You are on page 1of 8

Ahmed Safwat Ali Hussein Ewida

13 Hafez Ibrahim st,


Suez,
Egypt.
+201222871308
safwategy@gmail.com
Date of birth: 11 of October1982
Egyptian Engineering Syndicate membership NO.: 56/07301
Driving Licence: 37523
P.M.I membership

PROFILE
Seeking a position for a Planning & Scheduling Engineer in a big
Oil & Gas or Construction Company.

WORK EXPERTISE
Experience in Planning, Monitoring and Controlling Civil, Mechanical, Electrical and
Instrument activities with respect to Plan, Progress and Resources using latest planning tools
like Primavera Enterprise (Version 6.0).

Prepare the Work Breakdown Structure (WBS) accordance with the project requirements.
The Schedule is prepared using the Critical Path Method Technique,Loading resources on the
Schedules and generating S-curves for direct and indirect resources.

Continuous monitoring of work progress against planned schedules and Preparing delay
analysis for delayed activities and advice corrective action to meet the target through a recovery
plan.

Preparations of micro level schedules for critical activities, daily work schedules, weekly
and monthly look ahead schedules.

Recover the delay of the projects and taking corrective actions with intentional
departments (engineering, procurements ,) by attending Follow up meetings.
Education

Sep 1999 - May 2004


Cairo University - Faculty of Engineering,
Electronics & Communication Department.

Grade: Good

Graduate Project

Digital audio watermarking implemented on F.P.G.A

Grade: Excellent.

Project courses: V.H.D.L, Matlab, Visual C++,


Basic Knowledge in MP3 Program.

Job Title: Senior planning engineer in ETROJET Company


Since May 2006

Additional courses
- Planning& management: PMP course , Primavera enterprise, Cost control, Claims & Disputes ,
Negotiation skills, , Primavera (P3) level 1, level 2, Presentation skills.

- Industrial safety: OHSA


- Communication: Introduction to Alcatel GSM network, Digital Signal
Processing.
- Programming: VB.net course (dealing with crystal reports and SQL server2000), programming
hardware using V.H.D.L
- Networking: CISCO CERTIFIED (since April 2006)
Work Experience
Jan 2013 Till now:
Job Title: Senior Planning & Scheduling Engineer in P.M.O
Job Description:
Following Up Projects Progress For Petrojet Company In Gulf Area (Saudi Arabia, Jordan,
Qatar, U.A.E, Oman, Yemen) .
Preparing Weekly reports & Delay Analysis for C.E.O.
Review The Schedules of The Projects.
Preparing Schedules For Proposal Projects For Clients Like(ARAMCO,
TECHNIP,HYNDAI, QAFCO,YEMGAS).
Attending Follow up meeting to recover the delay of the projects and taking
corrective actions with intentional departments (engineering,procurments,)

Jan2011 Jan-2013:
Job Title: Senior Planning & Scheduling Engineer
Project: Construction Works for 6 Oil tanks With Capacity 175,000 m3
Client: Sumed
Main contractor: ENPPI
Construction Contractor: ETROJET
Project Budget: 100,000,000 U.S.D
Project Activities:
Civil Work:
Cut & Levelling works , shuttering, steel fixing and P.C , R.C pouring for Pumps Foundations &
Tanks Rings.
Excavation& Backfilling works for underground network.
Paving & Hard standing works, Construction of Control &Substation Buildings.
Mechanical works:
- Fabrication &Erection of 21000 Ton steel Plates For 6 Floating roof Tanks.
-Automatic & manual Welding For 652000 M.L For Steel plates.
-Welding for 200000 D.I For piping networks and Tie-ins.
-Erection of 1000 Tons of Pumps.
Electrical & instruments works:
Erection of cable trays, laying electrical cables (L.V. M.V & Optical fibre cables),installation of
H.V.A.C unit inside the control building, installation of instruments & sensors for equipments of
the plant .
Job Description:
Preparing of level IIII schedule for Civil, Mechanical and electrical activities
Loading resources (labors & equipments) .
Following up activities of the project and preparing progress reports and update schedule.
Monitoring progress & Preparing delay analysis for delayed activities and advice
corrective action to meet the target through a recovery plan.
April 2009 Jan 2011:
Job Title: Senior Planning & Scheduling Engineer
Project: Mopco. 1&2 PROJECT
Client: MOPCO
Main contractor: UHDE
Sub Contractor: ETROJET
Project Budget: 150,000,000
Project Activities:
Civil Work:
Piles work(poured & driven piles), Cut & Levelling works , shuttering, steel fixing and P.C , R.C
pouring for equipment & Pipe rack foundations.
Excavation& Backfilling works for underground network, precast for underground manholes
(catch basin, gullies, feulwater, open drain& closed drain), road crossing works. Paving &
Hard standing works, Construction of Control &Substation Buildings.
Mechanical works:
- Fabrication &Erection of 1,200,000 D.I of (C.S, S.S, L.T &Duplex) Piping Spools.
-Installation & Erection of 10,000 Tons of equipments.
-Installation of 8000 M.L of GRE Pipes in the Under Ground Network.
-Erection of 7,000 Tons of Pipe rack steel.
-Assembly & welding works for 10000m3 of two fixed roof water tanks, three dome
Tanks (double shell)(25000 m3) .
Electrical & instruments works:
Erection of cable trays, laying electrical cables (L.V. M.V & Optical fibre cables),installation of
H.V.A.C unit inside the control building, installation of instruments & sensors for equipments of
the plant .
Job Description:
Preparing of level IIII schedule for Civil, Mechanical and electrical activities
Loading quantities &resources (labors & equipments) .
Following up activities of the project and preparing progress reports and update schedule.
Preparing delay analysis for delayed activities and advice corrective action to meet
the target through a recovery plan.
April 2008 April 2009:
Job Title: Planning & Scheduling Engineer
Project: PDH/PP PROJECT
Client: EPPC
Main contractor: UHDE
Sub Contractor: ETROJET
Project Budget: 90,000,000
Project Activities:
Civil Work:
Piles work(poured & driven piles), Cut & Levelling works , shuttering, steel fixing and P.C , R.C
pouring for equipment & Pipe rack foundations.
Excavation& Backfilling works for under ground network, precast for under ground manholes
( catch basin,gullies,foulwater,open drain& closed drain) , road crossing works . Paving &
Hard standing works , Construction of Control &Substation Buildings .
Mechanical works:
- Fabrication &Erection of 629350 D.I of (C.S, S.S, L.T &Duplex) Piping Spools.
-Installation & Erection of 6614 Tons of equipments.
-Installation of 6000 M.L of GRE Pipes in the Under Ground Network.
-Erection of 4400 Tons of Pipe rack steel.
-Assembly & welding works for 10000m3 of two fixed roof water tanks , three dome
tanks(double shell)(17000 m3) & one spherical tank (1350m3).
Electrical & instruments works:
Erection of cable trays, laying electrical cables (L.V. M.V & Optical fibre cables),installation of
H.V.A.C unit inside the control building, installation of instruments & sensors for equipments of
the plant .
Job Description:
Loading quantities &resources (labours&equipments) .
Following up activities of the project and preparing progress reports and update schedule.
Preparing daily, weekly and monthly reports.
Preparations of micro level schedules for critical activities, daily work schedules,
weekly and monthly look ahead schedules.
Preparing delay analysis for delayed activities and advice corrective action to meet
the target through a recovery plan.
July 2007 April 2008:
Job Title: Planning & Scheduling Engineer
Project: Construction of Two water Boilers & Control Building.
Client: Suez Oil Petroleum Company (S.O.P.C.O) in Egypt
Contractor: Enppi
Subcontractor: ETROJET
Job Description:
Preparing Time schedule using Primavera program.

Generating progress reports & manpower histogram using Primavera.

Preparing daily, weekly and monthly reports.

Loading resources & quantities.

Project: Engineering, procurement and construction of Construction of Oil Water


Separation Basin.
Client: Suez Oil Petroleum Company (S.O.P.C.O) in Egypt
Contractor: ETROJET
Job Description:
Preparing Time schedule using Primavera program.
Generating progress reports & manpower histogram using Primavera.
Preparing daily, weekly and monthly reports.
Loading resources & quantities.
May 2006 July 2007:
Job Title: Planning & Scheduling Engineer
Project: Saqqara Gas Plant
Client: British Petroleum Company (B.P)
Engineering & Procurement: K.B.R
Contractor: ETROJET
Project Activities:
Civil Work:
Cut & Levelling works , shuttering , steel fixing and P.C , R.C pouring for equipment & Pipe
rack foundations , Excavation ,Backfilling works for under ground network, precast for under
ground manholes ( catch basin, gullies,foulwater,open drain& closed drain) , road crossing
works , Paving & Hard standing works , Construction of Control Building & Guard house.

Mechanical works:
-Fabrication &Erection of 9000 D.I of (C.S, S.S, L.T &Duplex) Piping Spools.
Stringing, Welding & Wrapping, N.D.T for 1 K.M Import & Export Lines.
-Installation & Erection of 2200 Tons of equipments.
-Installation of 6000 M.L of H.D.P.E Pipes in the Under Ground Network.
-Erection of 1200 Tons of Pipe rack steel.
-Assembly & welding works for 1000m3 of water tank.
Electrical works:
Erection of cable trays, laying electrical cables (L.V. M.V & Optical fibre cables),installation of
H.V.A.C unit inside the control building, installation of instruments & sensors for equipments of
the plant .

Job Description:
Generating progress reports (Time & cost) using Primavera.

Preparing daily, weekly and monthly reports.

Surveying Piping isometrics (2200 iso's) &building data base using Visual Basic.Net
programs & S.Q.L Server 2000

Preparing delay analysis for delayed activities and advice corrective action to meet
the target through a recovery plan.
Skills
Language skills:
- Arabic mother tongue.
- English very good.

Personal skills:

Strong negotiation and interpersonal skills

Hobbies:
- Marshal Arts.
- Reading
- Football.

References and Grades

Available on request

You might also like