Project Title: PROPOSED 46.20 SQM.

ONESIMUS BOUTIQUE GLORIETTA MALL (/ MAJOR RENOVATIONS)


Location: GLORIETTA MALL , AYALA , MAKATI CITY
Total Area: 46.20 sq.m.
Const. Period:
Project Manager: ENGR. SALVADOR ADOR
SPED Authorized Personnel

ITEM SCOPE OF WORK QTY.


I As-built Plan Adjustments
Dismantling (all possible items for dismantling) 1.00
Fitting Room with wood doors 1.00
Stockroom / Storage Room 1.00
Flooring (60cm x 60cm super white ord cer. Tiles as indicated in plans) 24.96
Ceiling Rectification Gypsum boards on metal furrings / carrying channels 46.20

II Category Panels
Tux Section - prep and wall paper finish/install brackets, vinyl finish 1.00
ledges with covelights
Suits and Jackets Section - prep and wall paper fin, instn stainless 1.00
modules vinyl finish ledges w/ covelights
Pants and Hats Section-prep wall paper fin, install bracket system, vinyl 1.00
fin ledges w/ covelights
Office Barongs Section-prep and wall paper finish, install brackets sys, 1.00
vinyl fin ledges w/ covelights
Formal Barongs Section-prep and wall paper finish, install brackets sys, 1.00
vinyl fin ledges w/ covelights
The Shift Bar Section-prep and wall paper finish, install brackets sys, vinyl 1.00
fin ledges w/ covelights
Elevated Platform - prep and wall paper fin, underside cabinets, stairs 1.00
note : other display metal racks are excluded

III ELECTRICAL (lighting rectifications)


All Electrical Works - instn of Additional Lights with Existing Electl supply 42.60
exclude : cctv, sound system, main entrance detector, other special trades-mechanical
works, smoke detectors, sprinkler systems.Reused existing wirings and devices, panelboards,
IV OTHERS
Deliveries of materials and pull out of debris 1.00
mobilization & demobilization 1.00
Permits (Building and Occupancy Permits, Signage)/ optional 1.00
mall security charges ( required due to overtime work by sec. guards) 1.00
bonds (CGLI/CARI, Ayala Admin requirements ) 1.00
temporary facilities, 1.00
Board up installation( to cover frontage with reqd admin board up, painted
with access door) 14.35
As-built Plan 1.00
12mm thk. gypsum board cladding (single board) on 64mm vertical and 73.36
horizontal metal studs-admin reqts
12mm thk. gypsum and MDF board double wall on 64 mm vertical & 5.60
horizontal metal studs at Stock Room and Fitting Room
sliding glass door and panels at front storage room 6mm thk tempered
clear glass with alum anoluk frames 1.00
Painting of Gypsum ceiling on 3 coats latex paint finish 42.60
please note : other items not included above shall be considered additional works
to be approved and as agreed prior to implementation.

Total Cost
12% VAT
GRAND TOTAL
Construction Period : Calendar Days

Prepared by:

DRCB SQUARE CONSTRUCTION & DEVELOPMENT CORPORATION


Name of Company
ENGR. DEMET C. BAUTISTA
Name of Representative
President & COO
Designation

Signature
JUNE 16, 2016
Date
NOVATIONS)

UNIT UNIT COST AMOUNT

lot 27,812.50 27,812.50


lot 18,356.25 18,356.25
lot 22,928.63 22,928.63
sq.m. 750.94 18,743.40
sq.m. 845.50 39,062.10

sub total 126,902.88

lot
13,203.15 13,203.15
lot
11,692.38 11,692.38
lot
21,980.78 21,980.78
lot
26,837.95 26,837.95
lot
12,259.75 12,259.75
lot
30,008.58 30,008.58
lot 67,862.50 67,862.50

sub total 183,845.08

sq.m.
1,557.50 66,349.50
chanical
ices, panelboards, sub total 66,349.50

lot 16,687.50 16,687.50


lot 55,625.00 55,625.00
lot 89,000.00 89,000.00
lot 33,375.00 33,375.00
lot 10,012.50 10,012.50
lot 16,687.50 16,687.50

sq.m. 945.63 13,569.72


lot 10,012.50 10,012.50
sq.m.
845.50 62,025.88
sqm
967.88 5,420.10

lot 35,600.00 35,600.00


sq.m. 400.50 17,061.30

sub total 365,077.00

total 742,174.45
89,060.93
grand total 831,235.38