01-1011556_J shayne@haynesgroup
R shayne@haynesgroup Repair/Installation Re
Repair/Breakdown
Installation Report
01-1011556
1300 761 822
I/We declare that the above safety assessments were conducted prior to the commencement of these works:
X
Comments
Collected equipment to perform job
Filled in paperwork
Set up access
Cross travel not working
Found circuit breaker tripped
Checked circuits for shorts or unbalanced circuits - ok
Reset circuit breaker and checked operation - ok
Set up lifting frames on beam
Set up chain blocks and slings
Removed tow arm assembly
Lifted hoist
Tried to undo retaining bolts and found to be to tight for allocated tooling
Sourced extra tooling to loosen bolts
Removed cross travel motors to allow access to remove wheels
Separated hoist
Removed grease cover off one wheel, removed circlip and started to remove wheel
Wheel would not come off, as gap was too small
Loosened off counterweight bolts and moved back
Dropped hoist below beam level to enable free access to circlips and wheels
Went to change out first wheel and found that only two wheels which were supplied were correct
Sourced two new wheels
Changed first wheel
Moved EWP into position
Removed circlip, changed next wheel
Repeated process for the rest of the wheels
Lifted hoist back into position
Re-spanned hoist
Moved counterweight back into position
Tightened all bolts
Reinstated cross travel drives
Reinstated tow arm
Removed chain blocks
Removed lifting equipment
Packed up all tooling
Test ran cross travel - all ok
Test ran all functions - ok
LSR/Hour Meter Reading: Also performed during this service (tick): Earth Continuity Check Load Test
Christopher Goulevitch
Certificate of Test I hereby certify that any electrical installation work listed above has been tested in accordance with the prescribed procedures and that such work
complies with the requirements of Section 227 (3) Electrical Safety Regulation 2013. | Electrical Contractors License Number. 65624
The equipment has been function tested and at the time of service is in operational condition: Yes Job Complete: Yes Repairs Quote Required: No
Notes: 1. This report is made following visual inspection only of the equipment in accordance with AS2550.3-2002
2. No responsibility will be taken for unseen internal condition of components
3. Resultant repair work will only be conducted following authorization from the equipment owner
4. This docket should be kept as a record of inspection as required by government legislation
X X
On completion a copy of this report will be emailed to shayne@haynesgroup.com.au Additional Email Address: