You are on page 1of 19

Purchasing Power Appendix 8

WRI Request for Proposal

This resource accompanies the recommendations of Purchasing Power: Best Practices Guide to
Collaborative Solar Procurement, co-published by Joint Venture: Silicon Valley Network, the
World Resources Institute and Optony. The Best Practices Guide assists commercial and
government entities in the process of organizing and executing a collaborative solar purchase.
Readers are encouraged to tailor these resources and sample documents to the needs of their
individual initiatives. This tool did not undergo the formal external review typical of WRI
documents, but suggestions for improvement are welcome. To reach the authors with feedback or
questions, please refer to the contact information available at www.wri.org/buying-solar.

This resource is Appendix 8 WRI Request for Proposal. It is intended for use in Steps 6-7 of
the Best Practices.

This document is the redacted version of the RFP that was issued by WRI for The Collaborative
Solar Project. Items [in brackets] have been redacted to generic terms. This document can serve
as a useful reference for any collaborative purchasing initiative, but should be heavily tailored to
fit the initiatives participant needs, probable vendor audience, and target market segments. The
Microsoft Excel sheet also titled as Appendix 8 was issued as part of this RFP to solicit pricing
from bidders in a standard format, which is recommended.

1
Request for Proposal

The Collaborative Solar Project:


Accelerating the Rate and Scale of Solar PV Deployment
through Demand Aggregation

2
A. Introduction..............................................................................................................................3

B. Overview..................................................................................................................................4
1. Issuers..............................................................................................................................4
2. Roof top systems..............................................................................................................4
3. Confidentiality.................................................................................................................4
4. Purchasing Model............................................................................................................4
5. Vendor Evaluation Criteria..............................................................................................5
6. Timeline...........................................................................................................................5

C. RFP Requirements...................................................................................................................6
1. Company Information......................................................................................................6
2. Project Experience...........................................................................................................6
3. Experience in the Region.................................................................................................6
4. Financial Information......................................................................................................6
5. Sub Contractors...............................................................................................................7
6. Site Visit Schedule...........................................................................................................8
7. Facility Bids.....................................................................................................................9
8. Additional Questions.......................................................................................................9
9. Timeline...........................................................................................................................9
10. PPA Contract Language...............................................................................................9

Appendix 1: About the World Resources Institute........................................................................10

Appendix 2: Site Schedule.............................................................................................................11


1. Company A........................................................................................................................12
2. Company B........................................................................................................................22
3. Company C........................................................................................................................26
4. Company D........................................................................................................................28
5. Company E........................................................................................................................29

Appendix 3: Scope of Services......................................................................................................31


1. General...........................................................................................................................31
2. PV Panel, Inverter, and Other Plant Component Specifications...................................31
3. Installation.....................................................................................................................31
4. Interconnection..............................................................................................................32
5. Commissioning and Acceptance Testing.......................................................................32
6. Monitoring.....................................................................................................................32
7. Rebates, Incentives, and Subsidies................................................................................33
8. Operations, Maintenance, and Reporting......................................................................33
9. Permitting fees & Application process..........................................................................34

Appendix 4: Bid Sheet...................................................................................................................35

3
A. Introduction
On behalf of [participating companies in the Green Power Market Development Group] the
World Resources Institute (WRI) is requesting proposals from potential vendor partners with
expertise in designing, procuring, installing, and commissioning rooftop solar power systems to
provide commercial and industrial customers with renewable power.

This request for proposal (RFP) is issued by WRI in its role as convener of the Green Power
Market Development Group (GPMDG), the Green Power Group California Affiliates (GPG-
CA), and US Climate Business Group (USCBG), on behalf of participating corporations. For
information on WRI and its affiliated partnerships please refer to Appendix 1.

This RFP is meant to secure information necessary to place on-site solar photovoltaic (PV)
systems across the rooftops of multiple corporate facilities in the Northern California area. By
aggregating the demand for on-site solar photovoltaic (PV) systems across neighboring
businesses, the Issuers endeavor to:
Increase the scale and accelerate the rate of deployment of solar technologies
Encourage corporations to invest in on-site renewable power generation
Support technology advancements
Reduce greenhouse gas emissions

4
B. Overview
1. Issuers
The World Resources Institute issues this RFP on behalf of the following participants:
[Company A]
[Company B]
[Company C]
[Company D]
[Company E]

These companies will collectively be referred to as the Issuers hereinafter. Through this
RFP, the Issuers seek proposals on the feasibility and benefits of deploying solar power
generation across an aggregated set of corporate facilities.

A site schedule from the Issuers is provided in Appendix 2.

2. Roof top systems


This document describes 19 potential sites with approximately 1.2 million square feet of flat
roof space in Northern California.

The potential sites are all located within an approximate 15 mile radius. The facilities span
the towns of Palo Alto, Cupertino, Santa Clara, Fremont, Newark, Union City, and San
Ramon in California. For all facilities, the Issuers own the facility or lease the facility with
roof rights included.

Details of the roofs and aerial photos can be found in Appendix 2.

3. Confidentiality
As vendors have signed a NDA with WRI in advance of reviewing the content in this RFP
document, all metering and facility data should be considered confidential. Vendor bid
packages will not be shared outside of the Issuers and WRI.

4. Purchasing Model
The Issuers wish to maximize cost-effective solar power at the facilities listed on the Site
Schedule (Appendix 2). They have agreed to make their roof space in the Northern
California area available in aggregate to maximize economies of scale and synergies from the
proximity of the facilities.

Aggregate Pricing
All pricing data submitted as part of the proposals will be considered part of an aggregate
purchase and understood to be different from pricing if the Issuers decided to pursue
disaggregated purchases for individual sites.

Both PPA and Turnkey Purchasing Models


5
When providing bids, vendors should include price quotes for:
$/kWh for a 10-year Power Purchase Agreements
$/kWh for a 15-year Power Purchase Agreements
$/watt installed for a turnkey development

A template bid sheet can be founding Appendix 5 and is available in softcopy format from
WRI.

Installation Time Frame


All pricing should be based on the assumption that systems will be placed in service within 9
months of contract finalization. Final contracts will include Issuer obligations as well as
vendor development milestones that ensure timely execution and construction of solar
projects resulting from this RFP.

5. Vendor Evaluation Criteria


Vendors will be evaluated on their experience, track record, financial condition, choice of
technology, and pricing. Based on RFP responses, solar vendors will be scored across a
series of criteria. Each criterion is weighted based on the relative importance of the
characteristic to the group.

The evaluation attributes and their respective weights are:

COMPANY Weight
Track record: yrs experience, references, scale, success 2.00
Bay Area experience 1.00
Financial condition & ability to secure financing 2.00
PRICING & TECHNOLOGY Weight
Pricing & terms 2.00
# of facilities included in proposal 0.50
Total MW included in proposal 0.50
Installation timeline 0.25

Based primarily on the criteria above, the Issuers will select a single vendor to provide solar
installations and fulfill the terms of their proposal. That single vendor will sign contracts
with each Issuing company.

6. Timeline
Milestone/Action Item Date
Request for Proposal released 4/20/09
Site Visits 4/27/09 to 5/8/09
RFP Responses due 6/12/09

6
C. RFP Requirements
All responses and inquiries should be sent to:
Christopher Lau
World Resources Institute
clau@wri.org

RFP Response requirements are as follows:

1. Company Information
a. Name of organization
b. Mailing address
c. Name of primary contact
d. Contact title
e. Contact email
f. Contact phone number
g. Contact address (if different from mailing address)
h. Legal status (corporation, partnership, joint venture, etc.)

2. Project Experience
Proposals shall include a brief description of the vendors 3 largest completed solar
projects/programs. The description for each project/program should include:
a. The project name
b. Year placed in service
c. Project size (total cost and project capacity in kW)
d. Project type turnkey or third party energy sales
e. Up-time of project
f. Location
g. Name of project manager
h. Name of client contact
i. Brief physical description of the project (equipment manufacturer, model, etc.)

3. Experience in the Region


Please provide a short description of your level of experience implementing projects in the
municipalities of the Bay Area and in the state of California. Please include information on the
number of PPA transactions for roof-top PV that have you completed in the state.

4. Financial Information
Selecting a financially viable partner is critical to the Issuers. Please submit financial statements
certified by a reputable accounting firm as accurately presenting the financial position of your
company in accordance with generally accepted accounting principles.

The financial data submitted for this RFP will not be shared beyond the Issuers and WRI.
7
5. Sub Contractors
Please provide a list of the contractors you anticipate working with to complete this project. For
each contractor, please include the following:
a. Company name
b. Contact information
c. Description and expected function

8
6. Site Visit Schedule
Zip
Company Meeting Address City Code Visit Date Visit Time Point of Contact Email

Vendors will have the opportunity to visit all 19 sites. A site visit schedule is listed above. Please email the company contact to
indicate that you will be attending the site visit and the number of people from your company in attendance.

Company A will schedule each vendor individually. Please contact [Contact Person] at Company A to setup a facility evaluation time.

Metering data will be provided at the time of the site visits.

9
7. Facility Bids
Vendor proposals should include bids for all sites where competitively priced solar power can be
provided. Vendors are not required to bid on every facility.
All pricing data submitted as part of vendor proposals will be considered part of an aggregate
purchase and understood to be different from pricing if the Issuers decided to pursue
disaggregated purchases for individual sites.
As part of your proposal, please complete the Bid Sheet in Appendix 4. Note that pricing
assumes that the Issuers retain ownership of RECs and Issuers will provide their own property
insurance for the solar power system.

8. Additional Questions
a. Describe the cost impact of the solar vendor retaining REC ownership.

b. What are your assumptions for REC pricing over the life of the PPA?

c. Describe cost impact of having vendor supplied property insurance for the solar power
system.

d. Describe how a 20-year PPA would affect financing and pricing.

e. Describe how you plan to use stimulus funds from the American Recovery and
Reinvestment Act on this Collaborative Solar Purchase, if at all.

f. Describe how the volume of roof space impacted your pricing, if at all.

9. Timeline
Vendor proposals should include an estimate timeline for deployment. The timeline should
define the timetable from the date of a signed contract.

10. PPA Contract Language


Vendor proposals should include a copy of their standard contract language as part of their
proposal.

10
Appendix 1: About the World Resources Institute
The World Resources Institute (WRI) is an environmental think tank that goes beyond research
to find practical ways to protect the earth and improve peoples lives.

Through its Green Power Market Development Group, the Green Power Group California
Affiliates, and the US Climate Business Group, WRI works closely with energy professionals to
develop strategies for companies to thrive in a carbon-constrained economy. Partners develop
greenhouse gas (GHG) management systems, share energy management practices and invest in
clean energy.

In addition, the partnerships build the business case for green power by identifying and analyzing
viable renewable energy projects. Since January 2001, the Green Power Market Development
Group has facilitated the development of over 700MW of new green power projects.

For more information on WRI, see:


http://about.wri.org

For more information on the GPMDG, see:


http://www.thegreenpowergroup.org

For more information on the US Climate Business Group, see:


http://www.wri.org/project/us-climate-business

11
Appendix 2: Site Schedule
Facility Roof Age Roof
Number Company Location ID Street Address City State Zip Code Roof Space (yrs) Type / Materials
1
2
3
4
5
6
7
8
9
10

11

12

13

14
15
16
17

18

19

Site Information Provided in Original RFP

12
Nb: For each site, the RFP provided the site address, and aerial photos of site roof, in addition to site information above. This
information has

13
Appendix 3: Scope of Services
1. General
The vendor shall design, engineer, install, and operate grid-tied solar PV systems on the
roof tops at Issuer facilities, taking into consideration the proposed installation sites; facility
electrical demand and load patterns; available solar resources; installation costs; all
applicable zoning ordinances; municipal, state, and federal requirements; and other relevant
factors.

The vendor shall identify an appropriate location for the solar PV inverter equipment and its
related components and environmental control systems that will meet the following criteria:
Ease of maintenance and monitoring
Efficient operation
Low operating losses
Secured location and hardware
Compatibility with existing facilities

The vendor shall secure from governing agencies and the utility company all necessary and
required rights, permits, approvals, and interconnection agreements at no additional cost to
Issuer. Issuer will become the signatory on applications, permits, and utility agreements
only where necessary and subject to the sole determination and discretion of Issuer.

The Issuers maintain the right to approve all design documents and add requirements on
compatibility with existing power infrastructure.

The vendor shall complete and submit in a timely manner all documentation required to
qualify each system for all available rebates and incentives which should be included in the
cost component of the RFP.

2. PV Panel, Inverter, and Other Plant Component Specifications


The vendor shall install PV panels, inverters and other components that meet the applicable
state regulations. In addition to meeting state regulations, vendors shall install PV panels
that meet a minimum performance of 225kWh/m2 per year, assuming the total insolation is
not less than 1,600kWh/m2/year.

3. Installation
The vendor shall supply all equipment, materials, and labor necessary to install the solar PV
systems and integrate them with other power sources. The integration of the system to
buildings and operators must be approved by the building owners. The vendor will engage
a Structural Engineer to ensure that live and dead loads added by the PV system will not
14
exceed the permissible loads for the respective buildings. Age of the roof will also be
considered as a design factor. The supplier must ensure that throughout the project, Issuer
assets (ie roofing, etc) will be protected and that the vendor is responsible for any damage
sustained during the installation process and the remainder of the contract period.

4. Interconnection
The vendor shall supply and install all equipment required to interconnect the solar PV
systems to the transmission and distribution system. The vendor shall fulfill all application,
study, and testing procedures to complete the interconnection process. All costs associated
with utility interconnection shall be borne by the vendor. All electrical interconnections
must be performed in accordance with all local, state and federal applicable safety
regulations. The Issuer and/or its independent engineer will need input and oversight as to
how the PV system interconnects into the issuers site distribution system.

All direct and associated costs including, but not limited to, application and special facility
interconnection fees and other costs paid to the utility will be the responsibility of the
vendor.

If the vendor intends to subcontract any portion of the work to third parties, the vendor will
identify those third parties in its proposal and the corresponding work to be performed.

5. Commissioning and Acceptance Testing


During the start-up, Issuer and/or its independent engineer shall observe and verify each
systems performance. Required commissioning and acceptance test services include:
Starting up the solar PV systems until it achieves the performance requirements of
the power sales agreement;
Conducting the successful delivery of power within thirty days following
completion of a system;
Coordinating acceptance by local utility companies.

6. Monitoring
The vendor shall provide a monitoring program that allows Issuer to monitor, analyze and
display historical and live solar electricity generation data for installed sites. The system
will allow Issuer to track progress toward the renewable goal for all the systems for each
Issue company as well as monitor performance against the warranted production
requirements on a site-by-site basis. The regularly collected data should reflect, but not be
limited to, the following:
System performance
System availability
Average and accumulated output
15
Capacity factor
Degradation

The data acquisition system shall be designed for turnkey, remote operation. Data shall be
transmitted via Internet, satellite, or telephone from each site to a server managed by the
vendor. Data storage (on a current and cumulative historical basis), management and
display will be the responsibility of the vendor. The data acquisition system must not
require that a dedicated or always-on personal computer be located at each site and are
subject to the review and approval of Issuer System Information team. Vendor must
coordinate with the Issuers information technology (IT) department to provide the data
link, which must be operational at commissioning.

Additionally the data acquisition system shall provide Issuer the ability to integrate live and
historical solar energy information for individual systems into participant websites.

The overall monitoring program and systems shall be established by the completion of the
first system installed for Issuer. The cost associated for providing the above-referenced
monitoring and data collection system shall be separately itemized in the proposal.

7. Rebates, Incentives, and Subsidies


Issuer will in many cases base its purchase decisions upon the availability of state or federal
Subsidies or tax credits for projects (Project Subsidies). If Project Subsidies are not
available at the levels initially contemplated, Issuer will reserve the right to cancel its
contractual relations with the Vendor without obligation as long as construction has not
begun. In cases where the Vendor takes the risk of availability of Project Subsidies and
those Project Subsidies are not available despite the Vendors efforts to obtain them, the
Vendor will be permitted to cancel a project prior to initiating installation but not thereafter.

8. Operations, Maintenance, and Reporting


Proposals must outline the projects expected O&M requirements, including the proposed
method for monitoring, diagnosing and tracking the energy output over the entire life of all
installations. This data must be accessible for reporting purposes.

The respondent must describe in any proposals how it intends to satisfy the following
requirements. The vendor must track logs of the following maintenance procedures:
During the initial term of operation and any extension thereof, the respondent will
be responsible for all maintenance, repairs, and parts, both scheduled and non-
scheduled. The minimal maintenance requirements include:
o Every three months, drive-by inspections of all modules, verification of
proper fan operation on each inverter, and checking/ cleaning the inverters
heat sinks as needed;
16
o Every six months, check the inverter enclosure seals for damage, visually
inspect condition of all inverter cables and connections; and
o Annually, check module ground connections and
o Every two years, perform a complete array electrical performance
verification.
Projects must have a real-time self-monitoring capability to alert operators and
maintenance personnel to potential problems or required maintenance needed.
Upon the indication of any problems, the vendor will inspect the site and perform
any necessary repairs.
The vendor shall submit Quarterly Energy Production and Operational Status
Reports no later than the 30 days after the end of each calendar quarter for a period
of initial term of operation and any extension thereof from Commissioning. Each
report shall include the following information:
o Time period covered by the report
o Operational status of any projects components (modules, inverters,
transformers)
o Description of any unusual operational events that occurred during the
quarter
o Description of any unusual weather events that occurred during the quarter if
they impact production
o Description of improvements, expansion or repairs to any projects during the
quarter
o List of needed and/or planned improvements, expansions or repairs
o Energy production for the quarter and cumulative to-date
o Degradation comparison to projected performance
o Description of any ownership, management, energy sales, or REC sales
changes during the quarter
o Name and contact information for the individual responsible for preparing
and submitting the report
o Copies of any engineering reports or independent evaluations of any projects
completed during the quarter
o Final Report Requirements to funding agencies (expected due date is 30
days after commissioning)
o Maintain reasonable remote site security, including upkeep of proposed
video or other measures. Interface with insurance company in event of
trespassing, vandalism, natural act, or other cause for claim

9. Permitting fees & Application process


The services provided by the vendor must include, but not be limited to, securing all required
permits, applications, and approvals from governing agencies. The services must also include

17
all labor, taxes, services, and equipment necessary to fully commission and operate a functional
PV system at the designated Issuer sites.

18
Appendix 4: Bid Sheet

(Refer to file Bid.Sheet.xls)

19