You are on page 1of 36

[CALCULATION SHEET FOR

132KV GANTRY CPF & CLUSTER]


Project Title: West Qurna Field 2nd Phase Project
Project Number: SO2476
SECL P.O. Number: 4500099784
Requisition Description: [132/33 kV Transmission Line]
Requisition Number: [8015-0151-SECL-00-000-CP-RQ-00001
Item Description: [132/33 kV Transmission Line]
Item Number [ALL ITEM]
Doc.Number: [8015-0151-82-PO-45-0009-9784-S03-12054]
APPROVED WITH COMMENTS
REVIEWED RESUBMIT

THIS APPROVAL OR REVIEW DOES NOT RELIEVE THE


VENDOR/SUBCONTRACTOR OF HIS RESPONSIBILITIES
TO MEET ALL OF THE SPECIFIED REQUIREMENTS OF
THE PURCHASE ORDER

ORIGINATOR CHECKED APPD(PR)


SIGN
DATE
SAMSUNG ENGINEERING CO., LTD

00 13.07.20 FOR APPROVAL S Y LEE W J LEE Y G BAE


REV. DATE DESCRIPTION MADE BY CHECKED BY APPROVED BY

SEAN ENGINEERING & CONSTRUCTION

SAMSUNG ENGINEERING CO. LTD.


SEOUL, KOREA

LUKOIL MID-EAST LIMITED


BASRAH, IRAQ
West Qurna Field 2nd
Phase Project
Page 1 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

CALCULATION SHEET

FOR

132kv Gantry CPF & Cluster

B 15.Jul.2013 ISSUE FOR REVIEW S.Y.LEE W.J.LEE Y.G.BAE

REV. DATE DESCRIPTION PREPARED BY REVIEWED BY APPROVED BY AUTHORIZED BY

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd.
And its use is conditioned upon the users agreement not to reproduce the document in whole or in part. Nor the material described
thereon nor to use the document for any purpose other than specifically permitted in writing by Samsung Engineering Co., Ltd.
_______________________________________________________________________________________________________________
Samsung Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 2 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

TABLE OF CONTENTS

1. DESIGN CRITERIA ------------------------------------------------------------------------------------------


1.1 DESIGN DESCRIPTION -----------------------------------------------------------------------------
1.2 DESIGN CODE -----------------------------------------------------------------------------------------
1.3 DESIGN LOADS ---------------------------------------------------------------------------------------
1.4 LOAD COMBINATIONS -------------------------------------------------------------------------------
1.5 MATERIAL SPECIFICATIONS ---------------------------------------------------------------------
1.6 UNIT WEIGHT OF MATERIAL ---------------------------------------------------------------------
1.7 COEFFICIENTS OF FRICTION --------------------------------------------------------------------
1.8 APPLIED SAFETY FACTORS ---------------------------------------------------------------------

2. CALCULATION OF 132kv GNATRY ---------------------------------------------------------------------


2.1 DESIGN DIMENSION---------------------------------------------------------------------------------
2.2 LOADING DATA-----------------------------------------------------------------------------------------
2.3 PROGRAM ANALYSIS -----------------------------------------------------------------------------
2.4 LOAD COMBINATIONS ----------------------------------------------------------------------------
2.5 BEARING CAPACITY CHECK --------------------------------------------------------------------
2.6 PROGRAM OUTPUT DATA FOR MEMBER DESIGN -------------------------------------
2.7 REBAR DESIGN -------------------------------------------------------------------------------------
2.8 REBAR SKETCH -------------------------------------------------------------------------------------

_____________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 3 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

1. DESIGN CRITERIA

1.1 DESIGN DESCRIPTION

1) Project Name : West Qurna Field 2nd Phase Project


2) Client : LUKOIL (Russia, Operator)
3) Location : West Qurna Field, Basra in Iraq

1.2 DESIGN CODE

1) 8015-0151-SECL-00-000-CI-SP-00001, general design rules for underground system.


2) 8015-0151-SECL-00-000-CI-SP-00002, general design rules for earthworks - road & fencing.
3) 8015-0151-SECL-00-000-CI-SP-00003, general design specification for civil works.
4) Industry Codes & Standards (UBC, ACI, DIN, ASCE, AASHTO, API etc)

1.3 DESIGN LOADS

Design Loads Load Description


DL Dead Loads
LL Live Loads
EF Equipment Empty
EE Equipment Erection
ET Equipment Test
EO Equipment Operating
TL Thermal Loads
SL Snow / Sand Loads
WL Wind Loads
EL Earthquake Loads
ML Maintenance Loads
IL Impact Loads
VL Vibration Loads
HL Earth Loads
FL Fluid Loads

1) Wind Load
- The detail Calculation procedure of wind load is shown on "APPENDIX-I"
- W = Wind Load (In accordance with UBC-97)

2) Earthquake Load (EL)


- The detail Calculation procedure of seismic load is shown on "APPENDIX-II"
- Site Specific design parameter shall confirm to 8015-0151-SECL-00-000-CI-SP-00003
- Applied Code : UBC 97
- Seisimic Zone : 1 (Seismic zone factor Z=0.075)
- Importance Factor : 1.0
- Soil profile type : Se

_____________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 4 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

3) Thermal load (TL)


-Thermal loads are those forces caused by temperature variations. Three different types of thermal loads
shall be considered in design of structures and foundations.

4) Snow/Sand Load (SL)


-Snow/Sand load is not applicable

5) Maintenance Load (ML)


-Maintenance loads are temporary forces due to dismantling, repair or painting of equipment.
-In static calculations they shall be considered as live loads.
-Exchanger bundle pulling : Bundle pulling shall be considered equal to the weight of the bundle or to 10 kN,
whichever is bigger.

6) Impact Load (IL)


-Impact loads are forces caused by moving objects, such as bridge-cranes and monorails, on their supporting
structures, on their runways or where they place the lifted loads.

7) Vibration Load (VL)


-Vibration loads are those forces and moments caused by rotating or reciprocating machinery such as compressors,
turbines, fan, blowers, and pumps.
These loads shall be decided according to Manufacture's information.

8) Fluid Load (FL)


-Fluid loads are those forces due to weight and pressure of fluids.
In static calculations it shall be considered as live loads.

9) Earth Load (HL)


-Earth loada are those loads due to soil, and ground water pressure when necessary, against structure
and foundation.

_____________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 5 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

1.4 LOAD COMBINATIONS

1) For statability check


- Load combination for stability check refer to 8015-0151-SECL-00-000-CI-SP-00003, Provision 3.15

Normal
Design Load Erection Test Maintenance Empty
Operation
DL 1.0 1.0 1.0 1.0 1.0
LL 1.0 1.0 1.0 1.0
EF 1.0 1.0
EE 1.0
ET 1.0
EO 1.0
TL 1.0
SL
WL 1.0 (*) 0.5 1.0 (*) 0.33 1.0 (*)
EL 1.0 (*) 1.0 (*) 1.0 (*)
ML 1.0
IL 1.0
VL
HL
FL
(*) Wind loads or Earthquake load whichever is greater

2) For member design


- Load combination for member design refer to ACI-318-08

Design Load Erection Test Normal Operation Maintenance Empty

DL 1.2 1.2 1.2 0.9 1.2 1.2 1.2


LL 1.0 1.0 1.0 1.6 1.0
EF 1.2 1.2
EE 1.2 1.2
ET 1.2
EO 0.9 1.2
TL 0.9 1.2 1.2
SL
WL 1.6 (*) 0.8 1.6 (*) 1.6 (*) 1.6 (*)
EL 1.0 (*) 1.0 (*) 1.0 (*) 1.0 (*)
ML 1.6
IL 1.0 1.0 1.0 1.6 1.0
VL 1.0 1.0
HL 1.6 1.6
FL
(*) Wind loads or Earthquake load whichever is greater

_____________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 6 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

1.5 MATERIAL SPECIFICATIONS

1) Reinforcing Bars
(ref. 8015-0151-SECL-00-000-CI-SP-00003, Provision 4.1.2)

Deformed reinforcing steel bar (ASTM A 615) : fy = 420 MPa (Grade 60)

2) Concrete Strength (Compressive Strength on cylinder at 28days, ASTM C39)


(ref. 8015-0151-SECL-00-000-CI-SP-00003, Provision 4.1.1)

fc = 25 MPa

ITEM f'c (MPa) Remark


Lean concrete 10
Concrete for duct bank and anchor blocks 20
Foundation and elevation concrete (cast in situ) 25
Foundation and elevation concrete for heavy
25
vibrating machines
Paving and ditches 25
Cast in situ piles 25
Basin and water retaining structure 30
Prefabricated piles 35

1.6 UNIT WEIGHT OF MATERIAL (ref. 8015-0151-SECL-00-000-CI-SP-00003, Provision 3.1.1)

Material Unit Weight (kN/m) Remark


Reinforced concrete (c) 25
Cement screed finishes (c) 23
Well-compacted soil (t) 18
Water (w) 10.0

1.7 COEFFICIENTS OF FRICTION (ref. 8015-0151-SECL-00-000-CI-SP-00003, Provision 3.4)

Condition Coefficients of Friction Remark


Teflon to teflon 0.10
Teflon to stainless steel 0.10
Steel to steel 0.35
Concrete to soil (clay soil) 0.35
Steel to concrete 0.45

_____________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 7 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

1.8 APPLIED SAFETY FACTORS

1) Overturning
-All case S.F = 1.5

2) Sliding
-All case S.F = 1.5

3) Buoyancy
-All case S.F = 1.2

_____________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 8 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2. CALCULATION OF 132kv GNATRY

2.1 DESIGN DIMENSION


[Unit : m]

1.10
0.80
5.00

1.20
0.30

(Hp)
1.00

0.80
1.80

0.70
(Hs)
(Ht)

1.10
0.80

(Hf)

1.1 2.8 1.1


5.00

SECTION PLAN

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 9 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.2 LOADING DATA

2.2.1 TOWER OUTPUT DATA ( Refer to Tower Load.)

TOWER 1- FOUNDATION LOADS

Fx Fy Fz Mx My Mpx Mpy Mfx Mfy


Load
(kN) (kN) (kN) (kN.m) (kN.m) (kN.m) (kN.m) (kN.m) (kN.m)
DL - - 38.72 - - - - - -
Wind-X 56.40 - - 735.80 - 792.20 - 837.32
Wind-Y - 98.32 - 1282.68 1381.00 - 1459.66 -
where, - Fx, Fy, Fz, Mx, My is Tower Reaction
- Mfx = Mx + Fy (Hp + Hf)
- Mfy = My + Fx (Hp + Hf)

2.2.2 FOUNDATION WEIGHT

1) Footing Weight (W f) = 25.00 X 5.00 X 5.00 X 0.80 = 500.00 KN


2) Pedestal Weight (W p) = 25.00 x 0.80 x 2.80 x 1.00x 2ea = 112.00 KN
3) Soil Weight (W s) = 18.00 X (5.00 X 5.00 - 0.80 X 2.80x 2ea) X 0.7 258.55 KN
4) Total Weight (DS) = Wf + Wp + Ws = 870.55 KN

2.2.3 OVERTURNING CHECK

M0 = 98.32 x 1.80 + 1282.68 = 1459.66 KN-m


Mr = ( 870.55 + 38.72 ) x 2.50 = 2273.18 KN-m

s = 2273.18 / 1459.66 = 1.56 1.50 O.K

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 10 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.3 PROGRAM ANALYSIS

2.3.1 MODEL VIEW

2.3.2 SECTION DEFINITION

Section Element Thickness (m) Material Remark


Bottom Slab Plate 0.80 Concrete -
PEDESTAL BEAM 1.20 x 2.80 Concrete -

2.3.3 SPRING CONSTANT ( Kv )

Kv = Kvo x ( Bv / 30 ) -3/4 = 9.052 N/ = 9052.00 kN/m3

Where, Eo = 28 x N = 28 x 8 = 2240 kg/cm2


Kvo = 1/30 x x Eo = 1/30 x 1.0 x 2240.0 = 74.67 N/
Bv = Av = ( 500 x 500 ) = 500.000 cm

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 11 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.3.4 LOADING DATA

1) Dead Load, DL

Footing Concrete weight is inputted by program selfweight function automatically.

- Soil Weight = 18 kN/m3 x 0.70 = 12.6 kN/m2

Appied Load
Fx Fy Fz Mx My
SUPPORT
(kN) (kN) (kN) (kN.m) (kN.m)
- - 38.72 - -

2) Wind Load, WL

X-direction Wind Load, WLX

Appied Load
Fx Fy Fz Mx My
SUPPORT
(kN) (kN) (kN) (kN.m) (kN.m)
56.40 - - - 735.80

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 12 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

Y-direction Wind Load, WLY

Appied Load
Fx Fy Fz Mx My
SUPPORT
(kN) (kN) (kN) (kN.m) (kN.m)
- 98.32 - 1282.68 -

2.4 LOAD COMBINATIONS

1) For Stability Check

- Load combinations are selected with governing case.


For Stability Check
A. Dead Load + Wind case
1. DL + WLX
2. DL + WLY

2) For Member Design

- Load combinations are selected with governing case.


For Member Design
B. Dead Load + Wind case
1. 0.9DL + 1.6 WLX
2. 0.9DL + 1.6 WLY
3. 1.2DL + 1.6WLX
4. 1.2DL + 1.6WLY

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 13 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.5 BEARING CAPACITY CHECK

1) Terzaghi Method
Qult = 1.3 x c x Nc + x Df x Nq + 0.4 x x B x Nr

kpr c Nc Nq Nr r
10 14.7 35 9.6 2.7 - 8

Qult = 1.3 x 35 x 9.6 + 8 x 1.5 x 2.7 + 0.4 x 8 x 4.2 x 0 = 469.20 kN/m2

Qa = Qult / 3 = 469.2 / 3 = 156.40 kN/m2

2) Reaction
2 x V
q(MAX) = Mu
LxX

2.000 x 870.552
=
5.00 x 2.80

= 124.210 = 124.210 kN/m2

Where, : X = 3 x (B/2 - e) = 2.803 m


e = B/2 - (Mr-Mo)/V = 1.566 m B/6 = 0.8

3) Bearing capacity check

q(MAX)= 124.210 kN/m2 < 156.4 kN/m2 ----------- O.K

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 14 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.6 PROGRAM OUTPUT DATA FOR MEMBER DESIGN

1) Bottom Slab

(a) Shear Force Diagram

Max. Shear Force (Vu)


Max
Section X - Direction Y - Direction
/Min
Load case Result Load case Result
Max Comb B4 144.55 kN Comb B4 29.28 kN
T = 0.8
Min Comb B4 -120.72 kN Comb B4 -168.97 kN

X - Direction Y - Direction

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 15 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

(b) Bending Moment Diagram (For Concrete Member Design)

Max. Moment Force (Mu)


Max
Section X - Direction Y - Direction
/Min
Load case Result Load case Result
Max Comb4 49.29 kN-m Comb4 79.86 kN-m
T = 0.8
Min Comb4 -50.71 kN-m Comb4 -72.45 kN-m

X - Direction Y - Direction

2) Summary of design member force

Strength Design
THK. Appied
Section Direction
(m) Vu Mu Location
( kN) ( kN-m )
49.29 Bottom bar
X - Direction 144.55
Mw at Top -50.71 Top bar
0.80
of Pedestal 79.86 Bottom bar
Y - Direction 29.28
-72.45 Top bar

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 16 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.7 REBAR DESIGN

2.7.1 PEDESTAL DESIGN

1) Factored Working Loads at the Bottom of Pedestal


Vertical Load Lateral Force Factor
Vu Mu T
L/C DL LL WL EL Hx Hy Mpx Mpy Lateral
DL LL
kN kN kN kN kN kN kN.m kN.m Force kN kN.m kN/ea
B1 150.72 - - - 56.40 - - 792.2 0.9 - 1.6 135.65 1267.52 140.65
B2 150.72 - - - - 157.31 1381.00 0.0 0.9 - 1.6 135.65 2209.60 295.60
B3 150.72 - - - 90.24 - - 792.2 1.2 - 1.6 180.86 1267.52 118.04
B4 150.72 - - - - 157.31 1381.00 0.0 1.2 - 1.6 180.86 2209.60 272.99
where, - DL = W p+DL
- H = Each Factor x Lateral Force ( Wind)
- Vu = Each Factor x (DL+LL+WL+EL)
- Mu is working at the bottom of the pedestal.
- T= (4 x Mu) / {N x (D - 2 x d`)} - Vu / N

2) Re-bar Design

(1) Number of Vertical bar

2ea- L-150x12

(2) Calculation of Tension

- T = Mu / (2 x Aleg x D) - Vu/4

(3) Calculation As

* Assumed Re-bar Size : L-150x12 As = 3477 mm/ea


- Tallow = x As x fy = 0.90 x 3,477 x 420 = 1314306 N/ea = 1314.31 kN/ea
Tallow T
> OK.!
1314.31 295.60

USE : 1 ea - L-150x12 ( As = 3477 mm )

safety facter = 445%

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 17 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.7.2 FOOTING DESIGN

- Rebar Design (ref. ACI-318M-08, Provision 7.12.2, 9.3, 10.3 & 10.5)

Mw at Top of Pedestal ( X - Direction)

- Bottom bar

Mu = 49.29 kNm , d = 700 mm , fy = 420 MPa


h = 800 mm , b = 1000 mm , f'c = 25 MPa
Cover = 100 mm b = 0.90

Followed by ACI 9.3.2


a = (As x fy) / (1 x fc x b) = 26.23 mm
s = 0.003 x ( dt - c ) / c <where c = a / 1> = 0.0771 >0.005
At nominal strength, confirm s > y, for flexural member >0.004 O.K.

6
Mu 49.29 x 10
Required Rn = = 2
= 0.11177 N/mm
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 1 - 2 X 0.11177
= 1- 1- = 1- = 0.000267
fy 0.85 f'c 420 0.85 X 25

STEP1 : Check for As(Use) > As(req.)


As(req.) = XbXd= 0.000267 X 1,000 X 700 = 187 mm
STEP2 : Check for As(min.) < 4/3 As(req.) followed by ACI 10.5.1
As(min.) = 1.4 / fy X b X d = 1.4 / 420 X 1,000 X 700 = 2,333 mm
4/3 As(req.) = 4/3 X 187 = 250 mm
STEP3 : If As(min.) > 4/3 As(req.) , then check for 4/3 As(req.) > As(temp.) followed by ACI 7.12.2.1
As(temp.) = 0.0018 X b X h/2 = 0.0018 X 1,000 X 800/2 = 720 mm (One Side)
STEP4 : If not, use As(temp.) for rebar requirement.

Selected As = 720 mm

USE : D 16 @ 150 ( As = 1327 mm ) OK.!

safety facter = 184%

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 18 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

- Top bar

Mu = 50.71 kNm , d = 700 mm , fy = 420 MPa


h = 800 mm , b = 1000 mm , f'c = 25 MPa
Cover = 100 mm b = 0.90

Followed by ACI 9.3.2


a = (As x fy) / (1 x fc x b) = 26.23 mm
s = 0.003 x ( dt - c ) / c <where c = a / 1> = 0.0771 >0.005
At nominal strength, confirm s > y, for flexural member >0.004 O.K.

6
Mu 50.71 x 10
Required Rn = = 2
= 0.11499 N/mm2
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 2 X 0.11499
= 1- 1- = 1- 1- = 0.000275
fy 0.85 f'c 420 0.85 X 25

STEP1 : Check for As(Use) > As(req.)


As(req.) = XbXd= 0.000275 X 1,000 X 700 = 193 mm
STEP2 : Check for As(min.) < 4/3 As(req.) followed by ACI 10.5.1
As(min.) = 1.4 / fy X b X d = 1.4 / 420 X 1,000 X 700 = 2,333 mm
4/3 As(req.) = 4/3 X 193 = 258 mm
STEP3 : If As(min.) > 4/3 As(req.) , then check for 4/3 As(req.) > As(temp.) followed by ACI 7.12.2.1
As(temp.) = 0.0018 X b X h/2 = 0.0018 X 1,000 X 800/2 = 720 mm (One Side)
STEP4 : If not, use As(temp.) for rebar requirement.

Selected As = 720 mm

USE : D 16 @ 150 ( As = 1327 mm ) OK.!

safety facter = 184%

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 19 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

Mw at Top of Pedestal ( Y - Direction )

- Bottom bar

Mu = 79.86 kNm , d = 700 mm , fy = 420 MPa


h = 800 mm , b = 1000 mm , f'c = 25 MPa
Cover = 100 mm b = 0.90

Followed by ACI 9.3.2


a = (As x fy) / (1 x fc x b) = 26.23 mm
s = 0.003 x ( dt - c ) / c <where c = a / 1> = 0.0771 >0.005
At nominal strength, confirm s > y, for flexural member >0.004 O.K.

6
Mu 79.86 x 10
Required Rn = = 2
= 0.18109 N/mm
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 1 - 2 X 0.18109
= 1- 1- = 1- = 0.000433
fy 0.85 f'c 420 0.85 X 25

STEP1 : Check for As(Use) > As(req.)


As(req.) = XbXd= 0.000433 X 1,000 X 700 = 304 mm
STEP2 : Check for As(min.) < 4/3 As(req.) followed by ACI 10.5.1
As(min.) = 1.4 / fy X b X d = 1.4 / 420 X 1,000 X 700 = 2,333 mm
4/3 As(req.) = 4/3 X 304 = 406 mm
STEP3 : If As(min.) > 4/3 As(req.) , then check for 4/3 As(req.) > As(temp.) followed by ACI 7.12.2.1
As(temp.) = 0.0018 X b X h/2 = 0.0018 X 1,000 X 800/2 = 720 mm (One Side)
STEP4 : If not, use As(temp.) for rebar requirement.

Selected As = 720 mm

USE : D 16 @ 150 ( As = 1327 mm ) OK.!

safety facter = 184%

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 20 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

- Top bar

Mu = 72.45 kNm , d = 700 mm , fy = 420 MPa


h = 800 mm , b = 1000 mm , f'c = 25 MPa
Cover = 100 mm b = 0.90

Followed by ACI 9.3.2


a = (As x fy) / (1 x fc x b) = 26.23 mm
s = 0.003 x ( dt - c ) / c <where c = a / 1> = 0.0771 >0.005
At nominal strength, confirm s > y, for flexural member >0.004 O.K.

6
Mu 72.45 x 10
Required Rn = = 2
= 0.16429 N/mm2
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 2 X 0.16429
= 1- 1- = 1- 1- = 0.000393
fy 0.85 f'c 420 0.85 X 25

STEP1 : Check for As(Use) > As(req.)


As(req.) = XbXd= 0.000393 X 1,000 X 700 = 276 mm
STEP2 : Check for As(min.) < 4/3 As(req.) followed by ACI 10.5.1
As(min.) = 1.4 / fy X b X d = 1.4 / 420 X 1,000 X 700 = 2,333 mm
4/3 As(req.) = 4/3 X 276 = 368 mm
STEP3 : If As(min.) > 4/3 As(req.) , then check for 4/3 As(req.) > As(temp.) followed by ACI 7.12.2.1
As(temp.) = 0.0018 X b X h/2 = 0.0018 X 1,000 X 800/2 = 720 mm (One Side)
STEP4 : If not, use As(temp.) for rebar requirement.

Selected As = 720 mm

USE : D 16 @ 150 ( As = 1327 mm ) OK.!

safety facter = 184%

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 21 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.8 REBAR SKETCH

D 16 @ 150 D 16 @ 150
SECTION

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 22 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2. CALCULATION OF 132kv GNATRY

2.1 DESIGN DIMENSION


[Unit : m]

1.10
0.80
5.00

1.20
0.30

(Hp)
1.00

0.80
1.80

0.70
(Hs)
(Ht)

1.10
0.80

(Hf)

1.1 2.8 1.1


5.00

SECTION PLAN

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 23 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.2 LOADING DATA

2.2.1 TOWER OUTPUT DATA ( Refer to Tower Load.)

TOWER 1- FOUNDATION LOADS

Fx Fy Fz Mx My Mpx Mpy Mfx Mfy


Load
(kN) (kN) (kN) (kN.m) (kN.m) (kN.m) (kN.m) (kN.m) (kN.m)
DL - - 38.72 - - - - - -
Wind-X 56.40 - - 735.80 - 792.20 - 837.32
Wind-Y - 98.32 - 1282.68 1381.00 - 1459.66 -
where, - Fx, Fy, Fz, Mx, My is Tower Reaction
- Mfx = Mx + Fy (Hp + Hf)
- Mfy = My + Fx (Hp + Hf)

2.2.2 FOUNDATION WEIGHT

1) Footing Weight (W f) = 25.00 X 5.00 X 5.00 X 0.80 = 500.00 KN


2) Pedestal Weight (W p) = 25.00 x 0.80 x 2.80 x 1.00x 2ea = 112.00 KN
3) Soil Weight (W s) = 18.00 X (5.00 X 5.00 - 0.80 X 2.80x 2ea) X 0.7 258.55 KN
4) Total Weight (DS) = Wf + Wp + Ws = 870.55 KN

2.2.3 OVERTURNING CHECK

M0 = 98.32 x 1.80 + 1282.68 = 1459.66 KN-m


Mr = ( 870.55 + 38.72 ) x 2.50 = 2273.18 KN-m

s = 2273.18 / 1459.66 = 1.56 1.50 O.K

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 24 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.3 PROGRAM ANALYSIS

2.3.1 MODEL VIEW

2.3.2 SECTION DEFINITION

Section Element Thickness (m) Material Remark


Bottom Slab Plate 0.80 Concrete -
PEDESTAL BEAM 1.20 x 2.80 Concrete -

2.3.3 SPRING CONSTANT ( Kv )

Kv = Kvo x ( Bv / 30 ) -3/4 = 9.052 N/ = 9052.00 kN/m3

Where, Eo = 28 x N = 28 x 8 = 2240 kg/cm2


Kvo = 1/30 x x Eo = 1/30 x 1.0 x 2240.0 = 74.67 N/
Bv = Av = ( 500 x 500 ) = 500.000 cm

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 25 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.3.4 LOADING DATA

1) Dead Load, DL

Footing Concrete weight is inputted by program selfweight function automatically.

- Soil Weight = 18 kN/m3 x 0.70 = 12.6 kN/m2

Appied Load
Fx Fy Fz Mx My
SUPPORT
(kN) (kN) (kN) (kN.m) (kN.m)
- - 38.72 - -

2) Wind Load, WL

X-direction Wind Load, WLX

Appied Load
Fx Fy Fz Mx My
SUPPORT
(kN) (kN) (kN) (kN.m) (kN.m)
56.40 - - - 735.80

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 26 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

Y-direction Wind Load, WLY

Appied Load
Fx Fy Fz Mx My
SUPPORT
(kN) (kN) (kN) (kN.m) (kN.m)
- 98.32 - 1282.68 -

2.4 LOAD COMBINATIONS

1) For Stability Check

- Load combinations are selected with governing case.


For Stability Check
A. Dead Load + Wind case
1. DL + WLX
2. DL + WLY

2) For Member Design

- Load combinations are selected with governing case.


For Member Design
B. Dead Load + Wind case
1. 0.9DL + 1.6 WLX
2. 0.9DL + 1.6 WLY
3. 1.2DL + 1.6WLX
4. 1.2DL + 1.6WLY

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 27 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.5 BEARING CAPACITY CHECK

1) Terzaghi Method
Qult = 1.3 x c x Nc + x Df x Nq + 0.4 x x B x Nr

kpr c Nc Nq Nr r
5 12.2 35 7.3 1.6 - 18

Qult = 1.3 x 35 x 7.3 + 18 x 1.5 x 1.6 + 0.4 x 18 x 4.2 x 0 = 375.35 kN/m2

Qa = Qult / 3 = 375.4 / 3 = 125.12 kN/m2

2) Reaction
2 x V
q(MAX) = Mu
LxX

2.000 x 870.552
=
5.00 x 2.80

= 124.210 = 124.210 kN/m2

Where, : X = 3 x (B/2 - e) = 2.803 m


e = B/2 - (Mr-Mo)/V = 1.566 m B/6 = 0.8

3) Bearing capacity check

q(MAX)= 124.210 kN/m2 < 125.1 kN/m2 ----------- O.K

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 28 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.6 PROGRAM OUTPUT DATA FOR MEMBER DESIGN

1) Bottom Slab

(a) Shear Force Diagram

Max. Shear Force (Vu)


Max
Section X - Direction Y - Direction
/Min
Load case Result Load case Result
Max Comb B4 144.55 kN Comb B4 29.28 kN
T = 0.8
Min Comb B4 -120.72 kN Comb B4 -168.97 kN

X - Direction Y - Direction

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 29 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

(b) Bending Moment Diagram (For Concrete Member Design)

Max. Moment Force (Mu)


Max
Section X - Direction Y - Direction
/Min
Load case Result Load case Result
Max Comb4 49.29 kN-m Comb4 79.86 kN-m
T = 0.8
Min Comb4 -50.71 kN-m Comb4 -72.45 kN-m

X - Direction Y - Direction

2) Summary of design member force

Strength Design
THK. Appied
Section Direction
(m) Vu Mu Location
( kN) ( kN-m )
49.29 Bottom bar
X - Direction 144.55
Mw at Top -50.71 Top bar
0.80
of Pedestal 79.86 Bottom bar
Y - Direction 29.28
-72.45 Top bar

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 30 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.7 REBAR DESIGN

2.7.1 PEDESTAL DESIGN

1) Factored Working Loads at the Bottom of Pedestal


Vertical Load Lateral Force Factor
Vu Mu T
L/C DL LL WL EL Hx Hy Mpx Mpy Lateral
DL LL
kN kN kN kN kN kN kN.m kN.m Force kN kN.m kN/ea
B1 150.72 - - - 56.40 - - 792.2 0.9 - 1.6 135.65 1267.52 140.65
B2 150.72 - - - - 157.31 1381.00 0.0 0.9 - 1.6 135.65 2209.60 295.60
B3 150.72 - - - 90.24 - - 792.2 1.2 - 1.6 180.86 1267.52 118.04
B4 150.72 - - - - 157.31 1381.00 0.0 1.2 - 1.6 180.86 2209.60 272.99
where, - DL = W p+DL
- H = Each Factor x Lateral Force ( Wind)
- Vu = Each Factor x (DL+LL+WL+EL)
- Mu is working at the bottom of the pedestal.
- T= (4 x Mu) / {N x (D - 2 x d`)} - Vu / N

2) Re-bar Design

(1) Number of Vertical bar

2ea- L-150x12

(2) Calculation of Tension

- T = Mu / (2 x Aleg x D) - Vu/4

(3) Calculation As

* Assumed Re-bar Size : L-150x12 As = 3477 mm/ea


- Tallow = x As x fy = 0.90 x 3,477 x 420 = 1314306 N/ea = 1314.31 kN/ea
Tallow T
> OK.!
1314.31 295.60

USE : 1 ea - L-150x12 ( As = 3477 mm )

safety facter = 445%

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 31 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.7.2 FOOTING DESIGN

- Rebar Design (ref. ACI-318M-08, Provision 7.12.2, 9.3, 10.3 & 10.5)

Mw at Top of Pedestal ( X - Direction)

- Bottom bar

Mu = 49.29 kNm , d = 700 mm , fy = 420 MPa


h = 800 mm , b = 1000 mm , f'c = 25 MPa
Cover = 100 mm b = 0.90

Followed by ACI 9.3.2


a = (As x fy) / (1 x fc x b) = 26.23 mm
s = 0.003 x ( dt - c ) / c <where c = a / 1> = 0.0771 >0.005
At nominal strength, confirm s > y, for flexural member >0.004 O.K.

6
Mu 49.29 x 10
Required Rn = = 2
= 0.11177 N/mm
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 1 - 2 X 0.11177
= 1- 1- = 1- = 0.000267
fy 0.85 f'c 420 0.85 X 25

STEP1 : Check for As(Use) > As(req.)


As(req.) = XbXd= 0.000267 X 1,000 X 700 = 187 mm
STEP2 : Check for As(min.) < 4/3 As(req.) followed by ACI 10.5.1
As(min.) = 1.4 / fy X b X d = 1.4 / 420 X 1,000 X 700 = 2,333 mm
4/3 As(req.) = 4/3 X 187 = 250 mm
STEP3 : If As(min.) > 4/3 As(req.) , then check for 4/3 As(req.) > As(temp.) followed by ACI 7.12.2.1
As(temp.) = 0.0018 X b X h/2 = 0.0018 X 1,000 X 800/2 = 720 mm (One Side)
STEP4 : If not, use As(temp.) for rebar requirement.

Selected As = 720 mm

USE : D 16 @ 150 ( As = 1327 mm ) OK.!

safety facter = 184%

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 32 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

- Top bar

Mu = 50.71 kNm , d = 700 mm , fy = 420 MPa


h = 800 mm , b = 1000 mm , f'c = 25 MPa
Cover = 100 mm b = 0.90

Followed by ACI 9.3.2


a = (As x fy) / (1 x fc x b) = 26.23 mm
s = 0.003 x ( dt - c ) / c <where c = a / 1> = 0.0771 >0.005
At nominal strength, confirm s > y, for flexural member >0.004 O.K.

6
Mu 50.71 x 10
Required Rn = = 2
= 0.11499 N/mm2
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 2 X 0.11499
= 1- 1- = 1- 1- = 0.000275
fy 0.85 f'c 420 0.85 X 25

STEP1 : Check for As(Use) > As(req.)


As(req.) = XbXd= 0.000275 X 1,000 X 700 = 193 mm
STEP2 : Check for As(min.) < 4/3 As(req.) followed by ACI 10.5.1
As(min.) = 1.4 / fy X b X d = 1.4 / 420 X 1,000 X 700 = 2,333 mm
4/3 As(req.) = 4/3 X 193 = 258 mm
STEP3 : If As(min.) > 4/3 As(req.) , then check for 4/3 As(req.) > As(temp.) followed by ACI 7.12.2.1
As(temp.) = 0.0018 X b X h/2 = 0.0018 X 1,000 X 800/2 = 720 mm (One Side)
STEP4 : If not, use As(temp.) for rebar requirement.

Selected As = 720 mm

USE : D 16 @ 150 ( As = 1327 mm ) OK.!

safety facter = 184%

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 33 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

Mw at Top of Pedestal ( Y - Direction )

- Bottom bar

Mu = 79.86 kNm , d = 700 mm , fy = 420 MPa


h = 800 mm , b = 1000 mm , f'c = 25 MPa
Cover = 100 mm b = 0.90

Followed by ACI 9.3.2


a = (As x fy) / (1 x fc x b) = 26.23 mm
s = 0.003 x ( dt - c ) / c <where c = a / 1> = 0.0771 >0.005
At nominal strength, confirm s > y, for flexural member >0.004 O.K.

6
Mu 79.86 x 10
Required Rn = = 2
= 0.18109 N/mm
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 1 - 2 X 0.18109
= 1- 1- = 1- = 0.000433
fy 0.85 f'c 420 0.85 X 25

STEP1 : Check for As(Use) > As(req.)


As(req.) = XbXd= 0.000433 X 1,000 X 700 = 304 mm
STEP2 : Check for As(min.) < 4/3 As(req.) followed by ACI 10.5.1
As(min.) = 1.4 / fy X b X d = 1.4 / 420 X 1,000 X 700 = 2,333 mm
4/3 As(req.) = 4/3 X 304 = 406 mm
STEP3 : If As(min.) > 4/3 As(req.) , then check for 4/3 As(req.) > As(temp.) followed by ACI 7.12.2.1
As(temp.) = 0.0018 X b X h/2 = 0.0018 X 1,000 X 800/2 = 720 mm (One Side)
STEP4 : If not, use As(temp.) for rebar requirement.

Selected As = 720 mm

USE : D 16 @ 150 ( As = 1327 mm ) OK.!

safety facter = 184%

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 34 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

- Top bar

Mu = 72.45 kNm , d = 700 mm , fy = 420 MPa


h = 800 mm , b = 1000 mm , f'c = 25 MPa
Cover = 100 mm b = 0.90

Followed by ACI 9.3.2


a = (As x fy) / (1 x fc x b) = 26.23 mm
s = 0.003 x ( dt - c ) / c <where c = a / 1> = 0.0771 >0.005
At nominal strength, confirm s > y, for flexural member >0.004 O.K.

6
Mu 72.45 x 10
Required Rn = = 2
= 0.16429 N/mm2
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 2 X 0.16429
= 1- 1- = 1- 1- = 0.000393
fy 0.85 f'c 420 0.85 X 25

STEP1 : Check for As(Use) > As(req.)


As(req.) = XbXd= 0.000393 X 1,000 X 700 = 276 mm
STEP2 : Check for As(min.) < 4/3 As(req.) followed by ACI 10.5.1
As(min.) = 1.4 / fy X b X d = 1.4 / 420 X 1,000 X 700 = 2,333 mm
4/3 As(req.) = 4/3 X 276 = 368 mm
STEP3 : If As(min.) > 4/3 As(req.) , then check for 4/3 As(req.) > As(temp.) followed by ACI 7.12.2.1
As(temp.) = 0.0018 X b X h/2 = 0.0018 X 1,000 X 800/2 = 720 mm (One Side)
STEP4 : If not, use As(temp.) for rebar requirement.

Selected As = 720 mm

USE : D 16 @ 150 ( As = 1327 mm ) OK.!

safety facter = 184%

_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 35 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476

2.8 REBAR SKETCH

D 16 @ 150 D 16 @ 150