Sr No Equipment/particulers Status of Item Input From Huntsman Consultant Scope

1. Hydraulic calculation.
1 Gas Supply From Gail to Pre Heater of Dryer Existing 2. Consultant will do sizing, routing and isometric.
2 Design of Pre-Heater TBC Consultant will provide the Design of Preheater
3 Piping from Pre-heater to Dryer Burner Consultant will do sizing, routing and isometric.

1. Rate of Slurry to dryer.


2. Specification of slurry i.e solid%, 1. Consutant will review Sizing, mechanical design,
solid mechnical and thermal
3 Spray Dryer Chamber properties. GA, Febrication drawing.
2. Conultant will prepear the specification, vendor
3. Liquid properties. interaction.
4. % moisture required in product.
5. Product withdraw rate.

1. size the tank/vessel.


4 Slurry Tank 2. Mechanical design, GA.
1. Hydraulic calculation
5 Slurry Transfer Pump 2. Consultant will do sizing, routing and isometric.
1. Hydraulic calculation
6 Duct from Spray Dryer to Filter Bag 2. Consultant will do sizing, routing and isometric.

1. Consutant will review Sizing, mechanical design,


GA, Febrication drawing.
7 Filter Bag 2. Conultant will prepear the specification, vendor
interaction.

1. Hydraulic calculation
8 Filtter Bag to ID fan piping/Duct 2. Consultant will do sizing, routing and isometric.

1. Consutant will review Sizing, mechanical design,


GA, Febrication drawing.
9 Spray Druer Chamber to Packing 2. Conultant will prepear the specification, vendor
interaction.

1 Equipment layout.
2 PFD & P&ID.
3 Instrument Datasheet.
4 Piping, Instrument, electrical, Civil, Mechnical, Structure, Fire Fighting.
Vendor Reamrks

Based on Heat & Mass Balance Vendor will provide the


rate of Fuel Gas required to Burner
In Case, If pr-heater is existing

1. Vendor will do heat and mass balance for


drying based on rate provided by Huntsman.
2. Vendor will provided the sizing and mechanical
design ofdryer.

1. Vendor will provided the sizing and mechanical


design of packing unit