A Case Study of the Apple Computer Stores -

Glass Structures 2001 - 2005


James OCallaghan BEng (Hons), CEng, MIStructE
Director Eckersley OCallaghan Structural Design

Keywords

1=Laminating 2=Structural Glass 3=Connections

Abstract; responsible has been fundamental to itself to the need for a physical bridge
their success. connection between the upper levels
The author describes the history of
of the retail zones over the proposed
the development of the feature glass
Concept; location for the glass stair. The solution
structures that have been the focus
to this was very quickly realised as a
of the architectural design of the high The initial concept developed was to
glass bridge.
prole Apple Computer stores in the create a structure that would allow
The original format for store was
USA, UK and Japan between 2001 and maximum transparency through the
the blueprint for the rst four US stores
2005. space and not defer customers views
in New York, Chicago, San Francisco
The author has been the principle of the products displayed. At the same
and Los Angeles. Stores in Japan have
designer for these structures throughout time the importance of design to Apple
developed signicantly from this and
the world and this paper follows the led them to strongly want a series of
this paper describes these evolutions
developments in glass design and structures that were not only functional
and the consequent effects on the
innovative connection methods adopted but also magical, structures that had a
structural glass design.
leading to their design and realisation. major wow factor and would grab the
The author goes on to describe the fascination of the customers in the store
Apple Stores New York, Chicago,
importance of the client, designer team environment itself. Clearly these magical
San Francisco and London
and fabricator relationship and the structures would be complemented with

Building Projects
levels of achievement possible through very highly rened architectural design The rst store in New York set the

Case Studies
a collaborative team approach and and nishes. theme for all the other stores listed
long term relationship understanding The high prole stores all have at above. The focus of these stores being
between all parties. least two levels and for this reason it an all glass stair case and a glass bridge
was suggested by the author that a between the upper retail zones.
Introduction; glass stair would be feasible to transport
customers from one level to another. Staircase Design;
Apple Computer Inc embarked in
The idea of the glass stair proved and
2001on worldwide retail expansion plan Glass Treads;
immediate success as an idea as it
through the construction of high prole
fullled the brief of allowing maximum The overall clear span of the treads is
retail outlets. These types of stores have
visual corridors throughout the lower 2.45m and the loading for the treads is
been created in the following cities;
level to open the store up an express the generally around 4.5kN/m2 depending
New York, Chicago, San Francisco, Los
product. on the store location and the loading
Angeles, Tokyo, Osaka, Nagoya and
The architectural design of the code adopted. It was the design intent
London. Innovative design aesthetic
concept high prole store also lent to develop a stair tread that was as thin
being at the core of Apples product
development, it was seen that these
high prole stores should reect this
company policy in some manner.
Through a close working relationship
with the architects Bohlin Cywinski
Jackson in Berkeley, California, the
author was able to put forward the idea
of an all glass staircase and bridge as
the core design features within the high
prole stores.
This paper presentation studies
the glass structures designed and
constructed in all of the above locations,
it focuses on the innovative techniques
use in design and fabrication. Further it
goes on to study the importance of the
relationship between client, design team
and fabricator in the realisation of highly
ambitious glass structures.
This portfolio now represents some
of the most signicant commercially
utilized glass structures around the
world today. The techniques developed
during the years they have been Image 1 Image 2
evolving and the ambition of the team Night view of stair and bridge - NY Glass stair with trafc - NY

GLASS PROCESSING DAYS 2005 - www.gpd.fi 1


as possible whilst safely resisting the enhance the clarity and whiteness periods after the autoclave process
forces imposed in both its serviceability of the low iron glass used in this varied from a few hours to a few days.
state and its fractured state. sapplication. There appeared to be a compatibility
Furthermore the deection of the tread issue between the glass and metal insert
was to be kept within a comfortable Glass Tread Insert Development; during the cooling and contraction
range in order the keep the natural period after the autoclave.
A primary focus of the initial design
frequency above the advisable threshold
was a method by which the glass treads
of 5Hz.
could be connected to the vertical
Various glass congurations were
glass support walls that moved away
considered for the tread taking into
from the more typical methods of
account strength, durability and
providing a frame around the tread or
appearance. The client was looking for
locally supporting the glass with clips.
a very sharp aesthetic with a patterned
A method that looked to integrate
surface to the tread similar to that
the support with the glass itself was
found on chequer plate steel. There
considered the design aim. This was
were two key reasons to use an all-
achieved by experimenting with the
annealed glass tread, involving both
lamination of a metal insert within
aesthetics and durability. Firstly, it
the laminates discrete to the location
could be polished after the laminating
where support would be provided by
process, signicantly increasing the
a bolt through to the glass wall. The
sharp appearance of the edge of the
metal insert, now known as a puck,
tread. Secondly, should the top sheet be
is generally semi-circular in plan shape
clipped by foot trafc, the tread could
and is laminated in the 3rd layer of the
remain in place for a reasonable amount
tread laminate. The main reason for the
of time without needing replacement,
plan shape was to ease the build up of
whereas a tempered glass sheet that
local stresses around the metal insert
failed would compromise the aesthetic.
both during the lamination process
Key also to the development
and as it would transfer load from the
of the tread itself was that of the
tread through the bolt into the glass
interlayer choice. After calculations and
supporting wall.
consideration of aesthetics a Sentry
This innovative approach required Figure 2
Glass Plus interlayer fabricated by
testing to establish its feasibility as a FEA output illustrating stress concentrations in
Dupont was proposed for the following glass tread around the titanium inserts
potential method of connecting glass
reasons;
to other mediums. It was understood
The interlayer has a superior stiffness
Building Projects

from Dupont that the sentry glass plus


to that of a regular PVB interlayer
interlayer had superior ow properties
Case Studies

allowing a greater transfer of shear


to that of PVB during the lamination Further study by Dr Steve Bennison
between layers of glass under both
process as well as superior bonding of Dupont revealed that materials
short term and long term loading
properties between glass and metals. with closer thermal expansion and
conditions. The result of this being
A nite element model to predict the conductance properties to that of glass
the signicant reduction in
local stress build up around the tting may be more successful. The material
deections experienced for the same
during load transfer. chosen with a prole very close to that
loading scenarios as that of PVB.
The rst series of tests were not of glass whilst possessing the strength
With increased stiffness performance
promising with the trial materials used required to transfer load was titanium.
comes the ability to minimize the
for the puck being stainless steel (of The titanium pucks are laminated
overall thickness of the glass tread
various grades such as 316L and 17- shy of the glass edge to allow for
beneting the overall aesthetic of the
4PH) and aluminum. Some of the treads polishing of the glass after lamination.
tread.
cracked during the lamination process, The method by which the glass walls
Sentry glass plus when laminated
some through the autoclave process, support the treads via the metal inserts
does not posses the slight yellow tint
the majority appeared to be ne once is through a saddle piece. This in turn
that can be found in many more
out of the autoclave but some others hooks over a barrel piece machined
typical Butyl interlayers that helps to
cracked after periods of time. The time from stainless steel. The barrel being
located by way of a bolt through the
intended oversized holes in the glass
wall panels. The oversized holes were
then lled. The ideal ller material
discovered for this usage was Hilti HIT
HY50, the ability to post inject a liquid
material that cures after time allowed
all lamination tolerance and hole quality
issues to be ironed out allowing for
a more predictable behaviour of load
transfer through the hole in the glass.

Figure 1
FEA output of stress build up across half of glass tread

2 GLASS PROCESSING DAYS 2005 - www.gpd.fi


Apple Store, Los Angeles, USA Apple Store, Shinsaibashi, Osaka and the inner ribbon of 1.9m dia. There
are a total of 25 treads with a glass
Vertical glass walls support the glass The Osaka store demanded a very
bridge connecting the stair to the main
treads either side as would typically stair different architectural layout to achieve
oor level.
stringers. The store in New York and the the desired store layout, this resulted
The structural design of the stair had
store in Los Angeles vary in this support in the ideal layout of the stair being a
to respect the very high local seismic
approach. New York has vertical glass spiral stair located at one end of the
loads. The stair being and internal
walls that are gravity loaded at the base store linking the ground and rst oor. It
structure was designed to 0.5G lateral
and carry the load of the treads to a was decided this was an opportunity to
load with an appropriate stiffness such
base steel channel. The Los Angeles stair create a very spectacular glass structure
that deections would be within an
has the treads supported between the utilising the combination of technology
acceptable range. The vertical load of
glass walls that in turn are hung from derived from the previous linear
the glass ribbons being supported via
the second oor. The magic of the Los staircases combined with the very best
a series of vertical stainless steel rods
Angeles hanging glass wall approach in curved laminated glass fabrication.
anchored into the stainless steel tting
is emphasized by the manner in which The stair was completed for the opening
which splices the individual glass panels
the walls levitate clear of the oor from in August 2004.
forming the ribbon. This particular
where the stair rises. The principle of the stair is a fully
splice tting is designed to provide the
All staircase walls are formed from a suspended glass stair utilizing two
necessary stiffness to emulate the glass
tri laminate of fully tempered glass. The ribbons of glass acting as the guardrails
ribbon effectively being continuous.
make up of the walls is 15mm (inner) either side of the treads. The ribbons
The continuity of the glass ribbons is
and two 12mm sheets. The sheets wind around an outer diameter of 5.2m
fundamental to the overall stiffness
are fabricated to various proles to
of the spiral in resisting lateral seismic
follow the stair rise and receive holes
loads.
to accommodate the bolts that in turn
Similar to the family of stair
support the treads. The maximum size
developed to date this relation has
of the glass panels is 5.8m high x 1.6m
similar details. The treads used are of
wide.
exactly the same build up of annealed
glass and diamond plate acid etched
patterning. The connection of the treads
to the curved glass side walls uses
the same tting using the laminated
titanium pucks and a saddle seat bolt
detail through the glass. The main
difference is that the curved nature of
the laminated glass walls requires a

Building Projects
higher tolerance, this being achieved via

Case Studies
Image 5 a modication of the tting allowing
it to adjust to accommodate these
Spiral Glass
tolerances.
The glass for the spiral glass ribbons
are formed with 3x10mm thick
laminated chemically toughened glass.
The company used to achieve the
tolerances required in both curving and
the subsequent laminating was Isoclima,
Italy. The quality of the product is
outstanding, the edge tolerances being
Image 3 less than 2mm between laminations on
View of rear of stair such complex curves is rst rate.

Apple Store, Nagoya, Japan


The last of the case study example is the
most recent store, this being our rst
linear spanning glass stair. The stair was
Image 6
Juxtaposition

Image 4 Image 7 Image 8


Levitating glass walls Treads/inner ribbon Guardrail glass beams

GLASS PROCESSING DAYS 2005 - www.gpd.fi 3


Image 9
Spanning panels and splice

completed for the opening in January


2005.
This example is particularly ambitious
given that the glass guardrails either Figure 3
side of the treads act as beams spanning Elevation of free spanning glass stair panel conguration
between the ground and rst oors.
Unlike the linear examples described
earlier in the paper, the vertical loads are to the job site and to an exacting quality the world has effectively sponsored
not transferred directly to the ground, that only Apple could demand. The the development of structural glass
the beam action of the guardrail client has understood the importance lamination and connection technology.
provides the vertical load carrying of these projects in creating unique The techniques used in laminating
capacity. glass structures and has been happy material into glass in such a manner as
This span of the stair is 6.5m and the to sponsor the ongoing research and to allow direct connection of adjacent
development required to make these structural glass elements is a rst on
Building Projects

rise is 3.7m with a total of 21 treads


making this stair one of, if not the, structures possible. such a large scale commercial projects.
Case Studies

largest commercially utilised all glass The design team has had to The success of the projects and
spanning stair in the world. There have remain very focused on continually the development in technology have
been examples of similar stairs built striving to make sure each successive opened up the manner in which we
but seeing the levels of foot trafc the glass structure is a step ahead of its approach glass design. We believe this
Nagoya stair sees on a daily basis. predecessor in some way and yet has signicantly broadened the horizon
Each guardrail beam is formed with ensuring that the overall design theme and possibilities of structural glass in
three panels. The panels are fabricated is not drastically changed that it could many different applications and has
from 3x15mm laminated toughened affect the Apple brand. This subtlety has resulted many more ambitious glass
glass spliced together with a metal strap been achieved in a number of ways with structures being designed around the
tension/shear tting at the lower edge the designs illustrated in this case study world.
of the beam and the guardrail at the top and continues to be the aim of the team
of the panel acting as the compression going forward. Acknowledgements;
strap between each piece of glass. Finally, the contractor, Seele GmbH,
Apple Computer Inc. (Client)
The lateral seismic loads which are has continued to astound the team
Steve Jobs-CEO, Bob Bridger, John
signicant in this zone are transferred with their level of commitment, focus
Hillegass
via diaphragm action of the glass stair to detail and ability to continually
Bohlin Cywinski Jackson, Berkeley, CA
acting as a plate between its base and deliver uncompromisingly on the ideas
(Design Team)
the upper retail level. The treads are developed by the team. They have
Peter Bohlin, Karl Backus, Rosa Sheng,
connected to one another laterally via proven the most reliable partner one
Anastasia Congdon, Brian Padgett, Joe
the glass riser which is keyed into the could wish for and have always been a
Holsen
tread via a tting at its support. pleasure to work alongside and learn
Eckersley OCallaghan (Design Team)
Redundancy is accounted for in the from.
Graham Coult, Brian Eckersley, Philip
triple laminate which is designed such It is this mutual understanding
Khalil, Jon Corpe, Sheila Bull
that up to two layers can fail while and respect from all levels within the
Dewhurst Macfarlane and Partners PC
sustaining full design loads. whole team from the client down that
(Design Team)
has been the recipe for success. The
Tim Macfarlane
The Team; total commitment to all and the belief
Seele GmbH & Co.KG
that it can be achieved has resulted in
A fundamental reason to the success (Glass Contractor)
uncompromising excellence and quality.
of these ambitious structural glass Seigfried Gossner, Thomas Geissler, Nelli
This model has shown how what may at
projects is the focus and energy of Diller, Holger Krueger
rst appear to be unrealistic ambitions
the team involved. The client, Apple Kajima Japan - Hiroyuki Sakamoto
and schedules can be surmounted with
Computers, have the enthusiasm and Verroplan (Contractor Design Team)
every play pulling in the same direction
will to make this happen and with Peter Beyle, Markus Diedrich
and supporting one another.
a driving ambition like this from the Tripyramid Structures Inc
top down it creates a great deal of Tim Eliassen, Michael Mulhern
Summary;
motivation within the overall team. The Depp Glass Inc
timescale with all these projects has The design and development of the Wesley Depp Snr, Wesley Depp Jnr
been very tight and miracles have had glass stair and bridge for the various Bischoff Glastechnik
to happen to ensure glass has made it high prole Apple stores throughout Gerhard Bischoff

4 GLASS PROCESSING DAYS 2005 - www.gpd.fi

You might also like