Office Specification Requirements


Network Planning Fiberco Project
Ver1.9
4 ELECTRICAL SYSTEM
For Indoor, Shelter CO Room Type and ODC Type

Source Power
Here is a table of the power requirements and the MCB capacity to supply OLT

POWE MINIMUM MAIN MCB
MIN POWER
R OPTION (Ampere)
No LOAD REQUIREMENT REQUIREME
SOUR 1- 3- DC
NT (A)
CE PHASE PHASE
1 AC OLT + Battery + Air 26.17 32 10
Conditioner
2 AC OLT + Air Conditioner 19.63 32 10
3 AC OLT + Battery 16 16 6
4 AC OLT 9 10 6
5 DC OLT 28.71875 32

Note:
Minimum requirements above measured in maximum power consumed by OLT and Air-
Conditioner, 10% charging of battery for 200Ah capacity (8 hours backup capability).

Grounding
Grounding is required as a conductor of electric current to earth during an electrical
voltage arising from insulation failure of the electrical system or electrical equipment.

Grounding deployment option:
1. Use building existing grounding
2. Use electrical/PLN grounding
3. Install new grounding system

Here are the suggested criteria and specifications to create a new grounding:
Equipment grounding should use copper because it is the most effective
conductors of electric current to pass and not easily rust when used in dry soil,
moist soil.
Installation of the correct grounding has resistance values 5 ohm at CO room.
Wall / Rack Mounted Copper Ground Bus Bar with specifications:
Material : Copper
Dimensions : 15cm x 4 cm x 0,5cm
Number of Holes : 6 up to 10