 153.80 307.60 0.00 0.00 0.00 0.00 0.00 0.00 2.00 307.60 100.00
13.04.00 TASA.TURCA.CON TANQUE ALTO UND 1.00 90.80 90.80 0.00 0.00 0.00 0.00 0.00 0.00 1.00 90.80 100.00
13.05.00 DISPENSADOR.DE JABON.LIQUIDO UND 4.00 32.19 128.76 0.00 0.00 0.00 0.00 0.00 0.00 4.00 128.76 100.00
13.06.00 PAPELERA CROMADA SOBREPONER UND 8.00 7.30 58.40 0.00 0.00 0.00 0.00 0.00 0.00 8.00 58.40 100.00
13.07.00 GANCHO CROMADO DE SOBREPONER UND 9.00 6.00 54.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 54.00 100.00
13.08.00 ESPEJO SOBREPONER 0.60X0.040 M UND 6.00 56.65 339.90 0.00 0.00 0.00 0.00 0.00 0.00 6.00 339.90 100.00
13.09.00 COLOCACION DE APARATOS SANITARIOS UND 18.00 33.57 604.26 0.00 0.00 0.00 0.00 0.00 0.00 18.00 604.26 100.00
13.10.00 COLOCACION DE ACCESORIOS SANITARIOS UND 20.00 11.20 224.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 224.00 100.00
14.00.00 VARIOS
14.01.00 BANC.CONC.ARM.PULIDO+FILETE CERAMICO UND 19.00 141.40 2,686.60 0.00 0.00 0.00 0.00 0.00 0.00 19.00 2,686.60 100.00
14.02.00 BANCAS DE CONCRETO ARMDO EN CELDAS UND 2.00 172.23 344.46 0.00 0.00 0.00 0.00 0.00 0.00 2.00 344.46 100.00
14.03.00 LOSA DE CONCRETO ARMADO PULIDO EN LOCUTORIO UND 1.00 121.01 121.01 0.00 0.00 0.00 0.00 0.00 0.00 1.00 121.01 100.00
14.04.00 PLACA BRONCE .60 X 60 M S/DISEO UND 1.00 245.54 245.54 0.00 0.00 0.00 0.00 0.00 0.00 1.00 245.54 100.00
14.05.00 JARDINERIA M2 196.66 3.81 749.27 0.00 0.00 0.00 0.00 0.00 0.00 196.66 749.27 100.00
14.06.00 LIMPIEZA PERMANENTE DE OBRA M2 717.10 0.33 236.64 0.00 0.00 0.00 0.00 0.00 0.00 717.10 236.64 100.00
TOTAL COSTO DIRECTO 229,342.77 0.00 7,382.15 7,382.15 221,960.62
GASTOS GENERALES 15% 34,401.42 0.00 1,107.32 1,107.32 33,294.09
UTILIDAD 10% 22,934.28 0.00 738.22 738.22 22,196.06
TOTAL 286,678.47 0.00 9,227.69 9,227.69 277,450.77
FACTOR DE RELACION: 0.90000 258,010.62 0.00 8,304.92 3.22% 8,304.92 3.22% 249,705.69 96.78%
PROYECTO: MODULO BASICO DE JUSTICIA
PROPIETARIO:
ADJUDICACION DIRECTA N 0XX-2000-GCR/PJ
CONTRATISTA: ASOCIADOS
SUPERVISOR: ING
VALORIZACION MENSUAL N 01 DEL 03/11/2000 AL 30/11/2000
FORMULA : 03 INSTALACIONES ELECTRICAS
PRESUPUESTO BASE : S/ 686,034.31 AL 30/04/2000 INICIO PLAZO CONTRACTUAL : 03/11/2000 PLAZO DE EJECUCION: 135 DIAS CALENDARIO
PRESUPUESTO CONTRATADO: S/ 617,431.00 INC. IGV FIN DEL PLAZO CONTRACTUAL 17/03/2001 FACTOR DE RELACION: 0.90000

PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR


ITEM DESCRIPCION UND CANTIDAD P.UNIT PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
01.00.00 SALIDAS INTERIORES
01.01.00 CENTROS DE LUZ PTO 49.00 66.24 3,245.76 0.00 0.00 0.00 0.00 0.00 0.00 49.00 3,245.76
01.02.00 SALIDAS P/BRAQUETE EN PARED PTO 39.00 58.34 2,275.26 0.00 0.00 0.00 0.00 0.00 0.00 39.00 2,275.26
01.03.00 TOMACORRIENTE BIPOLAR DOBLE PTO 40.00 77.05 3,082.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 3,082.00
01.04.00 SALIDA TOMACORR.BIPOLAR DOBLE L/T PTO 31.00 85.65 2,655.15 0.00 0.00 0.00 0.00 0.00 0.00 31.00 2,655.15
01.05.00 TOMACORRIENTE BIPOLAR DOBLE C/PROTECCION PTO 4.00 78.56 314.24 0.00 0.00 0.00 0.00 0.00 0.00 4.00 314.24
HUMEDAD 15A-250V(PA)
01.06.00 SALIDA DE FUERZA PTO 2.00 117.42 234.84 0.00 0.00 0.00 0.00 0.00 0.00 2.00 234.84
01.07.00 SALIDA COMPUTO PTO 29.00 85.11 2,468.19 0.00 0.00 0.00 0.00 0.00 0.00 29.00 2,468.19
01.08.00 SALIDA PARA ESTABILIZADOR DE POTENCIA 8 KW PTO 1.00 94.04 94.04 0.00 0.00 0.00 0.00 0.00 0.00 1.00 94.04
01.09.00 SALIDA PARA AIRE ACONDICIONADO PTO 1.00 116.14 116.14 0.00 0.00 0.00 0.00 0.00 0.00 1.00 116.14
01.10.00 SALIDA PARA INTERRUPTOR BIPOLAR 2X30A f= 10A PTO 1.00 51.83 51.83 0.00 0.00 0.00 0.00 0.00 0.00 1.00 51.83
01.11.00 SALIDA P/INTERRUPTOR BIPOLAR 2X30A f= 15A PTO 1.00 51.83 51.83 0.00 0.00 0.00 0.00 0.00 0.00 1.00 51.83
01.12.00 SALIDA P/ CENTRAL TELEFONICA PTO 1.00 145.96 145.96 0.00 0.00 0.00 0.00 0.00 0.00 1.00 145.96
02.00.00 CAJAS DE PASE
02.01.00 CAJA DE PASE OCTOGONAL 100X55 UND 26.00 24.57 638.82 0.00 0.00 0.00 0.00 0.00 0.00 26.00 638.82
02.02.00 CAJA PASE P/SISTEMA DECOMPUTO( 250X250X150) UND 3.00 38.71 116.13 0.00 0.00 0.00 0.00 0.00 0.00 3.00 116.13
02.03.00 CAJA DISTRIBUCION TELEFONICA "C"(600X350X150) UND 2.00 42.31 84.62 0.00 0.00 0.00 0.00 0.00 0.00 2.00 84.62
02.04.00 CAJA DE PASE RECTANGULAR (100X55X50) UND 29.00 19.71 571.59 0.00 0.00 0.00 0.00 0.00 0.00 29.00 571.59
02.05.00 CAJA DE PASE CUADRADA (250X250X150) UND 6.00 29.07 174.42 0.00 0.00 0.00 0.00 0.00 0.00 6.00 174.42
02.06.00 CAJA DE PASE CUADRADA (300X300X150) UND 1.00 30.16 30.16 0.00 0.00 0.00 0.00 0.00 0.00 1.00 30.16
03.00.00 ACOMETIDAS Y REDES ELECTRICAS
03.01.00 RED ALIMENTACION THW 3X35MM2+1X16MM2/T-40MM. ML 20.00 44.40 888.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 888.00
PVC-P ALIMENT. DE POSTE A TG
03.02.00 RED ALIMENTACION TW 3X16MM2+1X6MM2/T-35MM. ML 22.80 20.28 462.38 0.00 0.00 0.00 0.00 0.00 0.00 22.80 462.38
PVC-P ALIMENT. DEL TDN
03.03.00 RED ALIMENTACION THW 3X35MM2+1X6MM2/T-40MM. ML 4.30 44.44 191.09 0.00 0.00 0.00 0.00 0.00 0.00 4.30 191.09
PVC-P ALIMENT GRUPO ELECTR.
03.04.00 RED ALIMENTACION TW 1X16MM2/ T-25MM-PVC-P ML 12.00 18.95 227.40 0.00 0.00 0.00 0.00 0.00 0.00 12.00 227.40
ALIMENT. POZO A TIERRA DEL TG.
03.05.00 RED ALIMENTACION TW 1X10 MM2/T-25MM PVC-P ML 11.80 13.52 159.54 0.00 0.00 0.00 0.00 0.00 0.00 11.80 159.54
ALIMENT. POZO A TIERRA DEL TES.
03.06.00 RED ALIMENTACION THW 2-1X10 MM2+1X6MM2/T-35 MM ML 16.00 31.36 501.76 0.00 0.00 0.00 0.00 0.00 0.00 16.00 501.76
PVC-P ALIMENT. DEL TES
03.07.00 RED ALIMENTACION TW 2X6 MM2+1X4MM2/T-20 MM ML 15.00 28.56 428.40 0.00 0.00 0.00 0.00 0.00 0.00 15.00 428.40
PVC-P ALIMENT. DEL TBA
03.08.00 RED ALIMENTACION 1X35 MM2 CU DESNUDO 25 MM PVC-P ML 51.95 15.74 817.69 0.00 0.00 0.00 0.00 0.00 0.00 51.95 817.69
ALIMENT POZO A TIERRA DE PARARAYOS
03.09.00 CONEXIN DOMICILIARIA Y MEDIDOR ELECTRICO DE GLB 1.00 1,200.00 1,200.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,200.00
ENERGIA ELECTRICA.
04.00.00 TABLEROS DE DISTRIBUCION
04.01.00 TABLERO GENERAL NORMAL TG S/ESPECI YPLANOS UND 1.00 1,114.98 1,114.98 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,114.98
04.02.00 TABLERO DE DISTRIBUCION NORMAL TDN S/PLANOS UND 1.00 718.41 718.41 0.00 0.00 0.00 0.00 0.00 0.00 1.00 718.41
04.03.00 TABLERO TENSION ESTABILIZADA TES S/PLANOS UND 1.00 741.92 741.92 0.00 0.00 0.00 0.00 0.00 0.00 1.00 741.92
04.04.00 TABLERO DE BOMBA DE AGUA TBA SEGN DISEO UND 1.00 404.21 404.21 0.00 0.00 0.00 0.00 0.00 0.00 1.00 404.21
05.00.00 DISTRIBUCION
05.01.00 SALIDA PARA INTERRUPTOR UNIPOLAR 16A,250V SIMPLE UND 21.00 10.72 225.12 0.00 0.00 0.00 0.00 0.00 0.00 21.00 225.12
05.02.00 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE UND 4.00 14.87 59.48 0.00 0.00 0.00 0.00 0.00 0.00 4.00 59.48
05.03.00 SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE UND 2.00 27.77 55.54 0.00 0.00 0.00 0.00 0.00 0.00 2.00 55.54
05.04.00 SALIDA PARA INTERRUPTOR DE CONMUTACION 1 GOLPE UND 2.00 23.07 46.14 0.00 0.00 0.00 0.00 0.00 0.00 2.00 46.14
06.00.00 ARTEFACTOS DE ILUMINACION
06.01.00 BRAQUETE JARDINERA CON FLUORESCENTE DE 36W UND 24.00 81.69 1,960.56 0.00 0.00 0.00 0.00 0.00 0.00 24.00 1,960.56
SIMILAR AL MODELO MJS-A 2X36 W DE MECRIL

PROYECTO: MODULO BASICO DE JUSTICIA


PROPIETARIO:
ADJUDICACION DIRECTA N 0XX-2000-GCR/PJ
CONTRATISTA: ASOCIADOS
SUPERVISOR: ING
VALORIZACION MENSUAL N 01 DEL 03/11/2000 AL 30/11/2000
FORMULA : 03 INSTALACIONES ELECTRICAS
PRESUPUESTO BASE : S/ 686,034.31 AL 30/04/2000 INICIO PLAZO CONTRACTUAL : 03/11/2000 PLAZO DE EJECUCION: 135 DIAS CALENDARIO
PRESUPUESTO CONTRATADO: S/ 617,431.00 INC. IGV FIN DEL PLAZO CONTRACTUAL 17/03/2001 FACTOR DE RELACION: 0.90000

PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR


ITEM DESCRIPCION UND CANTIDAD P.UNIT PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
06.03.00 FLUORESCENTE DE 36W SIMILAR AL MODELO MBS 2X36 UND 48.00 102.37 4,913.76 0.00 0.00 0.00 0.00 0.00 0.00 48.00 4,913.76
DE MECRIL
06.04.00 FLUORESCENTE CIRCULAR 32W MODELO MCS 1X32 DE UND 3.00 69.78 209.34 0.00 0.00 0.00 0.00 0.00 0.00 3.00 209.34
MECRIL
06.05.00 FLUORESCENTE DE 36W SIMILAR AL MODELO IP65 2X36 W UND 14.00 155.11 2,171.54 0.00 0.00 0.00 0.00 0.00 0.00 14.00 2,171.54
DE MECRIL
07.00.00 REDES TELEFONICAS Y COMUNICACIN
07.01.00 RED TELEFONICA I/ SOLO TUBERIA-50 MM PVC-P ML 49.20 30.48 1,499.62 0.00 0.00 0.00 0.00 0.00 0.00 49.20 1,499.62
07.02.00 RED TELEFONICA I/ SOLO TUBERIA-25 MM PVC-P ML 91.10 28.35 2,582.69 0.00 0.00 0.00 0.00 0.00 0.00 91.10 2,582.69
08.00.00 VARIOS
08.01.00 POZO DE TIERRA S/ESPEC Y PLANOS UND 6.00 634.73 3,808.38 0.00 0.00 0.00 0.00 0.00 0.00 6.00 3,808.38
08.02.00 TAPA CIEGA RECTANGULAR UND 68.00 4.09 278.12 0.00 0.00 0.00 0.00 0.00 0.00 68.00 278.12
08.03.00 SUJECION DE EQUIPOS DE ILUMINACION UND 49.00 20.69 1,013.81 0.00 0.00 0.00 0.00 0.00 0.00 49.00 1,013.81
08.04.00 PARRARAYOS FRANKLIN CON 3 PUNTAS O SIMILAR UND 3.00 2,620.88 7,862.64 0.00 0.00 0.00 0.00 0.00 0.00 3.00 7,862.64
TOTAL COSTO DIRECTO 50,893.50 0.00 0.00 0.00 50,893.50
GASTOS GENERALES 15% 7,634.03 0.00 0.00 0.00 7,634.03
UTILIDAD 10% 5,089.35 0.00 0.00 0.00 5,089.35
TOTAL 63,616.88 0.00 0.00 0.00 63,616.88
FACTOR DE RELACION: 0.90000 57,255.19 0.00 0.00 0.00% 0.00 0.00% 57,255.19
EJECUTAR
%

100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00

100.00

EJECUTAR
%
100.00

100.00

100.00

100.00
100.00

100.00
100.00
100.00
100.00

100.00%
PROYECTO: MODULO BASICO DE JUSTICIA
PROPIETARIO:
ADJUDICACION DIRECTA N 0XX-2000-GCR/PJ
CONTRATISTA: ASOCIADOS
SUPERVISOR: ING
VALORIZACION MENSUAL N 01 DEL 03/11/2000 AL 30/11/2000
FORMULA : 04 INSTALACIONES SANITARIAS
PRESUPUESTO BASE : S/ 686,034.31 AL 30/04/2000 INICIO PLAZO CONTRACTUAL : 03/11/2000 PLAZO DE EJECUCION: 135 DIAS CALENDARIO
PRESUPUESTO CONTRATADO: S/ 617,431.00 INC. IGV FIN DEL PLAZO CONTRACTUAL 17/03/2001 FACTOR DE RELACION: 0.90000

PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR


ITEM DESCRIPCION UND CANTIDAD P.UNIT PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
01.00.00 MOVIMIENTO DE TIERRAS PARA AGUA, DESAGUE
Y AGUA DE LLUVIA
01.01.00 TRAZO, NIVELES Y REPLANTEO PRELIMINAR ML 192.55 1.15 221.43 0.00 0.00 0.00 0.00 0.00 0.00 192.55 221.43
01.02.00 EXCAVACION MANUAL TUBERIA DE AGUA H=0.50 ML 102.35 3.22 329.57 0.00 0.00 0.00 0.00 0.00 0.00 102.35 329.57
01.03.00 EXCAVACION MANUAL TUBERIA DE DESAGUE H=0.70 ML 90.20 5.86 528.57 0.00 0.00 0.00 0.00 0.00 0.00 90.20 528.57
01.04.00 RELLENO COMPACTADO P/ TUB DE AGUA M 102.35 2.14 219.03 0.00 0.00 0.00 0.00 0.00 0.00 102.35 219.03
01.05.00 RELLENO COMPACTADO P/TUB DE DESAGUE M 90.20 2.58 232.72 0.00 0.00 0.00 0.00 0.00 0.00 90.20 232.72
01.06.00 ELIMINACION DE MATERIAL EXCEDENTE. M3 7.70 15.05 115.89 0.00 0.00 0.00 0.00 0.00 0.00 7.70 115.89
02.00.00 AGUA FRIA
02.01.00 SALIDA DE AGUA FRIA PTO 18.00 61.42 1,105.56 0.00 0.00 0.00 0.00 0.00 0.00 18.00 1,105.56
02.02.00 RED DE DISTRIBUCION DE AGUA FRIA 0.00 0.00
02.02.01 TUBERIA PVC C-10 D=1"(INGRE+DISTRIBUCION) R M 63.55 11.64 739.72 0.00 0.00 0.00 0.00 0.00 0.00 63.55 739.72
02.02.02 TUBERIA PVC C-10 D=3/4" M 38.80 10.04 389.55 0.00 0.00 0.00 0.00 0.00 0.00 38.80 389.55
02.02.03 VALVULA CHECK D= 1" UND 2.00 57.58 115.16 0.00 0.00 0.00 0.00 0.00 0.00 2.00 115.16
02.02.04 VALVULA DE BOLA D= 1" UND 3.00 57.65 172.95 0.00 0.00 0.00 0.00 0.00 0.00 3.00 172.95
02.02.05 VALVULA DE BOLA D= 3/4" UND 4.00 46.83 187.32 0.00 0.00 0.00 0.00 0.00 0.00 4.00 187.32
02.02.06 VALVULA DE BOLA D= 1/2" UND 2.00 38.25 76.50 0.00 0.00 0.00 0.00 0.00 0.00 2.00 76.50
02.02.07 PRUEBA HIDRAULICA Y DESINFECCION UND 102.35 1.74 178.09 0.00 0.00 0.00 0.00 0.00 0.00 102.35 178.09
02.03.00 ACCESORIOS DE REDES
02.03.01 CODO 1" X 90 PVC C/R UND 7.00 9.52 66.64 0.00 0.00 0.00 0.00 0.00 0.00 7.00 66.64
02.03.02 TEE 1" X1" PVC C/R UND 4.00 9.37 37.48 0.00 0.00 0.00 0.00 0.00 0.00 4.00 37.48
02.03.03 CODO 3/4" X 45 PVC C/R UND 2.00 12.58 25.16 0.00 0.00 0.00 0.00 0.00 0.00 2.00 25.16
02.03.04 CODO 1/2" X 90 PVC CR UND 4.00 7.66 30.64 0.00 0.00 0.00 0.00 0.00 0.00 4.00 30.64
02.03.05 REDUCCION 3/4" A 1/2" PVC CR UND 1.00 7.76 7.76 0.00 0.00 0.00 0.00 0.00 0.00 1.00 7.76
02.04.00 NICHO CON MARCO Y TAPA DE MADERA UND 6.00 24.28 145.68 0.00 0.00 0.00 0.00 0.00 0.00 6.00 145.68
02.05.00 CAJA DE VALVULAS UND 3.00 58.76 176.28 0.00 0.00 0.00 0.00 0.00 0.00 3.00 176.28
03.00.00 DESAGUE
03.01.00 SALIDA DE DESAGUE
03.01.01 SALIDA DE DESAGUE PVC SAL 4" PTO 9.00 78.27 704.43 0.00 0.00 0.00 0.00 0.00 0.00 9.00 704.43
03.01.02 SALIDA DE DESAGUE PVC SAL 2" PTO 9.00 47.17 424.53 0.00 0.00 0.00 0.00 0.00 0.00 9.00 424.53
03.01.03 SALIDA DE VENTILACION PVC-SAL 2" PTO 7.00 67.92 475.44 0.00 0.00 0.00 0.00 0.00 0.00 7.00 475.44
03.01.04 SOMBRERO DE VENTILA PVC- SAL 2" PZA 7.00 9.66 67.62 0.00 0.00 0.00 0.00 0.00 0.00 7.00 67.62
03.01.05 TRAMPA TIPO "P" (D=4") UND 1.00 56.85 56.85 0.00 0.00 0.00 0.00 0.00 0.00 1.00 56.85
03.02.00 REDES DE RECOLECCION
03.02.01 TUBERIA PVC SAP DESAGUE DIAM. 6" ML 27.60 27.58 761.21 0.00 0.00 0.00 0.00 0.00 0.00 27.60 761.21
03.02.02 TUBERIA PVC SAP DESAGUE DIAM 4" ML 17.45 16.87 294.38 0.00 0.00 0.00 0.00 0.00 0.00 17.45 294.38
03.02.03 PRUEBA HIDRAULICA M 45.05 1.37 61.72 0.00 0.00 0.00 0.00 0.00 0.00 45.05 61.72
03.03.00 ACCESORIOS DE REDES
03.03.01 REGISTRO ROSCADO BRONCE D=6" UND 3.00 22.73 68.19 0.00 0.00 0.00 0.00 0.00 0.00 3.00 68.19
03.03.02 REGISTRO ROSCADO BRONCE D=4" UND 4.00 19.92 79.68 0.00 0.00 0.00 0.00 0.00 0.00 4.00 79.68
03.03.03 SUMIDERO CROMADO D= 4" UND 4.00 24.95 99.80 0.00 0.00 0.00 0.00 0.00 0.00 4.00 99.80
03.04.00 CAJAS DE INSPECCION 0.00 0.00
03.04.01 CAJAS DE REGISTRO C/ TAPA DE CONCRETO 12"X24" UND 7.00 135.82 950.74 0.00 0.00 0.00 0.00 0.00 0.00 7.00 950.74
04.00.00 TANQUE EN FIBRA DE VIDRIO
04.01.00 TUBERIAS
04.01.01 TUBERIA DE F.G.D=11/2" ML 0.50 17.59 8.80 0.00 0.00 0.00 0.00 0.00 0.00 0.50 8.80
04.01.02 TUBERIA DE F.G.D= 2" ML 3.40 23.28 79.15 0.00 0.00 0.00 0.00 0.00 0.00 3.40 79.15
04.01.03 TUBERIA DE F.G D= 1" ML 5.55 13.41 74.43 0.00 0.00 0.00 0.00 0.00 0.00 5.55 74.43
04.01.04 TUBERIA PVC SAL P/DESAGUE DIAM.2" ML 4.50 14.19 63.86 0.00 0.00 0.00 0.00 0.00 0.00 4.50 63.86
04.01.05 TUBERIA PVC C-10 D=1" M 4.50 11.64 52.38 0.00 0.00 0.00 0.00 0.00 0.00 4.50 52.38
04.01.06 PRUEBA HIDRAULICA M 18.45 1.74 32.10 0.00 0.00 0.00 0.00 0.00 0.00 18.45 32.10
04.02.00 CODOS
04.02.01 CODO 2"X90 FG UND 3.00 14.57 43.71 0.00 0.00 0.00 0.00 0.00 0.00 3.00 43.71
04.02.02 CODO 1"X90 FG UND 3.00 10.36 31.08 0.00 0.00 0.00 0.00 0.00 0.00 3.00 31.08

PROYECTO: MODULO BASICO DE JUSTICIA


PROPIETARIO:
ADJUDICACION DIRECTA N 0XX-2000-GCR/PJ
CONTRATISTA: ASOCIADOS
SUPERVISOR: ING
VALORIZACION MENSUAL N 01 DEL 03/11/2000 AL 30/11/2000
FORMULA : 04 INSTALACIONES SANITARIAS
PRESUPUESTO BASE : S/ 686,034.31 AL 30/04/2000 INICIO PLAZO CONTRACTUAL : 03/11/2000 PLAZO DE EJECUCION: 135 DIAS CALENDARIO
PRESUPUESTO CONTRATADO: S/ 617,431.00 INC. IGV FIN DEL PLAZO CONTRACTUAL 17/03/2001 FACTOR DE RELACION: 0.90000

PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR


ITEM DESCRIPCION UND CANTIDAD P.UNIT PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
04.03.00 TEES
04.03.01 TEE FG 2" X 11/2" UND 2.00 22.08 44.16 0.00 0.00 0.00 0.00 0.00 0.00 2.00 44.16
04.04.00 TRANSICIONES DE FG A PVC
04.01.00 TRANSICION FG PVC D=2" UND 1.00 28.29 28.29 0.00 0.00 0.00 0.00 0.00 0.00 1.00 28.29
04.02.00 TRANSICION FG PVC D=1" UND 2.00 23.29 46.58 0.00 0.00 0.00 0.00 0.00 0.00 2.00 46.58
04.05.00 UNION UNIVERSAL
04.05.01 UNION UNIVERSAL D= 11/2" UND 5.00 24.55 122.75 0.00 0.00 0.00 0.00 0.00 0.00 5.00 122.75
04.05.02 UNION UNIVERSAL D= 1" UND 5.00 15.57 77.85 0.00 0.00 0.00 0.00 0.00 0.00 5.00 77.85
04.06.00 VALVULAS
04.06.01 VALVULA COMPUERTA BRONCE D= 1" UND 1.00 56.69 56.69 0.00 0.00 0.00 0.00 0.00 0.00 1.00 56.69
04.06.02 VALVULA COMPUERTA D= 11/2" UND 1.00 86.77 86.77 0.00 0.00 0.00 0.00 0.00 0.00 1.00 86.77
04.07.00 SOMBREROS DE VENTILACION
04.07.01 SOMBRERO DE VENTILACION D= 2" UND 1.00 9.66 9.66 0.00 0.00 0.00 0.00 0.00 0.00 1.00 9.66
04.08.00 TANQUE ELEVADO
04.08.01 TANQUE ELEVADO FIBRA DE VIDRIO UND 2.00 319.57 639.14 0.00 0.00 0.00 0.00 0.00 0.00 2.00 639.14
04.08.02 TANQUE ACCESORIOS DE 1" UND 2.00 79.68 159.36 0.00 0.00 0.00 0.00 0.00 0.00 2.00 159.36
05.00.00 CISTERNA Y CAMARA DE BOMBEO
05.01.00 TUBERIAS
05.01.01 TUBERIA DE FG D= 1 1/4" ML 5.20 17.12 89.02 0.00 0.00 0.00 0.00 0.00 0.00 5.20 89.02
05.01.02 TUBERIAS DE FG D= 1" ML 8.00 13.41 107.28 0.00 0.00 0.00 0.00 0.00 0.00 8.00 107.28
05.01.03 PRUEBA HIDRAULICA ML 13.20 1.37 18.08 0.00 0.00 0.00 0.00 0.00 0.00 13.20 18.08
05.02.00 CODOS
05.02.01 CODO 1" X 90 FG UND 2.00 8.70 17.40 0.00 0.00 0.00 0.00 0.00 0.00 2.00 17.40
05.03.00 TEES
05.03.01 TEE FG 1 1/4" X 1" UND 2.00 15.42 30.84 0.00 0.00 0.00 0.00 0.00 0.00 2.00 30.84
05.03.02 TEE FG 1 " X 1" UND 1.00 18.19 18.19 0.00 0.00 0.00 0.00 0.00 0.00 1.00 18.19
05.04.00 UNION UNIVERSAL
05.04.01 UNION UNIVERSAL D= 11/4" UND 2.00 17.96 35.92 0.00 0.00 0.00 0.00 0.00 0.00 2.00 35.92
05.04.02 UNION UNIVERSAL D= 1" UND 6.00 15.57 93.42 0.00 0.00 0.00 0.00 0.00 0.00 6.00 93.42
05.05.00 VALVULAS
05.05.01 VALVULA COMPUERTA BRONCE D=1" UND 2.00 56.69 113.38 0.00 0.00 0.00 0.00 0.00 0.00 2.00 113.38
05.05.02 VALVULA CHECK D= 1" UND 2.00 57.66 115.32 0.00 0.00 0.00 0.00 0.00 0.00 2.00 115.32
05.05.03 VALVULA DE PIE Y CANASTILLA DE SUCCION D=11/4" UND 2.00 143.85 287.70 0.00 0.00 0.00 0.00 0.00 0.00 2.00 287.70
05.06.00 ELECTROBOMBAS Y ACCESORIOS
05.06.01 ELECTROBOMBA CENTRIFUGA Q=1.0 LPS, HDT= 18.0 MT UND 2.00 1,016.40 2,032.80 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2,032.80
P= 0.60 HP
05.06.02 CONTROL ELECTRICO DE NIVELES GLB 1.00 75.00 75.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 75.00
05.07.00 ACCESORIOS DE CISTERNA
05.07.01 CAJA DE REBOSE CON REJILLA UND 1.00 37.26 37.26 0.00 0.00 0.00 0.00 0.00 0.00 1.00 37.26
05.07.02 TAPA SANITARIA DE FIERRO DE 0.60X0.60 E= 1/4" UND 1.00 169.62 169.62 0.00 0.00 0.00 0.00 0.00 0.00 1.00 169.62
05.08.00 ROMPEAGUAS DE CISTERNA
05.08.01 ROMPEAGUAS DE CISTERNA D= 11/4" UND 2.00 2.97 5.94 0.00 0.00 0.00 0.00 0.00 0.00 2.00 5.94
05.08.02 ROMPEAGUAS DE CISTERNA D= 4" UND 1.00 3.43 3.43 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3.43
06.00.00 SISTEMA EVACUACION DE LLUVIA
06.01.00 REDES DE RECOLECCION
06.01.01 TUBERIA DE PVC SAP DESAGUE DIAM.2" ML 6.40 8.92 57.09 0.00 0.00 0.00 0.00 0.00 0.00 6.40 57.09
06.01.02 TUBERIA PVC SAP DESAGUE DIAM. 3" ML 16.80 14.30 240.24 0.00 0.00 0.00 0.00 0.00 0.00 16.80 240.24
06.01.03 TUBERIA PVC SAP DESAGUE DIAM. 4" ML 21.95 16.87 370.30 0.00 0.00 0.00 0.00 0.00 0.00 21.95 370.30
06.01.04 PRUEBA HIDRAULICA M 45.15 1.37 61.86 0.00 0.00 0.00 0.00 0.00 0.00 45.15 61.86
06.02.00 ACCESORIOS PARA TUBERIAS DE AGUA DE LLUVIA
06.02.01 CODO PVC SAP 2"X90 UND 1.00 20.28 20.28 0.00 0.00 0.00 0.00 0.00 0.00 1.00 20.28
06.02.02 CODO PVC SAP 3"X45 UND 3.00 27.84 83.52 0.00 0.00 0.00 0.00 0.00 0.00 3.00 83.52
06.02.03 CODO PVC SAP 3"X90 UND 1.00 29.73 29.73 0.00 0.00 0.00 0.00 0.00 0.00 1.00 29.73
06.02.04 CODO PVC SAP 4"X45 UND 2.00 46.25 92.50 0.00 0.00 0.00 0.00 0.00 0.00 2.00 92.50

PROYECTO: MODULO BASICO DE JUSTICIA


PROPIETARIO:
ADJUDICACION DIRECTA N 0XX-2000-GCR/PJ
CONTRATISTA: ASOCIADOS
SUPERVISOR: ING
VALORIZACION MENSUAL N 01 DEL 03/11/2000 AL 30/11/2000
FORMULA : 04 INSTALACIONES SANITARIAS
PRESUPUESTO BASE : S/ 686,034.31 AL 30/04/2000 INICIO PLAZO CONTRACTUAL : 03/11/2000 PLAZO DE EJECUCION: 135 DIAS CALENDARIO
PRESUPUESTO CONTRATADO: S/ 617,431.00 INC. IGV FIN DEL PLAZO CONTRACTUAL 17/03/2001 FACTOR DE RELACION: 0.90000

PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR


ITEM DESCRIPCION UND CANTIDAD P.UNIT PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
06.03.00 BAJADAS DE AGUA DE AGUA DE LLUVIA
06.03.01 TUBERIA DE FG D= 4" ML 4.40 38.85 170.94 0.00 0.00 0.00 0.00 0.00 0.00 4.40 170.94
06.03.02 TUBERIA DE FG D= 3" ML 17.60 29.51 519.38 0.00 0.00 0.00 0.00 0.00 0.00 17.60 519.38
06.03.03 TUBERIA DE FG D= 2" ML 2.50 23.28 58.20 0.00 0.00 0.00 0.00 0.00 0.00 2.50 58.20
06.03.04 CODO 4" X 45 FG UND 4.00 31.58 126.32 0.00 0.00 0.00 0.00 0.00 0.00 4.00 126.32
06.03.05 CODO 4" X 90 FG UND 1.00 23.89 23.89 0.00 0.00 0.00 0.00 0.00 0.00 1.00 23.89
06.03.06 CODO 3" X 45 FG UND 16.00 23.68 378.88 0.00 0.00 0.00 0.00 0.00 0.00 16.00 378.88
06.03.07 CODO 3" X 90 FG UND 4.00 23.68 94.72 0.00 0.00 0.00 0.00 0.00 0.00 4.00 94.72
06.03.08 CODO 2" X 45 FG UND 2.00 14.57 29.14 0.00 0.00 0.00 0.00 0.00 0.00 2.00 29.14
06.03.09 CODO 2" X90 FG UND 1.00 14.57 14.57 0.00 0.00 0.00 0.00 0.00 0.00 1.00 14.57
06.03.10 TRANSICION PVC FG D= 2" UND 1.00 28.29 28.29 0.00 0.00 0.00 0.00 0.00 0.00 1.00 28.29
06.03.11 TRANSICION PVC A FG D= 3" UND 4.00 30.29 121.16 0.00 0.00 0.00 0.00 0.00 0.00 4.00 121.16
06.03.12 TRANSICION PVC FG D= 4" UND 1.00 38.29 38.29 0.00 0.00 0.00 0.00 0.00 0.00 1.00 38.29
06.04.00 CANALETAS PARA AGUAS DE LLUVIA
06.04.01 CANALETAS DE ACERO ALUMINIZADOS E=0.45 mm EN ML 8.60 43.00 369.80 0.00 0.00 0.00 0.00 0.00 0.00 8.60 369.80
PATIO
06.04.02 CANALETA DE ACERO ALUMINIZADO EN EDIFICACION ML 47.10 39.53 1,861.86 0.00 0.00 0.00 0.00 0.00 0.00 47.10 1,861.86
E= 0.45 MM
06.05.00 CAJAS DE REGISTRO
06.05.01 CAJAS DE REGISTRO 10" X 20" UND 5.00 92.46 462.30 0.00 0.00 0.00 0.00 0.00 0.00 5.00 462.30
06.06.00 REGISTRO ROSCADO Y SUMIDERO
06.05.01 REGISTRO ROSCADO BRONCE D= 6" UND 6.00 22.73 136.38 0.00 0.00 0.00 0.00 0.00 0.00 6.00 136.38
06.05.02 SUMIDERO DE REJILLA DE 4" UND 1.00 27.02 27.02 0.00 0.00 0.00 0.00 0.00 0.00 1.00 27.02
07.00.00 SISTEMA CONTRA INCENDIO
07.01.00 EXTINTORES DE POLVO QUIMICO ABC 6 KG UND 3.00 140.25 420.75 0.00 0.00 0.00 0.00 0.00 0.00 3.00 420.75
08.00.00 SISTEMA DE RIEGO
08.01.00 GRIFO DE RIEGO UND 2.00 221.77 443.54 0.00 0.00 0.00 0.00 0.00 0.00 2.00 443.54
08.02.00 LLAVE DE RIEGO D= 1/2" CAJA DE CONCRETO PULIDO UND 2.00 88.67 177.34 0.00 0.00 0.00 0.00 0.00 0.00 2.00 177.34
09.00.00 CONEXIN A RED EXTERIOR
09.01.00 CONEXIN A RED DE AGUA FRIA GLB 1.00 636.00 636.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 636.00
09.02.00 CONEXIN A RED EXTERIOR DE DESAGUE GLB 1.00 756.00 756.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 756.00
TOTAL COSTO DIRECTO 21,903.94 0.00 0.00 0.00 21,903.94
GASTOS GENERALES 15% 3,285.59 0.00 0.00 0.00 3,285.59
UTILIDAD 10% 2,190.39 0.00 0.00 0.00 2,190.39
TOTAL 27,379.92 0.00 0.00 0.00 27,379.92
FACTOR DE RELACION: 0.90000 24,641.93 0.00 0.00 0.00% 0.00 0.00% 24,641.93
R EJECUTAR
%

100.00
100.00
100.00
100.00
100.00
100.00

100.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00

100.00
100.00
100.00

100.00

100.00
100.00
100.00
100.00
100.00
100.00

100.00
100.00

R EJECUTAR
%

100.00

100.00
100.00

100.00
100.00

100.00
100.00

100.00

100.00
100.00

100.00
100.00
100.00

100.00

100.00
100.00

100.00
100.00

100.00
100.00
100.00
100.00

100.00

100.00
100.00

100.00
100.00

100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00

R EJECUTAR
%

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

100.00

100.00

100.00

100.00
100.00
100.00

100.00
100.00

100.00
100.00

100.00%
RESUMEN DE LA VALORIZACION N 01
DEL 03/11/2000 AL 30/11/2000

Obra : MODULO BASICO DE JUSTICIA-


Propietario :
Ubicacin :
Valor Referencial : S/. 686,034.31 Inicio Plazo Contractual : 11/3/2000
Presup. Contrat : S/. 617,431.00 Fin del plazo Contractual : 3/17/2000
Contratista : CONSORCIO Valor Referen :
Supervisor : ING Presup.Contr :
Adel. En Efectivo, sin I.G.V : S/. 52,324.66 Fecha Adel: 03/11/2000
Monto Contrato, sin I.G.V : S/. 523,246.61 Plazo Ejecucin
Adj.Directa N 0XX-2000-GCR/XX : Factor Relac :

Monto del VALORIZACION ACUMULADO SALDO


DESCRIPCION
Contrato S/IGV Anterior Actual Monto % Monto

VALORIZACION CONTRACTUAL(V)
FORMULA N 01 ESTRUCTURAS 183,337.87 0.00 18,029.26 18,029.26 0.00 165,308.61
FORMULA N 02 ARQUITECTURA 258,010.62 0.00 8,304.92 8,304.92 3.22 249,705.70
FORMULA N 03 INST. ELECTRICA 57,255.19 0.00 0.00 0.00 0.00 57,255.19
FORMULA N 04 INST. SANITARIA 24,641.93 0.00 0.00 0.00 0.00 24,641.93
TOTAL CONTRACTUAL 523,245.61 26,334.18 26,334.18 496,911.43
AVANCE DE OBRA A LA FECHA % 0.00 5.03 5.03
AVANCE DE OBRA PROGRAMADO % 0.00 12.39 12.39
REAJUSTES(S)
REAJUSTES FORMULAS N 01 ESTRUCTURAS 0.00 108.18 108.18
REAJUSTES FORMULAS N 02 ARQUITECTURA 0.00 714.22 714.22
REAJUSTES FORMULAS N 03 INST ELECTRIC 0.00 0.00 0.00
REAJUSTES FORMULAS N 04 INST. SANITARIA 0.00 0.00 0.00
TOTAL REAJUSTES 822.40 822.40
VALORIZACION BRUTA (VB= V+S) 27,156.58 27,156.58
AMORTIZACIONES (A)
AMORTIZACION ADELANTO EFECTIVO 52,324.66 2,633.42 2,633.42
AMORTIZACION DE MATERIALES 104,649.32 10,232.51 10,232.51
TOTAL AMORTIZACIONES 12,865.93 12,865.93
VALORIZACION NETA(VN= VB-A) 14,290.65 14,290.65
MULTA POR ATRAZO DE OBRA(M) 0.00 0.00
MONTOS A PAGAR AL CONTRATISTA
EFECTIVO(VN-M) S/IGV 14,290.65 14,290.65
IMPUESTO GENRAL VENTAS 18% 2,572.32 2,572.32
MONTO TOTAL CON IGV

TOTAL COMPROMISO A SOLICITAR 16,862.97 16,862.97


###
###

135 dias calen.


0.90000

SALDO
%

74.11
96.78
100.00
100.00
REINTEGRO AUTORIZADO

OBRA: MODULO BASICO DE JUSTICIA


Contratista: ASOCIADOS Financiamiento: Convenio de Prestamo N XXXX/OC-PE
Mo Contrat: S/. 617,431.00 c /IGV
Adjudicacin Directa N 0XX-2000-GCR/XX Mo Contrat: S/. 523,246.61 s /IGV

Valoriz Valoriz. Valorizacin Valorizacin Reajuste Reajuste Reintegro Deducciones por adelantos
K-1
N 01 11/30/2000 Programada Real Program. Real Autorizado En efectivo Para materi
A B C D E F= C*E G= D*E H I J

ESTRUCTURAS

1 Nov-00 64,830.25 18,029.26 0.006 388.98 108.18 108.18 0.00 0.00


2 Dec-00 79,152.74
3 Jan-01 37,931.45
4 Feb-01 0.00
5 Mar-01 1,423.47
SUB TOTAL 183,337.91 18,029.26 388.98 108.18 108.18

ARQUITECTURA

1 Nov-00 0.00 8,304.92 0.086 0.00 714.22 714.22 0.00 0.00


2 Dec-00 26,686.09
3 Jan-01 74,328.30
4 Feb-01 97,529.03
5 Mar-01 59,467.27
SUB TOTAL 258,010.69 8,304.92 0.00 714.22 714.22

ELECTRICAS

1 Nov-00 0.00 0.00 0.019 0.00 0.00 0.00 0.00 0.00


2 Dec-00 3,578.60
3 Jan-01 17,797.90
4 Feb-01 26,409.39
5 Mar-01 9,470.22
SUB TOTAL 57,256.11 0.00 0.00 0.00 0.00

SANITARIAS

1 Nov-00 0.00 0.00 0.009 0.00 0.00 0.00 0.00 0.00


2 Dec-00 7,526.65
3 Jan-01 10,876.57
4 Feb-01 4,199.39
5 Mar-01 2,039.35
SUB TOTAL 24,641.96 0.00 0.00 0.00 0.00

TOTAL 523,246.67 26,334.18 388.98 822.40 822.40 0.00 0.00


Acumulado Anterior
Reintegro Actual
Acumulado Actual
Reintegro
Autorizado
L=H-I-J

108.18

108.18

714.22

714.22

0.00

0.00

0.00

0.00

822.40
0.00
822.40
822.40
REINTEGRO AUTORIZADOS QUE NO CORRESPONDEN
POR EL ADELANTO EN EFECTIVO
(Con los K del mes siguiente de la valorizacin)

OBRA: MODULO BASICO DE JUSTICIA Financiam: Convenio de Prestamo N XXX/OC-PE


Contratista: CONSORCIO ASOCIADOS Mo Contrato con IG S/. 617,431.00
Mo Contrato sin IG S/. 523,246.61

Adjudicacin Directa N XXX-2000-GCR/XX

Adelanto en Efectivo, sin IGV (A)= 52,324.66


Monto del Contrato, sin IGV = 532,246.61

Estructuras Ka : 1.006
Arquitectura Ka : 1.086
Instalac. Electricas Ka : 1.019
Instalac. Sanitarias Ka : 1.009

Valorizacin Coeficientes del mes del Reintegro


Pago del Adel. que NO
No Mes Monto Reajuste
en efectivo Corresponde
V K Ka D= V*A/C(K/Ka-1)
ESTRUCTURAS
1 Nov-00 18,029.26 1.006 1.006 0.00
2 Dec-00
3 Jan-01
4 Feb-01
5 Mar-01
SUB TOTAL 18,029.26 0.00

ARQUITECTURA
1 Nov-00 8,304.92 1.086 1.086 0.00
2 Dec-00
3 Jan-01
4 Feb-01
5 Mar-01
SUB TOTAL 8,304.92 0.00

ELECTRICAS
1 Nov-00 0.00 1.019 1.019 0.00
2 Dec-00
3 Jan-01
4 Feb-01
5 Mar-01

SUB TOTAL 0.00 0.00

SANITARIAS
1 Nov-00 0.00 1.009 1.009 0.00
2 Dec-00
3 Jan-01
4 Feb-01
5 Mar-01

SUB TOTAL 0.00 0.00

TOTAL 26,334.18 0.00


CALCULO DE LA AMORTIZACION DEL ADELANTO EN

OBRA: Modulo Basico de Justicia


Contratista: CONSORCIO ASOCIADOS

Adjudicacin Directa N XXX-2000-GCR/XX

Adelanto materiales : S/. 104,649.32


Monto Contratado : S/. 523,246.61

Valorizacin
Monto Amortizacin
No Mes
(V) Anterior

1 Nov-00 26,334.18 0.00


2
3
4
5

TOTAL 26,334.18
ON DEL ADELANTO EN MATERIALES

(Sin / IGV)
(Sin / IGV)

Amortizacin Amortizacin Saldo


Actual Acumulada
0.38856385
10,232.51 10,232.51 94,416.81

10,232.51 10,232.51 94,416.81


CALCULO DE LA AMORTIZACION DEL ADELANTO EN EFECTIVO

OBRA: Modulo Basico de Justicia


Contratista: CONSORCIO ASOCIADOS

Adjudicacin Directa N XXX-2000-GCR/XX

Adelanto en Efectivo : S/. 52,324.66 (Sin / IGV)


Monto Contratado : S/. 523,246.61 (Sin / IGV)

Valorizacin
Monto Amortizacin
No Mes
(V) 10.00% V

1 26,334.18 2,633.42
2
3
4
5

TOTAL 26,334.18 2,633.42


EFECTIVO

Saldo

49,691.24

49,691.24
REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO PARA MATERIALES N 01

Obra: Modulo Basico de Justicia Financiamiento Convenio de Prestamo N XXXX/OC-PE


Contratista: Consorcio ASOCIADOS Monto Contrato C/IGV S/ 617,431.00
Monto AdelantoMateriales C/IGV S/123,486.20
Adjud. Directa: N XXX-2000-GCR/XX DEFLATADO CONDICIONAL

MATERIAL VALORIZACION ADELANTO OTORGADO COEF INDICES ADELANTO ADELANTO DEDUCCION


Indice No Mes Monto Monto s/IGV Fecha de INICID P.Base Adel. Indice Deflacionado Utilizado AMORTIZAC D
V Ad pago Cx% Io Ia Ir F= AdxIo/Ia U= Vx C% UxIa/Io Ux(Ir-Ia)/Io

ESTRUCTURAS
Cemento 1 Nov-00 18,029.26 12,026.97 11/3/2000 0.194 339.22 339.22 339.22 12,026.97 3,497.68 3,497.68 0.00
(21)

Madera nacional 1 Nov-00 18,029.26 28,600.70 11/3/2000 0.062 372.56 376.88 376.88 28,272.86 1,117.81 1,130.77 0.00
(43)

Agreg. Grueso 1 Nov-00 18,029.26 10,560.26 11/3/2000 0.136 190.50 192.81 192.81 10,433.74 2,451.98 2,481.71 0.00
(05)

Acero 1 Nov-00 18,029.26 23,537.65 11/3/2000 0.092 229.75 231.02 231.02 23,408.26 1,658.69 1,667.86 0.00
(03)

Total Estructuras

ARQUITECTURA
Cemento 1 Nov-00 8,304.92 10,385.35 11/3/2000 0.076 339.22 339.22 339.22 10,385.35 631.17 631.17 0.00
(21)

Madera Nacional 1 Nov-00 8,304.92 12,711.86 11/3/2000 0.098 372.56 376.88 376.88 12,566.15 813.88 823.32 0.00
(43)

Total Arquitectura

ELECTRICAS
Tubera de PVC 1 Nov-00 0.00 5,863.03 11/3/2000 0.118 258.10 262.81 262.81 5,757.95 0.00 0.00 0.00
(74)

Total Electricas

SANITARIAS

Tubera de PVC Nov-00 0.00 2,779.61 11/3/2000 0.141 258.10 262.81 262.81 2,729.79 0.00 0.00 0.00
(72)

Tub. De acero Nov-00 0.00 1,774.22 11/3/2000 0.090 203.62 191.27 191.27 1,888.78 0.00 0.00 0.00
Negro
(65)

Total Sanitarias

108,239.65 TOTAL 10,232.51 0.00


CALCULO DE LA CONSTANTE DE REAJUSTES DE PRECIOS
(segn indices unificados de CREPCO)

OBRA : MODULO BASICO DE JUSTICIA


PROPIETARIO :
FECHA BASE : 30 DE ABRIL DEL 2000
FORMULA 01 : ESTRUCTURAS

K = 0.234x(Jr/Jo)+ 0.196x(CBDr/CBDo) + 0.13x(MMr/MMo)+0.236x(AAHr/AAHo)+ 0.204x(GGUr/GGUo)

indice ind.base ind.real


monomio elemento representativo coeficiente % particip
crepco (Abril 2000) (Octu. 2000)
J 47 Mano de obra Inc. leyes sociales 0.234 100.00 258.94 258.94
17 Bloque y ladrillo 0.196 0.51 354.83 354.33
CBD 21 Cemento portland Tipo I 0.196 98.98 339.22 339.22
29 Dlar 0.196 0.51 342.96 354.09
43 Madera nacional para Encof y Carpint 0.130 47.69 372.56 376.88
MM
48 Maquinaria y Equipo Nacional 0.130 52.31 316.40 313.34
03 Acero de Construccin corrugado. 0.236 38.98 229.75 231.02
AAH 05 Agregado grueso. 0.236 57.63 190.50 192.81
37 Herramienta manual. 0.236 3.39 248.49 255.01
GGU 39 Indice general de precios al consumidor 0.204 100.00 277.53 282.71
K

CALCULO DE LA CONSTANTE DE REAJUSTES DE PRECIOS AL MES DEL ADELANTO EN EFECTIVO

indice ind.base ind.Mes adel.


monomio elemento representativo coeficiente % particip
crepco (Abril 2000) (Nov. 2000) *
J 47 Mano de obra Inc. leyes sociales 0.234 100.00 258.94 258.94
17 Bloque y ladrillo 0.196 0.51 354.83 354.33
CBD 21 Cemento portland Tipo I 0.196 98.98 339.22 339.22
29 Dlar 0.196 0.51 342.96 354.09
43 Madera nacional para Encof y Carpint 0.130 47.69 372.56 376.88
MM
48 Maquinaria y Equipo Nacional 0.130 52.31 316.40 313.34
03 Acero de Construccin corrugado. 0.236 38.98 229.75 231.02
AAH 05 Agregado grueso. 0.236 57.63 190.50 192.81
37 Herramienta manual. 0.236 3.39 248.49 255.01
GGU 39 Indice general de precios al consumidor 0.204 100.00 277.53 282.71
Ka

(*) Se utiliza los indices conocidos a la fecha.


GGUo)

K
0.234

0.196

0.130

0.238
0.208
1.006

EN EFECTIVO

Ka
0.234

0.196

0.130

0.238
0.208
1.006
CALCULO DE LA CONSTANTE DE REAJUSTES DE PRECIOS
(segn indices unificados de CREPCO)

OBRA : MODULO BASICO DE JUSTICIA


PROPIETARIO :
FECHA BASE : 30 DE ABRIL DEL 2000
FORMULA 02 : ARQUITECTURA

K = 0.267x(Jr/Jo)+ 0.076x(Cr/Co) + 0.098x(MADr/MADo)+0.075x(CPr/CPo)+ 0.125x(BMPr/BMPo)+0.154x(Dr/Do)+ 0.205(GGUr/GGUo)

indice ind.base ind.real


monomio elemento representativo coeficiente % particip
crepco (Abril 2000) (Octu. 2000)
J 47 Mano de obra Inc. leyes sociales 0.267 100.00 258.94 258.94
C 21 Cemento portland Tipo I 0.076 100.00 339.22 339.22
MAD 43 Madera nacional para Encof y Carpint 0.098 100.00 372.56 376.88
26 Cerrajera nacional. 0.075 66.67 283.82 283.76
CP
51 Perfil de acero liviano. 0.075 33.33 242.67 244.35
17 Bloque y ladrillo. 0.125 47.20 354.83 354.33
BMP 48 Maquinaria y equipo nacional. 0.125 26.40 316.40 313.34
54 Pintura latex. 0.125 26.40 314.77 316.25
D 30 Dlar(general ponderado) 0.154 100.00 342.96 354.09
GGU 39 Indice general de precios al consumidor 0.205 100.00 277.53 282.71
K

CALCULO DE LA CONSTANTE DE REAJUSTES DE PRECIOS AL MES DEL ADELANTO EN EFECTIVO

indice ind.base ind.Mes adel.


monomio elemento representativo coeficiente % particip
crepco (Abril 2000) (Nov. 2000)*
J 47 Mano de obra Inc. leyes sociales 0.267 100.00 258.94 258.94
C 21 Cemento portland Tipo I 0.076 100.00 339.22 339.22
MAD 43 Madera nacional para Encof y Carpint 0.098 100.00 372.56 376.88
26 Cerrajera nacional. 0.075 66.67 283.82 283.76
CP
51 Perfil de acero liviano. 0.075 33.33 242.67 244.35
17 Bloque y ladrillo. 0.125 47.20 354.83 354.33
BMP 48 Maquinaria y equipo nacional. 0.125 26.40 316.40 313.34
54 Pintura latex. 0.125 26.40 314.77 316.25
D 30 Dlar(general ponderado) 0.154 100.00 342.96 354.09
GGU 39 Indice general de precios al consumidor 0.205 100.00 277.53 282.71
Ka

(*) Se utiliza los indices conocidos a la fecha.


0.205(GGUr/GGUo)

K
0.267
0.076
0.099
0.075
0.076

0.125
0.159
0.209
1.086

N EFECTIVO

Ka
0.267
0.076
0.099
0.075
0.076

0.125
0.159
0.209
1.086
CALCULO DE LA CONSTANTE DE REAJUSTES DE PRECIOS
(segn indices unificados de CREPCO)

OBRA : MODULO BASICO DE JUSTICIA


PROPIETARIO :
FECHA BASE : 30 DE ABRIL DEL 2000
FORMULA 03 : INSTALACIONES ELECTRICAS

K = 0.247x(Jr/Jo)+ 0.16x(Dr/Do) + 0.162x(AEr/AEo)+0.118x(Tr/To)+ 0.113x(Alr/Alo)+0.2x(GGUr/GGUo)

indice ind.base ind.real


monomio elemento representativo coeficiente % particip
crepco (Abril 2000) (Octu. 2000)
J 47 Mano de obra Inc. leyes sociales 0.247 100.00 258.94 258.94
D 30 Dlar(general ponderado) 0.160 100.00 342.96 354.09
AE 11 Artefacto de alumbrado exterior. 0.162 100.00 223.54 233.22
T 74 Tubera de PVC para electricidad(SAP) 0.118 100.00 258.10 262.81
Al 12 Artefacto de alumbrado interior. 0.113 100.00 249.32 250.83
GGU 39 Indice general de precios al consumidor 0.200 100.00 277.53 282.71
K

CALCULO DE LA CONSTANTE DE REAJUSTES DE PRECIOS AL MES DEL ADELANTO EN EFECTIVO

indice ind.base ind.mes adel.


monomio elemento representativo coeficiente % particip
crepco (Abril 2000) (Nov. 2000)*
J 47 Mano de obra Inc. leyes sociales 0.247 100.00 258.94 258.94
D 30 Dlar(general ponderado) 0.160 100.00 342.96 354.09
AE 11 Artefacto de alumbrado exterior. 0.162 100.00 223.54 233.22
T 74 Tubera de PVC para electricidad(SAP) 0.118 100.00 258.10 262.81
Al 12 Artefacto de alumbrado interior. 0.113 100.00 249.32 250.83
GGU 39 Indice general de precios al consumidor 0.200 100.00 277.53 282.71
Ka

(*) Se utiliza los indices conocidos a la fecha.


GUr/GGUo)

K
0.247
0.165
0.169
0.120
0.114
0.204
1.019

NTO EN EFECTIVO

Ka
0.247
0.165
0.169
0.120
0.114
0.204
1.019
CALCULO DE LA CONSTANTE DE REAJUSTES DE PRECIOS
(segn indices unificados de CREPCO)

OBRA : MODULO BASICO DE JUSTICIA


PROPIETARIO :
FECHA BASE : 30 DE ABRIL DEL 2000
FORMULA 04 : INSTALACIONES SANITARIAS

K = 0.314x(Jr/Jo)+ 0.141x(Tr/To) + 0.09x(TAr/TAo)+0.072x(PLr/PLo)+ 0.182x(Dr/Do)+0.201x(GGUr/GGUo)

indice ind.base ind.real


monomio elemento representativo coeficiente % particip
crepco (Abril 2000) (Octu. 2000)
J 47 Mano de obra Inc. leyes sociales 0.314 100.00 258.94 258.94
T 72 Tubera de PVC para agua. 0.141 100.00 258.10 262.81
TA 65 Tubera de acero negro y/o galvanizado 0.090 100.00 203.62 191.27
PL 56 Plancha de acero LAC. 0.072 100.00 223.11 226.81
D 30 Dlar(general ponderado) 0.182 100.00 342.96 354.09
GGU 39 Indice general de precios al consumidor 0.201 100.00 277.53 282.71
K

CALCULO DE LA CONSTANTE DE REAJUSTES DE PRECIOS AL MES DEL ADELANTO EN EFECTIVO

indice ind.base ind.Mes adel.


monomio elemento representativo coeficiente % particip
crepco (Abril 2000) (Nov. 2000)*
J 47 Mano de obra Inc. leyes sociales 0.314 100.00 258.94 258.94
T 72 Tubera de PVC para agua. 0.141 100.00 258.10 262.81
TA 65 Tubera de acero negro y/o galvanizado 0.090 100.00 203.62 191.27
PL 56 Plancha de acero LAC. 0.072 100.00 223.11 226.81
D 30 Dlar(general ponderado) 0.182 100.00 342.96 354.09
GGU 39 Indice general de precios al consumidor 0.201 100.00 277.53 282.71
Ka

(*) Se utiliza los indices conocidos a la fecha.


S

1x(GGUr/GGUo)

K
0.314
0.144
0.085
0.073
0.188
0.205
1.009

LANTO EN EFECTIVO

Ka
0.314
0.144
0.085
0.073
0.188
0.205
1.009
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA
OBRA: MODULO BASICO

PRESUPUESTO CONTRATADO: 617,431.00


VALOR REFERENCIAL : 686,034.31
FACTOR DE RELACION : 0.90000
TIEMPO DE EJECUCION DE OBRA
ITEM DESCRIPCION PARCIALES NOV DIC ENE FEB MARZO
28 DIAS 31 DIAS 31 DIAS 28 DIAS 17 DIAS
1.00 OBRAS PROVISIONALES 3,173.04 3,173.04
2.00 TRABAJOS PRELIMINARES 2,530.61 1,265.31 1,265.30
3.00 MOVIMIENTO DE TIERRAS 17,193.74 13,096.38 4,097.36
4.00 OBRAS DE CONCRETO SIMPLE 56,918.35 30,075.81 26,842.54
5.00 OBRAS DE CONCRETO ARMADO 83,151.25 10,016.34 39,418.07 33,716.84
6.00 ALBAILERIA 34,995.25 13,536.16 21,459.09
7.00 REVOQUES 24,523.94 5,885.75 16,138.19 2,500.00
8.00 PISOS 22,084.34 2,299.59 4,784.86 14,999.89
9.00 CONTRAZOCALOS 2,280.65 429.11 1,378.70 472.84
10.00 ZOCALOS Y GUARDILLAS 1,829.95 1,829.95
11.00 PINTURA 20,725.20 3,316.04 17,409.16
12.00 COBERTURAS 47,586.02 6,662.05 25,122.19 15,801.78
13.00 TABIQUERIA 21,230.19 3,396.83 12,313.51 5,519.85
14.00 CARPINTERIA DE MADERA 12,574.22 1,257.42 9,216.31 2,100.49
15.00 CERRAJERIA 1,619.51 1,619.51
16.00 CARPINTERIA METALICA 31,406.95 1,570.35 10,992.44 15,075.34 3,768.82
17.00 APARATOS Y ACCESORIOS SANITARIOS 4,103.03 1,846.38 2,256.65
18.00 VARIOS 4,383.52 4,383.52
19.00 SALIDAS DE INTERIORES(CENTROS Y PARED) 14,735.24 6,778.21 7,957.03
20.00 CAJAS DE PASE 1,615.74 1,615.74
21.00 ACOMETIDAS Y REDES ELECTRICAS 4,877.06 731.58 1,706.98 2,438.50
22.00 TABLEROS DE DISTRIBUCION 2,979.52 2,979.52
23.00 DISTRIBUCION 386.28 386.28
24.00 ARTEFACTOS DE ILUMINACION 9,255.20 1,851.04 7,404.16
25.00 REDES TELEFONICAS Y TELECOMUNICACIONES 4,082.31 2,449.39 1,632.92
26.00 VARIOS 12,962.95 4,086.50 7,862.64 1,013.81
27.00 MOVIMIENTO DE TIERRAS PARA REDES DE 1,647.21 1,647.21
AGUA, DESAGUE Y AGUA DE LLUVIA
28.00 AGUA FRIA 3,454.49 1,105.43 2,349.06
29.00 DESAGUE 4,044.59 2,583.54 1,461.05
30.00 TANQUE DE FIBRA DE VIDRIO 1,656.76 1,656.76
31.00 CISTERNA Y CAMARA DE BOMBEO 3,250.60 1,142.80 2,107.80
32.00 SISTEMA DE EVACUACION DE LLUVIA 5,416.66 1,354.17 2,437.50 1,624.99
33.00 SISTEMA CONTRA INCENDIO 420.75 420.75
34.00 SISTEMA DE RIEGO 620.88 620.88
35.00 CONEXIN A RED EXTERIOR 1,392.00 1,392.00
COSTO DIRECTO 465,108.00 57,626.88 103,950.25 125,274.82 113,900.25 64,355.80
GASTOS GENERALES 15.00% 69,766.20 8,644.03 15,592.54 18,791.22 17,085.04 9,653.37
UTILIDAD 10.00% 46,510.80 5,762.69 10,395.03 12,527.48 11,390.03 6,435.58
PARCIAL 581,385.00 72,033.60 129,937.82 156,593.52 142,375.32 80,444.75
FACTOR DE RELACION = 0.90000 523,246.60 64,830.25 116,944.06 140,934.20 128,137.81 72,400.29
IGV 18.00% 94,184.39 11,669.45 21,049.93 25,368.16 23,064.81 13,032.05

TOTAL DEL PRESUPUESTO 617,430.99 76,499.70 137,993.99 166,302.36 151,202.62 85,432.34


PORCENTAJE PARCIAL 12.39% 22.35% 26.93% 24.49% 13.84%
PORCENTAJE ACUMULADO 12.39% 34.74% 61.67% 86.16% 100.00%
MONTO DE OBRA CONTRATADO:

Monto adelanto efectivo: 10%

fecha adelanto efectivo:

Monto adelanto de materiales:20%

fecha adelanto materiales:

RESUMEN COSTO DIRECTO

ESTRUCTURAS
ARQUITECTURA
INSTALACIONES ELECTRICAS
INSTALACIONES SANITARIAS

TOTAL COSTO DIRECTO


617,431.00 INCLUIDO IGV

61,743.10 inc IGV


52,324.66 s/IGV
11/3/2000

123,486.20 inc IGV


104,649.32 S/IGV
11/3/2000

18,029.26
8,304.92
0.00
0.00

26,334.18

You might also like