TECHNICAL BID REVIEW QUERIES

Customer / Purchaser: PETROLEUM DEVELOPMENT OMAN LLC / WORLEYPARSONS ENGINEERING OMAN LLC Vendor: Prepared by:
Project Title: GB Bulk Procurement Project Vendor Offer Reference: Reviewed by:
Project No. EPCC 11006 Technical Query Number: Approved by:
Item / Req No Revision: (Name / Signature)
SPECIAL NOTE(s):
1) Reference clause of Material Requisition or applicable Technical Standards / Specifications on which Query being raised shall be specified.
2) The reply shall be clear and precise to the query raised.
3) Typical acceptable types of replies shall be such as but not limited to Confirmed / Not Confirmed (OR) Included / Not Included (OR) Consider / Not Considered (OR) Complied / Not Complied (OR) Acceptable / Not acceptable etc., during this Technical bid review process.
4) The response such as "Noted" is NOT acceptable.

WP WP
Document Reference
Code Status Vendor's reply
SR. Technical Query Description Vendor's reply WPAI / PDO Response for the Vendor's reply WPAI / PDO Response for the Vendor's reply Vendor's reply WP / PDO Response for the Vendor's reply
(TEQ-2 Reply)
NO. Material Requisition Bid Document TEQ-1 (TEQ-1 Reply) (TEQ-2) (TEQ-3) (TEQ-3 Reply) (Final)
DISC O/C Reference Reference
(Note. 1) (Note. 1)

1 PR

2 CE

3 CA

4 EL

5 ME

6 MP

7 QA

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

C - Closed Project Internal Page 1 of 1


O - Open
PR - Process; CE - Civil; CA - Control and Automation; EL - Electrical; ME - Mechanical; PI - Piping; QA - Quality