You are on page 1of 18

P2

(D-200)
BALANCE DE MOLINO III (24-08-99)

ALIMENTACION DESCARGA O/F


MESH ABERT. PESO % PESO % AC. RET. %AC. PAS. PESO % PESO % AC. RET.%AC. PAS. PESO % PESO% AC. RET.%AC. PAS.
12500 64.00 5.31 5.31 94.69 11.60 1.27 1.27 98.73 0.00 0.00 0.00 100.00
.3/8 9500 232.40 19.28 24.58 75.42 13.80 1.52 2.79 97.21 0.00 0.00 0.00 100.00
.1/4 6300 406.90 33.75 58.33 41.67 9.10 1.00 3.79 96.21 0.00 0.00 0.00 100.00
4 4750 136.70 11.34 69.67 30.33 11.50 1.26 5.05 94.95 0.00 0.00 0.00 100.00
10 1700 153.90 12.76 82.43 17.57 34.90 3.83 8.89 91.11 0.00 0.00 0.00 100.00
20 841 38.00 3.15 85.59 14.41 57.30 6.29 15.18 84.82 0.20 0.06 0.06 99.94
35 425 24.30 2.02 87.60 12.40 143.70 15.78 30.96 69.04 5.80 1.77 1.83 98.17
48 300 10.40 0.86 88.46 11.54 85.90 9.43 40.40 59.60 14.50 4.43 6.26 93.74
65 212 11.40 0.95 89.41 10.59 89.90 9.87 50.27 49.73 25.60 7.82 14.08 85.92
100 150 11.80 0.98 90.39 9.61 72.80 8.00 58.26 41.74 30.00 9.16 23.24 76.76
150 106 12.50 1.04 91.42 8.58 49.50 5.44 63.70 36.30 27.70 8.46 31.70 68.30
200 75 12.70 1.05 92.48 7.52 37.70 4.14 67.84 32.16 24.40 7.45 39.16 60.84
270 53 11.60 0.96 93.44 6.56 27.10 2.98 70.82 29.18 19.70 6.02 45.17 54.83
325 45 5.60 0.46 93.90 6.10 12.70 1.39 72.21 27.79 9.10 2.78 47.95 52.05
400 38 3.20 0.27 94.17 5.83 5.20 0.57 72.78 27.22 4.70 1.44 49.39 50.61
-400 17 70.30 5.83 100.00 0.00 247.80 27.22 100.00 0.00 165.70 50.61 100.00 0.00
1205.70 0 910.50 327.40
TMSH ### ### 242.58
DENSIDAD (Kg/l) 2.207 1.306

PARAMETROS DE OPERACION DATOS DEL CICLON


TMH 250 %H2O= 2.97 DIAM. APEX 5 1/2*
KW-H 2985 DIAM. VORTEX 9 1/2* F80 P80
AMP 395 DIAM. INLET 9 1/2" (m) (m)
VOLT 4300 ALTURA 77.14 8300 170
Fp 1 PRESION 9.4
G.E. 3 N CICLONES 3 Malla Under Over

Page 1
P2

9)

U/F % Efi % Efici


PESO % PESO % AC. RET.%AC. PAS. CC Molie Clasifi 100.00
6.70 0.68 0.68 99.32 76.00
20.00 2.04 2.73 97.27 88.65 90.00
17.70 1.81 4.54 95.46 93.50
80.00
12.70 1.30 5.84 94.16 92.75
45.80 4.68 10.52 89.48 89.22 70.00
90.50 9.25 19.77 80.23 82.27 27.35
274.20 28.03 47.80 52.20 1.73 64.66 49.91 60.00
140.00 14.31 62.11 37.89 1.57 54.34 55.12
125.60 12.84 74.95 25.05 1.47 43.78 58.69 50.00
82.20 8.40 83.35 16.65 1.40 35.54 60.10
40.70 4.16 87.51 12.49 1.34 30.32 59.04 40.00

22.00 2.25 89.76 10.24 1.31 26.64 56.95


30.00
12.60 1.29 91.05 8.95 1.27 24.21 54.72
6.10 0.62 91.67 8.33 1.25 23.10 53.81 20.00
2.90 0.30 91.97 8.03 1.22 22.71 53.21
78.60 8.03 100.00 0.00 10.00
978.30 1.39 10.00

338.31
2.123

D50 D50(C) Wi
(m) (m) Kw-H/TM
160.00 192 18.72
120

% ACUM. PASS.
Abertura
100

80
Page 2

60
P2

CALCULO DE D50 Y D50(C)

100.00

90.00

80.00

70.00

60.00 Column
P
50.00

40.00

30.00

20.00

10.00
10.00 100.00 1000.00

Y 80
80 8.8074243

CALCULO DE P80 Y F80

120

100

80
Page 3

60
P2

Peso Peso
% SOL. L/S 20 31.30 0.15
ALIMEN. CICLON 82.03 0.22 35 94.82 4.30
OVERFLOW 35.15 1.85 48 48.41 10.74
UNDERFLOW 79.35 0.26 65 43.43 18.97
100 28.43 22.23
150 14.07 20.52
200 7.61 18.08
270 4.36 14.60
325 2.11 6.74
400 1.00 3.48

Page 4
P2 120

% ACUM. PASS.
100
D50 D50(C) Prom. (m) BYPASS
99.53 99.44 841.00 0.16
95.66 94.81 633.00 80
81.84 78.27 362.50
69.60 63.62 256.00 60
56.12 47.49 181.00
40.68 29.01 128.00
40
29.62 15.77 90.50
22.99 7.84 64.00
23.83 8.85 49.00 20

10 10
0

Page 5
CALCULO DE P80 Y F80

120 P2

100

80

60

40

20

10 100 1000 10000 100000


0
ABERT. um

F80 P80

Page 6
P3

D300
BALANCE DE MOLINO III (24-08-99)

ALIMENTACION DESCARGA O/F


MESH ABERT. PESO % PESO % AC. RET.%AC. PAS. PESO % PESO % AC. RET.%AC. PAS. PESO % PESO % AC. RET.%AC. PAS.
.1/2 12500 29.50 2.12 2.12 97.88 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00
.3/8 9500 137.70 9.90 12.02 87.98 7.10 0.65 0.65 99.35 0.00 0.00 0.00 100.00
.1/4 6300 302.00 21.72 33.74 66.26 13.80 1.26 1.91 98.09 0.00 0.00 0.00 100.00
4 4750 155.00 11.15 44.88 55.12 6.20 0.57 2.47 97.53 0.00 0.00 0.00 100.00
10 1700 324.40 23.33 68.21 31.79 38.70 3.53 6.01 93.99 0.00 0.00 0.00 100.00
20 841 108.00 7.77 75.98 24.02 57.20 5.22 11.23 88.77 0.10 0.03 0.03 99.97
35 425 71.50 5.14 81.12 18.88 145.50 13.28 24.50 75.50 2.30 0.64 0.67 99.33
48 300 26.00 1.87 82.99 17.01 99.00 9.04 33.54 66.46 9.50 2.65 3.32 96.68
65 212 26.90 1.93 84.92 15.08 120.80 11.02 44.57 55.43 21.70 6.05 9.36 90.64
100 150 27.00 1.94 86.86 13.14 116.90 10.67 55.23 44.77 32.10 8.94 18.31 81.69
150 106 26.00 1.87 88.73 11.27 81.00 7.39 62.63 37.37 34.90 9.72 28.03 71.97
200 75 25.50 1.83 90.57 9.43 68.60 6.26 68.89 31.11 35.80 9.97 38.01 61.99
270 53 25.00 1.80 92.36 7.64 84.80 7.74 76.63 23.37 44.80 12.48 50.49 49.51
325 45 11.90 0.86 93.22 6.78 6.10 0.56 77.18 22.82 8.70 2.42 52.91 47.09
400 38 7.50 0.54 93.76 6.24 5.70 0.52 77.70 22.30 7.40 2.06 54.97 45.03
-400 17 86.80 6.24 100.00 0.00 244.30 22.30 100.00 0.00 161.60 45.03 100.00 0.00
1390.70 0 1095.70 358.90
TMSH 222.53 529.57 222.53
DENSIDAD (Kg/l) 2.3 1.29

PARAMETROS DE OPERACION DATOS DEL CICLON


TMH 230 %H2O= 3.25 DIAM. APEX 5 1/2*
KW-H 2972 DIAM. VORTEX 9 1/2* F80 P80
AMP 389 DIAM. INLET 9 1/2" (m) (m)
VOLT 4300 ALTURA 77.14 8280 142
Fp 1 PRESION 9.3
G.E. 3 N CICLONES 3 Malla Under Over

Page 7
P3

Peso Peso
% SOL. L/S 20 27.86 0.06
ALIMEN. CICLON 84.78 0.18 35 69.94 1.43
OVERFLOW 33.72 1.97 48 39.13 5.89
UNDERFLOW 84.21 0.19 65 43.63 13.45
100 34.36 19.90
150 18.54 21.64
200 8.86 22.20
270 5.52 27.78
325 2.15 5.39
400 1.17 4.59

Page 8
P3

99)

U/F % Efi % Efici

% EFIC. CLASIF.
PESO % PESO % AC. RET.%AC. PAS. CC Molie Clasifi
100.00
0.00 0.00 0.00 100.00 100.00
23.80 2.01 2.01 97.99 94.61 90.00
27.60 2.33 4.33 95.67 94.35 80.00
16.80 1.42 5.75 94.25 94.49
70.00
72.50 6.11 11.87 88.13 91.20
107.60 9.07 20.94 79.06 1.15 85.22 52.20 60.00
270.10 22.78 43.72 56.28 1.24 69.79 57.50
50.00
151.10 12.74 56.46 43.54 1.32 59.58 58.48
168.50 14.21 70.67 29.33 1.35 47.52 60.67 40.00
132.70 11.19 81.86 18.14 1.39 36.41 62.57 30.00
71.60 6.04 87.90 12.10 1.37 29.42 62.40
20.00
34.20 2.88 90.78 9.22 1.41 23.94 59.78
21.30 1.80 92.58 7.42 1.64 17.04 55.31 10.00
8.30 0.70 93.28 6.72 1.51 17.20 54.95 10.00
4.50 0.38 93.66 6.34 1.42 17.12 54.11
75.20 6.34 100.00 0.00
1185.80 1.38
307.05
2.28

120.00
D50 D50(C) Wi
(m) (m) Kw-H/TM

% ACUM. PASS.
140.00 159 18.31 100.00

Abertura
80.00

Page 9 60.00
% ACUM. PASS.
100.00
P3

80.00
D50 D50(C) Prom. (m) BYPASS
99.78 99.75 841.00 0.12
98.00 97.74 633.00 60.00
86.92 85.19 362.50
76.43 73.33 256.00
63.32 58.49 181.00 40.00
46.14 39.05 128.00
28.52 19.11 90.50
16.57 5.58 64.00 20.00
28.49 19.08 49.00
10 100
0.00

Page 10
P3

CALCULO DE D50R Y D50(C)

00

00

00

00

00 D50
C
00

00

00

00

00
10.00 100.00 1000.00
ABERT. um

CALCULO DE P80 Y F80

Page 11
P3

100 1000 10000 100000

ABERT. um

F80 P80

Page 12
P1

(D-250)

BALANCE DE MOLINO III (24-08-99)


ALIMENTACION DESCARGA O/F
MESH ABERT. PESO % PESO % AC. RET.%AC. PAS. PESO % PESO % AC. RET.%AC. PAS. PESO % PESO % AC. RET.
.1/2 12500 69.10 3.05 3.05 96.95 0.00 0.00 0.00 100.00 0.00 0.00 0.00
.3/8 9500 364.50 16.10 19.16 80.84 4.60 0.39 0.39 99.61 0.00 0.00 0.00
.1/4 6300 631.60 27.90 47.06 52.94 10.90 0.93 1.32 98.68 0.00 0.00 0.00
4 4750 238.80 10.55 57.61 42.39 9.40 0.80 2.12 97.88 0.00 0.00 0.00
10 1700 413.30 18.26 75.87 24.13 33.20 2.83 4.95 95.05 0.00 0.00 0.00
20 841 124.00 5.48 81.35 18.65 56.30 4.80 9.75 90.25 0.20 0.06 0.06
35 425 80.80 3.57 84.92 15.08 157.00 13.38 23.13 76.87 3.90 1.10 1.15
48 300 29.60 1.31 86.22 13.78 104.70 8.92 32.06 67.94 11.70 3.29 4.44
65 212 30.40 1.34 87.57 12.43 124.60 10.62 42.68 57.32 26.00 7.31 11.74
100 150 30.50 1.35 88.92 11.08 124.00 10.57 53.25 46.75 34.80 9.78 21.52
150 106 29.60 1.31 90.22 9.78 92.00 7.84 61.09 38.91 35.90 10.09 31.61
200 70.794578 30.20 1.33 91.56 8.44 82.40 7.02 68.11 31.89 36.30 10.20 41.81
270 53 31.00 1.37 92.93 7.07 110.80 9.44 77.56 22.44 41.20 11.58 53.39
325 45 15.20 0.67 93.60 6.40 4.50 0.38 77.94 22.06 10.30 2.89 56.28
400 38 7.50 0.33 93.93 6.07 5.50 0.47 78.41 21.59 8.40 2.36 58.64
-400 17 137.40 6.07 100.00 0.00 253.30 21.59 100.00 0.00 147.20 41.36 100.00
2263.50 0 1173.20 355.90
TMSH 217.64 511.16 217.64
DENSIDAD (Kg/l) 2.252 1.32

PARAMETROS DE OPERACION DATOS DEL CICLON


TMH 225 %H2O= 3.27 DIAM. APEX 5 1/2*
KW-H 2978 DIAM. VORTEX 9 1/2* F80
AMP 392 DIAM. INLET 9 1/2" (m)
VOLT 4301 ALTURA 77.14 9406
Fp 1 PRESION 8.9
G.E. 3 N CICLONES 3 Malla Under
Peso

Page 13
P1

24-08-99)
U/F % Efi % Efici
%AC. PAS. PESO % PESO % AC. RET.%AC. PAS. CC Molie Clasifi
100.00 0.00 0.00 0.00 100.00 100.00
100.00 9.00 0.84 0.84 99.16 97.95
100.00 21.80 2.04 2.88 97.12 97.19
100.00 16.00 1.50 4.38 95.62 96.32
100.00 50.80 4.75 9.13 90.87 93.47
99.94 82.30 7.70 16.83 83.17 1.37 88.01 46.48
98.85 241.60 22.60 39.43 60.57 1.35 72.76 52.62
95.56 156.80 14.67 54.09 45.91 1.25 62.82 56.27
88.26 154.80 14.48 68.57 31.43 1.19 51.26 57.62
78.48 119.80 11.21 79.78 20.22 1.20 40.11 58.04
68.39 63.50 5.94 85.72 14.28 1.20 32.29 56.45
58.19 34.40 3.22 88.93 11.07 1.26 25.61 53.51
46.61 26.60 2.49 91.42 8.58 1.74 16.54 50.62
43.72 7.30 0.68 92.11 7.89 1.53 16.73 49.81
41.36 5.60 0.52 92.63 7.37 1.39 16.52 48.86
0.00 78.80 7.37 100.00 0.00
1069.10 1.35
293.51
2.193

P80 D50 D50(C) Wi


(m) (m) (m) Kw-H/TM
100.00
160.5 145.00 170 19.94

% ACUM. PASS.
90.00
Over Abertura
80.00
Peso EFIC.(R) EFIC.(C) Prom. (m) BYPASS

70.00

Page 14
60.00

50.00
P1

CALCULO DE D50 Y D50(C)


% EFIC. CLASIF.

100.00

90.00

80.00 90
70.00

60.00
Column
50.00 P

40.00

30.00

20.00

10.00

0.00
10 100 1000
ABERT. um

CALCULO DE P80 Y F80

100.00
% ACUM. PASS.

90.00

80.00

70.00

Page 15
60.00

50.00
P1

% SOL. L/S 20 22.59


ALIMEN. CICLON 83.39 0.20 35 66.33
OVERFLOW 36.36 1.75 48 43.05
UNDERFLOW 81.60 0.23 65 42.50
100 32.89
150 17.43
200 9.44
270 7.30
325 2.00
400 1.54

Page 16
100.00

% ACUM. PASS.
90.00
P1
80.00

0.12 99.46 99.37 841.00 0.15 70.00


2.38 96.53 95.93 633.00
7.15 85.75 83.27 362.50 60.00

15.90 72.77 68.04 256.00


50.00
21.28 60.72 53.89 181.00
21.95 44.26 34.58 128.00 40.00
22.20 29.85 17.66 88.40
30.00
25.19 22.47 9.00 61.90
6.30 24.14 10.96 49.00
20.00
5.14
10.00
10

Page 17
100.00

% ACUM. PASS.
90.00
P1
80.00

70.00

60.00

50.00

40.00

30.00

20.00

10.00
10 100 1000 10000 100000
ABERT. um

F80 P80

Page 18