You are on page 1of 4
CHAPTER : 1.0 CARRIAGE OF MATERIALS LIST OF BUREAU OF DIAN STANDARD CODES S.No. TS.No Subject 1 TS 4082 Stacking and storage of construction materials and components at site - Recommendations 2 1S 1141 Seasoning of Timber — Code of Practice ‘Chapter-L Carriage of materials, rT SNo. Materials Unit Rate (Rs) Remarks Tkm ] 2km | Skm | 4km | Skm | Beyond Beyond km 20km upto 10 per km per addi km. Km. I 2 3 a 3 6 7 z 9 1 12 1.1 _| Transportation By Mechanical Transport including loading , unloading and stacking. TL] Lime, moorum, building rubbish ‘eum [111.50 | 125.60 | 139.46 | 152.75 | 165.63] 1138 ] 1030 | 7.27 | Therateswillbe applicable to net T12__| Earth cum [139.47 [157.00 | 174.33 | 190.94 [207.04 | 1423 [1288 [908] guanities after T13 | Manure of sludge cum | 121.20 | 136.52 | 151.59 | 166.03 | 180.03 | 1238 | 11.20 | 7.90 deduction of prescribe Tid | Excavated rock eum | 223.46 | 251.21 | 270.93 | 305.50 | 33.27 | 2277 | 2061 | 1454 | percentage for TTS | Sand, sone aggregate below 40mm [eum 412.50 [125.60 | 139.46 [152.75 | 165.63] 1138 | 1030 | 7.27 | Voids mentioned nominal size specification under subbead T.1.6 | Stone aggregate 40 mm nominal size [cum | 421.20 | 136.52 [151.59 | 166.03 | 180.03] 1238 | 1120 ] 750 |rcarewor and above T.1.7_| Soling stone eam | 101.43 | 114.10 | 126.79 [138.86 [15057] 1035 | 937 | 6.60 118 | Bricks 1000 | 297.55 | 334.95 [371.92 | 407.34 | aai.69| 3036 | 2748 | 1938 Nos. T19_ | Cement, stone blocks, GLCI,AC, | tonne | 9948 [41165 [12397 | 135.78 [14723| i012 [916 | 646 & C.C. pipes below 100 mm dia and other heavy aterials, T110_| Steel tonne | 99.28 | 111.65 | 123.97 [135.78 [147.23 1012 | 916 | 646 TIM | timber eam | 127.52 | 143.55 | 159.39 [17457 |is9.30| 1301 | 1178 | 831 Chapter: Carriage of materials 3 Ttem | Descriptions Unit Rate Gn Rs) No. 12 | Transportation by manual labour including loading, unloading and stacking for lead upto 50 metre: T21 | Lime, moorum, building rubbish cum 33.43 122 | Earth eum 6678 123 | Manure or sludge eum 38.07 124 | Exeavated rock eum 106.85 125 | Sand, stone aggregate below 40mm nominal size cum 678 12.6 _ | Stone aggregate 40mm nominal size and above cum 7220 12.7 __ | Soling stone cum 7857 128 | Bricks TO00 Nos. 124.66 T3 | Addextra for every additional lead of 50 metre or part thereof T2.1 | Lime, moorum, building rubbish cum 1163 122 | Earth eum 1434 123 | Manure or sludge eum 12.64 124 | Excavated rock cum 2.27 125 | Sand, stone aggregate below 40mm nominal size cum 1454 12.6 | Stone aggregate 40mm nominal size and above cum 1572 12.7 _ | Soling stone cum TTA 128 | Bricks 1000 Nos. 274 1 Carriage of materials rr

You might also like