You are on page 1of 3

Name : ELHADJALI

First Name : Sad Massinissa


Adress : cite 450 logs B09, N67
Elkhroub 25100 - Constantine
Mobile : 06 72 48 73 25.
Phone : 031 80 85 12.
E-mail : massioss@hotmail.fr
Born 1/7/1986 at. CONSTANTINE.

HVAC & BUILDINGS INSTALLATIONS ENGINEER


Formation : Institute of Engineering (Zerzara) Mentouri University of Constantine
Engineer's degree, HVAC, Buildings Installations, 2004 - 2009
University of CONSTANTINE
Heating, Air Conditioning, Ventilation and Refrigeration Maintenance

Competences : Word & Excel


MS PROJECT
Auto CAD
AUROCAD MEP
Fisa Cad
Auto Fluid
Power Point
Mastered Standards : SMACNA: The Metal and Air Conditioning Contractors' National Association
ASHRAE: American Society of Heating, Refrigerant and Air Conditioning Engineers
STANDARDS NFS: NFS 62-201, EN 694 / BS EN 671-1 & EN 671-2 for the Fire hose real
NFS 61-758 / NFS 61-759 for Dry and Wet Columns
NFS 61-213 / 211 for Fire Hydrant
NF EN 12845 for the Sprinkler

Language : English : Good + Frensh /Arab : excellent


Desired contract : open-ended contract
Driving license : B Category
Military situation : Clear all national obligations
Remuneration desired : to explore
Activity Sector : Buildings, Oil & Gas
Experience : 9 Years

-: HVAC Engineer Supervisor, PETROFAC


July 2017 Now
Project: CPF OIL & GAS REGGAN ADRAR
Position: HVAC Supervisor Construction, pre-commissioning, commissioning.

HVAC & Hydraulic manager, KOUGC


-: December 2016 Jun 2017 (7 months)
Project: Algiers Metro EXTENSION A & C
Position: HVAC & Hydraulic Manager of: water supply, fire Lute, dry risers, waste and drainage,
ventilation and smoke extraction.
Spot:
- Elaboration of the method of work: calculation notes, drawings, meter, Quantitative and
Estimative Quotation, Price List Unit, Business Consultation File
- Validation of the technical documents and procedures of the site construction, validation of
method statements.
- Development and validation of HVAC batch drawings

HVAC & Plumbing Engineer at GROUPE NOX


-: August 2015 November 2016 (1 year, 2 months)
Engineer HVAC & Plumbing NOX Al (NOX GROUPE International): Project Construction of an
IBIS hotel NOVOTEL SETIF
Position: HVAC & Plumbing Engineer in charge for:
- Drawing's and data sheet's Validation and Visa (Air Conditioning, heating, plumbing, electricity,
Smoke, Fire fighting).
- Monitoring the technical installation.
- Development of a Technical Audit for HVAC, Smoke, Plumbing and electrical leads to a
specification for the resumption.
- Consultations of enterprises to finalize the work.
- Analyses different Quote, attachments and signing of companies working situations.
- Inspection of technical systems with checklist for Preparing for the reception.
- Tests & technical assistance with APAVE and Algerian Civil Protection
- Hotel Opening

Electromechanical engineer at CSSI France Oil & Gas


-: May 2014 August 2015 (1 year, 4 months)
HVAC Engineering and Construction for a Project Hassi Moumen HMN for PETROFAC
- Proposal Solutions for Engineering (HVAC)
- Monitoring of the Construction achievement.
- Rising of RFIs (Request for Inspection) QA / QC.
Among the Buildings
- Control Building IS CPF (02 Air Handling Units Carrier+ 02 Chillers Carrier)
- Sport Hall + Multi Use (01 Handling Units Carrier+ 01 Chiller Carrier)
- Restaurant Building (01 Handling Units Carrier+ 01 Chiller Carrier))
- Emergency Vehicle (01 Handling Units Carrier+ 01 Chiller Carrier)
- Office & Clinic (01 Handling Units Carrier+ 01 Chiller Carrier+ Fan Coil Units
Cassette with same Brand)

Engineer responsible of Engineering and Construction For HVAC at IDEAL COLD Agent
-: DAIKIN Japan in Algeria
March 2011 - May 2014 (3 Years 3 months)
- Design of ventilation systems and air conditioning (ducts, vents for circulation, extraction fans,
air handling units ...) - Design of Hydraulic cooling systems (piping, chiller, fan coils, boilers,
radiators ...)
- Design of VRV systems (pipes, outdoor units, air terminals) - Preparation of specifications, the
pro formats, qualitative and quantitative estimate
- Follow up on construction of all stages of installation of air conditioning systems
Among the projects:
- Archives Center of justice in Constantine
- Constantine tax office - Court of Justice in Zighoud Youcef
- Hotels & Tourism Complexes: Hammam Melouan (Blida), Sabri in Annaba Guendouz inBiskra,
Rainbow in Skikda, The Aftices Jijel
- Hospitals & Clinics: Hospital Chelghoum Laid (Mila), Ibn al-Nafis (Annaba)
- Presidential Residence & Residence Host Tlemcen
- Mosque: Jamaa el Kebir in Constantine; Mosque in Zighoud Youcef
- Administration for ENMTP plant (SOFAME Constantine)
- Textile Factory CEVITAL DAR el Beida, Algiers
June 2013: Air Handling Unit Selection Software Training at LENATE MILAN, Italy
(DAIKIN MCQUAY ITALY)

-: Engineer HVAC and technical equipment at BET NACERI Salim


May 2010 - March 2011 (11 months)
Engineering and Monitoring in the Technical Engineering Office: Naceri Salim. Engineering for
electricity, heating, water and gas supply, drainage and sanitation, air conditioning and cold.
Among the new projects:
- Air Tribunal Tadjnanet (Mila) and the smoke of his car.
- Low Voltage Networks plots outside of the university city of Constantine.
- Facilities and equipment of boiler and heating system outside for 3000 beds campus at Souk
Ahras.
- Equipment of the apartments (500 units of Skikda and & 130 units Constantine Massinissa
among others) in all secondary trades + riser gas, water and electricity.
- Low voltage networks (telephone, TV, Fire Detection, Call in sick) of 240 hospital beds to Taref.

-: Engineering Supervisor at ETP GUESSOUM Youcef


March 2010 - May 2010 (3 months)
Monitoring and supervision of construction site of a fuel station : by contracting with Sonatrach
-: Engineer HVAC at BET NACERI Salim
July 2009 - March 2010 (9 mois)
Engineering: Refrigeration, heating, air conditioning, hydraulics and electricity.
Among the projects:
- The University City of Constantine (arrangement of boilers, district heating and electricity).
- Hospital Taref (air conditioning, cold rooms, medical gas, hydraulic).
- The residence halls at Annaba, Skikda, Souk AHRAS, Ouargla. (All Engineering of electricity,
heating, and plumbing).
-: Engineer HVAC at GROUPE Iso Froid
March 2009 - May 2009 (3 months)
installation of a cold room at the Wilaya of Batna and Installation ductable system for an
operating room at Hospital Elkhroub
-: Engineering internship discipline: cold, electricity, heating
June 2008 - September 2008 (4 Months)
ENMTP (Complex Excavators and cranes) Ain Smara, Constantine, Algeria

You might also like