You are on page 1of 6

Date :- 01 July 2010

To
Ajanta Bottlers & Blenders Pvt Ltd
96 – 99B & 105 – 107B,
Tupudana Industrial Area
Hatia, Ranchi - 834003
Jharkhand.

Kind Attn : Mr. S. Chatterjee - Director

Sub : Offer for Pressure Reducing Station for the new plant expansion.

Dear Sir,

We thank you for the courtesy extended during my visit to your plant on 01 st July 2010.
With reference to above subject and as per our study of the plant, we are pleased to
submit our proposal for effective pressure reduction in the main stream header for the
different process.

Observation during plant study

It is observed that the old steam pressure reducing station is not in use from a long time.
Also since plant expansion is taken place, hence the dimensions of the old PRS is not
match with existing required dimensions, so it is recommended that to go with the new
pressure reducing station with all required dimensions.

Post our visit to site and subsequent discussions we are pleased to offer our quote for
Pressure Reducing Station as below.

Pneumatic Operated Arca Pressure Reducing Station comprising of the following


Design pressure of the boiler is 10.54kg/cm2 and capacity is 3 ton

3 bar
8to 10bar

80 NB inlet 150 NB outlet


80NB Robotor, Inlet Pressure Gauge, Inlet 80NB Isolation piston Valve, 80NB Strainer,
80NB Moisture Separator with drain trap Assembly, 150NB Outlet Isolation piston Valve,
80NB Bypass Isolation piston Valve, Safety Valve, Outlet Pressure Gauge and all
Interconnecting piping with ready to mount flanged connection.

Unit Price :-
With control valve with roboter =
With control valve with positioned PID Type =

Air Venting
Before to go with the concepts of air venting we must have to see the Barriers to Heat
Transfer without the air venting with the temperature profile.

It is too often overlooked that when steam is first admitted to a line after a period of shut
down, the pipe will usually be full of air. Further amounts of air and other non-
condensable gases will enter with the steam, although the proportions of these gases
are normally very small compared to the steam. Nevertheless, these gases will
accumulate within the pipe, and in the steam spaces of the heat exchangers, when the
steam condenses, unless steps are taken to discharge them.

Automatic air vents for steam systems are nothing more than thermostatic steam traps,
fitted above the level of any condensate, so that only steam, air or air/steam mixtures
can reach them. They are usually best located at the ends of the steam mains and the
larger diameter branches. The above slide shows the use of a tee piece to provide
convenient air venting and condensate drainage connections.

The discharge from the air vent can be piped to any safe place. In practice, it often is
taken into the condensate line, when this is a gravity line falling towards a vented
receiver.

It should be noted here that the subject of "Air Venting" of steam using appliances is
dealt with in the training package "Steam Trapping and Air Venting".
Balanced Pressure Air

steam Main line / header

Thermodynamic Steam Trap with


optional Blowdown and for ease of
maintenance a universal coupling
Air

Unit Price = Rs. 9600 (Ex Works PUNE)

Sr. Position Quantity


No.
1 At the End of the Main Steam line 1
Just after the main Line.
2 On the Main Header 1
3 Top of the all 5 process tanks 5

Total Price = Rs. 67200 (EX Works Pune).

Condensate Recovery Pump

During the observation and continuous discussion with the Mr. Chatterjee it is found that
in the earlier capacity of the plant there is no condensate recovery done. We like to
quote the condensate recovery pump unit for recovering the condensate from the
process and fed to the feed water tank and take the maximum utilization of the
condensate temperature.
Advantages of PPPU condensate recovery system.
1) No use of electricity, it is self acting,
2) Can feed max. Achievable temp. To the feed water tank.
3) This is a steam operated automatic pump which is unaffected by high
temperature of condensate and will transfer condensate immediately on receipt.
4) Moreover since this pump is steam operated, cost of operation and maintenance
is negligible.
The problems facing with the condensate recovery by the centrifugal pump.
1) Centrifugal pump cannot transfer fluid more than 70 deg.c,
2) Extra Electricity consumption to run centrifugal pump,
3) Cannot transfer maximum condensate temperature in the feed water tank, hence
fuel consumed to heat lower temp. water is more,
4) Cannot measure the exact quantity of the condensate coming from the plant.
Total Steam utilization in to the plant approx. 2700kg/hr. condensate from the plant is
collected into the PPPPU and then it feded to the Feed Water Tank.Avg. Hight Of Feed
Water tank 6m.

Unit Price =
Condensate recovery pump with 50 Nb Inlet and 50 Nb Outlet.
= RS. 2,22,000 ( Ex. Works Pune)

DEAERATOR HEAD IN FEED WATER TANK


Deaerators head in the feed water tank is used to ensure thorough mix feed water,
condensate and flash steam and also to remove the dissolved gases like O2 present in the
water. Deaerators are designed to remove dissolved gases from the boiler feed water they
are effective & oxygen can be reduced to trace levels. The water enters the Deaerators &
is broken into a spray or mist & scrubbed with steam & hot condensate return to force out
dissolved gases. The released gases are then discharged to atmosphere through the vent
outlet. This not only reduces in the cost of chemicals but also limits the increase in boiler
TDS due to such chemicals.

Unit Price= Rs. ( Ex Workes Pune)

Steam Flow Meter


Also it is found that there is no steam flow meter for measuring the actual steam
generation in to the plant. So for that we like to recommend that the every plant should
have the steam flow meter and like to offer you the same.
The main benefits for using steam flow metering include:

 Monitoring Specific Fuel / Specific Steam Consumption

 Monitoring Steam : Fuel Ratio and understanding Boiler Efficiency

 Diagnostic Tool towards Accurate Control of Energy Management

 Monitoring Individual Equipment / Section Efficiencies

 Identification of Major Steam Users

 Better Process Control


 Final Product Costing

Unit Price = 80 NB Accuflow Meter without MCI 2000 (MIN. 270 KG/hr max.
6000Kg/hr.) = RS. 2,23,000 (EX Works Pune)
Side Display = Rs. 9000

COMMERCIAL TERMS & CONDITIONS


PRICE
Ex-works, Pune. Packing & forwarding Charges @ 2.5%. Excise Duty (@10.30% at
present or as applicable at the time of dispatch), sales tax @ 2% at present against "C”
Form and any other taxes and duties will be extra as applicable at the time of dispatch.
Freight will be charged extra at actual on ‘FREIGHT TO PAY’ basis.
Insurance to be arranged by you at your cost.
EXCISE
The following information are required for dispatch of material:

a. Your Excise registration no.


b. Full address of your Jurisdictional Superintendent.
c. Full address of your Jurisdictional Assistant Commissioner.
d. Collectorate.
PAYMENT
30% advance with order and balance 70% against proforma prior to before dispatch.
DELIVERY
7 - 8 weeks from the date of our Order Acknowledgement.
VALIDITY
30 days from our date of offer.
ROAD PERMIT
Please send the Road Permit along with Purchase Order. In case you are unable to give the same
please provide the names of your authorized transporters operating from Pune who will accept and
carry the materials without Road Permit.
ORDERING INFORMATION
Kindly place the order on our manufacturing unit:
Spirax Marshall Pvt. Ltd.
Mumbai Pune Road
Kasarwadi
Pune 411 034
Also Forwared a Copy to
Forbes Marshall Pvt. Ltd.
5A, Orient Row,
Near Park Circus Maidan,
Kolkata 700017. (W.B.) India
We are sure that you will find the above in line with your requirement. We now look forward to your
advice as to how we can proceed further in this regard towards finalization of your requirement.

Thanking you and assuring you of our best attention at all times, we remain for SPIRAX
MARSHALL PVT. LTD.
Aditya Birewar
08981311558