Formwork Scaffolding Engineering

Issue 1 | 2010 SG MY

Successful construction with PERI scope

Resorts World Sentosa, Singapore The MRT Circle Line, Singapore


Page 4 Page 12

Marina Bay Sands, Singapore The Troika, Kuala Lumpur, Malaysia


Page 8 Page 14
Dear customers,

We are very pleased to through cost effective GRIDFLEX, the new alumi- PERI is continuously striving
present PERI Asias first engineering solutions with nium grid slab formwork to deliver the best quality
edition of the PERI Scope better safety and higher system has been developed products and services to our
covering interesting con- productivity. for flexible, fast and safe customers. We thank you for
struction sites in Singapore residential construction and your trust in our ability to
and Malaysia. Falling from height is the is currently being introduced do so and are looking forward
number one accident on into the Singapore market. to working with you on future
Over the years, we have construction sites. PERI has construction projects.
achieved and sustained our successfully introduced The high durability and reus-
position as market leader innovative products such ability of PERI formwork
in the local formwork market. as the RCS P (Rail Climbing systems has also helped our
As a partner of the con- System Protection) to customers to reduce wast-
struction industry, we are allow for safe working from age of resources and play an Bernd Kieslich
committed in helping our height, resulting in increased active part in sustaining our Managing Director
customers to achieve a productivity and reduced environment. PERI Asia Pte. Ltd.
successful project outcome construction costs.

Fast and safe construction of large slab areas


with PD 8 Table System
Midview City at Bright Hill Drive, Singapore

Midview City is a huge inte- PERIs formwork systems been able to achieve a 15 formwork systems are being
grated business hub which has started in the middle of day cycle per floor despite used jointly for the construc-
sits on a land area of over January 2009. not being able to work tion of the core walls of the
552,000 sq ft. It is situated beyond 6.30 pm, as the site buildings.The project has
in the central part of Singa- For slabs, the contractor is near to a residential area. been scheduled to be fully
pore at Bright Hill Drive. uses PERIs PD 8 table sys- For columns, the VARIO completed by December
The development will have tem which is very suitable GT 24 Column formwork 2009.
six 8-storey blocks and one for constructing large slab system with dimensions of
3-storey terrace block with areas. More than 8,000 m 800 mm x 800 mm x 3.60 m
more than 1.38 million sq ft of formwork area have been has been utilised. Finally, Contractor
of prime business space. supplied for constructing the CB 240 climbing system Yee Hong Pte. Ltd.
Field Service
Construction work using slabs. The contractor has and VARIO GT 24 Wall
PERI ASIA Pte. Ltd., Singapore

PD 8 slab tables are positioned neatly Lee Fu Liang,


at the site.
Senior Project Manager:
I will recommend the use
of PERI formwork systems
as they are faster, safer and
An overview of the site with various very suitable for projects
PERI formwork systems. with large slab areas.

2
Fast and crane-independent solution
with PERI RCS Rail Climbing System
Sky@eleven Condominium, Singapore

Contractor
Tiong Seng Contractors (Pte.) Ltd.
Field Service
PERI ASIA Pte. Ltd., Singapore

Allan Moreno,
Senior Formwork Engineer:
The SRS Steel Circular
Column is fast and highly
efficient as it allows the
casting of a 15 m high
column to be done in one
cast, previously almost
unheard of in the local
industry.

The lift cores using the RCS Rail


Climbing System climbing in advance
of the slabs.

Construction work on the climbing devices and hydrau- completely encloses the Stacking Tower is being used
luxurious Sky@eleven con- lic pumps that allows crane- slab edges. Consequently, for shoring of the transfer
dominium project located at independent climbing as site personnel are protected beams of up to a height of
Thomson Lane has begun in and when necessary. With against the risk of falling 25 m. For slabs, the contrac-
July 2007. The development this self-climbing feature, from height and strong tor is using the light weight
owned by Singapore Press the RCS is able to improve winds at all times. This im- SKYDECK aluminium slab
Holdings Ltd will have 265 productivity and saves on provement in safety would formwork system for easy
large apartments and eight expensive crane operations. help to increase productivity and tireless erection and
duplex penthouses when The RCS can also be fitted on the construction site. early striking with the drop-
completed in 2010. For this with protection panels that Besides the RCS, the ST 100 head.
project, the contractor is
The robust and quick assembling shoring of transfer beams up to The fast and crane-independent
using PERIs SRS Steel
ST 100 Stacking Towers were used for a height of 25 m. RCS Rail Climbing System.
Circular Column formwork
to construct 15.80 m high
columns for the condomi-
nium. It is the first time this
formwork system is being
used in Singapore and cas-
ting of a column of such
height in one pour was
almost unheard previously
in the local industry.

Another first for the project


involves the use of the
RCS Rail Climbing System.
This state-of-the-art system
comes with mobile self-

3
Multiple Advanced Formwork Systems
for a World Class Development
Resorts World Sentosa, Singapore

Resorts World Sentosa (RWS) is one and is located on Sentosa Island, resort will have include Southeast
of the two integrated resorts currently covering an area of 49 hectares. Asias first and only Universal Studios
being built in Singapore and is sched- theme park, six hotels with different
uled to be open in early 2010. The Built at a cost of S$ 6.59 billion, some themes and the worlds largest ocean-
resort is owned by Genting Singapore of the attractions and facilities the arium.

Contractor
Kajima-Tiong Seng Joint Venture
Field Service
PERI ASIA Pte. Ltd., Singapore PERI TSE
Quick striking of shaft formwork

The prominent red TRIO panels being


used at the Resorts World Sentosa site.

4
A world class integrated resort in the Edwin Lee,
making.
Senior Project Manager:
Given the massive volume of structure works and
fast track nature of the Sentosa IR project, usage of PERI
has helped us achieved productivities three times that of
conventional for varying heights of 6 m to 12 m! Even the
sub-contractors are greatly surprised with the producti-
vities their workers are achieving with the PERI systems.

The speed and ease of handling of the ST 100 The ST 100 Stacking Towers could achieve a 14 days
Stacking Towers resulted In higher productivity. cycle for a 1,000 m area at the RWS.

Kajima Overseas Asia Pte. Ltd. and work area of over 800,000 m, a variety achieving off form finish quality
Tiong Seng Contractors (Pte.) Ltd. have of PERIs formwork systems are being without compromising on their high
formed a joint venture and won the used. The SKYDECK aluminium slab productivity of a three day cycle for
contract to build three of the six hotels formwork is used in combination with a stretch of 25 m x 9 m wall-pour.
in RWS. The contract also include MULTIPROPs to achieve maximum
building the resorts main thoroughfare productivity and flexibility for applica- Other PERI formwork systems that
known as Festive Walk, a casino located tions varying from 3 m to 6 m floor were used in the project were also able
beneath the Crockfords Tower and a height. A seven days cycle time could to deliver high productivity and these
1,600-seat Festive Grand showroom be achieved for a 1,000 m area. include the ST 100 Stacking Towers
within Festive Hotel. (14 days cycle for 1,000 m area),
Using the TRIO 3.30 m x 2.40 m SRS Steel Circular Column (one column/
To meet the challenges of this fast panels, retaining walls were easily cast day/mould) and the CB 240 climbing
track project with a massive total form- for heights of up to 9 m in one pour system (three days per cycle).

PERI SKYDECK
Early striking after 2 days
60

Shuttered Drophead lowered


The panels and cover strips form the soffit The cover strips and dropheads remain in position
of the concrete. while the panels and beams are struck.

5
Efficient and safe working conditions
up to nearly 230 m
Asia Square Tower 1, Singapore

Contractor
Hyundai Engineering &
Construction Co., Ltd.
Field Service
PERI ASIA Pte. Ltd., Singapore

Kim Ju-Han,
Asia Square Tower 1 is loca-
Construction Manager:
ted along Marina View at
the Marina Bay area. It is the We have been able to
first of a twin-tower deve- achieve a 5 days per floor
lopment that will have two cycle with the ACS and
million m of office space, a RCS climbing systems.
280-room five-star hotel and I would recommend the
60,000 m of retail space. use of PERI formwork
systems for their speed,
For columns, the VARIO safety features as well as
GT 24 Column formwork good technical support.
system is being used for
typical floor height of 3.60 m of PD 8 table system and Climbing Systems. The ACS R the RCS P Climbing Protec-
and up to a maximum height PERI MULTIPROP system with its high load capacity, tion Panel is being used as a
of 12.60 m. For slabs, the are being used for casting is being used as an external protection screen around the
ST 100 Stacking Tower is of the typical floors. platform with a platform tower to protect the workers
being used for heavy load length of up to 15 m and against falling from height.
shoring of up to a height For corewalls, more than formwork height of 4.70 m. Both the ACS and RCS uses
of 12.37 m (from 1st to 3rd 4,500 m of formwork area On the other hand, the RCS a specialised hydraulic-ena-
storey) and 9.20 m (from are being used. These Formwork Scaffolding is bled machinery to climb
3rd to 6th storey) respectively. include the VARIO GT 24 being used for the internal and thus, do not require the
In addition, more than Girder Wall Formwork platform up to a platform use of cranes which could
5,200 m of formwork area system, the ACS and RCS length of 9.75 m. For safety, be utilised for other usage.

RCS Rail Climbing System: The modular system


for a wide range of climbing applications

The RCS climbing system RCS Climbing Protection Panel


Encloses floors and protects against area provides protection against wind
combines the advantages of
falling when working at great heights. and weather resulting in increased
existing systems in a newly The completely shielded working productivity.
developed modular concept.
Depending on the use, the
system can be climbed with
the crane or lifted by means
of mobile, hydraulic climbing
devices. The range of possi-
ble assemblies can be easily
adapted to meet the project-
specific requirements through
the modular construction
system. Depending on the RCS Formwork Scaffolding
application, there are two Rail-guided moving of wall formwork
with optional self-climbing technology.
versions: the RCS Formwork
The formwork is supported on a
Scaffolding and the RCS mobile carriage which can be retrac-
Protection Panel. ted up to a distance of 90 cm.

6
High productivity
with system formwork
Marina Bay Financial Centre, Singapore

Contractor
Kajima-Tiong Seng
Joint Venture
Field Service
PERI ASIA Pte. Ltd.,
Singapore

Masashi Yamamoto,
Construction Manager:
We have achieved a five day cycle
per floor (2,880 m for slab and 4,100 m
for corewall). The system formwork has
allowed for higher speed, productivity
and a safe work environment!

Tower 1 and Tower 2 of the Marina Bay Financial


Centre.

Marina Bay Financial Centre (MBFC) A typical core wall section


of Tower 2 with the ACS
Is located on a prime waterfront 3.55 ha
for external walls and the
site in the heart of Singapores new RCS for internal walls.
downtown. The developer for the
project is BFC Development Pte. Ltd.
4.25

It is a joint venture by three of Asias


well-known property developers -
4.25

Cheung Kong (Holdings)/Hutchison


Whampoa, Hongkong Land and Keppel
Land.Kajima Overseas Asia Pte. Ltd. in
4.25

a joint venture with Tiong Seng Con-


tractors (Pte.) Ltd., have been awarded
the contract to construct one 33-storey
4.25

(Tower 1) and another 51-storey


(Tower 2) building. Construction of
the buildings for phase 1 have started
in September 2007 and is planned being used to construct the lift cores. On the other hand, the PD 8 table
for completion by March 2010. A steel tower has also been specially system and ST 100 Stacking Towers
designed and built to work with the are being used for slabs. The beam and
Several types of PERI formwork sys- RCS to allow it to climb in sequence slab tables of the PD 8 table system
tems are being used for this project. with the ACS. In addition, the RCS P for this project, have been designed
The VARIO GT 24 Wall formwork, safety screen which auto-climbs, to merge into one so as to minimise
the ACS Self Climbing System and is used around the perimeter of the movement of tables and to reduce the
RCS C Rail Climbing System are building to provide protection. cycle time.

7
Self-climbing technology and large slab tables
minimise crane times
Marina Bay Sands, Singapore

Marina Bay Sands Pte. Ltd. 2009. All rights reserved.

Furthermore, the individual floors are formwork are quickly and safely moved
also offset from one another in a longi- with only one crane lift. By means of a
tudinal direction. lifting mechanism and the chain guid-
ance shoe for transferring the force at
Only two cranes per tower are avail- the slab edge, the table can be pulled
able to the construction crews. Thus, horizontally from the building and then
PERI engineers created crane-inde- lifted immediately to the next shutter-
pendent and crane-saving formwork ing position.
solutions for the core walls and floor
slabs respectively. With the help of Using MULTIPROP aluminium slab
ACS self-climbing technology and props, a large lowering height is
The three concave-shaped hotel towers dominate the large-area SKYTABLE slab tables, achieved with slab offsets of up to
the city skyline and each has 55 floors that will be
crews can finish a complete floor with 20 cm and, at the same time, 50 cm
connected using the Sands SkyPark on the roof at
a height of nearly 200 m. a standard height of 3.00 m in only parapet wall heights, this is an enor-
four days. In order to be able to achieve mous advantage. In addition, the
this, the elevator shafts are climbing MULTIPROP props can be connected
Although the three hotel towers are three cycles in advance. For the 25 cm by means of MRK frames in order
still identical with regard to the height reinforced concrete slabs, a total of to form towers. Thus, SKYTABLE
and number of floors, the forms of the 110 SKYTABLE slab tables are required tables can be flexibly used for the
respective building elements never- for constructing two complete floors in intermediate storey heights of almost
theless have considerable differences each case. With SKYTABLE large-area 9.00 m as well. From the outset,
in terms of the base width, curvature slab tables, which are up to 20 m long PERI engineers took into considera-
radius and lateral offset dimension. and 5 m wide, close to 100 m of slab tion the continuously changing geo-

8
metry with their solution and used dimensions ranging between 2.30 m
an unchanged SKYTABLE framework and 10.10 m can be shuttered, struck
construction for the entire height of and climbed in four day cycles without
the building. This has meant that any the need of a crane. Altogether, five
table modifications required has been safe and secure working levels climb
kept to an absolute minimum, and at the same time to the next section:
time-consuming, costly conversion two platforms for forming, reinforce-
work which could lead to misapplica- ment work and concreting the shaft
tions have been avoided as far as walls as well as three finishing plat- Ahn Yoon Chul,
possible. forms for pre-tensioning the subsequent Engineering Manager:
storey slabs. In combination with CB PERI has provided us with very fast
The ACS self-climbing system is the climbing scaffold and the VARIO GT 24 and good technical support from all
optimal formwork scaffolding for girder wall formwork, ACS has thus levels of its organisation. From the
the altogether twelve elevator shafts optimised the operational sequences in-house design team, on site support
constructed in advance. With the help on the construction site. and all the way from the PERI HQ in
of ACS, the different-sized shafts with Germany.

A typical section view of the Contractor


SKYTABLE large-area slab tables. SsangYong Engineering & Construction Co. Ltd.
Field Service
3.00

PERI ASIA Pte. Ltd., Singapore

In each case, two floors are simultaneously shut-


tered with the SKYTABLE large-area slab tables.

PERI SKYTABLE: with only one crane lift, 100 m


of slab formwork is quickly and safely moved.
During the moving procedure, the operating person-
nel are always positioned in a safe and secure place
on the slab edge.

Typical section showing core wall with


ACS self-climbing formwork.

0.70 9.35 0.60 9.50 0.60


3.90

9
Main contractor A top down view of the two horse- Yap Kok Keong,
Sembawang Engineers & shoe-shaped theatres.
Formwork Supervisor
Constructors Pte. Ltd.
Sub-contractor (Wai Fong Construction Pte. Ltd.):
Wai Fong Construction Pte. Ltd. PERI formwork systems are fast and
Field Service easy to use. They have also enabled
PERI ASIA Pte. Ltd., Singapore
us to save up to 50 per cent time and
manpower.

Optimised Speed and Solution for theatres


with unique design
Marina Bay SandsTheatres, Singapore
0.50
4.35

55.34 (Theatre 2)
63.32 (Theatre 1)

18.55 18.55

RCS Rail Climbing System in the formwork system in the foreground. A typical section view of A plan view of the two theatres
background and VARIO GT 24 Wall the RCS platform. with the complicated shape.

The walls of the Marina One of the key challenges handling of formwork extre- PERIs formwork systems.
Bay Sands theatres are faced by the contractor mely difficult. In spite of The 4,000 seating capacity
constructed using PERIs was the horseshoe-shaped the difficulties, the contractor theatres are expected to
RCS Rail Climbing System theatre walls having incorpo- was still able to achieve a be ready in 2010.
and the VARIO GT 24 Wall rated columns protruding casting cycle of two to
formwork system. non-radially, resulting in very three days per wall panel
sharp angles which made (excluding M&E work) using

10
Customised Solution
for Safe and Fast Construction
Sentosa Monorail Mobile Protection Platform, Singapore Contractor
Kajima-Tiong Seng Joint Venture
Field Service
PERI ASIA Pte. Ltd., Singapore

The Sentosa Monorail


Mobile Protection Platform
(MMPP) project involved the
construction of a tunnel to
cover part of the existing rail
track and a new monorail
station. The major challeng-
es faced by the contractor
was to ensure public safety Allan Rowel,
amidst the tight construction Formwork Engineer:
schedule and limited work- PERI systems are well
ing hours, as construction designed and the compo-
work could only be carried nents made it easy for us
out during non-operating to understand it fast and
hours of the monorail service. be able to explain to our
To meet the requirement formwork workers on site.
for speed, safety and cost could support the designed and GT 24 girders, coupled I must admit that without
effectiveness, the PERI UP load for a span of 12 m with- with its high load capacity the PERI system especially
system scaffolding was used out jeopardizing the total have solved many heavy the ST 100 we may not be
in combination with the weight of the protection shoring problems at the site. able to achieve our casting
ST 100 and GT 24 girders tunnel structure. In addition, By attaching roller wheels deadlines.
to construct the MMPP. The the ease of assembling and to the ST 100 have also made
lattice beam of the PERI UP dismantling of the ST 100 the whole system mobile.

Quality finished and increased productivity


with system formwork
SingTel Data Centre, Singapore

Contractor
Kienta Engineering Construction Wong Kim Choy,
Pte. Ltd. Senior Project Engineer:
Field Service PERI formwork systems save
PERI ASIA Pte. Ltd., Singapore
time and labour. Less clean-
ing of the formwork is needed
and the quality of the finished
concrete is also good.

A nine storey data centre is x 5.55 m x 3.00 m. The 2nd A particular section of the measuring 1.50 m x 1.50 m
currently being built for phase of the project involved building also required the x 4.50 m were used. Finally
SingTel at Kim Chuan Road. the use of a variety of form- PD 8 table system to be for the liftcore walls, a com-
The 1st phase of the con- work systems. For slabs, the erected up to three storey or bination of the VARIO GT 24
struction work saw the PD 8 table system and ST 10 m high. The total form- Wall formwork system and
use of PERIs VARIO GT 24 100 Stacking Towers in loose work area supplied for each the CB 240 Climbing System
Wall formwork system for form were being utilised. floor was approximately were being used in synergy
constructing pile caps of The typical floor height was 3,960 m. For columns, the to create the passenger and
the building. Each set of the 5 m and the largest PD 8 VARIO GT 24 Column form- cargo lifts of the building.
formwork measures 5.55 m table was 5.50 m x 3.60 m. work system with the size

11
PERI Solutions
for Infrastructure Projects
The MRT Circle Line, Singapore

Map courtesy of Land Transport Authority, Singapore.

The Circle Line (CCL) which is set to


be fully completed from 2010 onwards,
will cut travelling time and allow com-
muters to bypass busy interchanges
like City Hall and Raffles Place. Costing
$ 6.7 billion, the CCL will be a fully
underground orbital line linking all
radial lines leading to the city. It will be
33.3 km long with 29 stations.

A combination of PERIs ST 100 Stack-


ing Towers, the MULTIPROP system
and the VARIO GT 24 Girder Wall
formwork system were used in the
construction of some of the 6 stations
and a certain section of the tunnels.
The stations were Bartley, Tai Seng,
MacPherson, Paya Lebar, Dakota and
Mountbatten. In all cases, PERIs
formwork systems were able to meet
the challenges of working within the
confined space underground and
with multiple struts above. The ST 100
Stacking Towers with height from a
few metres up to 10 m, provided shor-
ing for slabs that were up to 2 m thick.

A typical formwork design for the construction Danilo M. Soriano, Li Jiang, Project Manager, Nantong
of 2 m thick roof slab.
Senior Engineer, ECON-NCC JV: Qidong Construction Pte. Ltd.:
12.92 We are very impressed by PERIs We have chosen to use PERI form-
delivery and logistics capabilities. work system as it is fast and the price
They have been able to accommodate reasonable.
2.00

our request for huge quantities of


materials even at short notice and L.B. Zhang, Site Manager, CGW
always deliver on time. Construction & Engineering (S) Pte. Ltd.:
The ST 100 Stacking Towers are easy
4.60

Steve Ng, to use as there are less accessories


Senior Construction Manager, needed. We also find the engineering
Tobishima Corporation: design and support provided by PERI
0.40

PERIs formwork systems are of to be excellent.


good quality and can be used with
much ease. This has resulted in a Yutaka Nakajima,
20 % to 30 % saving in time and labour Senior Section Manager (Stations),
6.85

for our project. Nishimatsu-Lum Chang JV:


We would recommend the use of the
ST 100 Stacking Tower as it is simple,
fast and easy to use.

12
Increased speed and productivity
with PERI UP T 70
Cedar Girls Secondary School Upgrading, Cedar Avenue, Singapore

Justin Wong,
Senior Manager:
The PERI UP system is an
ideal external facade scaf-
folding that has been tested
and approved by Authority.
We have been able to
increase our productivity as
it is a safe, integrated and
easy-to-use system.

Upgrading works are cur- buildings. The contractor in advance of the next level working condition. Therefore,
rently being carried out at is using the PERI UP T 70 is assembled together with it is not surprising that the
the original site of Cedar scaffold system for external the T-frame from the lower contractor have found the
Girls Secondary School. facade work of the school secured level. As such, the PERI UP to be a fast and
The construction work buildings. scaffolder is already in a easy-to-use scaffold system.
will involve the erection of safe position when entering
two blocks of 2 to 4 storey One distinct advantage of the next level. This forms the
buildings and other ancillary the PERI UP is the guardrail basis for a quick and safe

ST 100 Stacking Tower The efficient


shoring system for civil engineering

ST 100 is quickly ST 100 planning is done


assembled. very quickly.
All system components are With only one frame size,
simply slotted together every working height is
without any bolts or pins. simple to plan and organize
without the need of combi-
ST 100 requires only nation tables.
five system parts.
This reduces stock quantities ST 100 stacking tower
and increases the utilisation. is type tested.
Four parts are often suffi- Expensive and time-consum-
cient, if diagonals are not ing static calculations are
required. This means the therefore unnecessary.
ST 100 is also very cost-
effective for low heights. The five system parts of ST 100
n base frame
n stacking frame
n diagonal brace
n base spindle
n head spindle

13
The Troika project
challenges constructions skills
The Troika, Kuala Lumpur, Malaysia

Perfectly vertical fair-faced Due to the limited space


concrete feature walls, is on site, it is critical that
the key design feature of formwork, scaffolding and
the project. Designed by Sir building materials are easy
Norman Foster and towering to handle and re-use. Since
50 stories over Kuala Lum- working hours are restricted
purs city centre. The Troika in residential areas, form-
comprises of three towers at work that reduces downtime
39, 45 and 50 stories height. and speeds up the construc-

Contractor
IJM Construction Sdn. Bhd., Malaysia
Field Service
PERI Formwork Malaysia Sdn. 3.50
Bhd., Malaysia

Foong Kok Foo,


Senior Construction
Manager:
Environmental protection
is very important for us. We
are spearheading the trend
of working with reusable
systems instead of disposa-
ble material. PERIs systems
are important steps forward
for us to be environmentally
friendlier.

tion process is a prerequisite. a new technique to bring


The key design feature of Fosters dream to reality. In
The Troika are the shear walls. order to do so, we needed
IJM has applied a new con- to work extremely close
struction method for this with the formwork supplier,
The design of the semi-precast shear presented immense challenges which building, a technique that states Mr. Foong.
walls, combined with a specific had to be tackled before construction
sequence of constructing the building, could begin.
is not commonly used in
Malaysia, says Tarun Deep Together with PERI, IJM
Dhatia, Construction Manager found an innovative way
of IJM. IJM uses precast to construct the building.
components for the shear By using the Rail Climbing
walls. The design of the System (RCS), the shear
shear walls, combined with walls are being constructed
a specific sequence of con- ahead of the slabs. Only
structing the building pre- once three stories have
sented immense challenges been completed, can the
that the company had to slab work begin. This
tackle before construction requires different teams
could begin. to work simultaneously.
Through the use of this
The three towers have ten, system, the time required
nine and six such shear to finish each floor was
walls. We had to develop reduced to 7 working days.

14
Ahead of schedule -
with innovative formwork
Kuala Lumpurs City Centre (KLCC), Kuala Lumpur, Malaysia

VT 20 girders are supported


by the PD 8 frame tower and
ST 100 tower systems for
floor heights of up to 6.50 m.
The advantage of using this
combination is that it can be
used for all floor heights as
well as for all slab and beam
thicknesses required. Song Ho Jun,
Construction Manager:
In order to provide on going We chose PERI Formwork
formwork training and sup- for this project as it gives
port to the construction team, us the flexibility we need.
PERI Malaysia has commis- In addition, we needed to
sioned experienced form- consider safety, environment
work supervisors to the pro- and cost of ownership.
Lot 171 is rising rapidly and steadily ject. The combined experi- PERI Formwork provides us
with the help of several PERI form-
ence of the contractor and with all these advantages.
work systems.
the formwork supervisors Contractor

3.20
has enabled the construction Daewoo Engineering & Construction
Co., Ltd.
team to establish a safe and
Field Service
productive working environ- PERI Formwork Malaysia Sdn.
ment. Bhd., Malaysia
5.12

Construction of Lot 171, working platforms ensure


a 60 storey Residential, a safe working environment
Commercial and Retail tower for the workforce in order
complex in Kuala Lumpur to clean the formwork and
is gathering momentum, main to fix reinforcement. TRIO
contractor Daewoo is confi- panel formwork is used for
dent that the 1,224,000 sq ft the Retaining Walls. Once
development will be com- assembled, the gang-formed
pleted on time. Various con- panels are quickly moved
struction methods were into position with the aid
evaluated, it was decided of a mobile crane. Fewer
that the buildings cores components require less
would be constructed ahead assembly time and easy
of the slabs. adjustment for both, varying
horizontal geometry as well
In order to facilitate this as for varying vertical dimen-
requirement, the CBC 240 sions.
climbing system was com-
missioned. The CB 240 A number of solutions are
climbing bracket supports used for the construction of
the VARIO Wall formwork the sub-structure. For the
which is retracted on roller slabs, PERI MULTIFLEX sys-
bearings. The 2.40 m wide tem is used. The GT 24 and

15
PERI The Service Provider
We offer more than just products

The broad range of PERI equipment and systems offers the


perfect solution for every requirement. However, the PERI
range of services goes far beyond production and system
equipment sales and rental.

Technical solution Logistics Onsite support Training

Due to their in-depth under- PERI has the worlds largest PERI formwork instructors Our training programme
standing of the needs of our rental equipment pool provide an extensive pro- includes both seminars
customers, our engineers and supplies its customers fessional briefing on site. with specified content and
are able to develop the reliably, fast and with a high This means that any impro- individualised courses.
best project-related solution. level of flexibility. Just in per handling is avoided and In so doing, we support
The services include, if time deliveries and return the risk of accidents is great- our customers by enabling
required, static calculations deliveries - according to ly reduced. Using the sys- them to find out about
as well as assembly plans the particular construction tems even more efficiently the latest formwork and
for special formwork. schedule. accelerates the construction scaffolding technologies

SG MY e 1/2010 4.0eb Art. Nr.: 792568 Copyright by PERI GmbH


Although 90% of all form- progress. for more efficiency and
work project requirements For very large material to be able to pass on this
can be covered using stand- requirements, the local team knowledge.
ard equipment from the works closely with other
broad PERI product range, logistic locations thus
a special construction is, ensuring an optimal delivery
however, sometimes more service to the construction
cost-effective - and it is sites.
exactly here that the engi-
neers apply their expertise
with great effect.

The illustration featured in this brochure are PERI ASIA Pte. Ltd. PERI Formwork Malaysia Sdn. Bhd.
photographs taken at a particular time on No. 1 Sims Lane #06 -10 B-3-1, Mines Waterfront Business Park
a construction site. This is why the safety Singapore 387355 No. 3, Jalan Tasik
details shown cannot be considered as final.
Mines Resort City
Copyright by PERI GmbH
Phone: (+65) 67 44 29 89 43300 Seri Kembangan
Fax: (+65) 67 44 36 93 Selangor Darul Ehsan
pha@periasia.com
www.periasia.com Phone: +60 (0)3. 89 45 72 55
Fax: +60 (0)3. 89 41 03 66
info@perimalaysia.com
www.perimalaysia.com
Fast Safe Flexible
GRIDFLEX Aluminium Grid Slab Formwork

Fast Safe Flexible


The standard field is formed using only The girder grid design of the GRIDFLEX The telescopic function provides a
three system parts: elements, plywood automatically forms an accessible flexible two-dimensional adaptability
and props. The easy to handle parts working area which provides a high in both transverse and longitudinal
and an element weight of 9.5 kg/m level of safety when laying the plywood directions with the elements.
simplify the forming process. sheets.

PERI ASIA Pte. Ltd. PERI Formwork Malaysia Sdn. Bhd.


No. 1 Sims Lane #06 -10 B-3-1, Mines Waterfront Business Park
Singapore 387355 No. 3, Jalan Tasik
Mines Resort City
Phone: (+65) 67 44 29 89 43300 Seri Kembangan
Fax: (+65) 67 44 36 93 Selangor Darul Ehsan Formwork
pha@periasia.com
Scaffolding
www.periasia.com Phone: +60 (0)3. 89 45 72 55
Fax: +60 (0)3. 89 41 03 66 Engineering
info@perimalaysia.com
www.perimalaysia.com www.peri.com
Step Up to
Integrated Advanced Formwork Systems
BCA Seminar | Workshop

Can improved safety, productivity, speakers at the event were Edwin Lee showcased new generation and inte-
quality and a sustainable environment from Tiong Seng Contractors Pte. Ltd., grated advanced formwork systems
all be achieved at the same time in a Markus Schade and Marcus Beez both that can increase safety levels and
construction process? The answer was from PERI GmbH. The speakers have labour productivity on job sites.
obvious to the more than 280 people provided the participants consisting The exhibition provided an opportunity
from the construction industry who of builders and safety professionals, for the participants to see for them-
attended a recent seminar and work- an insight and practical examples on selves the benefits of using integrated
shop on An Evolutionary Journey how the use of integrated advanced formwork systems as compared to
Conventional to Integrated Advanced formwork systems and 3 D planning conventional formwork.
Formwork Systems. can lead to improved productivity
and quality without compromising on The event has been very well received
The seminar and workshop was orga- safety and the environment. from both local and some overseas
nized by the Building and Construction participants. They have expressed their
Authority (BCA) and supported by Besides the seminar and workshop, wish for such an event to be held again
PERI Asia Pte. Ltd. The three invited there was also a mini-exhibition that in the future.

Nguyen Hong Viet, Mylene V. Aguinaldo, Puah Sze Hwee,


Hanoi Branch Director, Formwork Engineer, Quantity Surveyor,
COFICO: Tiong Seng Contractors Pte. Ltd.: Kajima Overseas Asia Pte. Ltd.:
The seminar was very professionally The seminar/workshop has been The video that was played at the
organized and easy to understand. It quite informative. For us, who do the seminar gave everybody a better
has given me a better understanding formwork design/drawings, it has understanding on the use of system
on the benefits of using integrated created the passion and excitement formwork and the time savings
formwork systems for construction. to learn more and advance our knowl- achieved as compared to conventio-
edge in 3D formwork planning. It is nal formwork. It successfully proves
also good to be able to see actual new to us the efficiency and safety in the
products such as the GRIDFLEX as use of integrated formwork systems.
shown in the exhibition. Lastly, I am
proud to be in a company that uses
these advanced integrated formwork
systems from PERI.