HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC) (HIRARC/ISFDKL-1)

Department & Exact Location Of The Work Performed: Warehouse Work Description: Forklift Charging

Risk Assessment Team (Name/s): Mr Barry, Mr Nathanael Approved By Safety & Health Department:
(Name, Date & Signature)

Date Conducted: 17/08/2017 Next Review Date:

Hazard Identification Risk Assessment Risk Control

1a. 1b 1c. 1d. 2a. 2b. 2c. 2d. 3a 3b 3c 3d 3e 3f

S/N Work activity Hazard Possible Accident/ Ill Existing Risk Severity Likelihood RPN* Additional Risk Control Measures Severity Likelihood RPN* Follow up by (name) Remarks
health to persons, fire Control & date
or property loss
Strict requirement that only competent
drivers may operate lift trucks to be
explained to all staff. Disciplinary
The vehicle crashing action to
All operators trained be taken against anyone involved in
Operation of into
1 Daily Forklift Operation and competent for breaking
Forklifts other vehicles and/or
use of the lift truck this rule
other objects;

Separate pedestrian entrance(s) with


Staff and visitors Warning signs protective barrier rail. Forklift is to
Operation of
2 Daily Forklift Operation being hit located around the remain in marked laneways.
Forklifts
by lift trucks; traffic route. Forklift is to be stopped if pedestrians
in vicinity.

Charging Forklift Fire Bulk storage


of easily burnt Fire extinguishers
3 materials located throughout -
warehouse

Ignited through
electrical fault, Fire extinguishers Ensure fire extinguisher is placed at
4 Charging Forklift Fire smoking materials, located throughout charge point and that power isolator is
battery recharging warehouse clearly marked.
etc

6
Risk Assessment Matrix
Risk Prioritisation Number = Severity x Likelihood

Severity Table

Pt Severity level Workplace Safety Workplace Health Environment Fire Damage Downtime Incurred

Acute Poisoning,
Fatality, More Than $10 More than 1 year for
Failure of Major Spills to Outside Campus
single or multiple million damages full re-instatement
Bodily Functions
5 Critical
Permanent Body
Infection with No Infection - outside
Injury or Loss of Use
Known Cure Campus area
for more than 30 days

Moderate exposure,
Injury requiring 30 days
Reversible injury to Spills to Outside More Than $1 More than 3 months for
of hospitalisation and/or
Bodily Functions on Building million damages full re-instatement
medical leave
prolong recovery
4 Very Serious
Temporary Body Injury
Infection with Infection - outside
or Loss of Use for more
Known Cure but Building area but within
than 10 days but not
extensive treatment Campus
exceeding 30 days

Mild exposure,
Injury requiring 10 days Reversible injury to
Spills to Outside More Than $100k More than 1 month for
of hospitalisation and/or Bodily Functions
Laboratory/Room damages full re-instatement
medical leave with less than 30
3 Serious days recovery

Temporary Body Infection with Infection - outside


Injury or Loss of Use Known Cure but Laboratory area but
for up to 10 days extensive treatment within building

Very Mild exposure,


Injury requiring Reversible injury to Spills to Outside
More Than $10k More than 5 days for
maximum of 3 days of Bodily Functions Workplace but within
damages full re-instatement
medical leave only with less than 3 days laboratory
recovery
2 Marginal

Temporary Body Infection with Infection - outside


Injury or Loss of Use Known Cure but workplace but within
for 3 days or less treatment needed Laboratory

Very Mild exposure,


Reversible injury to
Spills within Workplace Less than $5k No significant
First aid treatment only Bodily Functions
only damages downtime
with less than 3 days
1 Negligible recovery

No Infection or infection
No or superficial injury No Exposure with no effects within
workplace

Likelihood Table
Pt Likelihood level Likelihood of Occurrence / Exposure Criteria

5 Frequent Likely to occur many times per year


4 Moderate Likely to occur once per year
3 Occasional Might occur once in three years
2 Remote Might occur once in five years
1 Unlikely Might occur once in ten years

Risk level Determination - 5 x 5 Matrix


SEVERITY
Critical Very Serious Serious Marginal Negligible
(5) (4) (3) (2) (1)

Frequent 25 20 15 10 5
Operation not Operation not Review at
(5) permissible permissible High priority appropriate time Risk acceptable

Moderate 20 16 12 8 4
(4) Operation not Operation not High priority Review at Risk acceptable
permissible permissible appropriate time
LIKELIHOOD

Occasional 15 12 9 6 3
(3) High priority High priority Review at appropriate Risk acceptable Risk acceptable
time

10 8
Remote Review at Review at 6 4 2
(2) appropriate time appropriate time Risk acceptable Risk acceptable Risk acceptable

Unlikely 5 4 3 2 1
(1) Risk acceptable Risk acceptable Risk acceptable Risk acceptable Risk acceptable

Review the risk assessment records every year or whenever there are changes in processes, work activities or upon
any incident occurrence, whichever is earlier.

Action Table
Colour Score Risks Action

Operation not Permissible


16 - 25 High Stop operation & review controls. If necessary abort
experimentation.

High priority remedial action


12 - 15 Warning Proceed with extreme caution with PI present at all times.
Implement additional (secondary) controls immediately. Review
within 7 days. Emergency control measures shall be in place.

Take remedial action at appropriate time


8 -10 Medium
Proceed with care. Additional control is advised. Review shall be
implemented within 30 days.

Risk acceptable: Residual risk

If possible, risk reduction should be further considered,


1-6 Low particularly severity.

There are no imminent dangers. Frequent review shall be in place


especially changes in procedures, materials or environment.
Instructions for using the HIRARC form

Header Fill up all sections in the header of the HIRARC form.


Note 1: Discuss with your supervisor/reporting officer on the next review date for the HIRARC . Normally the next review
date is up to one year ahead. The
HIRARC is also reviewed: (1)
When there are changes in work processes/activities (2)
After any accidents/incidents Note 2:
Check your Division rules about team or individual submission for HIRARC

Column 1b Describe the work activity to be carried out. Note:


Please do not fill in names of machines/equipment to be used.

Column 1c Identify hazard(s) associated with the activity to be carried out.


Examples of hazards include chemical, biological, electrical, mechanical, physical, ergonomics, psychosocial, slip & fall etc.

Column 1d Identify possible accidents/ill health associated with each identified hazard.
Examples of possible accidents/ill health include fires, explosions, cuts, burns, frost bites, fractures etc.

Column 2a Indicate risk control measures that are already in place to eliminate or minimise risks.
Methods to control risks may be analysed according to the Hierarchy of Controls: Elimination, Substitution, Engineering
Controls, Administrative Controls and Personal Protective Equipment (PPE).
Elimination of the hazard should take first priority while PPE should be the last line of defence.
Elimination
Example: Use water
based solvents instead of organic based solvents
Substitution
Example: Use a less toxic solvent
Engineering Controls
Example: Use of fume cupboard or gloves boxes
Administrative Controls
Example: Work instructions. Good laboratory practices. Training on proper use of
chemicals PPE
Example: Use of safety eyewear plus respiratory
protection, use of gloves
Column 2b S=Severity
Severity is the degree or extent of injury or harm caused by the hazards, or as a result of an accident. Choose the most likely
severity from a value between 1 and 5, rather than the most extreme. Refer
to the Risk Matrix tab for the severity table

Column 2c L=Likelihood
Likelihood of occurance of an accident, incident or ill health is defined as the probability that the said accident, incident or
ill health will happen. Choose the likelihood from a value between 1 and 5. Consider the records of such events happening in
the past when deciding on the likelihood. Refer
to the Risk Matrix tab for the likelihood table

Column 2d RPN=Risk Prioritisation Number


RPN=Severity X Likelihood All
RPNs should not be more than 6

Column 3a Additional risk control measures are required when the RPN indicated in column 2d exceeds 6. If
the RPN is 6 or less, enter "NA" in the column

Column 3b S=Severity S may


reduce upon introduction of additional control measures

Column 3c L=Likelihood
L may reduce upon introduction of additional control measures

Column 3d RPN=Risk Prioritisation Number


RPN will reduce upon introduction of additional control measures

Column 3e Enter the name of the person appointed to oversee the implementation of the additional control measures.
Enter the follow-up date.

Column 3f Enter any remarks


HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)
Department & Exact Location Of The Work Performed: PP2 Work Description:

Risk Assessment Team (Name/s): Barry & Tan SL Approved By Safety & Health Department: Barry
(Name, Date & Signature)

Date Conducted: 25.03.2015 Next Review Date:

Hazard Identification Risk Assessment Risk Control

1a. 1b 1c. 1d. 2a. 2b. 2c. 2d. 3a 3b 3c 3d 3e 3f

S/N Work activity Hazard Possible Accident/ Ill Existing Risk Severity Likelihood RPN* Additional Risk Control Measures Severity Likelihood RPN* Follow up by (name) & Remarks
health to persons, fire Control date
or property loss

a. Use slip resistant floor surface in area Tan SL


where oil, water or dust create slipping
hazard
b. Ensure suitable footware
is chosen - refere to suppliers for selection
Rubber Boot / of footweat for different type of surface
1 Fat Blend Preparation Slippery floor Fall down 3 4 12 3 3 9
Safety Boot d. Ensure
area is free from oil - housekeeping

Tan SL
Monthly check / preventive maintenance Maintenance team
2 Stems exposure Hot air generate Skin Burn insulation 3 4 12 2 3 6
should be carried out in monthly basis.

Monthly checks should be carried out and Tan SL


3 Hot Water Haze generate Hot insulation 3 4 12 2 3 6 Maintenance team
findings recorded
Renovation will be carried out month of Tan SL
June - please advise contractor to provide Maintenance team
4 Pipe Line to close Congested 3 4 12 adequate space for employees to work at 3 3 9
this area wothout any risk.

Renovation will be carried out month of Tan SL


June - please advise contractor to provide Maintenance team
adequate space for employees to work at
5 Work Place congested Congested 3 4 12 this area wothout any risk. 3 3 9

a. All workers must attend audiometric test Tan SL


every year to determine if occupational
hearing loss is being prevented by
the noise management control measures

6 Drain Balance Oil from blending tank High Noise Level Ears Injuries Earmuff 3 4 12 b. Limiting the amount of time 3 3 9