Company Profile
2
CONTENTS
Programming and Scheduling Page 17
3
WHO WE ARE
4
SERVICES OFFERED
5
TURNKEY DESIGN & BUILD
Full scope of design and build service from conception and feasibility studies to
handover.
USD 90 100/psf NFA (est.)(based on above average Grade B quality)
Architecture
Specialist Structural
Service Engineer
DESIGN
&
BUILD
Building &
M&E
Civil Works
Finishing
Trades
6
PROJECT MANAGEMENT
Overall project ownership and client representation from pre-feasibility and concept through to
completion and close out.
CCL undertakes all aspects of communication, programme, cost and budget, quality, design, safety,
sustainability, change management and risk.
7
CONSTRUCTION MANAGEMENT
On site management of the construction cycle of the project is essential to ensure the build phase is
delivered in a safe & quality controlled manner, on time and on budget and in accordance with the
agreed design and specifications.
Duration: 32 -36 months
Fees: 2.5% 3% of overall construction cost (est.)
8
DUE DILLIGENCE AND FEASIBILITY STUDIES
CCL can partner with 3rd party service provider to assess on client potential projects viability and
run various option analyses to establish the most suitable and commercially beneficial roadmap .
Common factors under consideration are: Renovation vs. New Built or Project Management vs
Design & Build.
Duration: 3-6 months
Fee: USD 100, 000
9
DUE DILLIGENCE AND FEASIBILITY STUDIES
CCL would recommend the client to carry out feasibility study on river bank construction due to the
close proximity to the river bank . CCL will partner with 3rd party service provider to provide such
services
CCL would recommend the client to carry out the EIA ( Environment Impact Assessment) studies as
this will be the pre-requisite on the authority requirement. CCL will partner with 3rd party service
provider to provide such services.
10
FEASIBILITY STUDY ON RIVERBANK CONSTRUCTION
Selection of concepts for basement structure (if any) and construction method of basement (if any)
A comparison of the concepts with respect to constructability, construction time and risks.
11
EIA (ENVIRONMENTAL IMPACT ASSESSTMENT)
The processes of ESIA Implementation includes
Monitoring, field survey, remote sensing and collecting recent and historical data;
Provision of environmental and social management and monitoring plan by identifying the local, national and
institutional standards.
12
CONSULTANT APPOINTMENTS
CCL has in depth market knowledge of design and construction industry consultants within Myanmar.
We run an in house up to date pre-qualification system for our database of consultants.
We run professional RFPs and seek competitive fees from the most suited consultants for our
clients.
13
CONSULTANT APPOINTMENTS
14
COST AND COMMERCIAL MANAGEMENT
We work to establish our clients project budgets in tandem with the project brief and concept designs.
Subsequently we align all costs to the scope of work and ensure cost & procurement options are well
planned and considered against original budgets/quality and time.
15
PROJECT PROCUREMENT & CONTRACT ADMINISTRATION
Projects can be procured in various ways within the wider construction industry.
Typical methods of procurement include: Traditional Design-Bid-Build; Turnkey Design & Build;
Management Contracting and Commercial Construction Management.
As independent project managers we advocate full transparency during the procurement of our projects,
which is promoted by a Traditional or Commercial Construction Management procurement method.
Duration: 32 36 months
Fees: 0.5% 1% overall construction cost (est.)
16
PROGRAMMING AND SCHEDULING
Projects can be procured in various ways within the wider construction industry.
Typical methods of procurement include: Traditional Design-Bid-Build; Turnkey Design & Build;
Management Contracting and Commercial Construction Management.
As independent project managers we advocate full transparency during the procurement of our projects,
which is promoted by a Traditional or Commercial Construction Management procurement method.
Duration: 32 36 months
Fees: 0.5% 1% overall construction cost (est.)
17
DEFECTS AND FACILITIES MANAGMENT
CCL provides the field investigation for any suspected defect to determine the extent of any problem and
can respond on an emergency basis if needed.
Our expertise is based in extensive construction background and professional licenses in contracting and
engineering.
CCL QA/QC Group has witnessed a vast variety of construction problems and has helped identify issues
of construction defects.
Monthly Flat Fees of USD 10,000 USD 15,000 (est.) pending on scope of services
18
THE VALUE OF A PROJECT MANAGER
19
THE VALUE OF A PROJECT MANAGER
Your Benefits
Risk Management
We anticipate and manage risk relating to your project fundamentals, namely: Certainty of
Time Product and
Cost timing
Planning in advance so that things are done once, and
Quality done right
Value Management
We bring the experience and knowledge to get the best value for money
through:
Optimal value
Value Engineering to get the same for less or more for the same budget for every $
Value Engineering projects to be built quicker spent
Value Engineering projects to be built better
Process Management
20
PROJECT STRUCTURING
Go/No Go
To avoid risk to Owners it is advisable to structure projects in line with these 3 Phases with a formal
Go / No Go review at the completion of each stage and prior to the commencement of the next.
Structuring consultant contracts in line with 3 Phases limits an owners contractual and financial
exposure as you proceed through the project, and minimizes the risk of abortive works claims.
21
PHASE 1 DUE DILLIGENCE/TECHNICAL REVIEW & FEASIBILITY
Review / Develop the Project Brief
Evaluate scope of works and develop a project budget for each major item of
construction
Detailed costs required for
Civil & Structural Works
Infrastructure Requirements (MEP)
Typical Guestroom / Apartment & Circulation Areas
Key Public Facilities Spa, Reception, Restaurants, and etc.
Additional Features and External Work
Value Engineer and finalize an appropriate budget, scope of works and branding
solution
22
PHASE 2 PLANNING, DESIGN AND TENDERING
23
PHASE 3 CONSTRUCTION COORDINATION
Contract Award & Management
Construction Monitoring
Project Handover
Site Security
Waste removal
Contractors Canteens
24
PROJECT DELIVERY METHODOLOGY
Define Design Manage
Achieve
Goals &
Objectives
Highest
High Level Activities Quality
Possible
Lowest
Possible Cost
25
PROJECT DELIVERY METHODOLOGY
26
THE FUNDAMENTALS OF A SUCCESSFUL PROJECT
Carefully select advisors and contractors and engage them on a clearly defined Scope of Works
27
PROVEN TRACK RECORD
CCL is proud of its strong track record in the following types of projects:
Residential
Commercial
Industrial
Infrastructure
28
PROJECTS
REAL ESTATE
29
PROJECTS
Capital City
The development consists of Capital Mall and Residential
Building. The design is based on theme of Nature &
Movement, and created as a prominent skyline.
Landscaping is combination of natural greenery and
flowering water across the site.
REAL ESTATE
30
PROJECTS
Capital Mall
Conveniently located in a developed area, it features a blend of distinct outlets and includes a hyper-mart, cinemas, sports
departmental store and furniture store. It is designed as one-stop family-orientated refreshment and entertainments.
REAL ESTATE
31
PROJECTS
REAL ESTATE
32
PROJECTS
Commercial
33
PROJECTS
Commercial
1 Office tower
1 Hotel/Serviced
apartment block
Residential apartments
34
PROJECTS
Industrial
Monywa Distribution Centre Silo Receiving Warehouse at Diamond Star Flour Mill
REAL ESTATE
35
PROJECTS
Industrial
36
PROJECTS
37
PROJECTS
Infrastructure
FLYOVER FERRY TERMINAL & JETTY PORT
38
PROJECTS
Infrastructure
39
PROJECTS
40
PROJECTS
MCE Soap Factory Ford Car Showroom & Service Mingaladon Warehouse
41
CORPORATE SOCIAL RESPONSIBILITY
42
CORPORATE SOCIAL RESPONSIBILITY
43