Professional Documents
Culture Documents
1
Develop an action plan for the implementation of the productivity improvement program
that covers 50 enterprises benefiting from the program and document the developments
that took place due to the program implementation.
Develop, lead and support the orchestration of a group of subject-matter experts who are
supposed to grave manufacturing best practice, continuous improvement and process
innovation, to drive workforce productivity and safety whilst driving down cost and
reducing environmental impacts.
Organize collective seminars and workshops covering areas related to Productivity
Improvement such as Industrial Engineering (IE) framework, workforce skills
development, technology orientation and lean manufacturing workshops, Lean cell
design, 6 Sigma, 5S, Kaizen, Black Belt and piloting of the Green Belt workshops, reducing
cycle times, lead times and line manning levels.
Support the subject matter experts and productivity improvement task forces within
enterprises for the deployment of the improvement tools.
Set some measurement tools for measuring and calculating the work-loads of the
manufacturing lines and analytical methods to define material flow, realize new layout;
optimize the performances of the production tools, conceive analysis and follow-up tools.
Develop in collaboration with the subject matter experts, new concepts and techniques
to improve workflow, information and knowledge management
Develop in collaboration with subject matter experts Knowledge Work Productivity
Assessment Methods (KWPAM) and use them to assess workforce productivity. This will
include the following phases:
- Definition of organizations needs and the measuring process.