You are on page 1of 2
SCHEDULE 1 CONNECTION CHARGES FOR CATEGORY 3 CONSUMER kw MD TYPE OF ‘CONNECTION ‘CONNECTION METERING CHARGE CHARGE (uere the substation | (where the substation bauling and the andi to | asicing isto be but and beleased to TND ata | theland has to, ‘ominal east of RMO or | purchased by TNS a no substation is requied) | "prae agreed withthe unen (a) o © @ RM 250 M400 ten (LowcosT House | (ow cost House ase < RM 25,000) .2/o.8h yo ey C1. Yoo/s

You might also like