You are on page 1of 4

Issued REVISION APPROVED US POL

Seatrain 001 Pre Assessment Page 1 of 4


23.02.2016 SA

Name of the candidate: ----sanjay thapliyal-----------------


Rank : -----chief officer-----------------
Date : -------13th june
2016--------------------------------------------

SEATRAIN A-316 - 3
Issued REVISION APPROVED US POL
Seatrain 001 Pre Assessment Page 2 of 4
23.02.2016 SA

SEATRAIN A-316 - 3
Issued REVISION APPROVED US POL
Seatrain 001 Pre Assessment Page 3 of 4
23.02.2016 SA

US POLLUTION LAWS COMPLIANCE


*Please tick the right answer

SEATRAIN A-316 - 3
Issued REVISION APPROVED US POL
Seatrain 001 Pre Assessment Page 4 of 4
23.02.2016 SA

C. Port state control A. 12


1. Plan applicable in D. Flag state control B. 22
U.S waters with C. 25 10. As per VGP NOI is
special regard to 5. The QI must be D. 27(Y) an abbreviation of
33 CFR is called A. Fluent in English A. Notice of intent(Y)
A. CDM B. Shore-based in B. Not our intent
B. SMT the United C. Notice of
C. VRP(Y) States information
D. SERS C. Available on a 24- D. None of the
hour basis above
2. The requirements of D. All the above(Y)
(VGP) 2013 is
applicable from
midnight of 6. VGP is applicable
A. 10 Dec 2013 when operating
B. 19 Dec 2013(Y) within__ territorial
C. 19 Aug 2013 waters of the United
D. 19 Sep 2013 states or in the waters
of the inland sea
3. VRP can only be A. 2 nautical miles
approved by B. 3 nautical miles(Y)
A. Classification C. 4 nautical miles
society D. 5 nautical miles
B. Port state control
C. USCG(Y)
D. Company

7. The VRP should be


used within the EEZ
during
A. Oil pollution 9. Which Discharge
B. fire mentioned below is
C. grounding not covered under
D. any emergency(Y) VGP.
4. As per VRP, first A. Graywater
point of contact in 8. How many types of B. Firemain Systems
emergencies is the pollutants or C. Sewage(Y)
A. QI(Y) discharges are there D. L/Boat engine wet
B. DPA under the VGP Exhaust

SEATRAIN A-316 - 3

You might also like