Appendix-A
Mazdoor (Unskilled)
L-29 Day 1.00000 368.00 368.00
b) Machinery
100.000 15971.0
M-092 Compensation for earth taken from private land cum 159.71
00 0
TOTAL 25308.78
say 253.09
Say 417.34
od167065/2016_2017 :Filling up low lying and water logged areas with local material/quarry muck, spreading
in layers, leveling the top at site and consolidation by ramming etc complete
280500.00
MR Soil Gravel Mixture / Quarry Waste cum 300.00000 935.00
2944.00
L-29 Mazdoor (Unskilled) Day 8.00000 368.00
TOTAL 284420.80
say 948.07
Say 1051.19
Mazdoor (Unskilled)
L-29 Day 1.00000 368.00 368.00
b) Machinery
P&M-
Water tanker 6KL capacity hour 2.00000 200.00 400.00
165
12.0000
M-189 Water Kilo litre 13.00 156.00
0
100.000 15971.0
M-092 Compensation for earth taken from private land cum 159.71
00 0
TOTAL 25864.78
say 258.65
Say 426.00
SUBHEAD : 1.0
1.10.1
Haulage excluding Loading & Unloading
Haulage of materials by tipper excluding cost of loading, unloading and stacking.
Case-I : Surfaced Road
Unit = t.km
Taking output 10 t load and lead
10 km = 100 t.km
a) Machinery
Tipper
P&M-
10 t capacity, Haulage with load hour 0.4 225.00 90.00
173
P&M- Tipper
hour 0.29 225.00 65.25
173 10 t capacity, Empty return trip
TOTAL 155.25
%>
Add Overhead @ 10.0% 0.15
Say 2.69