verifying documents. For each relevant activity Subcontractor shall incorporate the kind of verification by
allocating Hold, Witness, Monitoring or Review points for approval by Contractor and if applicable, the
Subcontractor shall designate during the work, at all times, competent supervision (e.g. foreman,
construction manager) experienced in structural steelwork.
Subcontractor shall employ only skilled and qualified craftsmen to perform all aspects of the work
including NDT and inspection.
Subcontractor shall submit an ITP which chronologically lists all relevant aspects covering the full scope
1.5 Performance
Subcontractor shall designate a competent representative familiar with all phases of fabrication and
administration to which Contractor may communicate at all times.