You are on page 1of 27

PHILIPPINE GREEN BUILDING CODE COMPLIANCE CHECKLIST

10 ENERGY EFFICIENCY GB Code Developer Regulator Regulator


Design Compliance Construction Compliance
Required
Item Philippine Green Building Code Requirement Applicability value Design Value Document Document
Documentation needed Design Specification Relevant Documentation needed
Provided? Provided?
Building Envelope Yes/No Yes/No Remarks Yes/No
Required? Complied?
10.1.1 Air Tightness & Moisture Protection
Ocular Inspection &
a Sealed window and door assemblies Bay wall sections Verification
Enlarged details of building
Applies to all envelope showing required
b Sealed utility services air tightness & moisture Product labels
building occupancies
except building and protection elements
spaces without air-
conditioning system Building elevations &
c Sealed walls sections Brochures & Catalogs

d Sealed roofing Not Complied Technical specifications of Shopdrawings


required air tightness &
e Sealed ceiling Not Complied moisture protection
elements As-built Drawings
f Sealed flooring Not Complied

Design Value Documentation


Document Document
10.1.2 Glass Properties Use SHGC
Design Specification Relevant Documentation
Calculator needed Provided? needed Provided?
Architectural floor plans, Ocular Inspection &
a Solar Heat Gain Coefficient (SHGC) 0.24 Building elevations & Verification
Applies to all sections
building occupancies
b Visual Light Transmittance (VLT) without exceptions 0.35 Window Schedule Product labels
WWR Computation Table Brochures & Catalogs
Window Glass Shopdrawings
specifications
As-built Drawings

Applies to all Operable Document Document


10.1.3 Natural Ventilation building occupancies Window Design Value Documentation Design Specification Relevant Documentation
without exceptions Calculator needed Provided? needed Provided?

Architectural floor plans,


a Operable windows or balcony doors at least Applies to regularly Ocular Inspection &
10% Not Complied Building elevations &
10% of room space floor area occupied spaces
sections
Verification

b Operable window with safety features Window Schedule Product labels


Operable Window Brochures & Catalogs
Computation Table
Window Details on Shopdrawings
operation & safety
As-built Drawings
Required? Complied? Documentation Document Document
10.1.4 Building Envelope Color Design Specification Relevant Documentation
needed Provided? needed Provided?
Applies to all
a Building metal roof surface color white or building occupancies
Roof plan Ocular Inspection &
with min. SRI of 70 without exceptions Verification
Technical specs of roof Product labels
Brochures & Catalogs
Shopdrawings
As-built Drawings
Thermal Document Document
10.1.5 Roof Insulation Resistance Design Value Documentation Design Specification Relevant Documentation
Calculator needed Provided? needed Provided?

a Roof insulation at least R-8 in thermal Ocular Inspection &


Applies to all R-8.0 1.17 Roof plan & section
resistance Verification
building occupancies
without exceptions Technical specification of Product labels
insulation
Roof Insulation Brochures & Catalogs
Computation Table
Shopdrawings
As-built Drawings
Electrical Systems Yes/No Yes/No Remarks Yes/No
Required? Complied? Documentation Document Document
10.6.1 Daylight Provision Design Specification Relevant Documentation
needed Provided? needed Provided?
Applies to all Architectural floor
regularly occupied Ocular Inspection &
a Window plans,roof plan, building Verification
spaces of all building elevations & sections
occupancies except
b Light Shelf building spaces Product labels
where daylight
c Clerestorey access hinders Brochures & Catalogs
d Skylight intended functions Daylight provision details Shopdrawings
e Light monitor/light scoop
As-built Drawings
f Other devices
12 MATERIAL SUSTAINABILITY GB Code Developer Regulator Regulator
Design Compliance Construction Compliance
Required
Item Philippine Green Building Code Requirement Applicability value Design Value Documentati Documentati
Documentation needed Design Specification Relevant Documentation needed
on Provided? on Provided?
Required? Complied?
12.1 Non-Toxic Materials Yes/No Yes/No Remarks Yes/No

Paints, coatings, ashesives and sealants shall Architectural floor plans,


elevations and sections Ocular Inspection &
a have no VOC or within tolerable levels as per showing callouts and ID Verification
Table 14 tags of materials
Applies to all
building occupancies
b Composite wood with no urea formaldehyde without exceptions
Room Finish Schedule Product labels
c No other materials with harmful content Technical specs/MSDS Brochures & Catalogs
Non-Toxic Materials Shopdrawings
Confirmation Table
Material Safety Data Sheet
(MSDS)
13 SOLID WASTE MANAGEMENT GB Code Developer Regulator Regulator
Design Compliance Construction Compliance
Required
Item Philippine Green Building Code Requirement Applicability Design Value Documentati Documentati
value Documentation needed on Design Specification Relevant Documentation needed
Provided? on Provided?
MRF floor area
13.1 Material Recovery Facility (MRF) Calculator Yes/No Yes/No Remarks Yes/No

Architectural floor plans & Ocular Inspection &


a 0.00 0.00
Verification
MRF with minimum floor area as per Table 15 site development plan
b MRF fully enclosed & easily accessible showing location of MRF Product labels
Applies to all
building occupancies
Solid waste containers for 4 types of waste; without exceptions MRF Floor Area
c compostable; non-recyclable; recyclable; Computation Table Brochures & Catalogs
special
Technical specifications for
d For hospitals, isolated bins for hazardous the MRF Shopdrawings
wastes
As-built Drawings
14 SITE SUSTAINABILITY GB Code Developer Regulator Regulator
Design Compliance Construction Compliance
Required
Item Philippine Green Building Code Requirement Applicability Design Value Documentati Documentati
value Documentation needed on Design Specification Relevant Documentation needed
Provided? on Provided?
Required? Complied?
14.1 Site / Ground Preparation and Earthworks Yes/No Yes/No Remarks Yes/No

a Building site and erosion control Applies to all Site Erosion and Ocular Inspection &
building occupancies
b Pollution mitigation and construction safety Sedimentation Control Plan Verification
per Rule XI of the NBC without exceptions
c Storm water collection management plan Technical specifications in Shopdrawings
support of the erosion &
d Storm water collection facilities control plan As-built Drawings
14.2 Open Space Utilization USA Calculator Design Value
Applies to all Ocular Inspection &
a Minimum 50% of the required Unpaved building occupancies 50% Not Complied Site Development Plan
Verification
Surface Area (USA) shall be vegetated without exceptions
Technical specifications Shopdrawings
USA Computation Table As-built Drawings
DECLARED BY Signature Signature Signature

(Name of Design Professional)


DECLARED BY Signature

(Name of In-charge of Construction)


VERIFIED BY Signature Signature Signature

(Name of LGU OBO Checker)


gulator
on Compliance
GB Measure Applied

Yes/No Remarks

GB Measure Applied

GB Measure Applied
GB Measure Applied

GB Measure Applied
Yes/No Remarks

GB Measure Applied

gulator
on Compliance
GB Measure Applied

Yes/No Remarks

gulator
on Compliance
GB Measure Applied

Yes/No Remarks
gulator
on Compliance
GB Measure Applied

Yes/No Remarks
SHGC CALCULATOR
Building Elevations Gross Net Window MAXIMUM MINIMU Horizontal
Wall Area Glazing Wall Ratio REQUIRED M VLT Overhang
(m2) Area (m2) (%) SHGC Depth (m)

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
100% 0.24 0.35 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
TOTAL 0.00 0.00
Return to Architectural GB Checklist
Height from D/H Correction Vertical Distance from D/H Correctio ADJUSTE
Window Sill to Factor Fin Depth Opposite n Factor D SHGC
Bottom of (m) Window Edge
Overhang (m) to Fin (m)

0.00 0.0 1 0.00 0.00 0.0 1 0.24


OPERABLE WINDOW CALCULATOR
Frequently Occupied Building Space Floor Area Required Operable Window Area
Delete Unused Rows (m2) (Min. 10% of Floor Area) (m2)
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Return to Architectural GB Checklist
Designed Operable Window Area Not Complied
(m2) 100
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
THERMAL RESISTANCE CALCULATOR
Building Roof / Deck Component Thickness (mm) R-Value per 25.44 mmTotal Insulating Value
Outdoor surface, any position, moving air NA NA 0.25
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
Horizontal Indoor Surface NA NA 0.92
TOTAL 1.17
Return to Architectural GB Checklist
MRF FLOOR AREA CALCULATOR
Building Use Building TGFA Computed Required MRF Floor Area
(m2) (m2)
0.00 0.00
Return to Architectural GB Checklist
Designed MRF Provision
(m2)
0.00
Not Complied
UNPAVED SURFACE AREA CALCULATOR
Building Use/Occupancy Lot Area Required Total Open Designed Total Open
(m2) Space Space
(m2) (m2)

0.00 0.00 0.00


Not Complied 2 Not Complied
Return to Architectural GB Checklist
Required Minimum USA as per GB Code Required Designed USA
NBC Minimum USA w/ w/Vegetation
(m2) Vegetation (m2)
(m2)
0.00 0.00 0.00
Not Complied
Required Complied YesNo Provided ElevationsInsulation
Required Complied Yes Provided North Polyisocyanurate
Not Required Not Complied No Not Provided Northeast Polyurethane
Exempt Not Applicable East Closed cell spray foam
Southeast Phenolic foam
South Urea formaldehyde foam
SouthwestPlastic fiber
West Mineral fiber
NorthwestCementitious foam
Polystyrene
Fiberglass
Rockwool
Rigid foam
Cellulose
Open cell spray foam
Sheep's wool
Hemp
Cotton
Loose cellulose
Mineral wool
Straw
Vermiculite / Perlite
Reflective bubble foil
Poured Concrete
R-Value / Inch (25.44 mm) Use/Occupancy Requirement
5.6 Residential 0.0006
5.6 Hotel 0.0006
5.5 School 0.005
4.8 Hospital 0.0012
4.6 Office 0.001071429
4.3 Mercantile/Retail 0.00375
4.2
3.9
3.8
3.7
3.7
3.6
3.6
3.6
3.5
3.5
3.4
3
2.8
2.4
2.4
1
0.08

You might also like