Mukim Cheras, Daerah Hulu Langat, Selangor For Tetuan Syarikat Shoib Properties Sdn Bhd
Equipment Specification
a. Penstock 2 no
Type Non rising
Motor Power manual type
Channel Width 300mm
a. Mechanical Scree 1 no
Brand Herman
Model HER-1000
Type Front rake
Motor Power 0.75 kW
Channel width 500 mm
Clerance 25 mm
b. Static screen 2 no
Type Stainless steel bar
Channel width 500 mm
Clerance 25 mm
3 Wet wet
'file:///conversion/tmp/scratch/362193399.xls'#$Equip
Prepared by JURUTERA PERUNDING TEGAP
Proposed Sewage Pumping Station for Cadangan Pembangunan Di Atas Lot 1668 Dan 2043, Mukim Cheras,
Daerah Hulu Langat, Selangor For Tetuan Syarikat Shoib Properties SDN BHD
2.0 DESIGN OF INLET SCREEN CHAMBER & PRIMARY SCREEN CHAMBER FOR
ULTIMATE PHASE
Upon reaching the sewage treament plant, sewage flows to the primary screen prior to the pump
sump. The primary screening facilities consists of one mechanical screen and one manual screen as by
pass.
2.1 Finding total opening width in coarse screen
6mm
bars
6mm
m 25mm
50mm
80mm
x = no. of bars
W = Channel width = 500
W' = Total channel width
W - (50 x 2) = 6x + 25(x + 1)
x = 12.10 bars
W' = 25 mm x ( x + 1 )
W' = 350 mm
coarse screen
W.L. at Q peak
W.L at Q avg
h
Vapp Ho h
Vft L
H1=H2 H2
wet well of
pump sump
(2gh)1/2 = 0.2167
h = 0.0024 m
Thus, H2 = 0.0524 m
Given W = 0.5
W'= 0.350
a) At Qavg,
Therefore, H0 = H2 + hL
H0= 0.1024 m
I) Approach velocity; Vapp = Qavg/(WxH0)
= 0.1312 m/s
(<=1.0m/s) (table 5.2 Developer Guidelines, PG 82)
II) Flow through velocity; Vft = Qavg/(W'xH0)
= 0.1875 m/s
3 of 14
G:\04157\Cal\pumping station\[pump-sta.xls]calculation
(<=1.0m/s) (table 5.2 Developer Guidelines, PG 82)
b) At Qpeak,
Therefore, H0 = H2 + hL
H0= 0.4429 m
I) Approach velocity; Vapp = Qpeak/(WxH0)
= 0.1285 m/s
(<=1.0m/s) (table 5.2 Developer Guidelines, PG 82)
II) Flow through velocity; Vft = Qpeak/(W'xH0)
= 0.1835 m/s
(<=1.0m/s) (table 5.2 Developer Guidelines, PG 82)
Conclusion
a) Therefore, 1 nos. of
0.5 m x 0.4429 m mech.coarse screen is adequate.
From the guideline design of sewage treatment works, (Volume IV). Quantity of screening collected from Primary Screen.
Therefore provide One 1 unit of Collection Bin with dimension of 0.5m(L) x 0.5m(W) x 0.5m(D)
4 of 14
G:\04157\Cal\pumping station\[pump-sta.xls]calculation
Pump sump size provided = 1.35 m(D) x 2.1 m (L) x 1.6 m (W)
= 4.5 m 3
> 2.56 m 3
Please take note that the minimum level of difference shall be 150mm
The maximum hydraulic retention time at average flow Qave , is 30 min (Guidelines for Developers,
Volume iii, pg. 60)
tret = Veff/Qave
From Guideline for Developer, Volume III, Table 2.4 Recommended Design Parameters for inlet Pumps, Pg.59
Provide One (1) duty and One (1) (100% standby) Pump for this pumping station
Pump design flow each at 1.0 Qpeak
Static Head
Level of discharge point = 62.8 m
level of pump stop point = 47.8 m
Max. static head = 15 m
hf = Friction loss
C = Hazen -William Coefficient 110 For DI Pipe
V = Velocity in the pipe
L = Length of pipe
D = Equivalent diameter of the pipe
5 of 14
G:\04157\Cal\pumping station\[pump-sta.xls]calculation
16.19 Q1
^1.85
=
hf2= KV2/2g
= 100.620 Q12
H1 = hf1 + hf2 + hf
H1 = 16.19 Q1 ^1.85 + 100.620 Q12 + 15 m
hf1= KV2/2g
= 387.002 Q22
hf3 = V2/2g
51.600 Q2
2
=
6 of 14
G:\04157\Cal\pumping station\[pump-sta.xls]calculation
h2 = hf1 + hf2 + hf3
= 438.602 Q22 + 2248.1502 Q2^1.85
7 of 14
G:\04157\Cal\pumping station\[pump-sta.xls]calculation
Proposed Sewage Pumping Station for Cadangan Pembangunan Di Atas Lot 1668 Dan 2043, Mukim Cheras,
Daerah Hulu Langat, Selangor For Tetuan Syarikat Shoib Properties SDN BHD
PE = 2580 (A)
Module 1
1 Primary screen
Channel width 500 mm
Opening height 0.1 m
no of bar = 12.10 bars
select 13 bars
60.00
50.00
40.00
system curve
1 pump running
2 pump running
30.00
20.00
10.00
30.00
25.00
20.00
Head, H (m)
System Curve
1 pump running
15.00 2nd pump running
10.00
5.00
0.00
0.00 10.83 16.67 21.66 23.33 33.33 43.32 46.66 66.66
Flow, Q (l/s)