Issue 1 | 2010 SG MY
We are very pleased to through cost effective GRIDFLEX, the new alumi- PERI is continuously striving
present PERI Asias first engineering solutions with nium grid slab formwork to deliver the best quality
edition of the PERI Scope better safety and higher system has been developed products and services to our
covering interesting con- productivity. for flexible, fast and safe customers. We thank you for
struction sites in Singapore residential construction and your trust in our ability to
and Malaysia. Falling from height is the is currently being introduced do so and are looking forward
number one accident on into the Singapore market. to working with you on future
Over the years, we have construction sites. PERI has construction projects.
achieved and sustained our successfully introduced The high durability and reus-
position as market leader innovative products such ability of PERI formwork
in the local formwork market. as the RCS P (Rail Climbing systems has also helped our
As a partner of the con- System Protection) to customers to reduce wast-
struction industry, we are allow for safe working from age of resources and play an Bernd Kieslich
committed in helping our height, resulting in increased active part in sustaining our Managing Director
customers to achieve a productivity and reduced environment. PERI Asia Pte. Ltd.
successful project outcome construction costs.
Midview City is a huge inte- PERIs formwork systems been able to achieve a 15 formwork systems are being
grated business hub which has started in the middle of day cycle per floor despite used jointly for the construc-
sits on a land area of over January 2009. not being able to work tion of the core walls of the
552,000 sq ft. It is situated beyond 6.30 pm, as the site buildings.The project has
in the central part of Singa- For slabs, the contractor is near to a residential area. been scheduled to be fully
pore at Bright Hill Drive. uses PERIs PD 8 table sys- For columns, the VARIO completed by December
The development will have tem which is very suitable GT 24 Column formwork 2009.
six 8-storey blocks and one for constructing large slab system with dimensions of
3-storey terrace block with areas. More than 8,000 m 800 mm x 800 mm x 3.60 m
more than 1.38 million sq ft of formwork area have been has been utilised. Finally, Contractor
of prime business space. supplied for constructing the CB 240 climbing system Yee Hong Pte. Ltd.
Field Service
Construction work using slabs. The contractor has and VARIO GT 24 Wall
PERI ASIA Pte. Ltd., Singapore
2
Fast and crane-independent solution
with PERI RCS Rail Climbing System
Sky@eleven Condominium, Singapore
Contractor
Tiong Seng Contractors (Pte.) Ltd.
Field Service
PERI ASIA Pte. Ltd., Singapore
Allan Moreno,
Senior Formwork Engineer:
The SRS Steel Circular
Column is fast and highly
efficient as it allows the
casting of a 15 m high
column to be done in one
cast, previously almost
unheard of in the local
industry.
Construction work on the climbing devices and hydrau- completely encloses the Stacking Tower is being used
luxurious Sky@eleven con- lic pumps that allows crane- slab edges. Consequently, for shoring of the transfer
dominium project located at independent climbing as site personnel are protected beams of up to a height of
Thomson Lane has begun in and when necessary. With against the risk of falling 25 m. For slabs, the contrac-
July 2007. The development this self-climbing feature, from height and strong tor is using the light weight
owned by Singapore Press the RCS is able to improve winds at all times. This im- SKYDECK aluminium slab
Holdings Ltd will have 265 productivity and saves on provement in safety would formwork system for easy
large apartments and eight expensive crane operations. help to increase productivity and tireless erection and
duplex penthouses when The RCS can also be fitted on the construction site. early striking with the drop-
completed in 2010. For this with protection panels that Besides the RCS, the ST 100 head.
project, the contractor is
The robust and quick assembling shoring of transfer beams up to The fast and crane-independent
using PERIs SRS Steel
ST 100 Stacking Towers were used for a height of 25 m. RCS Rail Climbing System.
Circular Column formwork
to construct 15.80 m high
columns for the condomi-
nium. It is the first time this
formwork system is being
used in Singapore and cas-
ting of a column of such
height in one pour was
almost unheard previously
in the local industry.
3
Multiple Advanced Formwork Systems
for a World Class Development
Resorts World Sentosa, Singapore
Resorts World Sentosa (RWS) is one and is located on Sentosa Island, resort will have include Southeast
of the two integrated resorts currently covering an area of 49 hectares. Asias first and only Universal Studios
being built in Singapore and is sched- theme park, six hotels with different
uled to be open in early 2010. The Built at a cost of S$ 6.59 billion, some themes and the worlds largest ocean-
resort is owned by Genting Singapore of the attractions and facilities the arium.
Contractor
Kajima-Tiong Seng Joint Venture
Field Service
PERI ASIA Pte. Ltd., Singapore PERI TSE
Quick striking of shaft formwork
4
A world class integrated resort in the Edwin Lee,
making.
Senior Project Manager:
Given the massive volume of structure works and
fast track nature of the Sentosa IR project, usage of PERI
has helped us achieved productivities three times that of
conventional for varying heights of 6 m to 12 m! Even the
sub-contractors are greatly surprised with the producti-
vities their workers are achieving with the PERI systems.
The speed and ease of handling of the ST 100 The ST 100 Stacking Towers could achieve a 14 days
Stacking Towers resulted In higher productivity. cycle for a 1,000 m area at the RWS.
Kajima Overseas Asia Pte. Ltd. and work area of over 800,000 m, a variety achieving off form finish quality
Tiong Seng Contractors (Pte.) Ltd. have of PERIs formwork systems are being without compromising on their high
formed a joint venture and won the used. The SKYDECK aluminium slab productivity of a three day cycle for
contract to build three of the six hotels formwork is used in combination with a stretch of 25 m x 9 m wall-pour.
in RWS. The contract also include MULTIPROPs to achieve maximum
building the resorts main thoroughfare productivity and flexibility for applica- Other PERI formwork systems that
known as Festive Walk, a casino located tions varying from 3 m to 6 m floor were used in the project were also able
beneath the Crockfords Tower and a height. A seven days cycle time could to deliver high productivity and these
1,600-seat Festive Grand showroom be achieved for a 1,000 m area. include the ST 100 Stacking Towers
within Festive Hotel. (14 days cycle for 1,000 m area),
Using the TRIO 3.30 m x 2.40 m SRS Steel Circular Column (one column/
To meet the challenges of this fast panels, retaining walls were easily cast day/mould) and the CB 240 climbing
track project with a massive total form- for heights of up to 9 m in one pour system (three days per cycle).
PERI SKYDECK
Early striking after 2 days
60
5
Efficient and safe working conditions
up to nearly 230 m
Asia Square Tower 1, Singapore
Contractor
Hyundai Engineering &
Construction Co., Ltd.
Field Service
PERI ASIA Pte. Ltd., Singapore
Kim Ju-Han,
Asia Square Tower 1 is loca-
Construction Manager:
ted along Marina View at
the Marina Bay area. It is the We have been able to
first of a twin-tower deve- achieve a 5 days per floor
lopment that will have two cycle with the ACS and
million m of office space, a RCS climbing systems.
280-room five-star hotel and I would recommend the
60,000 m of retail space. use of PERI formwork
systems for their speed,
For columns, the VARIO safety features as well as
GT 24 Column formwork good technical support.
system is being used for
typical floor height of 3.60 m of PD 8 table system and Climbing Systems. The ACS R the RCS P Climbing Protec-
and up to a maximum height PERI MULTIPROP system with its high load capacity, tion Panel is being used as a
of 12.60 m. For slabs, the are being used for casting is being used as an external protection screen around the
ST 100 Stacking Tower is of the typical floors. platform with a platform tower to protect the workers
being used for heavy load length of up to 15 m and against falling from height.
shoring of up to a height For corewalls, more than formwork height of 4.70 m. Both the ACS and RCS uses
of 12.37 m (from 1st to 3rd 4,500 m of formwork area On the other hand, the RCS a specialised hydraulic-ena-
storey) and 9.20 m (from are being used. These Formwork Scaffolding is bled machinery to climb
3rd to 6th storey) respectively. include the VARIO GT 24 being used for the internal and thus, do not require the
In addition, more than Girder Wall Formwork platform up to a platform use of cranes which could
5,200 m of formwork area system, the ACS and RCS length of 9.75 m. For safety, be utilised for other usage.
6
High productivity
with system formwork
Marina Bay Financial Centre, Singapore
Contractor
Kajima-Tiong Seng
Joint Venture
Field Service
PERI ASIA Pte. Ltd.,
Singapore
Masashi Yamamoto,
Construction Manager:
We have achieved a five day cycle
per floor (2,880 m for slab and 4,100 m
for corewall). The system formwork has
allowed for higher speed, productivity
and a safe work environment!
7
Self-climbing technology and large slab tables
minimise crane times
Marina Bay Sands, Singapore
Furthermore, the individual floors are formwork are quickly and safely moved
also offset from one another in a longi- with only one crane lift. By means of a
tudinal direction. lifting mechanism and the chain guid-
ance shoe for transferring the force at
Only two cranes per tower are avail- the slab edge, the table can be pulled
able to the construction crews. Thus, horizontally from the building and then
PERI engineers created crane-inde- lifted immediately to the next shutter-
pendent and crane-saving formwork ing position.
solutions for the core walls and floor
slabs respectively. With the help of Using MULTIPROP aluminium slab
ACS self-climbing technology and props, a large lowering height is
The three concave-shaped hotel towers dominate the large-area SKYTABLE slab tables, achieved with slab offsets of up to
the city skyline and each has 55 floors that will be
crews can finish a complete floor with 20 cm and, at the same time, 50 cm
connected using the Sands SkyPark on the roof at
a height of nearly 200 m. a standard height of 3.00 m in only parapet wall heights, this is an enor-
four days. In order to be able to achieve mous advantage. In addition, the
this, the elevator shafts are climbing MULTIPROP props can be connected
Although the three hotel towers are three cycles in advance. For the 25 cm by means of MRK frames in order
still identical with regard to the height reinforced concrete slabs, a total of to form towers. Thus, SKYTABLE
and number of floors, the forms of the 110 SKYTABLE slab tables are required tables can be flexibly used for the
respective building elements never- for constructing two complete floors in intermediate storey heights of almost
theless have considerable differences each case. With SKYTABLE large-area 9.00 m as well. From the outset,
in terms of the base width, curvature slab tables, which are up to 20 m long PERI engineers took into considera-
radius and lateral offset dimension. and 5 m wide, close to 100 m of slab tion the continuously changing geo-
8
metry with their solution and used dimensions ranging between 2.30 m
an unchanged SKYTABLE framework and 10.10 m can be shuttered, struck
construction for the entire height of and climbed in four day cycles without
the building. This has meant that any the need of a crane. Altogether, five
table modifications required has been safe and secure working levels climb
kept to an absolute minimum, and at the same time to the next section:
time-consuming, costly conversion two platforms for forming, reinforce-
work which could lead to misapplica- ment work and concreting the shaft
tions have been avoided as far as walls as well as three finishing plat- Ahn Yoon Chul,
possible. forms for pre-tensioning the subsequent Engineering Manager:
storey slabs. In combination with CB PERI has provided us with very fast
The ACS self-climbing system is the climbing scaffold and the VARIO GT 24 and good technical support from all
optimal formwork scaffolding for girder wall formwork, ACS has thus levels of its organisation. From the
the altogether twelve elevator shafts optimised the operational sequences in-house design team, on site support
constructed in advance. With the help on the construction site. and all the way from the PERI HQ in
of ACS, the different-sized shafts with Germany.
9
Main contractor A top down view of the two horse- Yap Kok Keong,
Sembawang Engineers & shoe-shaped theatres.
Formwork Supervisor
Constructors Pte. Ltd.
Sub-contractor (Wai Fong Construction Pte. Ltd.):
Wai Fong Construction Pte. Ltd. PERI formwork systems are fast and
Field Service easy to use. They have also enabled
PERI ASIA Pte. Ltd., Singapore
us to save up to 50 per cent time and
manpower.
55.34 (Theatre 2)
63.32 (Theatre 1)
18.55 18.55
RCS Rail Climbing System in the formwork system in the foreground. A typical section view of A plan view of the two theatres
background and VARIO GT 24 Wall the RCS platform. with the complicated shape.
The walls of the Marina One of the key challenges handling of formwork extre- PERIs formwork systems.
Bay Sands theatres are faced by the contractor mely difficult. In spite of The 4,000 seating capacity
constructed using PERIs was the horseshoe-shaped the difficulties, the contractor theatres are expected to
RCS Rail Climbing System theatre walls having incorpo- was still able to achieve a be ready in 2010.
and the VARIO GT 24 Wall rated columns protruding casting cycle of two to
formwork system. non-radially, resulting in very three days per wall panel
sharp angles which made (excluding M&E work) using
10
Customised Solution
for Safe and Fast Construction
Sentosa Monorail Mobile Protection Platform, Singapore Contractor
Kajima-Tiong Seng Joint Venture
Field Service
PERI ASIA Pte. Ltd., Singapore
Contractor
Kienta Engineering Construction Wong Kim Choy,
Pte. Ltd. Senior Project Engineer:
Field Service PERI formwork systems save
PERI ASIA Pte. Ltd., Singapore
time and labour. Less clean-
ing of the formwork is needed
and the quality of the finished
concrete is also good.
A nine storey data centre is x 5.55 m x 3.00 m. The 2nd A particular section of the measuring 1.50 m x 1.50 m
currently being built for phase of the project involved building also required the x 4.50 m were used. Finally
SingTel at Kim Chuan Road. the use of a variety of form- PD 8 table system to be for the liftcore walls, a com-
The 1st phase of the con- work systems. For slabs, the erected up to three storey or bination of the VARIO GT 24
struction work saw the PD 8 table system and ST 10 m high. The total form- Wall formwork system and
use of PERIs VARIO GT 24 100 Stacking Towers in loose work area supplied for each the CB 240 Climbing System
Wall formwork system for form were being utilised. floor was approximately were being used in synergy
constructing pile caps of The typical floor height was 3,960 m. For columns, the to create the passenger and
the building. Each set of the 5 m and the largest PD 8 VARIO GT 24 Column form- cargo lifts of the building.
formwork measures 5.55 m table was 5.50 m x 3.60 m. work system with the size
11
PERI Solutions
for Infrastructure Projects
The MRT Circle Line, Singapore
A typical formwork design for the construction Danilo M. Soriano, Li Jiang, Project Manager, Nantong
of 2 m thick roof slab.
Senior Engineer, ECON-NCC JV: Qidong Construction Pte. Ltd.:
12.92 We are very impressed by PERIs We have chosen to use PERI form-
delivery and logistics capabilities. work system as it is fast and the price
They have been able to accommodate reasonable.
2.00
12
Increased speed and productivity
with PERI UP T 70
Cedar Girls Secondary School Upgrading, Cedar Avenue, Singapore
Justin Wong,
Senior Manager:
The PERI UP system is an
ideal external facade scaf-
folding that has been tested
and approved by Authority.
We have been able to
increase our productivity as
it is a safe, integrated and
easy-to-use system.
Upgrading works are cur- buildings. The contractor in advance of the next level working condition. Therefore,
rently being carried out at is using the PERI UP T 70 is assembled together with it is not surprising that the
the original site of Cedar scaffold system for external the T-frame from the lower contractor have found the
Girls Secondary School. facade work of the school secured level. As such, the PERI UP to be a fast and
The construction work buildings. scaffolder is already in a easy-to-use scaffold system.
will involve the erection of safe position when entering
two blocks of 2 to 4 storey One distinct advantage of the next level. This forms the
buildings and other ancillary the PERI UP is the guardrail basis for a quick and safe
13
The Troika project
challenges constructions skills
The Troika, Kuala Lumpur, Malaysia
Contractor
IJM Construction Sdn. Bhd., Malaysia
Field Service
PERI Formwork Malaysia Sdn. 3.50
Bhd., Malaysia
14
Ahead of schedule -
with innovative formwork
Kuala Lumpurs City Centre (KLCC), Kuala Lumpur, Malaysia
3.20
has enabled the construction Daewoo Engineering & Construction
Co., Ltd.
team to establish a safe and
Field Service
productive working environ- PERI Formwork Malaysia Sdn.
ment. Bhd., Malaysia
5.12
15
PERI The Service Provider
We offer more than just products
Due to their in-depth under- PERI has the worlds largest PERI formwork instructors Our training programme
standing of the needs of our rental equipment pool provide an extensive pro- includes both seminars
customers, our engineers and supplies its customers fessional briefing on site. with specified content and
are able to develop the reliably, fast and with a high This means that any impro- individualised courses.
best project-related solution. level of flexibility. Just in per handling is avoided and In so doing, we support
The services include, if time deliveries and return the risk of accidents is great- our customers by enabling
required, static calculations deliveries - according to ly reduced. Using the sys- them to find out about
as well as assembly plans the particular construction tems even more efficiently the latest formwork and
for special formwork. schedule. accelerates the construction scaffolding technologies
The illustration featured in this brochure are PERI ASIA Pte. Ltd. PERI Formwork Malaysia Sdn. Bhd.
photographs taken at a particular time on No. 1 Sims Lane #06 -10 B-3-1, Mines Waterfront Business Park
a construction site. This is why the safety Singapore 387355 No. 3, Jalan Tasik
details shown cannot be considered as final.
Mines Resort City
Copyright by PERI GmbH
Phone: (+65) 67 44 29 89 43300 Seri Kembangan
Fax: (+65) 67 44 36 93 Selangor Darul Ehsan
pha@periasia.com
www.periasia.com Phone: +60 (0)3. 89 45 72 55
Fax: +60 (0)3. 89 41 03 66
info@perimalaysia.com
www.perimalaysia.com
Fast Safe Flexible
GRIDFLEX Aluminium Grid Slab Formwork
Can improved safety, productivity, speakers at the event were Edwin Lee showcased new generation and inte-
quality and a sustainable environment from Tiong Seng Contractors Pte. Ltd., grated advanced formwork systems
all be achieved at the same time in a Markus Schade and Marcus Beez both that can increase safety levels and
construction process? The answer was from PERI GmbH. The speakers have labour productivity on job sites.
obvious to the more than 280 people provided the participants consisting The exhibition provided an opportunity
from the construction industry who of builders and safety professionals, for the participants to see for them-
attended a recent seminar and work- an insight and practical examples on selves the benefits of using integrated
shop on An Evolutionary Journey how the use of integrated advanced formwork systems as compared to
Conventional to Integrated Advanced formwork systems and 3 D planning conventional formwork.
Formwork Systems. can lead to improved productivity
and quality without compromising on The event has been very well received
The seminar and workshop was orga- safety and the environment. from both local and some overseas
nized by the Building and Construction participants. They have expressed their
Authority (BCA) and supported by Besides the seminar and workshop, wish for such an event to be held again
PERI Asia Pte. Ltd. The three invited there was also a mini-exhibition that in the future.