MUNICIPIO: ESTADO:
LOCALIZACION
CLAVE CONCEPTO
EJE TRAMO TIPO
ALCANTARILLA ESTACION 0+0
047-E.08 CHAPEO EN EL CORONAMIENTO DE ENRASE, CAJA DE ENTRADA
CON MORTERO DE CEMENTO-ARENA 1:5
(INCISO3.01.02.024-H.07). CAJA DE SALIDA
CHAP001 CHAPEO.
MIPI001
ENERADORES
8.3 M2
25.3 2.15 0.1 5.4395 5.4395 M3
25.3 25.3 M
0 0 0
2 4.15 8.3
1 2.15 2 4.3
12.6 12.6 M2
LARGO ANCHO ALTO PIEZAS
0 0 0 0
0 0 0 0 0
0 0 0 0
0 13.51 M3
LARGO ANCHO ALTO PIEZAS
2 1.42 2 5.68
1 2.15 1.82 2 7.826
13.506
SERVACIONES
PRESUPUESTO BASE
CALCULO:
OBRA: CONSTRUCCION DE ALCANTARILLADO
ING.
ESTADO:
MUNICIPIO:
UNICO 1
P.U
IMPORTE
$
00000
$159.34 $14,073.39
$154.00 $1,940.40
$1,666.84 $22,519.01
$143.52 $1,191.22
$488.49 $2,657.14
$2,656.24 $67,202.87
$125.97 $49,678.00
$272.90 1132.54
TOTAL: $160,394.56
TOTAL: $160,394.56
$160,395.00
NUMEROS GENERADORES
MUNICIPIO: ESTADO:
LOCALIZACION
CLAVE CONCEPTO
EJE TRAMO TIPO
ALCANTARILLA ESTACION 0+0
047-E.08 CHAPEO EN EL CORONAMIENTO DE ENRASE, CAJA DE ENTRADA
CON MORTERO DE CEMENTO-ARENA 1:5
(INCISO3.01.02.024-H.07). CAJA DE SALIDA
CHAP001 CHAPEO.
MIPI001
ENERADORES
8.3 M2
17.5 2.15 0.1 3.7625 3.7625 M3
17.5 17.5 M
0 0 0
2 4.15 8.3
1 2.15 2 4.3
12.6 12.6 M2
LARGO ANCHO ALTO PIEZAS
0 0 0 0
0 0 0 0 0
0 0 0 0
0 13.51 M3
LARGO ANCHO ALTO PIEZAS
2 1.42 2 5.68
1 2.15 1.82 2 7.826
13.506
SERVACIONES
PRESUPUESTO BASE
CALCULO:
OBRA: CONSTRUCCION DE ALCANTARILLADO
ING.
ESTADO:
MUNICIPIO:
UNICO 1
P.U
IMPORTE
$
00000
$159.34 $11,276.97
$154.00 $1,940.40
$1,666.84 $22,519.01
$143.52 $1,191.22
$488.49 $1,837.94
$2,656.24 $46,484.20
$125.97 $18,945.13
$272.90 1132.54
TOTAL: $105,327.41
TOTAL: $105,327.41
$105,328.00
NUMEROS GENERADORES
MUNICIPIO: ESTADO:
LOCALIZACION
CLAVE CONCEPTO
EJE TRAMO
ALCANTARILLA ESTACION
047-E.08 CHAPEO EN EL CORONAMIENTO DE ENRASE, CAJA DE ENTRADA
CON MORTERO DE CEMENTO-ARENA 1:5
(INCISO3.01.02.024-H.07). CAJA DE SALIDA
CHAP001 CHAPEO.
5) DE Fc=300 KG/CM2.
UMEROS GENERADORES
ALIZACION
LONGITUD ANCHO ALTO PIEZAS RESULTADO TOTAL OBSERVACIONES
TIPO
ALCANTARILLA ESTACION 0+00000000
3 8.5 25.5
51 M2
3 8.5 25.5
51 M2
LARGO ANCHO ALTO VOLUMEN
8.5 8.5 4.5 325.125
LARGO ANCHO ALTO
13.8 6 3 248.4
94.35
LARGO ANCHO ALTO PIEZAS SUMA
CHAP001 CHAPEO.
5) DE Fc=300 KG/CM2.
TOTAL:
FECHA PLANO
UNICO 1
P.U
IMPORTE
$
00
$159.34 $3,029.85
$154.00 $5,636.40
|
$1,666.84 $157,266.35
$143.52 $7,319.52
$125.97 $9,665.05
$272.90 $6,958.95
$2,010.37
$94,839.20
TOTAL:
$284,715.33
$284,716.00
LONGITUD DE LA OBRA
OBRA VIAL _________________________________________
TRAMO ______________________________________ DE Km________________A Km_______________
SUBTRAMO ______________________________________ ORIGEN____________________________________
l/T1 M= Q=
(l/T1) - S M1= M2=
F1= F1= F2=
h1= Q= QS=
d1=
L1=
0=
ELEVACION DE LA PLANTILLA
DATOS COMPLEMENTARIOS
COLCHON EN EL CL M;
CLASIFICACION DEL TERRENO
ALTURA PROMEDIO M
______________________
______________________
Espesor de la carpeta:____________ m.
la obra vial______________ %
w1( izq).___________________%
w2 (der).__________________%
l/T2
(l/T2) - S
F2=
h2=
d=
L2=
B=