28. RUNNING A SUCKER ROD STRING WITH EQUIP.


Elevated Loads in Dropped objects 4 C C4(P) Conduct dedicated safety meeting on job planning, Call trained base
Crane or /Hydraulic hazards associated with the job and HSE controls in first-aiders & offer
Winch Operations. place.Ensure that appropriate Risk Assessment has 1(P) first aid.
been carried out prior to commencement of task.
Working at Heights Bodily injury MED Prior to use, all lifting equipment to be visually Call Client
Heaavy Moving Risk inspected for correct color coding, SWL and Emergency number
Tubulars test certificates and any apparent damage. Low
(5555) / in case of
Never overload the crane. Always operate the Risk
Unsafe Fall from height crane with the stabilizer. serious injury
Draw-works Never walk or stand underneath the
Report the incident to
Hoisting crane load. Use tag lines.A safety
harness must be worn for all work Gulf Energy Mgt &
Equipment
Hand and finger injuries over 2 m height. Client.
Unsafe Tongs, All tools used at height must have safety
lines attached to the users belt. Refer to Gulf Energy
Slips and
Never hammer on ordinary tools. HSE Manual Ch. 8
Elevators Electrocution Never apply excessive force to tools. Emergency
Unsafe Manual 8.Never drop or throw tools.Improper use Response Procedure
of equipment or hands and other parts of
Lifting
the body.Never block the view of the
moving equipment controller.
Unsafe Electrical
Crown safety devices is correctly installed
Equipment and adjusted at start of shift.
The drillers view of the blocks or drill-string
Unsafe Rotating must never be blocked.
Equipment

36 | P a g e
JOB SAFETY ANALYSIS
HAZARD & Effect Management
FOR WORKOVER OPERATIONS
Doc.Ref:

Control Measures

Residual Risk
Consequence

Risk Rating
Probability
Identify Hazard Hazard Effect

measures
Recovery
(Potential to do (PPE / Procedure)
harm) (If hazard is released)

29. RUNNING A SUCKER ROD STRING CONTINUE


Elevated Loads in Dropped objects 4 C C4(P) Crew must not stand on the draw-works while Call trained base
Crane or /Hydraulic the drum is moving. first-aiders & offer
Winch Operations. Use correct racking method by 1(P) first aid.
derrickman
Working at Heights Bodily injury MED Do not pull string out to fast. Call Client
Heaavy Moving Risk Inspect trip tank and hoses before starting to Emergency number
Tubulars pull string out. Low
(5555) / in case of
Crew must never stand or work under loads or Risk
Unsafe Fall from height serious injury
equipment just supported by hydraulic
Draw-works machinery.
Report the incident to
Hoisting No adjustment or repairs are to take place to
hydraulic equipment without first isolating the Gulf Energy Mgt &
Equipment
Hand and finger injuries power supply and bleeding off trapped hydraulic Client.
Unsafe Tongs, pressure.
Wearing hearing protection in high noise Refer to Gulf Energy
Slips and
areas. HSE Manual Ch. 8
Elevators Electrocution Emergency
Unsafe Manual Response Procedure
Lifting

Unsafe Electrical
Equipment

Unsafe Rotating
Equipment

37 | P a g e
JOB SAFETY ANALYSIS
HAZARD & Effect Management
FOR WORKOVER OPERATIONS
Doc.Ref:

Control Measures

Residual Risk
Consequence

Risk Rating
Probability
Hazard Effect

measures
Recovery
Identify Hazard (PPE / Procedure)
(Potential to do (If hazard is released)
harm)

30. SPACING OUT DOWN HOLE PUMP


Pinch points Finger/ hand injuries 4 C C4(P) Call trained base
first-aiders & offer
Follow correctly procedures. 1(P) first aid.
Take clear instructions arrange the jobs
Unsafe Acts Bodily injury MED and kept updated tally of the strings. Call Client
Risk Observe all unsafe act. Emergency number
Conduct dedicated safety meeting on job planning, Low
(5555) / in case of
hazards associated with the job and HSE controls in Risk
serious injury
Human Error Miscalculation of RIH length place.
All employees should be fully trained on Safe Manual Report the incident to
Material Handling operation. Gulf Energy Mgt &
As far as possible, use mechanical means of material
Client.
Equipment damage handling such as forklifts and cranes.
Employees to be trained and strongly encouraged to
Refer to Gulf Energy
inspect all hand tools in use on a daily basis
Ensure that homemade / damaged hand tools are not HSE Manual Ch. 8
in use and removed from site / toolbox. Emergency
Response Procedure

38 | P a g e
JOB SAFETY ANALYSIS
HAZARD & Effect Management
FOR WORKOVER OPERATIONS
Doc.Ref:

Control Measures

Residual Risk
Consequence

Risk Rating
Probability
Identify Hazard Hazard Effect

measures
Recovery
(Potential to do (PPE / Procedure)
harm) (If hazard is released)

31. SEATING STANDING VALVE


3 C C3(P) Call trained base
Crew must never stand or work under first-aiders & offer
Rotating Equipment Finger/ hand injuries loads or equipment just supported by 1(P) first aid.
hydraulic machinery
MED
Crew must not stand on the drawworks Call Client
Risk while the drum is moving. Emergency number
Tongs, Slips and Bodily injury Low
Take clear instructions Risk
(5555) / in case of
Elevators Follow correctly procedures. serious injury

Report the incident to


Falling object per
Gulf Energy Mgt &
Drawworks Hoisting Client.
Equipment
Refer to Gulf Energy
HSE Manual Ch. 8
Emergency
Response Procedure

39 | P a g e
JOB SAFETY ANALYSIS
HAZARD & Effect Management
FOR WORKOVER OPERATIONS
Doc.Ref:

Control Measures

Residual Risk
Consequence

Risk Rating
Probability
Identify Hazard Hazard Effect

measures
Recovery
(Potential to do (PPE / Procedure)
harm) (If hazard is released)

32. PULLING TUBING OUT OF HOLE


Elevated Loads in Dropped objects head and 3 C C3(P) Call trained base
Crane or spinal injuries. Use correct racking method by derrickman first-aiders & offer
Air/Hydraulic Winch Do not pulling string out to fast. 1(P) first aid.
Operations. Hand and finger trapping and Inspection trip tank and hoses to well before
smashing in winch. MED start to pulling string out. Call Client
Working at Heights Risk Crew must never stand or work under Emergency number
Falling from height and loads or equipment just supported by Low
Heavy Moving (5555) / in case of
hydraulic machinery. Risk
Tubulars serious injury
No adjustment or repairs are to take place
to hydraulic equipment without first
Drawworks Hoisting Report the incident to
isolating the power supply and bleeding
Equipment off trapped hydraulic pressure. Gulf Energy Mgt &
Provision of drinking water and salt tablets Client.
Tongs, Slips and to be made.
Elevators Wearing hearing protection in high noise Refer to Gulf Energy
areas. HSE Manual Ch. 8
Manual Lifting
Prior to use, all lifting equipment to be visually Emergency
inspected for correct color coding, SWL and Response Procedure
Electrical Equipment
signs damage.
Never overload the crane. Always operate
Rotating Equipment
the crane with the stabilizer.

40 | P a g e