Professional Documents
Culture Documents
Note:
The approved updated final settings should be applied and printed out from
the relay by using the software of the relay.
The approved final setting and the printout final setting should be attached
with this test format.
The print out final setting should be signed by SEC AND Contractor.
The following test format contains minimum required tests and some of
settings are mentioned as an example and not as limitation.
3. ELECTRICAL TESTS
Note:
- Open HMI view after connecting to the relay.
- Click STATUS view and save the snapshot in to annexure word
document.
Contact Status
OUTPUT Remarks
Relay De- energized Relay Energized
K3 , K4 Closed ( ) Open ( )
To check time & date go to main menu on the display for 7SD522 then open
system time and adjust time & date.
To test keeping time and date setting this, remove the auxiliary supply from
the relay for approximately ( ) seconds, then restoring the auxiliary supply,
the time and date setting should not be lost.
Result: ____________
3.6.1 MEASUREMENTS
Input CT Applied CT Ratio Displayed Secondary Value Displayed Primary Value (A)
Value (A) Applied (A) (A)
IR 1.0
IY 1.0
IB 1.0
IN 0
Measured Pick
PHASE SETTING IDIFF > (A) Error
Up Value (A)
0.2
0.5
R
1.0
3
0.2
0.5
Y
1.0
3
0.2
0.5
B
1.0
3
Injected current
Phase T-DELAY I-DIFF> Setting (ms) measured Time (ms)
(A)
R
CASE ONE:
1210 (I-DIFF>: pick up value) = A
1213 (I-DIF>SWITCH ON pick up value) = A
1134 (Line Closure) = current flow or manual close BI
1132 (seal in time after all closures) = sec
1130 (pole open current threshold) less than (add.1210) =
Current flow or Manual close BI in state 1 for time more than
address. 1132 after that inject current as per tables below in state
2
(*) inject current in between setting of (I-DIFF> and I-
DIF>SWITCH ON)
Injected current
Setting I-DIFF> R-N Y-N B-N
Time(sec)
Time(sec)
2nd harmonic then the tripping will not blocked and tripping will
be blocked if the setting of cross block changed to yes so the
tripping blocking happen for time 2310.
I>>>> pick
I>>>setting I>>>pick up >>> drop off I>>>>setting I>>>> drop off
up
Setting:
CTR: 1200/1
LOCAL CT ERROR: 3%
REMOTE CT ERROR: 3%
SYSTEM ERROR: 2%
At setting 0.3
Using communication channel between two relays and by injected
current in both relays by 180 ANGLE difference.
SETTING:
CTR:
LOCAL CT ERROR:
REMOTE CT ERROR:
SYSTEM ERROR:
At Setting: 0.5
Current of 1.0A on remote end and 1.0A on local end with 180
phase shift between the two currents. The differential and
restraining currents are observed in both relays.
At setting I-Diff > 0.4
b. In Zone Fault:
c. Charging Current
I diff>PU= A
Indications:
Function Test result
LED: Inter trip send
LED: Inter trip receive
I> BF = A , T1-3pole = , T2 =
Simulate CB closed by activation BI and protection trip for CBF initiation
In such a case it is not necessary to wait for the response of the feeder
circuit breaker. If provision has been made for the detection of such
condition (e.g. control voltage monitor or air pressure monitor), the
monitor alarm signal can be fed to the binary input >CB faulty.
T1 = , T2 = , T3-BkrDefective=
3908 Trip BkrDefect. NO WITH T1-TRIP WITH T2-TRIP WITH T1/T2 - TRIP
T1 MEASURED
T2 MEASURED
T3 MEASURED
T1 = S , T2 = S ,
ADDRESS 3921 End Flt. Stage = ON
ADDRESS 3922 T-EndFault = 0
SIMULATE END FAULT BY APPLY B/I OF CB STATUS AS OPEND
AND B/I BF INTIATION AND INJECT TRIPPING CURRENT.
Note: while testing any stage of over current you have to raise the setting of
the other stages.
Note: for emergency operating mode mode o/c active with the block of
differential the address 2601 = Only Emer. Prot.
T: TRIP TIME
TP: SETTING VALUE TIME MULTPLIER
IP: SETTING VALUE CURRENT
I: FAU LT CURRENT
PHASE SETTING I-DIFF> (A) Measured Pick Up Value (A) Calculated value (A)
R
Y
B
Tolerance 5% of setting
b. Timing test
PHASE Inject current (A) Delay Time (ms) Operating Time (ms)
R 2* I-DIFF> 0.0
Y 2* I-DIFF> 0.0
B 2* I-DIFF> 0.0
Seal in = ms
MEASURED TIME
PHASE SETTING IDIFF>> (A) Measured Pick Up Value (A) Operating Time (ms)
R
Y
B
Setting:
CTR:
LOCAL CT ERROR: 3%
REMOTE CT ERROR: 3%
SYSTEM ERROR: 2%
At setting
Using communication channel between two relays and by injected
current in both relays by 180 ANGLE difference.
b. In Zone Fault:
I> BF = A , T1-3pole = , T2 =
Simulate CB closed by activation BI and protection trip for CBF
initiation
Formula Measured
Calculated Time
Cheractristic Value
Phase T.M.S 2 Is
Sec
R T = 0.14TP / {( I/IP )0.02 1}
Y
B
NORMAL N
INVERSE Y
B
N
Setting:
X= Ohms / Km
Tested by: ENG. Witnessed by: ENG.
Line Length = Km