You are on page 1of 3

Fichtner Consulting Engineers India Private Limited

VENDOR DRAWING REVIEW STATUS


PT. CITRA KUSUMA PERDANA
A. Drawing Approved.
B. Drawing Approved with Comments. Proceed with Fabrication/
H.
Construction Considering Comments.
Information furnished on the drawing is noted and the document/
FICHTNER
drawing is retained for our records
This documents/ drawings have been reviewed as noted with regard to
general conformity with the Contract specifications and requirements. The
Vendor/Contractor is responsible for correctness of design calculation and
details. Approval of this document / drawing does not relieve the
Vendor/Contractor of his responsibility in carrying out the work correctly and
fulfilling the complete requirements of the contract nor does it limit the
purchaser/s rights under the contract.
Letter Ref No.: 3208188-SBME-VDT-700-2775 Date: 14.05.2015
Signature: Initials : MV
PTPLI/WOG to ensure proper
routing of IBD and CBD drains
from each unit of boiler to the
common collection pit. PT. CITRA KUSUMA PERDANA
FICHTNER
TAG. NO. NAME OF EQUIPMENT PIPING PIPING SYMBOLS
PRESSURE CLASS IDENTIFICATION MISCELLANEOUS COMPONENTS
SPECIFICATION RATING
SERVICE IDENTIFICATION
SPECIFICATION RATING
PIPING SERVICE (MEDIUM CODE)
MATERIAL IDENTIFICATION
SPECIFICATION RATING
VALVE
VALVE OPERATION
INSTRUMENT SYMBOL
INSTRUMENT IDENTIFICATION
MACHINERY
M
M
M
PIPE LINE IDENTIFICATION
PT. CITRA KUSUMA PERDANA
FICHTNER

You might also like