COSTO DE MATERIALES: NOTAS:

CEMENTO ARENA GRAVA AGUA 1 ESTA TABLA ES TIL PARA OBRAS PEQUEAS DONDE HAY
PRECIO x TON: PRECIO x CAMIN PRECIO x CAMIN PRECIO x PIPA 2 LLENAR SLO LOS CAMPOS EN COLOR AMARILLO
20 Bultos de 50 Kg. DE 7M3 DE 7M3 DE 4000 LTS 3 LOS COSTOS OBTENIDOS SON SLO DE MATERIALES
$2,800.00 $2,927.26 $2,683.66 $1,120.00 4 CADA QUIEN DEBER AGREGAR SUS COSTOS DE OPERAC
PRECIO x BULTO: 5 ESTA TABLA DE COSTOS PUEDE USARSE PARA FINES DE P
DE 50 KG PRECIO x M3: PRECIO x M3: PRECIO x M3: 6 LAS PROPORCIONES DE LA TABLA FUERON TOMADAS DE:
$140.00 $418.18 $383.38 $280.00 "COSTO Y TIEMPO EN EDIFICACIN"
DESPERDICIO: DESPERDICIO: DESPERDICIO: DESPERDICIO: CARLOS SUREZ SALAZAR
3% 8% 8% 30% LIMUSA - NORIEGA EDITORES MXICO 1997
1.03 1.08 1.08 1.30 TERCERA EDICIN
COSTO CON DESP. COSTO CON DESP. COSTO CON DESP. COSTO CON DESP.
$2,884.00 $451.63 $414.05 $364.00

CLASIFICACIN AGREGADO CEMENTO BULTOS ARENA GRAVA AGUA


FC= REVENIMIENTO MXIMO TONELADA DE 50 KG M3 M3 M3
100 kg/cm2 8 A 10 CM 3/4" 0.260 5.20 0.500 0.680 0.195
1 1/2" 0.254 5.08 0.470 0.700 0.190
FIRMES Y 12 A 15 CM 3/4" 0.286 5.72 0.500 0.680 0.215
PLANTILLAS 1 1/2" 0.280 5.60 0.470 0.700 0.210

150 kg/cm2 8 A 10 CM 3/4" 0.323 6.46 0.480 0.670 0.210


1 1/2" 0.308 6.16 0.450 0.700 0.200
FIRMES, DALAS 12 A 15 CM 3/4" 0.354 7.08 0.480 0.670 0.230
Y CASTILLOS 1 1/2" 0.338 6.76 0.450 0.700 0.220

200 kg/cm2 8 A 10 CM 3/4" 0.355 7.10 0.470 0.650 0.195


1 1/2" 0.337 6.74 0.440 0.680 0.185
LOSAS DE 12 A 15 CM 3/4" 0.391 7.82 0.470 0.650 0.215
ENTREPISO 1 1/2" 0.373 7.46 0.440 0.680 0.205

250 kg/cm2 8 A 10 CM 3/4" 0.423 8.46 0.465 0.640 0.190


PISOS ESTRUCTURALES, 1 1/2" 0.400 8.00 0.435 0.670 0.180
COLUMNAS, DADOS, 12 A 15 CM 3/4" 0.467 9.34 0.465 0.640 0.210
ZAPATAS Y TRABES 1 1/2" 0.445 8.90 0.435 0.670 0.200
PARA OBRAS PEQUEAS DONDE HAY QUE ELABORAR EL CONCRETO EN OBRA
AMPOS EN COLOR AMARILLO
IDOS SON SLO DE MATERIALES
AGREGAR SUS COSTOS DE OPERACIN E INDIRECTOS
TOS PUEDE USARSE PARA FINES DE PLANEACIN DE COMPRA DE MATERIALES Y ANLISIS
DE LA TABLA FUERON TOMADAS DE:
Y TIEMPO EN EDIFICACIN"
SUREZ SALAZAR
NORIEGA EDITORES MXICO 1997

$$$ x M3 CON M3 CONCRETO COSTO AL CANTIDAD DE CANTIDAD DE CEM CANTIDAD DE CANTIDAD DE


DESPERDICIO REQUERIDOS: CONSTRUCTOR CEMENTO TON. BULTOS DE 50 KG ARENA EN M3 GRAVA EN M3

$1,328.19 0.00 $0.00 0.00 0.00 0.00 0.00


$1,303.80 0.00 $0.00 0.00 0.00 0.00 0.00
$1,410.46 0.00 $0.00 0.00 0.00 0.00 0.00
$1,386.06 0.00 $0.00 0.00 0.00 0.00 0.00

$1,502.17 0.00 $0.00 0.00 0.00 0.00 0.00


$1,454.14 0.00 $0.00 0.00 0.00 0.00 0.00
$1,598.85 0.00 $0.00 0.00 0.00 0.00 0.00
$1,547.94 0.00 $0.00 0.00 0.00 0.00 0.00

$1,576.20 0.00 $0.00 0.00 0.00 0.00 0.00


$1,519.52 0.00 $0.00 0.00 0.00 0.00 0.00
$1,687.30 0.00 $0.00 0.00 0.00 0.00 0.00
$1,630.63 0.00 $0.00 0.00 0.00 0.00 0.00

$1,764.09 0.00 $0.00 0.00 0.00 0.00 0.00


$1,692.99 0.00 $0.00 0.00 0.00 0.00 0.00
$1,898.27 0.00 $0.00 0.00 0.00 0.00 0.00
$1,830.05 0.00 $0.00 0.00 0.00 0.00 0.00
CANTIDAD DE
AGUA EN M3

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
RESISTENCIA CEMENTO
USOS ARENA BOTES
KG/CM2 BULTO
100 Pisos, Firmes y Banquetas 1 6
150 Trabes y Dalas 1 5
200 Losas, Castillos y Zapatas 1 4
250 Losas y Columnas Especiales 1 3

* Grava de "
* Botes Alcoholeros (18 L).
* Revenmiento de 10 12 cm.

RECOMENDACIONES

1. Es muy importante seleccionar agregados limpios, con mnima cantidad de arcillas o contaminantes que afecten la h

2. Los agregados ocupan de un 60 a un 75 % del volumen del concreto (70 a 85% en peso) y tienen una gran influencia

3. El agua debe estar libre de contaminaciones orgnicas y salinas. Cuando sea posible debe utilizarse agua potable.

4. El Cemento debe ser el adecuado para el tipo de obra tomando en cuenta el contenido de sales y humedad en el suel

5. La cimbra que se utilice debe colocarse de manera firme y bien sellada para evitar la prdida de lechada. Se debe re

6. La proporcin del concreto debe ser la adecuada a los esfuerzos a los cuales estar sometido. (Ver la Tabla de Dosifi
PARA 1 M3
GRAVA BOTES AGUA BOTES
HACERLO
7 2 5 VECES
6 2 6 VECES
5 1 7 VECES
4 1 8 VECES

arcillas o contaminantes que afecten la hidratacin del cemento.

5% en peso) y tienen una gran influencia sobre las propiedades del concreto fresco y endurecido, sobre las proporciones y la economa.

a posible debe utilizarse agua potable.

contenido de sales y humedad en el suelo. Se debe verificar el estado de los sacos, que no presenten roturas ni humedad.

a evitar la prdida de lechada. Se debe recubrir con aceite limpio y humedecerla previo a la colocacin del concreto.

estar sometido. (Ver la Tabla de Dosificaciones)


porciones y la economa.