PTTEP Arthit Field Development Doc. No. A-1-PP-PI-SP-0003 Rev.

B1
Central Facilities
Piping Stress Analysis Specification Page 17 of 23

NORMAL CASES
ASME B31.3 Stresses, Nozzle Loads , Restraint Loads & Hydro-test Restraint loads
Simple System System with added PSV Forces System with Spring Hangers
1 W+D4+T1+P1 (OPE) 1 W+D4+T1+P1+F1 (OPE) 1 W (HGR)
2 W+P1 (SUS) B31.3 Stresses 2 W+P1+F1 (OPE) 2 W+D4+T1+P1 (HGR)
3 WIN1 (OPE) 3 W+P1 (SUS) B31.3 Stresses 3 W+D4+T1+P1+H (OPE)
4 WIN2 (OPE) 4 WIN1 (OPE) 4 W+P1+H (SUS) B31.3 Stresses
5 WW+HP (HYD) Hydro-test Loads 5 WIN2 (OPE) 5 WIN1 (OPE)
6 L2+L3 (OCC) B31.3 Stresses 6 WW+HP (HYD) Hydro-test Loads 6 WIN2 (OPE)
8 L2+L4 (OCC) 7 L2+L4 (OCC) B31.3 Stresses 7 WW+HP (HYD) Hydro-test Loads
9 L1+L3 (OPE) Nozzle & 9 L2+L5 (OCC) 8 L4+L5 (OCC) B31.3 Stresses
10 L1-L3 (OPE) Restraint 10 L1+L4 (OPE) Nozzle & 9 L4+L6 (OCC)
11 L1+L4 (OPE) Loads 11 L1-L4 (OPE) Restraint 10 L3+L5 (OPE) Nozzle &
12 L1-L4 (OPE) 12 L1+L5 (OPE) Loads 11 L3-L5 (OPE) Restraint
13 L1-L2 (EXP) B31.3 Stresses 13 L1-L5 (OPE) 12 L3+L6 (OPE) Loads
14 L1-L2 (EXP) B31.3 Stresses 13 L3-L6 (OPE)
14 L3-L4 (EXP) B31.3 Stresses
Hydro-test load case shall be run
separately with Springs replaced by
Rigid hangers.

BLAST CASE TRANSPORTATION CASE W- Pipe Weight, Insulation Wt,


Stresses & Restraint Loads B31.3 Stresses, Nozzle & Restraint Loads Fluid Wt, Rigid Wt
1 W+D4+T1+P1 (OPE) WNC+D1+D2+D3+U1+U2+U3(SUS) WW - Pipe Weight, Insulation Wt,
2 W+P1 (SUS) Water-filled Wt, Rigid Wt
3 BLAST X (OCC) SLUG CASE WNC - Pipe Weight, Insulation Wt,
4 BLAST Y (OCC) This case is similar to Normal case Rigid Wt
5 BLAST Z (OCC) with added forces. The added forces P1 - Design or Operating Press.
6 L1+L3 (OPE) are Slug forces at pipe elbows. HP - Hydrostatic Test Pressure
7 L1-L3 (OPE) Restraint T1 - Design or Operating Temp.
8 L1+L4 (OPE) Loads SURGE CASE D1,D2 - Deck deflections during
9 L1-L4 (OPE) only This case is also similar to Normal & D3 transportation
10 L1+L5 (OPE) case with added forces. The added D4 - Anchor Thermal Movement
11 L1-L5 (OPE) forces are Surge forces at pipe elbows. F1 - Applied Forces or Moments
12 L2+L3 (OCC) If the system has to be designed for H - Hanger Load
13 L2-L3 (OCC) Stress Check, the effect of surge at one elbow at a WIN1 - X direction Wind Pressure
14 L2+L4 (OCC) Allowable = time, then as many number of cases as WIN2 - Z direction Wind Pressure
15 L2-L4 (OCC) Yield the number of elbows in the system BLAST - Blast Forces in X,Y,Z
16 L2+L5 (OCC) have to be analysed to determine the - X,Y,Z Directions
17 L2-L5 (OCC) worst loads. U1,U2 - Acceleration during
& U3 transportation

OPE - Operating (No code stress


check)
SUS - Sustained case
OCC - Occasional case
EXP - Expansion case
HYD - Hydro-test case
HGR - Hanger Load case