You are on page 1of 20

MATERIAL LIST

FOR
UPS AND DC SYSTEM

NO ID. NO. DESCRIPTION AND / OR SPECIFICATION

I BATTERIES, 110 VDC CHARGER, AND 220 VAC UPS

110 V DC system, 1200 Ah, lead-acid battery Plant type including cells, intercell and inter-row
1 BATTERIES
connectors, terminals lugs, rack, cell numbers and accessories.

-
The battery shall be rated in amperes and ampere-hours on 2 hours basis to a specified end
voltage and temperature. Aging factor of 10% shall be used in the calculation.

- Float charge voltage is max. 2.23 V/cell, Equalising charge is max. 2.4 V/cell, and End voltage
is 1.8 V/cell
- Aging factor of 10% shall be used in the calculation.
- Accessories :
- One thermometer,
- One hydrometer,
- One cell testing voltmeter, reading 3-0-3 V
- One acid resistant pair of gloves
- One eye anti-irritation device

110 V DC output system, a full wave silicon controlled rectifier type with fully automatic controls
2 BATTERY CHARGERS
and comply with IEC standard
- Heavy sheet metal cabinet, free standing with IP 31 enclosure
- Diode Dropper

Sheet 1 of 20
MATERIAL LIST
FOR
UPS AND DC SYSTEM

NO ID. NO. DESCRIPTION AND / OR SPECIFICATION

- Input : 400 V (+/- 10%) , 3 Ph, 50 Hz (+/-2% )


- Output voltage : 110 V DC (+/- 3%)
- Output current 400 A
- Voltage ripple: 2% RMS when connected to the battery.
- Protection, Metering dan Control system

3 DC DISTRIBUTION SWITCHBOARD 110 V DC Distribution Panel, indoor type, free standing metal enclosures.
-
Incoming power will be supplied to the equipment from the battery charger

- Outgoing will supply dc power for dc motors, emergency lighting, circuit breaker control, plant
control & instrumentation and data logging.
-
Incoming breakers shall be two poles manually operated air magnetic circuit breakers

- All outgoing breakers rated > 63 A shall be two-pole, manually operated, air magnetic circuit
breakers
- All outgoing breakers of 63 A shall be two pole manually operated molded case air magnetic
circuit breaker
- Each panel shall be equipped with the following:
- One (1) dc ammeter
- One (1) voltmeter with transducer for remote indication

Sheet 2 of 20
MATERIAL LIST
FOR
UPS AND DC SYSTEM

NO ID. NO. DESCRIPTION AND / OR SPECIFICATION

- One (1) voltmeter selector switch, to select bus and battery voltage
- One (1) ground detector voltmeter
- One (1) ground detector pushbutton
- One (1) Adjustable low voltage relay on bus with alarm contacts

4 UPS a) General
UPS, single phase, 230 V, 50 Hz, 0.8 lagging to 1.0 PF, power supplies including, but not be
limited to, the associated inverters, alternate supply voltage, output power distribution panels,
and static switch.

b) The UPS consists of :


- Heavy sheet metal cabinet, free standing with IP 31 enclosure
- 30 kVA Static Inverter
- Circuit breakers
- 30 kVA alternate supply transformer with line voltage regulator
- One manual bypass switch for ac output, 30 kVA
- One 230 V AC distribution panel c/w protection and metering
- Static Transfer Switch
- Protection, Control and Metering

5 UPS Panelboard 230 VAC Distribution Panel, indoor type, free standing metal enclosures.
- Incoming power will be supplied to the equipment from the UPS

Sheet 3 of 20
MATERIAL LIST
FOR
UPS AND DC SYSTEM

NO ID. NO. DESCRIPTION AND / OR SPECIFICATION

- Outgoing will supply power for plant workstation, fire protection panel, CCTV, PA system, and
PBX, GPS and radio communication
-
Incoming breakers shall be two poles manually operated air magnetic circuit breakers

- All outgoing breakers rated > 63 A shall be two-pole, manually operated, air magnetic circuit
breakers
- All outgoing breakers of 63 A shall be two pole manually operated molded case air magnetic
circuit breaker
- Each panel shall be equipped with the following:
- One (1) ammeter
- One (1) voltmeter with transducer for remote indication
- One (1) voltmeter selector switch, to select bus and battery voltage
- One (1) ground detector voltmeter
- One (1) ground detector pushbutton
- One (1) Adjustable low voltage relay on bus with alarm contacts

II TEST-INSPECTION AND COMMISSIONING WORK

Site Test Work & Inspection Work - Site Test Work & Inspection Work including tools and manpower
- Start-up & commissioning

III TRAINING

Sheet 4 of 20
MATERIAL LIST
FOR
UPS AND DC SYSTEM

NO ID. NO. DESCRIPTION AND / OR SPECIFICATION

Training for Owner's Personnel - On site training (3 days)

IV DOCUMENTATION

Documentation related to scope of work - Certificates, Warranty, Procedures


- Installation manual, Operating manual, Maintenance Manual
- Engineering documents, etc.
- Test Report
V SPARE PARTS

1 Recommended Spare Part for Testing and Commissioning List of Spare Part which are required for testing and commissioning

2 Recommended spare part for 2 (two) years operation List of Spare Part which are required for 2 years operations

Sheet 5 of 20
JOB NO. REV R
E
131809 0
V
DOC NO 0
1809-00-E-05-BT-003
DATE BY CHKD APVD D
C
A
B
A
H
P
Y
2-Jan-14 STI IYN AJI TV
D
E
D
QUANTITY F
REMARK e
UNIT Q'TY b

1
6
,
'
0
6

Set 2

Set 2

Set 2

Sheet 6 of 20
JOB NO. REV R
E
131809 0
V
DOC NO 0
1809-00-E-05-BT-003
DATE BY CHKD APVD D
C
A
B
A
H
P
Y
2-Jan-14 STI IYN AJI TV
D
E
D
QUANTITY F
REMARK e
UNIT Q'TY b

1
6
,
'
0
6

Panel 2

Sheet 7 of 20
JOB NO. REV R
E
131809 0
V
DOC NO 0
1809-00-E-05-BT-003
DATE BY CHKD APVD D
C
A
B
A
H
P
Y
2-Jan-14 STI IYN AJI TV
D
E
D
QUANTITY F
REMARK e
UNIT Q'TY b

1
6
,
'
0
6

Set 2

Set 2

Sheet 8 of 20
JOB NO. REV R
E
131809 0
V
DOC NO 0
1809-00-E-05-BT-003
DATE BY CHKD APVD D
C
A
B
A
H
P
Y
2-Jan-14 STI IYN AJI TV
D
E
D
QUANTITY F
REMARK e
UNIT Q'TY b

1
6
,
'
0
6

Lot 1 per unit power plant

Sheet 9 of 20
JOB NO. REV R
E
131809 0
V
DOC NO 0
1809-00-E-05-BT-003
DATE BY CHKD APVD D
C
A
B
A
H
P
Y
2-Jan-14 STI IYN AJI TV
D
E
D
QUANTITY F
REMARK e
UNIT Q'TY b

Lot 1 per 2 unit power plant 1


6
,
'
0
6
Lot 1 per 2 unit power plant

Lot 1 as per Manufacturer's Standard

Lot 1 as per Manufacturer's Standard

Sheet 10 of 20
BOQ ESSENTIAL PACKAGE

CNG PLANT 10 MMSCFD FOR RIAU GAS FIRED POWER PLANT (GFPP) 200 MW

SCOPE OF WORKS: RE = REKADAYA ELEKTRIKA; V = VENDOR; E = ERECTOR


SPECIFICATION SCOPE OF WORKS
No. DESCRIPTION
Capacity Rated Voltage Other Specification DESIGN MATERIAL SUPPLY INSTALL

1 Uninterruptible Power Supply (UPS) a) General V V E


UPS, single phase, 230 V, 50 Hz, 0.8 lagging to 1.0 PF, power supplies including,
but not be limited to, the associated inverters, alternate supply voltage, output
power distribution panels, and static switch.

b) Consist of :
- Heavy sheet metal cabinet, free standing with IP 31 enclosure
- 50 kVA Static Inverter
- Circuit breakers
- 50 kVA alternate supply transformer with line voltage regulator
- One manual bypass switch for ac output, 50 kVA
- One 230 V AC distribution panel c/w protection and metering
- Static Transfer Switch
- Protection, Control and Metering

230 Vac Distribution Panel, single phase, 50 Hz, 2W, 200 A indoor type, with IP
2 AC Distribution Board 230 VAC 31 free standing metal enclosures. V V E

- Incoming power will be supplied to the equipment from the UPS


- Outgoing will supply power for plant workstation, fire protection panel, CCTV, PA
system, and PBX
- Incoming breakers shall be two poles manually operated air magnetic circuit
breakers
- All outgoing breakers of 30-36 A shall be single pole branch switches
- Each panel shall be equipped with the following:
* One (1) ammeter
* One (1) voltmeter with transducer for remote indication
* One (1) voltmeter selector switch, to select bus and battery voltage
* One (1) ground detector voltmeter
* One (1) ground detector pushbutton
* One (1) Adjustable low voltage relay on bus with alarm contacts

3 Batteries and Charger


220 V DC system, 800 Ah (at 10 hours), High performance Planted lead-acid
3.1 Battery 220 Vdc battery (10 years design life) type including cells, intercell and inter-row V V E
connectors, terminals lugs, rack, cell numbers and accessories
BOQ ESSENTIAL PACKAGE

CNG PLANT 10 MMSCFD FOR RIAU GAS FIRED POWER PLANT (GFPP) 200 MW

SCOPE OF WORKS: RE = REKADAYA ELEKTRIKA; V = VENDOR; E = ERECTOR


SPECIFICATION SCOPE OF WORKS
No. DESCRIPTION
Capacity Rated Voltage Other Specification DESIGN MATERIAL SUPPLY INSTALL

- The battery shall be rated in amperes and ampere-hours on 3 hours basis to a


specified end voltage and temperature. Aging factor of 25% shall be used in the
calculation.

- Accessories :
* One (1) thermometer,
* One (1) hydrometervent-hole type,
* One (1) set of wrenches
* One (1) hand-operated hoist
* One (1) hand-operated lifter
* One (1) acid-resistant face shield and pair of gloves
* One (1) container for acid (adequated for one (1) year's service need)
* One (1) container for distilled water (adequated for one (1) year's service
need)
* One (1) cell bridging connector
* One (1) funnel
* One (1) eye anti-irritation device and first-aid kit
* Two (2) spare cells

110 V DC system, 20 Ah (at 10 hours), High performance Planted lead-acid


3.2 Battery 110 Vdc battery (10 years design life) type including cells, intercell and inter-row V V E
connectors, terminals lugs, rack, cell numbers and accessories.

- The battery shall be rated in amperes and ampere-hours on 3 hours basis to a


specified end voltage and temperature. Aging factor of 25% shall be used in the
calculation.

- Accessories :
* One (1) thermometer,
* One (1) hydrometervent-hole type,
* One (1) set of wrenches
* One (1) hand-operated hoist
* One (1) hand-operated lifter
* One (1) acid-resistant face shield and pair of gloves
* One (1) container for acid (adequated for one (1) year's service need)
* One (1) container for distilled water (adequated for one (1) year's service
need)
* One (1) cell bridging connector
BOQ ESSENTIAL PACKAGE

CNG PLANT 10 MMSCFD FOR RIAU GAS FIRED POWER PLANT (GFPP) 200 MW

SCOPE OF WORKS: RE = REKADAYA ELEKTRIKA; V = VENDOR; E = ERECTOR


SPECIFICATION SCOPE OF WORKS
No. DESCRIPTION
Capacity Rated Voltage Other Specification DESIGN MATERIAL SUPPLY INSTALL

* One (1) funnel


* One (1) eye anti-irritation device and first-aid kit
BOQ ESSENTIAL PACKAGE

CNG PLANT 10 MMSCFD FOR RIAU GAS FIRED POWER PLANT (GFPP) 200 MW

SCOPE OF WORKS: RE = REKADAYA ELEKTRIKA; V = VENDOR; E = ERECTOR


SPECIFICATION SCOPE OF WORKS
No. DESCRIPTION
Capacity Rated Voltage Other Specification DESIGN MATERIAL SUPPLY INSTALL

220 V DC output system, a full wave silicon controlled rectifier type with fully
3.3 Battery Charger 220 Vdc automatic controls and comply with IEC standard V V E

- Heavy sheet metal cabinet, free standing with IP 32 enclosure


- Input : 400 V (+/- 15%) , 3 Ph, 50 Hz (+/-10% )
- Output voltage : 220 V
- Output current : 350 A
- Voltage ripple: 0.1 % RMS when connected to the battery.
- Protection, Metering dan Control system

110 V DC output system, a full wave silicon controlled rectifier type with fully
3.4 Battery Charger 110 Vdc automatic controls and comply with IEC standard V V E

- Heavy sheet metal cabinet, free standing with IP 32 enclosure


- Input : 400 V (+/- 15%) , 3 Ph, 50 Hz (+/-10% )
- Output voltage : 110 V
- Output current : 4 A
- Voltage ripple: 0.1 % RMS when connected to the battery.
- Protection, Metering dan Control system

4 DC Distribution Switchboard
220 V DC Distribution Panel, indoor type, with IP 52 free standing metal
4.1 DC Distribution Switchboard 220 Vdc enclosures. V V E

- Incoming power will be supplied to the equipment from the battery charger

- Outgoing will supply dc power for dc motors, emergency lighting, circuit breaker
control, plant control & instrumentation and data logging.
- Incoming breakers shall be two poles manually operated air magnetic circuit
breakers
- All outgoing breakers rated at 250 A, 63 A, and 25 A shall be two-pole, manually
operated, drawout type, air magnetic circuit breakers
- Each panel shall be equipped with the following:
* One (1) dc ammeter and DC voltmeter
* One (1) DC voltmeter selector switch, to select bus and battery voltage

* One (1) ground detector voltmeter and push button


BOQ ESSENTIAL PACKAGE

CNG PLANT 10 MMSCFD FOR RIAU GAS FIRED POWER PLANT (GFPP) 200 MW

SCOPE OF WORKS: RE = REKADAYA ELEKTRIKA; V = VENDOR; E = ERECTOR


SPECIFICATION SCOPE OF WORKS
No. DESCRIPTION
Capacity Rated Voltage Other Specification DESIGN MATERIAL SUPPLY INSTALL

110 V DC Distribution Panel, indoor type, with IP 52 free standing metal


4.2 DC Distribution Switchboard 110 Vdc enclosures. V V E

- Incoming power will be supplied to the equipment from the battery charger

- Outgoing will supply dc power for dc motors, emergency lighting, circuit breaker
control, plant control & instrumentation and data logging.
- Incoming breakers shall be two poles manually operated air magnetic circuit
breakers
- All outgoing breakers rated at 250 A, 63 A, and 25 A shall be two-pole, manually
operated, drawout type, air magnetic circuit breakers
- Each panel shall be equipped with the following:
* One (1) dc ammeter and DC voltmeter
* One (1) DC voltmeter selector switch, to select bus and battery voltage

* One (1) ground detector voltmeter and push button

5 Factory Acceptance Test (FAT) V V N/A

TOTAL
Revision Rev 0 Rev 1 Rev 2
Date 31/3/2017
BY FWJ
CHCK STI
APPRD KRS/RIS
MATERIAL PRICE * DIMENSION (METER) * WEIGHT (TON) *

QTY UNIT UNIT PRICE TOTAL PRICE L W H EACH TOTAL

1 set

1 set

1 set
Revision Rev 0 Rev 1 Rev 2
Date 31/3/2017
BY FWJ
CHCK STI
APPRD KRS/RIS
MATERIAL PRICE * DIMENSION (METER) * WEIGHT (TON) *

QTY UNIT UNIT PRICE TOTAL PRICE L W H EACH TOTAL

1 set
Revision Rev 0 Rev 1 Rev 2
Date 31/3/2017
BY FWJ
CHCK STI
APPRD KRS/RIS
MATERIAL PRICE * DIMENSION (METER) * WEIGHT (TON) *

QTY UNIT UNIT PRICE TOTAL PRICE L W H EACH TOTAL


Revision Rev 0 Rev 1 Rev 2
Date 31/3/2017
BY FWJ
CHCK STI
APPRD KRS/RIS
MATERIAL PRICE * DIMENSION (METER) * WEIGHT (TON) *

QTY UNIT UNIT PRICE TOTAL PRICE L W H EACH TOTAL

1 set

1 set

1 set
Revision Rev 0 Rev 1 Rev 2
Date 31/3/2017
BY FWJ
CHCK STI
APPRD KRS/RIS
MATERIAL PRICE * DIMENSION (METER) * WEIGHT (TON) *

QTY UNIT UNIT PRICE TOTAL PRICE L W H EACH TOTAL

1 set

1 lot

9
Note
* Vendor to Fill

You might also like