Tux Section - prep and wall paper finish/install brackets, vinyl finish 1.00
ledges with covelights
Suits and Jackets Section - prep and wall paper fin, instn stainless 1.00
modules vinyl finish ledges w/ covelights
Pants and Hats Section-prep wall paper fin, install bracket system, vinyl 1.00
fin ledges w/ covelights
Office Barongs Section-prep and wall paper finish, install brackets sys, 1.00
vinyl fin ledges w/ covelights
Formal Barongs Section-prep and wall paper finish, install brackets sys, 1.00
vinyl fin ledges w/ covelights
The Shift Bar Section-prep and wall paper finish, install brackets sys, vinyl 1.00
fin ledges w/ covelights
Elevated Platform - prep and wall paper fin, underside cabinets, stairs 1.00
note : other display metal racks are excluded
Total Cost
12% VAT
GRAND TOTAL
Construction Period : Calendar Days
Prepared by:
Signature
JUNE 16, 2016
Date
NOVATIONS)
lot
13,203.15 13,203.15
lot
11,692.38 11,692.38
lot
21,980.78 21,980.78
lot
26,837.95 26,837.95
lot
12,259.75 12,259.75
lot
30,008.58 30,008.58
lot 67,862.50 67,862.50
sq.m.
1,557.50 66,349.50
chanical
ices, panelboards, sub total 66,349.50
total 742,174.45
89,060.93
grand total 831,235.38