Worawut Yotnuengnit

CSCBL
MRT Blue Line Extension Project
Contract 5: Trackwork
2 August 2014
DC Traction System

Traction substation 3rd rail Collector shoe


(TSS)
Traction motor
M
Rail using for traction return current

Track bed Insulated Fastener

Stray current corrosion control 2


Stray Current

Traction substation 3rd rail


(TSS)
It

It - Is

Track bed

Stray current Is

Stray current corrosion control 3


Stray Current Corrosion

Traction substation 3rd rail


(TSS)
It Traction motor
M
It - Is Rail

Track bed
Is
Stray current corrosion Is
Is

Underground iron pipe

Stray current corrosion control 4


Electrochemical Corrosion

2Fe + O2 + 2H2O 2Fe++ 4OH

Fe++
Is
Fe++ O2
4OH
2Fe 2Fe++ + 4e O2 + 4e + 2H2O 4OH

4e

Underground iron pipe

Average corrosion of iron = 9 kg/A-year


Stray current corrosion control 5
Sample of Stray Current Corrosion

Stray current corrosion control 6


SCC
(TSS)

Continuous welded rail (CWR)
(Cross bond)
(UIC54 60E1)


Fastener

Slab track
(4th rail, London underground)

Stray current corrosion control 7


SCC
Structure earth system
Stray current collection system
Stray current monitoring and control system

Fastener

Stray current corrosion control 8


Structure Earth System

Stray current corrosion control 9


Stray Current Collection System

Traction substation 3rd rail


(TSS)
It Traction motor
Insulated Fastener
M
It - Is Rail

Is Track bed

Stray current collector mat

Is

Stray current corrosion control 10


Stray Current Collection System
TRACTION SUBSTATION

RECTIFIER RECTIFIER CUBICLE

NEGATIVE RETURN CUBICLE

DRAINAGE PANEL
NEGATIVE RETURN
CABILE TERMINALS CONNECTING ONE, MORE OR
ALL CONDUCTING MATS TO SCCC MONITORING
TO WB TRACK CABLES AS REQUIRED
185 mm2 SCCC DRAINAGE CABLE
STATION SIDE
TRACK SIDE

EB TRACK SCCC DRAINAGE 35 mm2 SCCC


TERMINAL BOX MONITORING CABLE

RUNNING RAIL
By M&E
SCCC DRAINAGE TERM.
TERMINAL BOX BOXES AT APPROX.
200M C/C

EARTH REF. ELECTRODE

CONDUCTING MESH IN TRACKBED CONCRETE IN APPROX. 100M LENGTHS

By trackwork Stray current collector mat


Stray current corrosion control 11
Stray Current Collection System

Stray current corrosion control 12


Stray Current Collector Mat C5

Stray current corrosion control 13


Stray Current Collector Mat C5

Stray current corrosion control 14


SC Monitoring and Control System
SCADA Remote Control unit

Traction substation
(TSS)

3rd rail

Running rail

Sensors
Comm & network

Stray current corrosion control 15


EN 50122-2:2010
5.2 Criteria for the protection of the tracks
Experience proves that no damage in the tracks
over a period of 25 years, if the average stray
current per unit length < 2.5 mA/m
If the conductance per length GRE 0,5 S/km
and average rail potential URE + 5 V during
the system life-time, further investigations need
not be performed.

Stray current corrosion control 16


OS 14 Electrical testing
Track to ground resistance (running rails are
connected) Minimum resistance when damp
for a 1,000 m. of track = 10 , or 10 -km
EN 50122-2 vs. OS 14
GRE 0,5 S/km -> 2 -km
Track to ground resistance > 10 -km

Stray current corrosion control 17


SCC in OS Requirements
16. Stray Current Protection
(2) Trackslabs shall provide a positive roll-off 1 to
2% and ensure that the drainage is adequate to
prevent standing water
(6) The Contractor shall monitoring of this
continuous electrical path and shall
demonstrate to the ER

Stray current corrosion control 18


OS Requirements Interpret
Slab track shall has positive 1 to 2% roll-off to
prevent standing water
SCC mat shall be measured and achieved the
required electrical resistance (< 100 m at 10A)
SCC mat shall be isolated from running rails and
other slab rebars, IR shall be measured (> 1M
500Vdc) before concreteing

Stray current corrosion control 19


Electrical Path & IR Test

Electrical continuty of SCC mat Insulation resistance between


measurement running rail and SCC mat
measurement

Stray current corrosion control 20


Q&A

Stray current corrosion control 21