You are on page 1of 50

MALIK MIJ CHUNXING RESORUCES RECYCLINING LIMITED

PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
BILL OF QUANTITIES

MAIN PLANT BUILDING (A)

CIVIL WORKS

A B C=B-A

Quantity
Excess Quantity
As per Quantity As per M/s
Item Claim byM/s Rocky
Description of Items Unit Construc- Rocky Construction
No. Construction Co.
tion Co. upto IPC 6
upto IPC 6
drawings

SECTION-1 PRELIMINARIES & EARTHWORKS

1.4 EARTH WORK

Structural backfill in foundations with approved suitable


excavated soil from BOQ Item 1.4.1 including breaking
clods, dressing watering, compacting mechanicaly in layers
1.4.2 not exceeding 225mm thick depth to 95% Modification M3 1,230 2,616.00 1,386.00
Proctor Dry Density (MPD) from any lead and any lift
compacted as per Specification and as per approval of the
Engineer.
SECTION-2 CONCRETE WORKS
2.4 Structural Concrete

Provide and lay structural cement concrete of 3000 psi


cylinder crushing strength at 28 days using O.P.Cement,
Chenab sand and Sargodha crush stone including formwork
2.4.1 and its removal, placing,compacting, finishing and curing
complete in all respects (including screening and washing of
stone aggregate) but excluding the cost of reinforcement as
per Specifications

a) R.C.C.Footings / Pile Capping M3 3,125 3,195.06 70.06

SECTION-16 PILING

16.2 Board Cast in Place R.C.C. Pile

WORKING PILES

a) 13,500mm and 600mm nominal dia RM 13,202 13,446.00 244.00

Provide, supply and fix steel reinforcing hot rolled


reformed steel bars Grade 60 conforming to ASTM A-
16.2.2 615 in piles, Steel including vertical bars, spirals, holding Ton 585 592.23 7.23
rings and stiffeners etc. longitudinal bars in required cut
lengths and staggered laps.
SECTION-17 SPECIAL ITEMS

17.1 Miscellaneous Special Items

Provide and lay selected granular material bedding of


footings comprising 70% crushed stone and 30% sand
17.1.4 compacted upto 98% Modification Proctor Dry Density
(M.P.D.) complete in all respect as shown in drawing
and as additionally directed by the Engineer.

a) 98% compaction under Footings / Brick

M3 8,680 8,853.38 173.38


Foundations & under floor

TOTAL:Amount
LIMITED

D Z=A X D

Rate As per Claim Claim justification


Contract
Agreement

Amount
(Rs)

Claimed as per site


with extra working
370.00 512,820 space and soil
collapse
This activity done
according to
excavation

Claimed as per site


12,000.00 840,720 according to
excavation

Claimed as per site


4,920.00 1,200,480 requirement with
extrea length

Claimed as per site


120,300.00 869,769 requirement with
extrea length
Claimed as per site
3,200.00 554,816 requirement with
extrea length

3,978,605
MALIK MIJ CHUNXING RESORUCES RECYCLINING LIMITED
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
BILL OF QUANTITIES

WASHING/LOCKERS BUILDING (B)

CIVIL WORKS
A B

Quantity Quantity As
As per per M/s Rocky
Item No. Description of Items Unit
Construc-tion Construction
drawings Co. upto IPC 6

SECTION-1 PRELIMINARIES &


EARTHWORKS

1.4 EARTH WORK

Structural excavation in soil above sub soil


water level for levelling and grading of walls
and columns foundation as shown in
1.4.1 drawings and Specifications and as per M3 605 1,300.30
approval of the Engineer.

Structural backfill in foundations and under


floor with approved suitable excavated soil
from BOQ Item 1.4.1 including breaking
clods, dressing watering, compacting
mechanicaly in layers not exceeding
225mm thick depth to 95% Modification
1.4.2 Proctor Dry Density (MPD) from any lead M3 400 1,149.00
and any lift compacted as per Specification
and as per approval of the Engineer.
Compacted fill with approved earth under
floor including dressing, watering,
compacting mechanically in layers not
excluding 230mm thick in depth to 98%,
Modification Proctor Dry Density (MPD)
brought from outside the Project limits, any
1.4.3 M3 642.90
lead and any lift compacted as per
Specifications and as per approval of the
Engineer.

SECTION-3 MASONRY

3.1 Brick Work

Provide and lay first class brick work in


foundation in 1;5 cement sand mortar using
chenab sand including, scafolding and
making flush or groove joints, raking out
3.1.2
joins curing i/c provision and fixing of metal
ties for jointing concrete and brick work
along height of wall etc; as shown on
drawings and as specified

a) 230mm thick M3 140 161.58

TOTAL:Amount
CYCLINING LIMITED

LABAD

ING (B)

C=B-A D Z=A X D

Excess
Quantity
Claim
byM/s Rate As per Claim Claim justification
Rocky Contract
Construc Agreement
tion Co.
upto IPC
6 Amount
(Rs)

Excavated the whole


695.30 339.00 235,707 area as per site
requirements

This activity done


749.00 370.00 277,130 according to
excavation
This activity claimed
642.90 570.00 366,453 with site require
ment

This activity claimed


with site require
ment

21.58 8,200.00 176,956

1,056,246
MALIK MIJ CHUNXING RESORUCES RECYCLINING LIM
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
BILL OF QUANTITIES

DESULURIZING POOL (C)

CIVIL WORKS
A B

Quantity
Quantity As per
As per
M/s Rocky
Item No. Description of Items Unit Construc
Construction Co.
-tion
upto IPC 6
drawings

SECTION-1 PRELIMINARIES & EARTHWORKS

1.4 EARTH WORK

Structural excavation in soil below sub soil water level,


levelling, as shown in drawings and specifications and
1.4.7 as per approved of the Engineer. M3 3,570.30

Filling with excavated material for temporary track and


ramp as per approval of the Engineer
1.4.8 M3 1,387.20

SECTION-2 CONCRETE WORKS

2.3 Non-Structural Concrete


a) PCC (1:4:8) M3 296.40

2.4 Structural Concrete

a) R.C.C.Footings / Pile Cap M3 502 526.70


SECTION-17 SPECIAL ITEMS

17.3 Establishment of D-Watering System

Establishment of D-watering system up to the required

depth as approved by the Engineer, complete in all job 3,300,000.00

respects.
TOTAL:Amount
ECYCLINING LIMITED
A
ALABAD
S

(C)

C=B-A D Z=A X D

Excess
Quantity Claim Rate As per Claim Claim justification
byM/s Rocky Contract
Construction Agreement
Co. upto IPC 6
Amount
(Rs)

3,570.30 1,300.00 4,641,390 Excess work claim

1,387.20 339.00 470,261 Excess work claim

296.40 6,000.00 1,778,400 Excess work claim

24.70 15,000.00 370,500 Excess work claim


1.00 3,300,000.00 3,300,000 New Item added

10,560,551
MALIK MIJ CHUNXING RESORUCES RECYCLINING LIMITED
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
BILL OF QUANTITIES

BAG HOUSE FOUNDATION 2 (E)

CIVIL WORKS
A B

Quantity
Quantity As per M/s
As per Rocky
Item No. Description of Items Unit
Construc-tion Constructio
drawings n Co. upto
IPC 6

SECTION-1 PRELIMINARIES &


EARTHWORKS

1.4 EARTH WORK

Structural excavation in soil above sub soil


water level for levelling and grading of walls
and columns foundation as shown in drawings
1.4.1 and Specifications and as per approval of the M3 435 584.90
Engineer.

Structural backfill in foundations and under


floor with approved suitable excavated soil
from BOQ Item 1.4.1 including breaking clods,
dressing watering, compacting mechanicaly in
layers not exceeding 225mm thick depth to
1.4.2 95% Modification Proctor Dry Density (MPD) M3 80 234.20
from any lead and any lift compacted as per
Specification and as per approval of the
Engineer.
Compacted fill with approved earth under floor
including dressing, watering, compacting
mechanically in layers not excluding 230mm
thick in depth to 98%, Modification Proctor Dry
Density (MPD) brought from outside the
Project limits, any lead and any lift compacted
1.4.3 M3 115 145.90
as per Specifications and as per approval of
the Engineer.

SECTION-2 CONCRETE WORKS

2.3 Non-structural Concrete


Provide and lay lean concrete in foundations
and flooring etc., using crush stone as coarse
aggregate incluidng formwork and its removal,
leveling, compacting and curing etc., complete
in all respects as per drawings.

a) PCC (1:4:8) M3 11 12.30

2.4 Structural Concrete

Provide and lay structural cement concrete of


3000 psi cylinder crushing strength at 28 days
using O.P.Cement, Chenab sand and
Sargodha crush stone including formwork and
2.4.1 its removal, placing,compacting, finishing and
curing complete in all respects (including
screening and washing of stone aggregate)
but excluding the cost of reinforcement as per
Specifications

a) R.C.C.Footings M3 49.15 52.54


TOTAL:Amount
RECYCLINING LIMITED
1A
SALABAD
ES

ON 2 (E)

C=B-A D Z=A X D

Excess
Quantity
Rate As per Claim Claim justification
Claim byM/s
Contract
Rocky
Agreement
Construction
Co. upto IPC 6
Amount
(Rs)

Excess work claim


149.90 339.00 50,816
with site requirement

Excess work claim


154.20 370.00 57,054
with site requirement
Excess work claim
30.90 3,200.00 98,880
with site requirement

Excess work claim


0.87 6,000.00 5,220
with site requirement

Excess work claim


3.39 11,500.00 38,985
with site requirement
250,955
MALIK MIJ CHUNXING RESORUCES RECYCLINING LIMITED
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
BILL OF QUANTITIES

BAG HOUSE FOUNDATION 3 SETS (F)

CIVIL WORKS
A B C=B-A

Excess
Quantity Quantity
Quantity As per Claim
As per M/s byM/s
Item No. Description of Items Unit Construc Rocky Rocky
-tion Construc Construc
drawings tion Co. tion Co.
upto IPC upto IPC
6 6

SECTION-1 PRELIMINARIES &


EARTHWORKS

1.4 EARTH WORK

Structural excavation in soil above sub soil


water level for levelling and grading of walls
and columns foundation as shown in drawings
1.4.1 and Specifications and as per approval of the M3 435 490.90 55.90
Engineer.

Structural backfill in foundations and under


floor with approved suitable excavated soil
from BOQ Item 1.4.1 including breaking clods,
dressing watering, compacting mechanicaly in
layers not exceeding 225mm thick depth to
1.4.2 95% Modification Proctor Dry Density (MPD) M3 80 343.00 263.00
from any lead and any lift compacted as per
Specification and as per approval of the
Engineer.
Compacted fill with approved earth under floor
including dressing, watering, compacting
mechanically in layers not excluding 230mm
thick in depth to 98%, Modification Proctor Dry
Density (MPD) brought from outside the
Project limits, any lead and any lift compacted
1.4.3 M3 115 146.50 31.50
as per Specifications and as per approval of
the Engineer.

SECTION-2 CONCRETE WORKS

2.2 Reinforcement for Concrete


provide and fix steel reinforce mint Grade 60
deformed steel bars confirming to ASTM A-615
including cleaning,cutting, bending,placing,
binding etc.,including provision and cost of
2.2.1 spacers and binder wire, cost of chairs,
overlaps not shown on drawings etc., in any
kind of R.C.C works as specified.

a) Reinforcing steel bars of Grade 60(min.6000


Ton 7 36.42 29.17
psi yield strength)

2.3 Non-structural Concrete


Provide and lay lean concrete in foundations
and flooring etc., using crush stone as coarse
aggregate incluidng formwork and its removal,
2.3.1 leveling, compacting and curing etc., complete
in all respects as per drawings.

a) PCC (1:4:8) M3 11.43 12.50 1.07

TOTAL:Amount
YCLINING LIMITED

LABAD

SETS (F)

D Z=A X D

Rate As per Claim Claim justification


Contract
Agreement

Amount
(Rs)

Excess work claim


339.00 18,950
with site requirement

Excess work claim


370.00 97,310
with site requirement
Excess work claim
3,200.00 100,800
with site requirement

Excess work claim


115,000.00 3,354,550
with site requirement

Excess work claim


6,000.00 6,420
with site requirement

3,578,030
MALIK MIJ CHUNXING RESORUCES RECYCLINING LIMITED
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
BILL OF QUANTITIES

ADMIN BLOCK (G)

CIVIL WORKS
A B

Quantity
Quantity
As per M/s
As per
Rocky
Item No. Description of Items Unit Construc-
Constructi
tion
on Co. upto
drawings
IPC 6

SECTION-1 PRELIMINARIES & EARTHWORKS

1.4 EARTH WORK

Structural excavation in soil above sub soil water


level for levelling and grading of walls and columns
foundation as shown in drawings and Specifications
1.4.1 and as per approval of the Engineer. M3 2,950 3,739.10

Structural backfill in foundations and under floor with


approved suitable excavated soil from BOQ Item
1.4.1 including breaking clods, dressing watering,
compacting mechanicaly in layers not exceeding
225mm thick depth to 95% Modification Proctor Dry
Density (MPD) from any lead and any lift compacted
1.4.2 M3 340 663.00
as per Specification and as per approval of the
Engineer.
Compacted fill with approved Chenab sand and
Gravel (30:70)under raft including dressing,
watering, compacting mechanically in layers not
excluding 230mm thick in depth to 98%, Modification
Proctor Dry Density (MPD) brought from outside the
Project limits, any lead and any lift compacted as
1.4.4 M3 770 890.40
per Specifications and as per approval of the
Engineer.

SECTION-2 CONCRETE WORKS

2.3 Non-structural Concrete


Provide and lay lean concrete in foundations and
flooring etc., using crush stone as coarse aggregate
incluidng formwork and its removal, leveling,
2.3.1 compacting and curing etc., complete in all respects M3
as per drawings.

a) PCC (1:4:8) M3 140.00 164.00

2.4 Structural Concrete

Provide and lay structural cement concrete of 3000


psi cylinder crushing strength at 28 days using
O.P.Cement, Chenab sand and Sargodha crush
stone including formwork and its removal,
2.4.1
placing,compacting, finishing and curing complete in
all respects (including screening and washing of
stone aggregate) but excluding the cost of
reinforcement as per Specifications

b) R.C.C roof beams and lintles M3 210.00 222.66


c) R.C.C suspended slab i/c projection and shelvs M3 405.00 441.00
` d) R.C.C parapet M3 16.00 21.00
` f) R.C.C for stairs M3 23.00 24.90
SECTION-6 PLASTERING & POINTING

6.1 Cement Plaster


Supply, make, apply and cure 19mm thick smooth
finished plaster in 1:4 cement sand mortar, smooth
finished with steel trowel on columns, external
surface of walls and beams as shown in drawings,
6.1.1 including curing etc; as per Specifications and to the M2 4,450.00 4,834.00
approval of the Engineer.
Total Plaster work

Supply, make, apply and cure 19mm thick smooth


finished plaster in 1:4 cement sand mortar, smooth
finished with steel trowel on columns, external
surface of walls and beams as shown in drawings,
6.1.2 including curing etc; as per Specifications and to the M2 1,780.00 2,783.00
approval of the Engineer.
Total Plaster work

TOTAL:Amount
ECYCLINING LIMITED
A
ALABAD
ES

C=B-A D Z=A X D

Excess
Quantity
Claim byM/s Rate As per Claim Claim justification
Rocky Contract
Constructio Agreement
n Co. upto
IPC 6
Amount
(Rs)

Claimed as per site with


789.10 339.00 267,505 extra working space
and soil collapse

This activity done


323.00 370.00 119,510 according to excavation
claimed as per site to
120.40 3,200.00 385,280 stablize at the edges

This activity done


24.00 6,000.00 144,000 according to excavation

12.66 12,000.00 151,920


36.00 11,500.00 414,000
5.00 12,500.00 62,500
1.90 11,500.00 21,850
384.00 350.00 134,400 Bifurcation OF Plaster

1,003.00 350.00 351,050

2,052,015
MALIK MIJ CHUNXING RESORUCES RECYCLINING LIMITED
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
BILL OF QUANTITIES

MATERIAL STORAGE (H)

CIVIL WORKS
A B C=B-A

Excess
Quantity
Quantity Quantity
As per M/s
As per Claim byM/s
Rocky
Item No. Description of Items Unit Construc- Rocky
Constructi
tion Constructio
on Co. upto
drawings n Co. upto
IPC 6
IPC 6

SECTION-1 PRELIMINARIES &


EARTHWORKS

1.4 EARTH WORK

Structural excavation in soil above sub soil


water level for levelling and grading of walls
and columns foundation as shown in drawings
1.4.1 and Specifications and as per approval of the M3 480 1,112.20 632.20
Engineer.

SECTION-2 CONCRETE WORKS

2.4 Structural Concrete


Provide and lay structural cement concrete of
3000 psi cylinder crushing strength at 28 days
using O.P.Cement, Chenab sand and
Sargodha crush stone including formwork and
2.4.1 its removal, placing,compacting, finishing and
curing complete in all respects (including
screening and washing of stone aggregate) but
excluding the cost of reinforcement as per
Specifications

c) R.C.C slab on grade laid in panals M3 60.00 60.50 0.50


c) R.C.C columns and pedestals M3 16.00 23.60 7.60

SECTION-3 MASONRY

3.1 Brick Work

Provide and lay first class brick work in


foundation in 1;5 cement sand mortar using
chenab sand including, scafolding and making
3.1.2 flush or groove joints, raking out joins curing i/c
provision and fixing of metal ties for jointing
concrete and brick work along height of wall
etc; as shown on drawings and as specified

a) 230mm thick M3 50 90.02 40.02

TOTAL:Amount
NING LIMITED

D Z=A X D

Rate As per Claim Claim justification


Contract
Agreement

Amount
(Rs)

Claimed as per site


with extra working
339.00 214,316 space and soil
collapse
This activity done
according to
excavation

10,500.00 5,250
13,500.00 102,600

Excess work claim


with site requirement

8,200.00 328,164

650,330
MALIK MIJ CHUNXING RESORUCES RECYCLINING LIMITED
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
BILL OF QUANTITIES

CAR PARKING (I)

CIVIL WORKS
A B C=B-A

Excess
Quantity
Quantity Quantity
As per M/s
As per Claim byM/s
Rocky
Item No. Description of Items Unit Construc- Rocky
Constructi
tion Constructio
on Co. upto
drawings n Co. upto
IPC 6
IPC 6

SECTION-1 PRELIMINARIES &


EARTHWORKS

1.4 EARTH WORK

Structural excavation in soil above sub soil


water level for levelling and grading of walls
and columns foundation as shown in drawings
1.4.1 and Specifications and as per approval of the M3 361 799.70 438.70
Engineer.

SECTION-2 CONCRETE WORKS

2.3 Non-structural Concrete


Provide and lay lean concrete in foundations
and flooring etc., using crush stone as coarse
aggregate incluidng formwork and its removal,
2.3.1 leveling, compacting and curing etc., complete M3
in all respects as per drawings.

a) PCC (1:4:8) M3 10.30 10.80 0.50

2.4 Structural Concrete


Provide and lay structural cement concrete of
3000 psi cylinder crushing strength at 28 days
using O.P.Cement, Chenab sand and
Sargodha crush stone including formwork and
2.4.1 its removal, placing,compacting, finishing and
curing complete in all respects (including
screening and washing of stone aggregate) but
excluding the cost of reinforcement as per
Specifications

b) R.C.C coulmns M3 9.08 9.50 0.42

TOTAL:Amount
NING LIMITED

D Z=A X D

Rate As per Claim Claim justification


Contract
Agreement

Amount
(Rs)

Claimed as per site with


339.00 148,719 extra working space
and soil collapse

This activity done


according to excavation

6,000.00 3,000
Excess work claim with
site requirement

15,000.00 6,300

158,019
MALIK MIJ CHUNXING RESORUCES RECYCLINING LIMITED
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
BILL OF QUANTITIES

ADMIN BLOCK (G)

CIVIL WORKS
A B C=B-A

Excess
Quantity
Quantity Quantity
As per M/s
As per Claim byM/s
Rocky
Item No. Description of Items Unit Construc- Rocky
Constructi
tion Constructio
on Co. upto
drawings n Co. upto
IPC 6
IPC 6

SECTION-1 PRELIMINARIES &


EARTHWORKS

1.4 EARTH WORK

Structural excavation in soil above sub soil


water level for levelling and grading of walls
and columns foundation as shown in drawings
1.4.1 and Specifications and as per approval of the M3 417 491.50 74.50
Engineer.

Structural backfill in foundations and under


floor with approved suitable excavated soil
from BOQ Item 1.4.1 including breaking clods,
dressing watering, compacting mechanicaly in
layers not exceeding 225mm thick depth to
95% Modification Proctor Dry Density (MPD)
1.4.2 M3 220 253.20 33.20
from any lead and any lift compacted as per
Specification and as per approval of the
Engineer.
Compacted fill with approved Chenab sand
and Gravel (30:70)under raft including
dressing, watering, compacting mechanically in
layers not excluding 230mm thick in depth to
98%, Modification Proctor Dry Density (MPD)
brought from outside the Project limits, any
1.4.4 M3 120 146.60 26.60
lead and any lift compacted as per
Specifications and as per approval of the
Engineer.

SECTION-2 CONCRETE WORKS

2.2 Reinforcement for Concrete


provide and fix steel reinforce mint Grade 60
deformed steel bars confirming to ASTM A-615
including cleaning,cutting, bending,placing,
binding etc.,including provision and cost of
2.2.1 spacers and binder wire, cost of chairs,
overlaps not shown on drawings etc., in any
kind of R.C.C works as specified.

a) Reinforcing steel bars of Grade 60(min.6000


Ton 6.5 9.61 3.11
psi yield strength)

TOTAL:Amount
NING LIMITED

D Z=A X D

Rate As per Claim Claim justification


Contract
Agreement

Amount
(Rs)

Claimed as per site


with extra working
339.00 25,256 space and soil
collapse

This activity done


370.00 12,284 according to
excavation
Excess work claim
3,200.00 85,120
with site requirement

Excess work claim


with site requirement

115,000.00 357,650

480,310
MALIK MIJ CHUNXING RESORUCES RECYCLINING LIMITED
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
BILL OF QUANTITIES

CONCRETE PAVEMENT AND WALKWAYS (P)

CIVIL WORKS
A B C=B-A

Excess
Quantity Quantity
Quantity As
As per Claim byM/s
per M/s Rocky
Item No. Description of Items Unit Construc- Rocky
Construction
tion Constructio
Co. upto IPC 6
drawings n Co. upto
IPC 6

SECTION R-4 EARTH WORK FOR ROADS

Provide and fill sand approved by the


Engineer,under pavement, parking areas and
walkway, etc.,including cost of material,
R-4.3 transportation, placing, and compacting 95% M3 3,610 15,528.20 11,918.20
modified AASHTO dry density complete as per
Specification.

TOTAL:Amount
LINING LIMITED

AD

WAYS (P)

D Z=A X D

Rate As per Claim Claim justification


Contract
Agreement

Amount
(Rs)

Excess work claim


706.00 8,414,249
with site requirement

8,414,249
MALIK MIJ CHUNXING RESORUCES RECYCLINING LIMITED
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
BILL OF QUANTITIES

WEIGH BRIDGE

CIVIL WORKS
A B C=B-A

Excess
Quantity
Quantity Quantity
As per M/s
As per Claim byM/s
Rocky
Item No. Description of Items Unit Construc- Rocky
Constructi
tion Constructio
on Co. upto
drawings n Co. upto
IPC 6
IPC 6

SECTION-1 PRELIMINARIES &


EARTHWORKS

1.4 EARTH WORK

Structural excavation in soil above sub soil


water level for levelling and grading of walls
and columns foundation as shown in drawings
1.4.1 and Specifications and as per approval of the M3 195 458.50 263.50
Engineer.

Compacted fill with approved Chenab sand


and Gravel (30:70)under raft including
dressing, watering, compacting mechanically in
layers not excluding 230mm thick in depth to
98%, Modification Proctor Dry Density (MPD)
brought from outside the Project limits, any
1.4.3 M3 37 58.70 21.70
lead and any lift compacted as per
Specifications and as per approval of the
Engineer.

SECTION-2 CONCRETE WORKS

2.3 Non-structural Concrete


Provide and lay lean concrete in foundations
and flooring etc., using crush stone as coarse
aggregate incluidng formwork and its removal,
2.3.1 leveling, compacting and curing etc., complete M3
in all respects as per drawings.

a) PCC (1:4:8) M3 6.00 13.70 7.70

2.4 Structural Concrete

Provide and lay structural cement concrete of


3000 psi cylinder crushing strength at 28 days
using O.P.Cement, Chenab sand and
Sargodha crush stone including formwork and
2.4.1 its removal, placing,compacting, finishing and
curing complete in all respects (including
screening and washing of stone aggregate) but
excluding the cost of reinforcement as per
Specifications

a) R.C.C Footings M3 17.00 36.10 19.10

Ditto item aboe 2.4.1 but using structural


2.4.2 cement concrete of 3750 psi cylinder crushing
strength at 28 days

b) R.C.C coulmns M3 3.00 17.48 14.48

TOTAL:Amount
NING LIMITED

D Z=A X D

Rate As per Claim Claim justification


Contract
Agreement

Amount
(Rs)

Claimed as per site


with extra working
339.00 89,327 space and soil
collapse

This activity done


3,200.00 69,440 according to
excavation
6,000.00 46,200

Excess work claim


12,000.00 229,200
with site requirement

Excess work claim


15,000.00 217,200
with site requirement

651,367
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD

SUMMARY OF CLAIMS

Excess work claim


Sr. till IPC 06
Description
No.
Amount (Rs)

1 Main Plant Building (A) 3,978,605


o Civil Works

2 Washing & Locker Building (B) 1,056,246


o Civil Works

3 Desulfurizing Pool (C) 10,560,551


o Civil Works

5 Bag House Foundation 2 (E) 250,955


o Civil Works

6 Bag House Foundation 3 (F) 3,578,030


o Civil Works

7 Admin Block (G)


2,052,015
o Civil Works

8 Material Storage (H) 650,330


o Civil Works

9 Car Parking (I) 158,019

10 Wagon Parking (J) 480,310

11 Concrete Pavement & Walkways (P) 8,414,249

12 Weigh Bridge (R) 651,367

Total Claim Amount: 31,830,676


A
ALABAD

Remarks